CN103697999A - 一种高应力硬岩tbm施工隧道微震波速实时获取方法 - Google Patents
一种高应力硬岩tbm施工隧道微震波速实时获取方法 Download PDFInfo
- Publication number
- CN103697999A CN103697999A CN201310744321.8A CN201310744321A CN103697999A CN 103697999 A CN103697999 A CN 103697999A CN 201310744321 A CN201310744321 A CN 201310744321A CN 103697999 A CN103697999 A CN 103697999A
- Authority
- CN
- China
- Prior art keywords
- microseismic
- tunnel
- wave
- wave velocity
- rock
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 239000011435 rock Substances 0.000 title claims abstract description 90
- 238000010276 construction Methods 0.000 title claims abstract description 36
- 238000000034 method Methods 0.000 title claims abstract description 25
- 238000009412 basement excavation Methods 0.000 claims description 16
- 230000006378 damage Effects 0.000 claims description 7
- 238000005336 cracking Methods 0.000 claims description 5
- 230000001186 cumulative effect Effects 0.000 claims description 4
- 238000009434 installation Methods 0.000 claims description 4
- 230000000977 initiatory effect Effects 0.000 claims description 2
- 238000012544 monitoring process Methods 0.000 abstract description 11
- 238000005516 engineering process Methods 0.000 abstract description 3
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 abstract description 2
- 230000007547 defect Effects 0.000 abstract 1
- 238000004880 explosion Methods 0.000 abstract 1
- 230000005641 tunneling Effects 0.000 abstract 1
- 238000005422 blasting Methods 0.000 description 5
- 230000000694 effects Effects 0.000 description 3
- 239000000463 material Substances 0.000 description 2
- 238000005259 measurement Methods 0.000 description 2
- 238000005065 mining Methods 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
- 238000010998 test method Methods 0.000 description 1
- 230000001960 triggered effect Effects 0.000 description 1
Landscapes
- Geophysics And Detection Of Objects (AREA)
Abstract
本发明涉及施工隧道微震监测技术,具体涉及一种高应力硬岩TBM施工隧道微震波速实时获取方法。本发明的技术方案是:在高应力硬岩TBM施工隧道掌子面后方岩体内布置至少4个微震传感器,采集掌子面附近岩体破裂产生的震动信号。将掌子面附近发生的岩体破坏事件作为微震源,测量微震源及微震传感器坐标,提取微震传感器监测到的微震源震动信号到时,反演获取微震波速。随着TBM掘进,实时反演获取微震波速。本发明能够实时准确获取高应力硬岩TBM施工隧道微震波速,方法经济简洁,操作可行,避免了通过定位爆破和室内声波获取波速所存在的弊端及不可行性。适用于各种水利水电、交通等高应力硬岩TBM施工隧道。
