CN103633584A - Reversely-threading wire distribution construction process for office network - Google Patents
Reversely-threading wire distribution construction process for office network Download PDFInfo
- Publication number
- CN103633584A CN103633584A CN201310728628.9A CN201310728628A CN103633584A CN 103633584 A CN103633584 A CN 103633584A CN 201310728628 A CN201310728628 A CN 201310728628A CN 103633584 A CN103633584 A CN 103633584A
- Authority
- CN
- China
- Prior art keywords
- penetration pipe
- cable
- threading
- floor
- wearing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims abstract description 36
- 230000008569 process Effects 0.000 title claims abstract description 12
- 238000010276 construction Methods 0.000 title abstract description 29
- 238000009826 distribution Methods 0.000 title abstract description 5
- 230000035515 penetration Effects 0.000 claims description 56
- 238000004519 manufacturing process Methods 0.000 claims description 24
- 238000013461 design Methods 0.000 claims description 8
- 238000005452 bending Methods 0.000 claims description 7
- 238000005538 encapsulation Methods 0.000 claims description 7
- 210000003205 muscle Anatomy 0.000 claims description 7
- 239000003550 marker Substances 0.000 claims description 6
- 239000004744 fabric Substances 0.000 claims description 4
- 229920000915 polyvinyl chloride Polymers 0.000 claims description 4
- 239000004800 polyvinyl chloride Substances 0.000 claims description 4
- 208000006558 Dental Calculus Diseases 0.000 claims description 3
- 206010058109 Hangnail Diseases 0.000 claims description 3
- 239000003973 paint Substances 0.000 claims description 2
- 230000010412 perfusion Effects 0.000 claims description 2
- 239000005871 repellent Substances 0.000 claims description 2
- 230000000694 effects Effects 0.000 abstract description 4
- 230000002411 adverse Effects 0.000 abstract description 3
- 238000005034 decoration Methods 0.000 abstract description 3
- 230000006855 networking Effects 0.000 abstract description 3
- 238000007789 sealing Methods 0.000 abstract description 2
- 238000005553 drilling Methods 0.000 abstract 1
- 229910000831 Steel Inorganic materials 0.000 description 7
- 239000010959 steel Substances 0.000 description 7
- 238000009434 installation Methods 0.000 description 3
- 238000005520 cutting process Methods 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 239000000428 dust Substances 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 239000002184 metal Substances 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000007665 sagging Methods 0.000 description 2
- 241000238631 Hexapoda Species 0.000 description 1
- 238000004458 analytical method Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 238000004891 communication Methods 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 230000003287 optical effect Effects 0.000 description 1
- 238000005192 partition Methods 0.000 description 1
- 230000001681 protective effect Effects 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
- 230000010410 reperfusion Effects 0.000 description 1
- 238000003786 synthesis reaction Methods 0.000 description 1
- 230000007306 turnover Effects 0.000 description 1
Images
Landscapes
- Electric Cable Installation (AREA)
Abstract
The invention discloses a reversely-threading wire distribution construction process for an office network. The reversely-threading wire distribution construction process comprises the following steps: (1) determining a routing path and the positions of threading holes; (2) producing threading tubes; (3) drilling holes in a floor; (4) upwards threading the threading tubes out of the floor through the threading holes from the position below of the floor; (5) sealing the peripheries of the orifices of the threading holes; (6) paying off, determining the length of a wire cable according to the routing path, and temporarily marking the end heads of the wire cable; and (7) introducing the wire cable to a next wiring bridge frame from weak-current equipment in a weak-current room, then threading the wire cable in the threading tubes, and introducing the wire cable out of the upper ends of the threading tubes to a specified position. The reversely-threading wire distribution construction process disclosed by the invention is capable of meeting the requirements of decoration on an indoor elevation and free from large-area grooving in the floor on the basis of realizing the networking of office computers and related office equipment information interfaces, and ensuring the use stability, thus reducing the workload and construction cost, reducing adverse effects on a building floor structure, and reducing the influence of cross construction.
