CN103693573B - A kind of manualemergency operating device - Google Patents
A kind of manualemergency operating device Download PDFInfo
- Publication number
- CN103693573B CN103693573B CN201310750072.3A CN201310750072A CN103693573B CN 103693573 B CN103693573 B CN 103693573B CN 201310750072 A CN201310750072 A CN 201310750072A CN 103693573 B CN103693573 B CN 103693573B
- Authority
- CN
- China
- Prior art keywords
- manualemergency
- motor
- operating device
- flexible axle
- girder
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 239000000725 suspension Substances 0.000 claims abstract description 7
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 6
- 239000010959 steel Substances 0.000 claims abstract description 6
- 102000004315 Forkhead Transcription Factors Human genes 0.000 claims description 16
- 108090000852 Forkhead Transcription Factors Proteins 0.000 claims description 16
- 238000012423 maintenance Methods 0.000 claims description 7
- 238000009434 installation Methods 0.000 claims description 2
- 241000282693 Cercopithecidae Species 0.000 abstract description 8
- 238000010586 diagram Methods 0.000 description 6
- 239000000446 fuel Substances 0.000 description 2
- 235000014676 Phragmites communis Nutrition 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 238000007634 remodeling Methods 0.000 description 1
Landscapes
- Carriers, Traveling Bodies, And Overhead Traveling Cranes (AREA)
Abstract
The invention discloses a kind of manualemergency operating device, it is arranged on a girder, and this manualemergency operating device comprises: hoist ceiling crane, comprises lifting mechanism, operating unit, suspension hook and steel rope; This lifting mechanism has motor, and the spindle nose stretched out is left in one end of this motor; Flexible axle, one end connects the spindle nose stretched out of this motor, rotates for driving the motor shaft of this motor; I-beam section, is arranged on the downside of girder, and this hoist ceiling crane is installed on the downside of this I-beam section; Manual driving device, connects the other end of this flexible axle, so that this flexible axle of manual drives rotates, thus drives the motor shaft of this motor to rotate; Stay cord, its one end connects the drg of this lifting mechanism, to open or close this drg.The present invention adopts hoist ceiling crane to substitute traditional monkey, and the operating unit of hoist ceiling crane can arrange emergency facility equally.So can simplify crane span structure, significantly reduce costs, and fully meet the reliability requirement of emergency operation.
Description
Technical field
The present invention relates to a kind of manualemergency operating device, particularly relate to a kind of nuclear power manualemergency operating device of little tonnage.
Background technology
Because China's new forms of energy development is in recent years rapid, plan is a lot of with the nuclear station project of building.In the hoisting crane of fuel for nuclear power plant factory building, hoisting capacity is little, be mostly no more than 5 tons, and crane of nuclear power plant requires that there is manual-operated emergent device in each mechanism, so that can this mechanism of manual drives when electrical fault or power failure.Common monkey is made up of trolley frame, lifting mechanism and operating unit etc., and mostly manual-operated emergent device is the axle with handwheel direct-driving motor.Because dolly oad is comparatively large, and be arranged on crane span structure, namely Operation and Maintenance personnel easily close to lifting mechanism or operating unit, also can carry out manual-operated emergent operation easily more.But the monkey volume of this pattern is large, weight large, assembling is comparatively complicated and cost is higher, and the crane girder for its walking is twin beams, and weight is large, and cost is higher.
Summary of the invention
The object of the present invention is to provide a kind of manualemergency operating device of little tonnage, with alternative monkey, in order to solve in the hoisting crane of existing fuel for nuclear power plant factory building, because dolly oad is comparatively large, cause that weight is large, assembling is comparatively complicated and the problem that cost is higher.
A kind of manualemergency operating device of the present invention, be arranged on a girder, this manualemergency operating device comprises: hoist ceiling crane, this hoist ceiling crane comprises lifting mechanism, operating unit, suspension hook and steel rope, this manualemergency operating device also comprises: motor, be arranged on this lifting mechanism, the spindle nose stretched out is left in one end of this motor; Flexible axle, one end connects the spindle nose stretched out of this motor, rotates for driving the motor shaft of this motor; I-beam section, is arranged on the downside of girder, and this hoist ceiling crane is installed on the downside of this I-beam section; Manual driving device, connects the other end of this flexible axle, so as this flexible axle of manual drives rotate, thus drive this motor motor shaft rotate; Stay cord, its one end connects the drg of this lifting mechanism, to open or close this drg.
According to an embodiment of manualemergency operating device, wherein, also comprise: operation support, be arranged on hoist ceiling crane side, the other end of this flexible axle is arranged on this support, and the other end of this stay cord is arranged on this support.