Description
技术领域
本发明涉及施工隧道微震监测技术,具体涉及一种高应力硬岩TBM施工隧道微震波速实时获取方法,适用于各种水利水电、交通等高应力硬岩TBM施工隧道。
背景技术
微震是指岩体应力超过自身强度时,岩体内部产生裂纹错动、开裂和破坏,累积的能量以弹性波形式释放而在岩体中产生的微震动。微震定位技术是利用微震监测系统采集微震动信号,通过反演获取微震源的位置和发震时间。微震波速直接影响微震定位准确性与精度,进而影响微震监测效果。在TBM掘进隧道中,不同洞段岩体性质与结构将不一样,微震波速将会不同,需要实时动态获取微震波速。
目前,获取微震波速的方法主要有现场勘探和室内试验法,现场勘探主要指的是通过现场定位爆破反演获取波速,室内试验法指在室内通过对岩块试样进行声波试验而获取岩块的波速。在高应力硬岩隧道TBM掘进过程中,微震源一般发生在开挖掌子面及其附近,为了反映微震波真实传播路径,现场勘探法需要在掌子面附近进行定位爆破。但受TBM操作空间以及放炮容易对TBM设备造成损坏的限制,定位爆破反演波速是不可取的。而室内声波试验中所用的岩块并不能代表现场岩体的性质,将所测试的波速作为微震波速用于微震监测必然造成较大的定位误差。另外,以上方法均在一定程度上造成人力物力耗费,而其他方法也难以实时准确获取高应力硬岩TBM施工隧道微震波速。其中,中国专利公开号CN102096093A,公开日2011.06.15,发明名称“一种利用微震点作为震源计算矿区地震波传播速度的方法”,该申请案公开了一种针对矿区地震波传播速度方法,根据多个预定传感器测得的微震点产生的地震波时间确定微震点的坐标估计值,由于微震点坐标估计值精度不高,因此对所获取的地震波传播速度存在一定影响。文献《岩土力学》,2011年第10期,肖亚勋,“深埋隧洞极强岩爆段隧道掘进机半导洞掘进岩爆风险研究”,该文献利用典型岩爆触发的“大事件”来获取波速,未提供技术方案,也未见专文撰述。
发明内容
针对上述存在问题,本发明的目的在于提供一种高应力硬岩TBM施工隧道微震波速实时获取方法,用于解决TBM施工隧道微震监测定位中波速难以实时准确获取的问题,提高微震源定位精度,保障TBM施工隧道微震监测效果。
为了实现上述目的,本发明所采用的技术方案是:一种高应力硬岩TBM施工隧道微震波速实时获取方法,包括如下步骤:
a在高应力硬岩TBM施工隧道掌子面后方岩体内布置至少4个微震传感器,捕捉隧道岩体发生破裂时产生的微震动信号;
b根据右手法则在隧道中建立空间坐标系,测量高应力硬岩隧道TBM施工过程中掌子面附近发生的岩体破坏的空间坐标,将该坐标点作为微震源,用于微震波速反演。所述的岩体破坏指岩体塌方或岩爆或岩体开裂等宏观破坏;
c利用微震传感器监测微震源产生的微震动信号,提取每个传感器监测到的微震动信号的到时,微震动信号的到时包括微震P波和S波到时。测量每个微震传感器安装位置坐标;
d以所有微震传感器监测到的微震动信号监测到时和计算到时的累积残差绝对值和最小为目标函数获取微震波速,微震波速包括微震P波和S波波速,计算公式如下:
其中,公式(1)中f为到时残差,tPi为第i个传感器监测到的微震动信号P波到时,tSi为第i个传感器监测到的微震动信号S波到时,t0为微震动信号发震时间,VP为微震P波波速,VS为微震S波波速,m为微震传感器总个数,Ri为第i个微震传感器到微震源之间的距离,计算公式如下:
其中,公式(2)中(x,y,z)为微震源坐标,(xi,yi,zi)为第i个微震传感器的坐标。
e随着高应力硬岩隧道TBM掘进,所获取的微震波速不满足微震源定位要求时,重复上述步骤a-d。
由于采取了上述技术方案,本发明具有如下技术效果:
(1)准确获取了高应力硬岩TBM施工隧道微震波速,将硬岩隧道TBM施工过程中掌子面附近发生的岩体破坏的坐标点用于微震波速反演,由于该坐标点通过测量可直接精确获取,保证了获取的微震波速的准确性。
(2)方法经济简洁,操作可行,充分利用高应力硬岩TBM施工隧道中频繁发生岩体破坏事件的特征,避免了通过定位爆破和室内声波获取波速带来的大量人力物力耗费以及可行性问题。
(3)随着TBM的掘进能够实时获取高应力硬岩TBM施工隧道微震波速,解决了隧道TBM掘进过程中岩体微震波速经常发生改变的问题,确保了微震波速的准确性。
具体实施方式
结合具体实施例对本发明的技术方案作进一步详细描述。
一种高应力硬岩TBM施工隧道微震波速实时获取方法,所述方法按以下步骤进行:
a在高应力硬岩TBM施工隧道掌子面后方岩体内布置至少4个微震传感器,进行微震实时监测,捕捉隧道开挖过程中岩体发生破裂时产生的微震动信号。微震传感器的布置方案及数量应有利于微震传感器对微震动信号的采集以及微震源定位。微震传感器与掌子面须间隔一定距离,防止距离太近微震传感器易被掌子面开挖损坏,太远则超出了微震传感器采集微震动信号的范围。所捕捉的微震动信号包括高应力硬岩TBM施工过程中微震传感器监测范围内所有岩体破裂产生的微震动信号。
b根据右手法则在隧道中建立空间坐标系,测量高应力硬岩隧道TBM施工过程中掌子面附近发生的岩体破坏的坐标,将该坐标点作为微震源,用于微震波速反演。所述的岩体破坏指岩体塌方或岩爆或岩体开裂。岩体破坏坐标通过隧道里程桩号和皮尺或激光测距仪测量变为已知震源位置的微震源。岩体塌方或岩爆或岩体开裂时释放弹性能,产生微震动信号,微震动信号在岩体中传播,将会被布置在掌子面后方岩体内微震传感器监测。