Description
Technical field
The present invention relates to cable construction plan in a kind of comprehensive wiring, specifically a kind of anti-cable wiring manufacture technique of wearing about office building Administrative Area.
Background technology
The comprehensive wiring of office network is the network in building or groups of building, is to realize intelligentized basis.It not only makes in building
voice, data,
imageequipment and switching equipment and other
information management systemconnected with each other, also can make these equipment be connected with outside, realized the networking of Office PC and relevant office equipment information interface.
The cable wiring mode of existing office network mainly contains following two kinds:
1) adopt the mode of the cabling crane span structure of furred ceiling.This mode is applicable to building; for horizontal cable provides the cabling crane span structure of mechanical protection and support; it is a kind of closed type metal crane span structure; be arranged in furred ceiling; from Vertical Shaft for Light-Current, guide the room that is provided with information point into; at the penetration pipe by being embedded in different size within the walls, circuit is guided in the concealed installation can of assigned address on wall.But, because this mode can only be preset telecommunications outlet on the wall, after being separated, Administrative Area also needs to carry out secondary wiring, adopt corresponding secondary wire laying mode.
2) adopt ground slot cabling mode.This mode is adapted to the cubicle of large bay, has the situation of intensive ground type information outlets, needs first built-in metal wire casing or wire casing floor in ground cushion.Trunk groove is drawn from Vertical Shaft for Light-Current, along corridor, guide each room that is provided with information point into, with bracket groove, guide the information point line outlet in room into again, forceful electric power circuit can configure with light current circuit equality, but need be separated in different wire casings, can provide an integrated panel that comprises data, speech, uninterrupted power supply, mains lighting supply outlet to each user like this, realize office automation.But owing to cannot predicting staff's office location in advance, therefore this mode flexibility is not fine.
Also the office network wiring having adopts comprehensive above-mentioned two kinds of cable wiring modes, and as shown in Figure 3, cable is the penetration pipe through laying in vertical wall by cabling crane span structure, then by ground fluting, lays penetration pipe and cable is caused to the assigned address that cuts off Administrative Area.This cable wiring manufacture mode can meet the absolute altitude regulation requirement of the indoor 2850mm in room, building, and still, according to fluting specification, the installation of ground tubine need being slotted under existing ground elevation 30mm, to guarantee the quality of the unit's of decoration later stage laying floor.Because existing floor fluting depth capacity can only be 10mm, otherwise the reinforcing bar by destroying in floor, affects building body floor construction, but the penetration pipe diameter that comprehensive wiring is used is 25mm, therefore, the fluting of 10mm cannot meet penetration pipe in the requirement of ground parallel lay-up.
In sum, the cable wiring mode of traditional office network needs embedded threading pipe or fluting to lay penetration pipe, has not only increased difficulty of construction, has increased workload, and has greatly increased construction cost.
Summary of the invention
For above-mentioned deficiency, the invention provides a kind of anti-cable wiring manufacture technique of wearing about office building Administrative Area, not only can reduce difficulty of construction, reduce workload, and greatly reduce construction cost.
The technical solution adopted for the present invention to solve the technical problems is: a kind of anti-cable wiring manufacture technique of wearing of office network, it is characterized in that, and comprise the following steps:
1) determine wiring path and through wires hole position;
2) make penetration pipe, the manufacture method of described penetration pipe is: by penetration pipe simmering and bending, bend and be an angle of 90 degrees radian, then on vertical component outer wall, make equally distributed anti-skid structure;
3) on floor, punch, described through wires hole vertically runs through floor and slightly larger in diameter in penetration pipe diameter;
4) from below, floor, penetration pipe is upwards passed from through wires hole, penetration pipe upper end is above ground level;
5) through wires hole aperture is carried out to encapsulation process around;
6) unwrapping wire, determines length of cable according to wiring path, and cable knob is done to temporary marker;
7) cable weak current equipment between light current is caused next time cabling crane span structure, then pierce into penetration pipe and pass and cause assigned address from penetration pipe upper end.