According to an embodiment of manualemergency operating device, this manual driving device is long-armed crank, and this long-armed crank can be connected with this other end of this flexible axle, for driving this flexible axle to rotate, rotates to drive this motor shaft; Long-armed hook, can be connected with the other end of this stay cord, for driving this stay cord action, to open or close this drg.
According to an embodiment of manualemergency operating device, wherein, this other end of this flexible axle is provided with a spindle nose, and the side of this spindle nose is provided with two projections, the axisymmetrical of this two projection this spindle nose relative; The end that this other end of this long-armed crank and this flexible axle is connected is provided with a shift fork head, the bottom of this shift fork head has cavity, the form fit of this cavity and this spindle nose, the bottom of this shift fork head is provided with two grooves, the axisymmetrical of this two groove this shift fork head relative, this two groove mates with this two projection respectively, and this two projection can be snapped in this two groove respectively.
According to an embodiment of manualemergency operating device, wherein, the other end of this stay cord is provided with a draw ring; This long-armed hook can catch on this draw ring, to drive this stay cord action.
According to an embodiment of manualemergency operating device, wherein, this drg is configured with manual releasing draw ring, moves this manual releasing draw ring, can open drg, makes this motor shaft be in free state, and this one end of this stay cord connects this manual releasing draw ring.
According to an embodiment of manualemergency operating device, wherein, this girder connects an engine installation, to drive this girder parallel motion.
According to an embodiment of manualemergency operating device, wherein, this girder can pass through for operating personal.
In sum, the present invention adopts hoist ceiling crane to substitute traditional monkey, instead of two girder by single girder, by emergency operation devices such as operation support, flexible axle, stay cord, long-armed crank, long-armed hooks, can realize the emergency operation when accident condition of lifting mechanism, operating unit.So both maintained lifting mechanism, function that operating unit can carry out emergency operation, can crane span structure be simplified again, simplify monkey, significantly reduce costs.
Accompanying drawing explanation
Fig. 1 is the schematic diagram of an embodiment of a kind of manualemergency operating device reed of the present invention;
Fig. 2 is the lateral plan of Fig. 1;
Fig. 3 is the part A enlarged diagram of Fig. 1;
Fig. 4 is the part B enlarged diagram of Fig. 1;
Fig. 5 is the C enlarged schematic partial view of Fig. 1.
Detailed description of the invention
Fig. 1 is the schematic diagram of an embodiment of a kind of manualemergency operating device of the present invention, and Fig. 2 is the lateral plan of Fig. 1.As shown in Figure 1 and Figure 2, manualemergency operating device comprises: hoist ceiling crane 1, I-beam section 2, girder 3, operation support 4, flexible axle 5, stay cord 6, long-armed crank 7 and long-armed hook 8 etc.
As shown in Figure 1, I-beam section 2 is arranged on the downside of girder 3.Can walk about for Operation and Maintenance personnel on girder 3, both sides are provided with protection railing, and this girder is the primary load-carrying members of hoisting crane, and other mechanism of hoisting crane can drive this girder to carry out parallel motion.Hoist ceiling crane 1 is suspended on below I-beam section 2, hoist ceiling crane 1 can be conventional or customization hoist ceiling crane, usually lifting mechanism 1-1, operating unit 1-2, suspension hook 1-3, steel rope 1-4 etc. are comprised, lifting mechanism 1-1 comprises motor, drg, retarder, reel etc. usually, wherein the spindle nose 1-11 stretched out is left in motor one end, can be connected with one end of flexible axle 5, drg is configured with manual releasing draw ring 1-12, pull manual releasing draw ring 1-12, can open drg, namely the motor shaft of such motor is in free state.Operation support 4 is arranged on the side of hoist ceiling crane 1, for the operating side of fixing flexible axle 5 and stay cord 6.Flexible axle 5 one end connects the motor shaft head 1-11 of hosting mechanism of electric hoist 1-1, the other end of flexible axle 5 is fixed on operation support 4, and can be connected with long-armed crank 7, flexible axle 5 drives the motor shaft head 1-11 of hosting mechanism of electric hoist 1-1 to turn round by own rotation, and then drive motor axle, retarder and spool turns, and then suspension hook 1-3 is driven to move up and down by steel rope 1-4.One end of stay cord 6 connects the manual releasing draw ring 1-12 of lifting mechanism 1-1, to open drg, the other end of stay cord 6 is fixed on operation support 4, and can be connected with long-armed hook 8.