c利用微震传感器监测微震源产生的微震动信号,对监测到的微震动信号波形进行分析,提取每个微震传感器监测到的微震动信号的到时,微震动信号的到时包括微震P波和S波到时。通过隧道里程桩号和皮尺或激光测距仪测量微震每个传感器安装位置坐标。
d以所有微震传感器监测到的微震动信号监测到时和计算到时的累积残差绝对值和最小为目标函数反演获取微震波速,微震波速包括微震P波和S波的波速,计算公式如下:
其中,公式(1)中f为到时残差,tPi为第i个传感器监测到的微震动信号P波到时,tSi为第i个传感器监测到的微震动信号S波到时,t0为微震动信号发震时间,VP为微震P波波速,VS为微震S波波速,m为传感器总个数,Ri为第i个传感器到微震源之间的距离,计算公式如下:
其中,公式(2)中(x,y,z)为微震源坐标,(xi,yi,zi)为第i个传感器的坐标。
e随着高应力硬岩隧道TBM掘进,不同隧道洞段岩体性质将不一样,微震波速也随之改变,所获取的微震波速不满足微震源定位要求时,重复上述步骤a-d。所述的微震波速不满足微震源定位要求是指利用所获取的微震波速进行微震源定位时,当微震源的定位位置与实际位置存在较大误差,不满足硬岩隧道工程中微震源定位要求。本步骤的目的是实时获取高应力硬岩TBM施工隧道微震波速,解决了隧道TBM掘进过程中岩体微震波速经常发生改变的问题,确保微震波速的准确性。
具体实施例:
某高应力硬岩TBM施工隧道岩体较完整,隧道断面为圆形,采用全断面开挖,TBM施工过程中掌子面附近经常发生岩体塌方或岩爆或岩体开裂破坏。
a在高应力硬岩TBM施工隧道掌子面后方岩体内布置6个微震传感器,捕捉隧道岩体发生破裂时产生的微震动信号。微震传感器与掌子面间隔一定距离,布置在掌子面后方70~150m范围岩体内,防止距离太近微震传感器易被掌子面开挖损坏,太远则超出了微震传感器的采集微震动信号的范围。所捕捉的微震动信号包括高应力硬岩TBM施工过程中微震传感器监测范围内所有岩体破裂产生的微震动信号。
b根据右手法则在隧道中建立空间坐标系,测量高应力硬岩隧道TBM施工过程中掌子面附近发生的岩体破坏的坐标。2010年6月02日23时59分,在TBM掘进过程中TBM掌子面附近的北侧拱肩发生轻微岩爆。岩爆坐标通过隧道里程桩号和皮尺测量变为已知震源位置的微震源。经测量,岩爆事件的空间坐标为(139.0,4.6,-36.1)。将该坐标点作为微震源,用于微震波速反演。岩爆发生时在岩体中产生微震动信号,微震动信号向四周传播,被布置在掌子面后方的6个传感器捕捉到。
c利用微震传感器监测微震源产生的微震动信号,微震监测系统在2010年6月02日23时59分45秒监测到微震动信号。对监测到的微震动信号波形进行分析,提取每个微震传感器监测到的微震动信号的到时,微震动信号的到时包括微震P波和S波的到时。6个微震传感器监测到的微震P波和S波到时依次为(23:59:45.522828,23:59:45.536661),(23:59:45.522662,23:59:45.536161),(23:59:45.522328,23:59:45.537161),(23:59:45.531495,23:59:45.553494),(23:59:45.531161,23:59:45.553327)和(23:59:45.531662,23:59:45.552995)。通过隧道里程桩号和皮尺测量微震每个传感器安装位置坐标,6个微震传感器坐标依次分别为(215.7,-3.6,-36.7),(215.6,0.9,-35.3),(216.9,3.8,-36.5),(269.1,-3.7,-36.6),(270.3,0.2,-35.1)和(269.3,4.1,-36.8)。
d以所有微震传感器监测到的微震动信号监测到时和计算到时的累积残差绝对值和最小为目标函数获取微震波速,微震波速包括微震P波和S波波速,计算公式如下:
其中,公式(1)中f为到时残差,tPi为监测到的微震动信号P波到时,tSi为监测到的微震动信号S波到时,t0为微震动信号发震时间,VP为微震P波波速,VS为微震S波波速,m为传感器总个数,Ri为第i个传感器到微震源之间的距离,计算公式如下:
其中,公式(2)中(x,y,z)为微震源坐标,(xi,yi,zi)为第i个传感器的坐标。
根据以上公式,反演获取高应力硬岩TBM施工隧道微震波速为Vp=6555m/s,Vs=3091m/s。