Further, the described anti-cable wiring manufacture technique of wearing is further comprising the steps of:
The cable that cloth is put well is according to temporary marker and design and produce wiring label, and by label sticking at cable two ends.
Preferably, described anti-skid structure comprises bulge-structure or the downward hangnail structure of tartar.
Preferably, the length of described penetration pipe is at least 1200mm, and vertical component is reserved 100mm after passing through wires hole on the ground, below floor, to simmering and bending place, reserves 200mm.
Preferably, the horizontal component of described penetration pipe adopts and to hang muscle and fix, described in hang muscle upper end and be fixed on base plate lower surface.
Preferably, the aperture of described through wires hole adopts slightly expanded concrete perfusion to carry out encapsulation process.
Preferably, the aperture of described through wires hole adopt SBS waterproof roll or
water-repellent paintcarry out encapsulation process.
The cable wiring of deploying troops on garrison duty preferably, is neat and carry out colligation.
Further, the upper port place of described penetration pipe is provided with wire bushing, and described wire bushing embeds in penetration pipe.
Preferably, described wire bushing adopts polyvinyl chloride wire cover or rubber wire bushing.
The present invention has following outstanding beneficial effect: the present invention realize the networking of Office PC and relevant office equipment information interface and guarantee its can the basis of stability in use on, not only can meet the requirement of finishing to indoor absolute altitude, nor need to be on floor large-area fluting, workload and construction cost have been reduced, reduce the adverse effect to building floor structure simultaneously, reduced the impact of crossed construction.
Accompanying drawing explanation
Below in conjunction with accompanying drawing, the invention will be further described:
Fig. 1 is the counter wiring schematic diagram of wearing cable wiring manufacture method of the present invention;
Fig. 2 is the scheme of installation of penetration pipe of the present invention;
Fig. 3 is the wiring schematic diagram of traditional wiring construction method.
Embodiment
As depicted in figs. 1 and 2, the anti-cable wiring manufacture technique of wearing of a kind of office network of the present invention, it comprises the following steps:
1) according to cutting off Administrative Area furniture design putting position, determine wiring path and through wires hole position.
2) make penetration pipe, the manufacture method of described penetration pipe is: penetration pipe, in the simmering and bending of 600mm place, is bent and is an angle of 90 degrees radian, then on vertical component outer wall, make equally distributed anti-skid structure; Described anti-skid structure adopts the downward hangnail structure of tartar.
3) on floor, punch, described through wires hole vertically runs through floor and slightly larger in diameter in penetration pipe diameter.
4) from below, floor, penetration pipe is upwards passed from through wires hole, penetration pipe upper end is above ground level; The length of described penetration pipe is 4000mm, and vertical component passes after through wires hole reserved 100mm on the ground, below floor, to the reserved 200mm of simmering and bending place, and the horizontal component of penetration pipe is adopted and hangs muscle and be fixed.
5) to through wires hole aperture, adopt slightly expanded concrete reperfusion mode to carry out encapsulation process around.
6) unwrapping wire, determines length of cable according to wiring path, and cable knob is done to temporary marker.
7) cable weak current equipment between light current is caused to cabling crane span structure next time and lay neat and carry out colligation, then pierce into penetration pipe and pass and cause assigned address from penetration pipe upper end.
8) cable of cloth being put well is according to temporary marker and design and produce wiring label, and by label sticking at cable two ends.
Further, in order to protect cable, the upper port place of described penetration pipe is provided with the polyvinyl chloride wire bushing embedding in penetration pipe.
The present invention is mainly used in the comprehensive wiring of open Administrative Area, utilize the horizontal crane span structure of next floor, and in furred ceiling, hang after penetration pipe, information point position according to design drawing burrows, described through wires hole runs through floor, its diameter is 27mm, and penetration pipe, by turning over and be left in advance assigned address on next floor, is used to cut off furniture Administrative Area.The present invention both can meet the requirement of finishing to indoor absolute altitude, need to be on floor yet large-area fluting, reduced workload and construction cost, reduced the adverse effect to building floor structure simultaneously, reduced the impact of crossed construction.
