CN103701056A - Armored type metal sealed switch cabinet with transformer cabin and fuse handcart - Google Patents

Armored type metal sealed switch cabinet with transformer cabin and fuse handcart Download PDF

Info

Publication number
CN103701056A
CN103701056A CN201310579025.7A CN201310579025A CN103701056A CN 103701056 A CN103701056 A CN 103701056A CN 201310579025 A CN201310579025 A CN 201310579025A CN 103701056 A CN103701056 A CN 103701056A
Authority
CN
China
Prior art keywords
transformer
fuse handcart
cabin
main bus
handcart
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201310579025.7A
Other languages
Chinese (zh)
Inventor
梁宵
胡生旺
薛路
王立天
李汉卿
田雨
杜林�
刘武成
郑培慧
黄德冲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHUANTIE ELECTRIC (TIANJIN) GROUP Co Ltd
Original Assignee
CHUANTIE ELECTRIC (TIANJIN) GROUP Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHUANTIE ELECTRIC (TIANJIN) GROUP Co Ltd filed Critical CHUANTIE ELECTRIC (TIANJIN) GROUP Co Ltd
Priority to CN201310579025.7A priority Critical patent/CN103701056A/en
Publication of CN103701056A publication Critical patent/CN103701056A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Patch Boards (AREA)

Abstract

The invention provides an armored type metal sealed switch cabinet with a transformer cabin and a fuse handcart. An instrument cabin, a fuse handcart cabin, the transformer cabin and a main bus cabin inside the metal armored switch equipment cabinet of the switch cabinet are divided by metal plates; the fuse handcart is mounted in the fuse handcart cabin; a transformer is mounted in the transformer cabin; electric arc air flow pressure release channels are arranged in the fuse handcart cabin, the transformer cabin and the main bus cabin; the channel openings are formed in the top of the cabinet; the static contact of the line inlet end of the fuse handcart is connected with the first main bus and the second main bus of the main bus cabin through a first connecting copper bar and a second connecting copper bar; the line outlet end of the fuse handcart passes through a post insulator and is connected with the transformer through a third connecting copper bar. The switch cabinet has the benefits that the switch cabin is good in corrosion resistance, is safe and high in integration level as high voltage and low control voltage are isolated by steel plates, is capable of achieving the functions of incorrect operation prevention and interlocking, and is simple, rapid and convenient to install.