e随着高应力硬岩隧道TBM掘进,不同隧道洞段岩体性质将不一样,微震波速也随之改变,所获取的微震波速不满足微震源定位要求时,重复上述步骤a-d。所述的微震波速不满足微震源定位要求是指利用所获取的微震波速进行微震源定位,当微震源的定位位置与实际位置存在较大误差,不满足硬岩隧道工程中微震源定位要求。本步骤的目的是实时获取高应力硬岩TBM施工隧道微震波速,解决了隧道TBM掘进过程中岩体微震波速经常发生改变的问题,确保微震波速的准确性。2010年6月13日18时02分在TBM掌子面附近的北侧边墙发生中等岩爆,经测量,岩爆事件的空间坐标为(34,7,-40.3)。利用原所获取的微震波速进行微震源定位,微震源的定位位置为(32.3,-0.4,-33.8),与实际位置存在较大误差,不满足硬岩隧道工程中微震源定位要求。重复上述步骤a-d,提取微震传感器监测到的微震波信号到时,微震波到时包括P波和S波到时。6个微震传感器监测到的微震P波和S波到时依次为(18:02:34.566778,18:02:34.584611),(18:02:34.566944,18:02:34.584444),(18:02:34.567111,18:02:34.584944),(18:02:34.571347,18:02:34.594347),(18:02:34.571181,18:02:34.593847)和(18:02:34.571348,18:02:34.594347)。6个微震传感器坐标依次分别为(136.3,0.7,-34.7),(136.3,-3.7,-36.0),(137.5,3.5,-35),(165.5,-3.7,-36.4),(164.5,1,-35.1)和(165.8,3.7,-36.4)。根据公式(1)和(2),反演获取高应力硬岩TBM施工隧道微震波速为Vp=6371m/s,Vs=3029m/s。
以上实例仅用以说明本发明的技术方案而非限制,本领域的普通技术人员应当理解,本发明的技术方案进行修改或者同等替换,而不脱离本发明技术方案的精神和范围,均应涵盖在本发明的权利要求范围中。
Claims (1)
1.一种高应力硬岩TBM施工隧道微震波速实时获取方法,其特征在于,所述方法按以下步骤进行:
a在高应力硬岩TBM施工隧道掌子面后方岩体内布置至少4个微震传感器;
b根据右手法则在隧道中建立空间坐标系,测量高应力硬岩隧道TBM施工过程中掌子面附近发生的岩体破坏的坐标,将该坐标点作为微震源,用于微震波速反演。所述的岩体破坏指岩体塌方或岩爆或岩体开裂等宏观破坏;
c利用微震传感器监测微震源产生的微震动信号,提取每个传感器监测到的微震动信号的到时,微震动信号的到时包括微震P波和S波到时。测量每个微震传感器安装位置坐标;
d以所有微震传感器监测到的微震动信号监测到时和计算到时的累积残差绝对值和最小为目标函数获取微震波速,微震波速包括微震P波和S波波速,计算公式如下:
其中,公式(1)中f为到时残差,tPi为第i个传感器监测到的微震动信号P波到时,tSi为第i个传感器监测到的微震动信号S波到时,t0为微震动信号发震时间,VP为微震P波波速,VS为微震S波波速,m为微震传感器总个数,Ri为第i个微震传感器到微震源之间的距离,计算公式如下:
其中,公式(2)中(x,y,z)为微震源坐标,(xi,yi,zi)为第i个微震传感器的坐标。
e随着高应力硬岩隧道TBM掘进,所获取的微震波速不满足微震源定位要求时,重复上述步骤a-d。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310744321.8A CN103697999B (zh) | 2013-12-30 | 2013-12-30 | 一种高应力硬岩tbm施工隧道微震波速实时获取方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310744321.8A CN103697999B (zh) | 2013-12-30 | 2013-12-30 | 一种高应力硬岩tbm施工隧道微震波速实时获取方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103697999A true CN103697999A (zh) | 2014-04-02 |
CN103697999B CN103697999B (zh) | 2015-10-14 |
Family
ID=50359607
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310744321.8A Expired - Fee Related CN103697999B (zh) | 2013-12-30 | 2013-12-30 | 一种高应力硬岩tbm施工隧道微震波速实时获取方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103697999B (zh) |
Cited By (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104089695A (zh) * | 2014-07-04 | 2014-10-08 | 南华大学 | 一种测定锚杆中应力波传播速度的方法 |
CN104406681A (zh) * | 2014-11-21 | 2015-03-11 | 中国矿业大学 | 一种实时确定微震波速的测试方法 |
CN105758509A (zh) * | 2016-04-25 | 2016-07-13 | 宏大矿业有限公司 | 一种露天矿山岩体声速的现场测量方法 |
CN105928601A (zh) * | 2016-04-25 | 2016-09-07 | 宏大矿业有限公司 | 一种测量露天矿山爆区下方台阶岩体声速的方法 |
CN109343111A (zh) * | 2018-09-30 | 2019-02-15 | 中国科学院武汉岩土力学研究所 | 一种软硬互层地质条件下长距离tbm隧洞岩爆微震监测方法 |