Wherein, with reference to figure 1, long-armed crank 7 and long-armed hook 8 fixed placement when normal operation, above girder 3, only uses when accident.Long-armed crank 8 can be operated by operating personal when accident, rotates the operating side 5-1 of flexible axle 5, and then drives flexible axle 5 and motor shaft head 1-11 to rotate.Parts when operation support 4, flexible axle 5, stay cord 6, long-armed crank 7, long-armed hook 8 are all emergency operations.
Similar function can be realized by other forms of manual driving device for the long-armed crank 7 in above-described embodiment.And also can realize similar function by other device for long-armed hook 8.Because the selection art technology of concrete device can be selected according to the actual requirements flexibly, therefore do not repeat at this.
Fig. 3 is the part A enlarged diagram of Fig. 1.Referring to figs. 1 to Fig. 3, the operating side 5-1 of flexible axle 5 is fixedly installed on operation support 4, and the side of operating side 5-1 is provided with projection 5-11 and projection 5-12, the axisymmetrical of the relative operating side 5-1 of projection 5-11 and projection 5-12.
Fig. 4 is the part B enlarged diagram of Fig. 1.With reference to figure 4 and Fig. 3, one end of long-armed crank 7 is provided with a shift fork head 7-1, the bottom of shift fork head 7-1 has cavity, the form fit of cavity and operating side 5-1, the bottom of shift fork head 7-1 is provided with two groove 7-11, the axisymmetrical of two groove 7-11 relative shift fork head 7-1, because shift fork head 7-1 has middle control chamber, therefore in fact two groove 7-11 are arranged on the housing of shift fork head 7-1, two groove 7-11 mate with the projection 5-11 of operating side 5-1 and projection 5-12 respectively, when operating side 5-1 is inserted in the cavity of shift fork head 7-1, projection 5-11 and projection 5-12 can snap in two groove 7-11 respectively.
Fig. 5 is the C enlarged schematic partial view of Fig. 1.As shown in Figure 5, in addition, with reference to figure 1, a draw ring 6-1 can be set in the operating side of stay cord 6, and hook draw ring 6-1 by the U-shaped gib head 8-1 of a long-armed hook 8.Can be operated by operating personal during accident, hook the operating side 6-1 of stay cord 6, pull the manual releasing draw ring 1-12 of drg by stay cord 6 and make it rotate the angle of setting, and opening the drg in lifting mechanism 1-1.
Referring to figs. 1 to Fig. 5, for the ease of operated by personnel's flexible axle 5 and stay cord 6, operation support 4 is arranged on the side of hoist ceiling crane 1, the operating side 5-1 of flexible axle 5 is fixedly installed on operation support 4, and the operating side 6-1 of stay cord 6 is fixedly installed on operation support 4.And the operating side 5-1 of flexible axle 5 can rotate by opposite brackets 4, the operating side 6-1 of stay cord 6 can be lifted by opposite brackets 4.
In addition, girder 3 is parts of hoisting crane carrying structure, other mechanism of hoisting crane can drive this girder to carry out parallel motion (all the other structures of hoisting crane, mechanism is not shown), the I-beam section 2 that girder is installed for 3 times is hung with hoist ceiling crane 1, the operating unit 1-2 of hoist ceiling crane 1 can drive hoist ceiling crane 1 self to carry out horizontal rectilinear motion along I-beam section 2, such hoist ceiling crane 1 can make level under the drive of girder 3, perpendicular to the cross motion of girder, the longitudinal movement being parallel to girder can be made under the drive of operating unit 1-2, lifting mechanism 1-1 can drive suspension hook 1-3 up-and-down movement, weight can be realized like this to be carried to another vicinal function from a place.
Composition graphs 1 to Fig. 5 sketches a kind of operating process of the present invention.After the motor of the lifting mechanism 1-1 of hoist ceiling crane 1 breaks down or has a power failure, operating personal climbs up girder 3, but operating personal cannot be directly adjacent to hoist ceiling crane 1, at this moment operating personal first can hook the operating side 6-1 of stay cord 6 by long-armed hook 8, firmly pull-up again, the drg manual releasing draw ring 1-12 of lifting mechanism 1-1 in hoist ceiling crane 1 is pulled by stay cord 6, and make manual releasing draw ring 1-12 rotate the angle of setting, finally open drg, make motor shaft in lifting mechanism 1-1 be in free state.Then operating personal is by long-armed crank 7, by its lower end--shift fork head 7-1 is enclosed within the operating side 5-1 of flexible axle 5, shake long-armed crank 7, the motor shaft head 1-11 of lifting mechanism 1-1 in hoist ceiling crane 1 is driven to rotate by flexible axle 5, and then drive the motor in lifting mechanism 1-1, retarder, spool turns and then drive suspension hook 1-3 to move up and down, to complete set work by steel rope 1-4.Like this, Operation and Maintenance personnel, after accident occurs, long-rangely can manually manipulate the work that hoist ceiling crane 1 completes requirement, realize emergency operation.As emergency operation device need be arranged at operating unit, can refer to lifting mechanism and arrange equally, so that service personnel carries out remote control.