Description

Steel-clad switchbox with transformer room and fuse handcart
Technical field
The present invention relates to a kind of cabinet, particularly a steel-clad switchbox with transformer room and fuse handcart.This product is applicable to electric railway 27.5kV traction substation, switching station and section post, is for being switched on or switched off the load current of railway locomotive pulliung circuit, and excision faulty line, guarantees that locomotive traction circuit is all in normal operating condition all the time.
Background technology
At present, the general fast Traction Substation of Electric Railway 27.5kV equipment of China all adopts comparatively traditional net grid interval arrangement, and various single devices are arranged in respectively in the net grid interval in hyperbaric chamber.This arrangement makes equipment room wiring complicated, and device integration is low, and floor space and requisite space are large, installing engineering amount is large, and equipment debugging process is loaded down with trivial details, long construction period, operation maintenance workload is large, and security reliability is relatively low, and can not meet GB GB3906-2006 specification requirement.
Large scale construction and railway system continuous development of the reform along with China's electric railway, proposed requirements at the higher level to the miniaturization of traction power supply equipment, intellectuality, high safety reliability, low maintenance workload etc.Therefore the gas-insulated integrated equipment to high-performance, high-quality, low price, the demand in general fast electric railway is more and more stronger at home, substitutes that traditional net grid interval is arranged that the wiring bringing is complicated, taken up room greatly, the deficiency of low-security etc.
Summary of the invention
The deficiency existing for existing general fast Traction Substation of Electric Railway 27.5kV switchgear, the object of this invention is to provide a kind of steel-clad switchbox with transformer room and fuse handcart, be beneficial to meet GB GB3906-2006 requirement, degree of protection reaches IP4X.The electric connecting mode that adopts handcart-type, conveniently overhauls, and does not affect 27.5KV high-tension circuit normal power supply, realizes service without power-off.
For achieving the above object, the technical solution used in the present invention is to provide a kind of steel-clad switchbox with transformer room and fuse handcart, and this switch cubicle includes control room, fuse handcart chamber, metal clad switchgear cabinet, fuse handcart, transformer, transformer room, main bus bar chamber, fuse handcart chamber pressure relief plate, transformer room's pressure relief plate, bus-bar room pressure relief plate, end of incoming cables fixed contact, leading-out terminal fixed contact, the first main bus bar, the second main bus bar, the first connection copper bar, the second connection copper bar, the 3rd connection copper bar; Wherein: in described metal clad switchgear cabinet, be provided with the control room, fuse handcart chamber, transformer room, the main bus bar chamber that interconnect and separate by metal foil; Described fuse handcart chamber pressure relief plate, transformer room's pressure relief plate, main bus bar chamber pressure relief plate pass through nylon bolt directly and the top board bolt of metal clad switchgear cabinet; Described transformer is arranged on inside, transformer room, and the high pressure inlet wire side of transformer is directly connected copper bar and connects with the 3rd; In described fuse handcart inside, pass through two high-tension fuse integral installations in fuse handcart chamber interior; Handcart end of incoming cables fixed contact connects copper bar through the first connection copper bar, second and is connected with the first main bus bar, the second main bus bar, and leading-out terminal fixed contact is connected with transformer through the 3rd connection copper bar, post insulator.
Effect of the present invention is that cabinet adopts the compacting of aluminizing zine plate assembled formation, and its machining accuracy is 0.2 millimeter, and before overcoming, welding cabinet precision is the deficiency of 1.5 millimeters; And aluminizing zine plate anti-corrosive properties are good, and surface need not apply, before overcoming, welding cabinet falls to paint the phenomenon of getting rusty; Because each circuit arrangement is completed by a cabinet body, in cabinet, high voltage separates not only safety and integrated level but also high with control low-voltage with steel plate, for "smart" products exploitation from now on lays the first stone; Because equipment has all been debugged before dispatching from the factory, bus between an on-the-spot connecting cabinet, therefore install simple and convenient; The fuse handcart of two-phase integrated structure can be realized two-phase electricity line simultaneously, realizes tranformer protection.Adopt machinery and the electric connecting mode of handcart-type, can realize interlocking function, security reliability improves.When there is electric fault, handcart directly can be pulled out to cabinet and overhaul again outward, can realize main bus bar service without power-off.
Accompanying drawing explanation
Fig. 1 is the steel-clad switchbox structural representation with transformer room and fuse handcart of the present invention;
In figure:
1, control room 2, fuse handcart chamber 3, leading-out terminal fixed contact 4, metal clad switchgear cabinet 5, high-tension fuse 6, fuse handcart 7, the 3rd connect copper bar 8, transformer 9, post insulator 10, transformer room 11, transformer room's pressure relief plate 12, main bus bar chamber 13, bus-bar room pressure relief plate 14, the first main bus bar 15, the first connection copper bar 16, the second main bus bar 17, fuse handcart chamber pressure relief plate 18, the second connection copper bar 19, end of incoming cables fixed contact
embodiment
By reference to the accompanying drawings and implement the structure of the steel-clad switchbox with transformer room and fuse handcart of the present invention to be illustrated.
As shown in Figure 1, steel-clad switchbox structure with transformer room and fuse handcart of the present invention is that this switch cubicle includes control room 1, fuse handcart chamber 2, metal clad switchgear cabinet 4, fuse handcart 6, transformer 8, transformer room 10, main bus bar chamber 12, fuse handcart chamber pressure relief plate 17, transformer room's pressure relief plate 11, bus-bar room pressure relief plate 13, end of incoming cables fixed contact 19, leading-out terminal fixed contact 3, the first main bus bar 14, the second main bus bar 16, the first connection copper bar 15, the second connection copper bar 18, the 3rd connection copper bar 7.In described metal clad switchgear cabinet 4, be provided with the control room 1, fuse handcart chamber 2, transformer room 10, the main bus bar chamber 12 that interconnect and separate by metal foil; Described fuse handcart chamber pressure relief plate 17, transformer room's pressure relief plate 11, main bus bar chamber pressure relief plate 13 pass through nylon bolt directly and the top board bolt of metal clad switchgear cabinet 4; Described transformer 8 is arranged on 10 inside, transformer room, and the high pressure inlet wire side of transformer 8 is directly connected copper bar 7 and connects with the 3rd; In described fuse handcart 6 inside, pass through two high-tension fuse 5 integral installations in 2 inside, fuse handcart chamber; Handcart end of incoming cables fixed contact 19 connects copper bar 18 through the first connection copper bar 15, second and is connected with the first main bus bar 14, the second main bus bar 16, and leading-out terminal fixed contact 3 is connected with transformer 8 through the 3rd connection copper bar 7, post insulator 9.
Described fuse handcart 6 is for having the two-phase integrated structure of two-phase end of incoming cables, two-phase leading-out terminal.As shown in Figure 1, take KYN-27.2KV is example with the steel-clad switchbox of transformer room and fuse handcart.
Steel-clad switchbox function with transformer room and fuse handcart of the present invention is achieved in that
1, metal clad switchgear cabinet 4 compacting of use aluminizing zine plate assembled formations, metal clad switchgear cabinet 4 consists of four compartments such as control room 1, fuse handcart chamber 2, transformer room 10, main bus bar chambers 12.In metal clad switchgear cabinet 4, between each chamber, with metallic plate, separate, with Accident prevention, spread expansion.
2, fuse handcart 6 is equipped with in fuse handcart chamber 2, house transformer 8 is equipped with in transformer room 10.
3, the end of incoming cables fixed contact 19 of fuse handcart 6 is connected with the first main bus bar 14, second main bus bar 16 of main bus bar chamber 10 by the first connection copper bar 15, the second connection copper bar 18; The leading-out terminal fixed contact 3 of fuse handcart 6 is connected with house transformer 8 through post insulator 9 and by the 3rd connection copper bar 7, realizes circuit and connects.
4, be arc fault in anti-switch cubicle, on fuse handcart chamber 2, transformer room 10, main bus bar chamber 12, be respectively equipped with fuse handcart chamber pressure relief plate 17, transformer room's pressure relief plate 11, main bus bar chamber pressure relief plate 13; Fuse handcart chamber 2, transformer room 10, main bus bar chamber 12 are equipped with arc stream pressure release passage, and passway is located at the top of metal clad switchgear cabinet 4; Prevent that air-flow from washing cabinet front/rear door to injure human body open, guarantee operator safety.
5, finally do delivery test, can pack after qualified and be transported to on-the-spot installation.
Steel-clad switchbox with transformer room and fuse handcart of the present invention, because cabinet adopts aluminizing zine plate, appearance and modeling is more attractive in appearance than welding cabinet, and antiseptic property improves.Because door operation is closed in realization, only have after high voltage power-off, front/rear door can be opened, and reaches the interlocking functions such as prevention personnel mistakenly entering charged chamber, and security reliability improves.This will lead a class on electric railway special equipment, and can import substitutes, for exporting to from now on international market, lay a good foundation.
According to China's electric railway operation mileage medium-term and long-term plans, to the year two thousand twenty whole nation electric railway operation mileage, will increase again approximately 30,000 kilometers.Approximately build a traction substation for every 60 kilometers, each traction substation approximately will be installed 30 left and right KYN-27.5kV armored metal enclosed switch equipments.Due to primacy technically of this product and the economy in price, determined that this product must produce good economic benefit and social benefit.