CN110018062A (zh) * | 2019-05-07 | 2019-07-16 | 中国科学院武汉岩土力学研究所 | 一种直剪试验中岩石结构面剪切破坏位置定位方法 |
CN110045412A (zh) * | 2019-04-04 | 2019-07-23 | 中国科学院武汉岩土力学研究所 | 一种基于tbm碎岩微震信息掌子面前方不良地质体探测方法 |
CN110107308A (zh) * | 2019-04-30 | 2019-08-09 | 中国科学院武汉岩土力学研究所 | 一种发生在隧洞tbm刀盘内岩爆的等级确定方法 |
CN110761841A (zh) * | 2019-10-28 | 2020-02-07 | 煤炭科学技术研究院有限公司 | 一种基于微震监测的矿井群工作面开采互扰范围计算方法 |
CN111257415A (zh) * | 2020-01-17 | 2020-06-09 | 同济大学 | 基于移动列车振动信号的隧道损伤检测管理系统 |
CN112130204A (zh) * | 2020-09-02 | 2020-12-25 | 武汉大学 | 一种适用于深埋隧洞围岩波速的现场测试方法 |
CN113156492A (zh) * | 2021-04-21 | 2021-07-23 | 中国科学院武汉岩土力学研究所 | 一种应用于tbm隧道岩爆灾害实时智能预警方法 |
CN113791452A (zh) * | 2021-09-14 | 2021-12-14 | 中铁二十局集团第五工程有限公司 | 一种盾构隧道孤石波形线成像方法 |
CN114371218A (zh) * | 2021-12-02 | 2022-04-19 | 山东大学 | 基于弹性波法的盾构隧道运营期管片巡检装备及方法 |
CN114518592A (zh) * | 2022-02-25 | 2022-05-20 | 石家庄铁道大学 | 岩体监测系统、岩体稳定性分析方法及装置 |
CN114964469A (zh) * | 2022-04-21 | 2022-08-30 | 东北大学 | 一种非对称高应力隧道爆破振动测试方法及系统 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4405036A (en) * | 1980-12-11 | 1983-09-20 | Marathon Oil Company | Seafloor velocity and amplitude measurement apparatus method |
US4789969A (en) * | 1986-06-03 | 1988-12-06 | Compagnie Generale De Geophysique | Method of measuring the anisotropy of propagation or reflection of a transverse wave, particularly a method of geophysical prospecting by measurement of the anisotropy of propagation or of reflection of shear waves in rocks |
JP2000338256A (ja) * | 1999-05-31 | 2000-12-08 | Railway Technical Res Inst | 表面波位相速度検出システム、及び表面波の位相速度検出方法 |
CN101943599A (zh) * | 2010-09-25 | 2011-01-12 | 钟世航 | 一种在隧道中用弹性波反射法时测取掌子面前方岩体波速的方法 |
CN102096093A (zh) * | 2010-11-29 | 2011-06-15 | 杨本才 | 一种利用微震点作为震源计算矿区地震波传播速度的方法 |
CN202533410U (zh) * | 2012-04-23 | 2012-11-14 | 中南林业科技大学涉外学院 | 木材含水量探测装置 |
-
2013
- 2013-12-30 CN CN201310744321.8A patent/CN103697999B/zh not_active Expired - Fee Related
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4405036A (en) * | 1980-12-11 | 1983-09-20 | Marathon Oil Company | Seafloor velocity and amplitude measurement apparatus method |