In sum, the present invention adopts hoist ceiling crane to substitute traditional monkey, instead of two girder by single girder, by emergency operation devices such as operation support, flexible axle, stay cord, long-armed crank, long-armed hooks, can realize the emergency operation when accident condition of lifting mechanism, operating unit.So can simplify crane span structure, simplify monkey, significantly reduce costs.Meanwhile, above-described embodiment solves Operation and Maintenance personnel be difficult at an arbitrary position easily close to hoist ceiling crane by arranging long-armed crank and long-armed hook, causes being difficult to the problem with handwheel Direct driver hoist ceiling crane.
Although exemplary embodiment describe the present invention with reference to several, should be appreciated that term used illustrates and exemplary and nonrestrictive term.Spirit of the present invention or essence is not departed from because the present invention can specifically implement in a variety of forms, so be to be understood that, above-described embodiment is not limited to any aforesaid details, and should explain widely in the spirit and scope that claims limit, therefore fall into whole change in claim or its equivalent scope and remodeling and all should be claims and contained.
Claims (6)
1. a manualemergency operating device, be arranged on a girder, walk about for Operation and Maintenance personnel on described girder, this manualemergency operating device comprises: hoist ceiling crane, this hoist ceiling crane comprises lifting mechanism, operating unit, suspension hook and steel rope, it is characterized in that, this manualemergency operating device also comprises:
Motor, is arranged on this lifting mechanism, and the spindle nose stretched out is left in one end of this motor;
Flexible axle, one end connects the spindle nose stretched out of this motor, rotates for driving the motor shaft of this motor;
I-beam section, is arranged on the downside of girder, and this hoist ceiling crane is installed on the downside of this I-beam section;
Long-armed crank, connects the other end of this flexible axle, so that described Operation and Maintenance personnel are rotated by described long-armed this flexible axle of crank manual drives, thus drives the motor shaft of this motor to rotate;
Stay cord, its one end connects the drg of this lifting mechanism;
Long-armed hook, described Operation and Maintenance personnel pull described stay cord by described long-armed hook, to open or close this drg.
2. manualemergency operating device as claimed in claim 1, is characterized in that, also comprise:
Operation support, be arranged on hoist ceiling crane side, the other end of this flexible axle is arranged on this support, and the other end of this stay cord is arranged on this support.
3. manualemergency operating device as claimed in claim 2, it is characterized in that, this other end of this flexible axle is provided with a spindle nose, and the side of this spindle nose is provided with two projections, the axisymmetrical of this two projection this spindle nose relative; The end that this other end of this long-armed crank and this flexible axle is connected is provided with a shift fork head, the bottom of this shift fork head has cavity, the form fit of this cavity and this spindle nose, the bottom of this shift fork head is provided with two grooves, the axisymmetrical of this two groove this shift fork head relative, this two groove mates with this two projection respectively, and this two projection can be snapped in this two groove respectively.
4. manualemergency operating device as claimed in claim 2, is characterized in that,
The other end of this stay cord is provided with a draw ring;
This long-armed hook can catch on this draw ring, to drive this stay cord action.
5. manualemergency operating device as claimed in claim 1, is characterized in that,
This drg is configured with manual releasing draw ring, moves this manual releasing draw ring, can open drg, makes this motor shaft be in free state, and this one end of this stay cord connects this manual releasing draw ring.