Claims (2)

1. the steel-clad switchbox with transformer room and fuse handcart, this switch cubicle includes control room (1), fuse handcart chamber (2), metal clad switchgear cabinet (4), fuse handcart (6), transformer (8), transformer room (10), main bus bar chamber (12), fuse handcart chamber pressure relief plate (17), transformer room's pressure relief plate (11), bus-bar room pressure relief plate (13), end of incoming cables fixed contact (19), leading-out terminal fixed contact (3), the first main bus bar (14), the second main bus bar (16), first connects copper bar (15), second connects copper bar (18), the 3rd connects copper bar (7), it is characterized in that:
In described metal clad switchgear cabinet (4), be provided with the control room (1), fuse handcart chamber (2), transformer room (10), main bus bar chamber (12) that interconnect and separate by metal foil; Described fuse handcart chamber pressure relief plate (17), transformer room's pressure relief plate (11), main bus bar chamber pressure relief plate (13) pass through nylon bolt directly and the top board bolt of metal clad switchgear cabinet (4); Described transformer (8) is arranged on inside, transformer room (10), and the high pressure inlet wire side of transformer (8) is directly connected copper bar (7) and connects with the 3rd; In described fuse handcart (6) inside, pass through two high-tension fuses (5) integral installation in inside, fuse handcart chamber (2); Handcart end of incoming cables fixed contact (19) connects copper bar (18) through the first connection copper bar (15), second and is connected with the first main bus bar (14), the second main bus bar (16), and leading-out terminal fixed contact (3) is connected with transformer (8) through the 3rd connection copper bar (7), post insulator (9).
2. the steel-clad switchbox with transformer room and fuse handcart according to claim 1, is characterized in that: described fuse handcart (6) is for having the two-phase integrated structure of two-phase end of incoming cables, two-phase leading-out terminal.
CN201310579025.7A 2013-11-18 2013-11-18 Armored type metal sealed switch cabinet with transformer cabin and fuse handcart Pending CN103701056A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310579025.7A CN103701056A (en) 2013-11-18 2013-11-18 Armored type metal sealed switch cabinet with transformer cabin and fuse handcart

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310579025.7A CN103701056A (en) 2013-11-18 2013-11-18 Armored type metal sealed switch cabinet with transformer cabin and fuse handcart

Publications (1)

Publication Number Publication Date
CN103701056A true CN103701056A (en) 2014-04-02

Family

ID=50362501

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310579025.7A Pending CN103701056A (en) 2013-11-18 2013-11-18 Armored type metal sealed switch cabinet with transformer cabin and fuse handcart

Country Status (1)

Country Link
CN (1) CN103701056A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112531542A (en) * 2020-12-07 2021-03-19 北京双杰电气股份有限公司 Integrated small box transformer substation
CN114937930A (en) * 2022-06-24 2022-08-23 常州东皓电气有限公司 Cabinet body structure assembled by voltage-stabilizing high-temperature-resistant photovoltaic power generation dry-type transformer and switch cabinet

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004166390A (en) * 2002-11-13 2004-06-10 Toshiba Corp Metal closed switchgear
CN201956609U (en) * 2010-12-20 2011-08-31 胜利油田恒源电气有限责任公司 Improved built-in cabinet reformed aiming at harmonic elimination of power grid
CN202474651U (en) * 2012-03-13 2012-10-03 泉州亿兴电力有限公司 Safe and reliable high-voltage switch cabinet
CN103219669A (en) * 2012-12-23 2013-07-24 川铁电气(天津)集团有限公司 Armour type metal closed switch cabinet with transformer chamber
CN203596530U (en) * 2013-11-18 2014-05-14 川铁电气(天津)集团有限公司 Armored type metal enclosing switch cabinet with transformer chamber and fuse handcart