US4789969A (en) * | 1986-06-03 | 1988-12-06 | Compagnie Generale De Geophysique | Method of measuring the anisotropy of propagation or reflection of a transverse wave, particularly a method of geophysical prospecting by measurement of the anisotropy of propagation or of reflection of shear waves in rocks |
JP2000338256A (ja) * | 1999-05-31 | 2000-12-08 | Railway Technical Res Inst | 表面波位相速度検出システム、及び表面波の位相速度検出方法 |
CN101943599A (zh) * | 2010-09-25 | 2011-01-12 | 钟世航 | 一种在隧道中用弹性波反射法时测取掌子面前方岩体波速的方法 |
CN102096093A (zh) * | 2010-11-29 | 2011-06-15 | 杨本才 | 一种利用微震点作为震源计算矿区地震波传播速度的方法 |
CN202533410U (zh) * | 2012-04-23 | 2012-11-14 | 中南林业科技大学涉外学院 | 木材含水量探测装置 |
Cited By (28)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104089695A (zh) * | 2014-07-04 | 2014-10-08 | 南华大学 | 一种测定锚杆中应力波传播速度的方法 |
CN104406681A (zh) * | 2014-11-21 | 2015-03-11 | 中国矿业大学 | 一种实时确定微震波速的测试方法 |
CN104406681B (zh) * | 2014-11-21 | 2015-11-18 | 中国矿业大学 | 一种实时确定微震波速的测试方法 |
CN105758509A (zh) * | 2016-04-25 | 2016-07-13 | 宏大矿业有限公司 | 一种露天矿山岩体声速的现场测量方法 |
CN105928601A (zh) * | 2016-04-25 | 2016-09-07 | 宏大矿业有限公司 | 一种测量露天矿山爆区下方台阶岩体声速的方法 |
CN105758509B (zh) * | 2016-04-25 | 2019-05-10 | 宏大爆破有限公司 | 一种露天矿山岩体声速的现场测量方法 |
CN105928601B (zh) * | 2016-04-25 | 2019-07-30 | 宏大矿业有限公司 | 一种测量露天矿山爆区下方台阶岩体声速的方法 |
CN109343111A (zh) * | 2018-09-30 | 2019-02-15 | 中国科学院武汉岩土力学研究所 | 一种软硬互层地质条件下长距离tbm隧洞岩爆微震监测方法 |
CN110045412B (zh) * | 2019-04-04 | 2020-07-10 | 中国科学院武汉岩土力学研究所 | 一种基于tbm碎岩微震信息掌子面前方不良地质体探测方法 |
CN110045412A (zh) * | 2019-04-04 | 2019-07-23 | 中国科学院武汉岩土力学研究所 | 一种基于tbm碎岩微震信息掌子面前方不良地质体探测方法 |
CN110107308A (zh) * | 2019-04-30 | 2019-08-09 | 中国科学院武汉岩土力学研究所 | 一种发生在隧洞tbm刀盘内岩爆的等级确定方法 |
CN110107308B (zh) * | 2019-04-30 | 2020-08-25 | 中国科学院武汉岩土力学研究所 | 一种发生在隧洞tbm刀盘内岩爆的等级确定方法 |
CN110018062A (zh) * | 2019-05-07 | 2019-07-16 | 中国科学院武汉岩土力学研究所 | 一种直剪试验中岩石结构面剪切破坏位置定位方法 |
CN110018062B (zh) * | 2019-05-07 | 2020-05-08 | 中国科学院武汉岩土力学研究所 | 一种直剪试验中岩石结构面剪切破坏位置定位方法 |
CN110761841A (zh) * | 2019-10-28 | 2020-02-07 | 煤炭科学技术研究院有限公司 | 一种基于微震监测的矿井群工作面开采互扰范围计算方法 |
CN110761841B (zh) * | 2019-10-28 | 2021-06-04 | 煤炭科学技术研究院有限公司 | 一种基于微震监测的矿井群工作面开采互扰范围计算方法 |
CN111257415B (zh) * | 2020-01-17 | 2021-08-10 | 同济大学 | 基于移动列车振动信号的隧道损伤检测管理系统 |
CN111257415A (zh) * | 2020-01-17 | 2020-06-09 | 同济大学 | 基于移动列车振动信号的隧道损伤检测管理系统 |
CN112130204A (zh) * | 2020-09-02 | 2020-12-25 | 武汉大学 | 一种适用于深埋隧洞围岩波速的现场测试方法 |