6. manualemergency operating device as claimed in claim 1, it is characterized in that, this girder connects an engine installation, to drive this girder parallel motion.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310750072.3A CN103693573B (en) | 2013-12-31 | 2013-12-31 | A kind of manualemergency operating device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310750072.3A CN103693573B (en) | 2013-12-31 | 2013-12-31 | A kind of manualemergency operating device |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103693573A CN103693573A (en) | 2014-04-02 |
CN103693573B true CN103693573B (en) | 2016-01-06 |
Family
ID=50355274
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310750072.3A Expired - Fee Related CN103693573B (en) | 2013-12-31 | 2013-12-31 | A kind of manualemergency operating device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103693573B (en) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104071722B (en) * | 2014-06-20 | 2016-08-17 | 南京航空航天大学 | A kind of emergency braking mechanism of pull rope |
CN107975277A (en) * | 2017-12-20 | 2018-05-01 | 东风设备制造有限公司 | Pick-up structure and method when a kind of vertical circulation multi-storied garage has a power failure |
CN109626219A (en) * | 2019-01-02 | 2019-04-16 | 江南造船(集团)有限责任公司 | A kind of operating mechanism for engine room crane motor emergency release |
CN114371661B (en) * | 2021-12-02 | 2023-07-21 | 太原重工股份有限公司 | Emergency operation control system of coke dry quenching hoister |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB458018A (en) * | 1935-06-05 | 1936-12-10 | Romeylowerk Ges Fur Drahtlose | Control device for aerial winding mechanism on aircraft |
CN2264731Y (en) * | 1995-05-12 | 1997-10-15 | 李文彩 | Separating light winch for pulling back column |
US5738340A (en) * | 1996-09-20 | 1998-04-14 | Brantner; Charles U. | Stirrup device and method |
CN201737623U (en) * | 2010-08-05 | 2011-02-09 | 河南中州起重集团有限公司 | Manual-electric dual purpose cucurbit |
CN202864775U (en) * | 2012-10-18 | 2013-04-10 | 湖北银轮起重机械股份有限公司 | Manual electric dual purpose lift electric hoist |
CN103332622A (en) * | 2013-07-02 | 2013-10-02 | 中科华核电技术研究院有限公司 | Electric block for operation of nuclear fuel assembly |
-
2013
- 2013-12-31 CN CN201310750072.3A patent/CN103693573B/en not_active Expired - Fee Related
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB458018A (en) * | 1935-06-05 | 1936-12-10 | Romeylowerk Ges Fur Drahtlose | Control device for aerial winding mechanism on aircraft |
CN2264731Y (en) * | 1995-05-12 | 1997-10-15 | 李文彩 | Separating light winch for pulling back column |
US5738340A (en) * | 1996-09-20 | 1998-04-14 | Brantner; Charles U. | Stirrup device and method |
CN201737623U (en) * | 2010-08-05 | 2011-02-09 | 河南中州起重集团有限公司 | Manual-electric dual purpose cucurbit |
CN202864775U (en) * | 2012-10-18 | 2013-04-10 | 湖北银轮起重机械股份有限公司 | Manual electric dual purpose lift electric hoist |
CN103332622A (en) * | 2013-07-02 | 2013-10-02 | 中科华核电技术研究院有限公司 | Electric block for operation of nuclear fuel assembly |
Also Published As
Publication number | Publication date |
---|---|
CN103693573A (en) | 2014-04-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103693573B (en) | A kind of manualemergency operating device | |
CN202208605U (en) | High-positioning-accuracy hoisting mechanism of crane | |
KR20110023850A (en) | Multi-purpose load lifting work platform or / and composite bridge structure | |
CN105625704A (en) | Electric intelligent hoisting equipment suitable for attached lifting scaffold | |
CN204342297U (en) | A kind of transfer crane with jib structure | |
CN205575458U (en) | Intelligence construction elevator | |
CN102320531A (en) | High-positioning-accuracy lifting mechanism for crane | |
CN203794533U (en) | Light portable mobile lifting equipment | |
CN202744232U (en) | Tower crane long suspension arm lifting steel rope supporting device | |
CN203269412U (en) | Tower crane capable of carrying driver to get on and get off crane | |
CN205328478U (en) | Heavy balanced tower crane | |
CN203474351U (en) | Large-tonnage single-girder steel wire rope type electric hoist | |
CN203289011U (en) | Tension cross arm hoisting device | |
CN117125614A (en) | Hoisting device | |
CN106081901A (en) | A kind of novel SMD hoisting trolley | |
CN202729645U (en) | Tower crane with elevator | |
CN202766182U (en) | Electric hydraulic control rope blocking device | |
CN204727495U (en) | A kind of large-tonnage cable carries hoisting crane | |
CN104355238A (en) | Portal crane with jib structure | |
CN204434109U (en) | A kind of manual winding devices for escape ladder lifting | |
CN203284098U (en) | Disassembled and assembled part self-lifting device for tower crane | |
CN202201605U (en) | Escape elevator used in high-rise building | |
CN101672101A (en) | One-drive multi-hoisting-point hoisting system | |
CN221587805U (en) | Wallboard lifting machine | |
CN204778466U (en) | A bridge type removal flatcar for installation of inlayer colored steel |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160106 |