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004166390A (en) * 2002-11-13 2004-06-10 Toshiba Corp Metal closed switchgear
CN201956609U (en) * 2010-12-20 2011-08-31 胜利油田恒源电气有限责任公司 Improved built-in cabinet reformed aiming at harmonic elimination of power grid
CN202474651U (en) * 2012-03-13 2012-10-03 泉州亿兴电力有限公司 Safe and reliable high-voltage switch cabinet
CN103219669A (en) * 2012-12-23 2013-07-24 川铁电气(天津)集团有限公司 Armour type metal closed switch cabinet with transformer chamber
CN203596530U (en) * 2013-11-18 2014-05-14 川铁电气(天津)集团有限公司 Armored type metal enclosing switch cabinet with transformer chamber and fuse handcart

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112531542A (en) * 2020-12-07 2021-03-19 北京双杰电气股份有限公司 Integrated small box transformer substation
CN114937930A (en) * 2022-06-24 2022-08-23 常州东皓电气有限公司 Cabinet body structure assembled by voltage-stabilizing high-temperature-resistant photovoltaic power generation dry-type transformer and switch cabinet

Similar Documents

Publication Publication Date Title
CN102738726A (en) Indoor high-voltage switch cabinet
CN203596530U (en) Armored type metal enclosing switch cabinet with transformer chamber and fuse handcart
CN206389056U (en) Metal armouring intermediate value formula switchgear
CN204481353U (en) 10kV integral intelligent phased switch cabinet
CN201994576U (en) Double-bus bar fixed metallic enclosed switching device
CN203553648U (en) High-voltage switch cabinet
CN203596533U (en) Overhead inlet wire armour metal enclosed switchgear having withdrawable vacuum circuit breaker
CN201444550U (en) Armored moving high-voltage switch cabinet
CN203747282U (en) Armored moved type AC metal enclosed switchgear
CN103701056A (en) Armored type metal sealed switch cabinet with transformer cabin and fuse handcart
CN202737372U (en) Indoor high voltage switch cabinet
CN202997395U (en) Armored metal-enclosed switch cabinet with voltage transformer handcart
CN202997406U (en) Armored metal-enclosed switch cabinet with transformer chamber
CN204835263U (en) Low -voltage switchgear
CN203574287U (en) Overhead inlet wire armored enclosed metal switch cabinet having load and isolation switches
CN204793799U (en) In put formula cubical switchboard
CN203103825U (en) Overhead outgoing wire and load switch cabinet for armoured-type metal-enclosed switchgear
CN204290147U (en) With the Sheathed metal closed switch cabinet of current transformer handcart
CN202997352U (en) Armored metal enclosed switch cabinet with overhead outgoing line
CN205195050U (en) Cubical switchboard of reliable power supply
CN204290140U (en) With thus sentence the armored withdraw type metal enclosed switch cabinet of device
CN207518086U (en) A kind of knockdown change power distribution equipment
CN210577088U (en) Low-voltage fixed separation type switch cabinet
CN202076712U (en) Intelligent high/low-voltage power distribution unit
CN103219664A (en) Armour type metal closed switch cabinet with voltage transformer handcart

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent of invention or patent application
CB03 Change of inventor or designer information

Inventor after: Li Hanqing

Inventor after: Huang Dechong

Inventor after: Tian Yu

Inventor after: Wang Litian

Inventor after: Liang Xiao

Inventor after: Hu Shengwang

Inventor after: Xue Lu

Inventor after: Du Lin

Inventor after: Liu Wucheng

Inventor after: Zheng Peihui

Inventor before: Liang Xiao

Inventor before: Huang Dechong

Inventor before: Hu Shengwang

Inventor before: Xue Lu

Inventor before: Wang Litian

Inventor before: Li Hanqing

Inventor before: Tian Yu

Inventor before: Du Lin

Inventor before: Liu Wucheng

Inventor before: Zheng Peihui

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: LIANG XIAO HU SHENGWANG XUE LU WANG LITIAN LI HANQING TIAN YU DU LIN LIU WUCHENG ZHENG PEIHUI HUANG DECHONG TO: LI HANQING TIAN YU WANG LITIAN LIANG XIAO HU SHENGWANG XUE LU DU LIN LIU WUCHENG ZHENG PEIHUI HUANG DECHONG

C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20140402