CN113156492A (zh) * | 2021-04-21 | 2021-07-23 | 中国科学院武汉岩土力学研究所 | 一种应用于tbm隧道岩爆灾害实时智能预警方法 |
CN113791452A (zh) * | 2021-09-14 | 2021-12-14 | 中铁二十局集团第五工程有限公司 | 一种盾构隧道孤石波形线成像方法 |
CN113791452B (zh) * | 2021-09-14 | 2023-05-23 | 中铁二十局集团第五工程有限公司 | 一种盾构隧道孤石波形线成像方法 |
CN114371218A (zh) * | 2021-12-02 | 2022-04-19 | 山东大学 | 基于弹性波法的盾构隧道运营期管片巡检装备及方法 |
CN114518592A (zh) * | 2022-02-25 | 2022-05-20 | 石家庄铁道大学 | 岩体监测系统、岩体稳定性分析方法及装置 |
CN114518592B (zh) * | 2022-02-25 | 2024-11-05 | 石家庄铁道大学 | 岩体监测系统、岩体稳定性分析方法及装置 |
CN114964469A (zh) * | 2022-04-21 | 2022-08-30 | 东北大学 | 一种非对称高应力隧道爆破振动测试方法及系统 |
WO2023202074A1 (zh) * | 2022-04-21 | 2023-10-26 | 东北大学 | 一种非对称高应力隧道爆破振动测试方法及系统 |
US11982596B2 (en) | 2022-04-21 | 2024-05-14 | Northeastern University | Method and system for blast-induced vibration monitoring of tunnels in high asymmetric in-situ stresses |
Also Published As
Publication number | Publication date |
---|---|
CN103697999B (zh) | 2015-10-14 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103697999B (zh) | 一种高应力硬岩tbm施工隧道微震波速实时获取方法 | |
CN101968550B (zh) | 基于阵列光纤传感器的岩层识别装置及方法 | |
CN101614022A (zh) | 建筑物基础桩弹性波层析成像检测方法 | |
CN105510959A (zh) | 一种隧道的振源类型识别方法及振源位置定位方法 | |
CN104656123A (zh) | 一种测定区域岩体等效波速的方法 | |
JP6131027B2 (ja) | 地山弾性波速度測定方法 | |
CN105510880A (zh) | 一种基于双差法的微地震震源定位方法 | |
CN103742156B (zh) | 深埋硬岩隧道贯通前相向改单向掘进时机与方式确定方法 | |
CN107727737A (zh) | 一种开挖卸荷作用下地下工程未知地质构造活化识别方法 | |
CN103017822A (zh) | 高地应力区地下厂房围岩变形破裂演化测试方法及结构 | |
CN111335954A (zh) | 基于分布式光纤传感的岩爆监测系统及数据采集处理方法 | |
CN103323530A (zh) | 利用爆破作业震动波检测巷道群围岩稳定性的方法 | |
CN103344493A (zh) | 基于声发射原理的原岩应力测量方法和测试装置 | |
CN103837604B (zh) | 一种岩石爆破损伤跨孔声波测试中跨距的修正方法 | |
CN110188426B (zh) | 一种隧道地质条件协同预测方法 | |
CN105735971A (zh) | 一种基于弹性波的钻孔深度检测系统及其检测方法 | |
CN103630605B (zh) | 一种预应力锚索管道注浆检测方法 | |
CN112130204B (zh) | 一种适用于深埋隧洞围岩波速的现场测试方法 | |
CN113552629A (zh) | 一种隧道围岩纵波速度确定方法、装置和计算机设备 | |
CN107085238A (zh) | 一种tbm掘进过程中围岩波速构造连续自动测量装置及方法 | |
JP2015184144A5 (zh) | ||
CN103698805A (zh) | 一种柱状节理岩体单向微震监测传感器布置方向确定方法 | |
Xu et al. | Optimal design of microseismic monitoring networking and error analysis of seismic source location for rock slope | |
CN212003266U (zh) | 基于分布式光纤传感的岩爆监测系统 | |
CN102419346A (zh) | 锚杆群支护质量检测方法和检测装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20151014 Termination date: 20161230 |