For fear of the intersection management of wiring system and the increase of length of cable, between the large light current of every layer, by the horizontal crane span structure of lower one deck, by comprehensive wiring pipe well, turned over the rack on access upper strata on directly, the information point position netting twine of current floor is accessing distributing frame between layer light current, by floor, exchange UNICOM's network again, i.e. the information point position of current floor or management in this layer.This kind of form of construction work repeatedly, avoided the staggered floor management of comprehensive wiring, personnel's easy to use maintenance and trouble shoot, analysis between no longer passing through between two light current.
As shown in Figure 2, for guarantee the firmness of penetration pipe vertical component and avoid penetration pipe and Internal cable sagging, penetration pipe vertical component and horizontal component are by one whole KBG(attaching type Steel Thin-Wall conduit) steel tube bending forms.Whole KBG steel pipe 4000mm, on ground, reserved 100mm can play the effect of waterproof, insect protected, dust protection in use procedure from now on.Building floor thickness 300mm, KBG steel pipe vertical component is reserved 200mm below floor, is bent into 90 degree radian elbows at KBG steel pipe 600mm place, and angle can not be too straight, is convenient to netting twine and passes.KBG steel pipe horizontal component residue length 3300mm left and right, hangs muscle in the use of close bent angle 200mm place and fixes, and remainder hangs muscle according to one of actual conditions interval 2000mm increase and is fixed.
In cable wiring manufacture process, in penetration pipe exit, ground, use polyvinyl chloride wire bushing, wire bushing embeds the threading mouth of pipe.The use of wire bushing is fastening netting twine in pipe; effectively prevented sagging before fixing on office furniture of cable; avoid the wearing and tearing of steel pipe walls to cable simultaneously; cable has been played to protective effect; and the sealing of line up; prevent entering and destroying of dust, worm ant, protected to greatest extent cable.
The present invention adopts < < code for engineering design of generic cabling system for building and campus > > (GB 50311-2007) and < < building communication synthesis wiring system second portion integrated distribution cable optical cable technology to require > > (YD/T926.2-2009) relevant criterion to connect up.
1) this cable wiring manufacture method changes ground tick slot operation into that floor openings is counter wears, and has not only reduced difficulty of construction, and has reduced workload, greatly reduces construction cost.
2) through reality measuring and calculating, the anti-construction method of wearing of floor openings has been saved the materials such as cable, spool in a large number than former construction method.
3), according to the room absolute altitude requirement of building design, the method restricts indoor absolute altitude without being subject to ground fluting, also can not affect building floor construction and robustness because of large-area fluting on floor.
4) penetration pipe vertically passes from floor, and penetration pipe can directly cause assigned position according to cutting off Administrative Area furniture design putting position, and construction location is accurate, construction simple and flexible.
5) what construction penetration pipe can be more attractive in appearance is hidden into Administrative Area furniture preformed groove position, can not turn over and basset because of parallel laying on penetration pipe, and avoid turning over the inconsistent furniture preformed groove position of causing of angle on penetration pipe and cannot hide penetration pipe, furniture can not be put the phenomenon putting in place.
6) this cable wiring manufacture method and decoration construction cross influence are less, cloth can carry out ground surface finishing construction and furred ceiling after putting penetration pipe and cable well at once, can not affect finishing progress because of place fluting, and then seriously restrict whole project progress, and shortened the construction period of whole partition furniture open area cable wiring.
The above is the preferred embodiment of the present invention, for those skilled in the art, under the premise without departing from the principles of the invention, can also make some improvements and modifications, and these improvements and modifications are also regarded as protection scope of the present invention.
Claims (10)
1. the anti-cable wiring manufacture technique of wearing of office network, is characterized in that, comprises the following steps:
1) determine wiring path and through wires hole position;
2) make penetration pipe, the manufacture method of described penetration pipe is: by penetration pipe simmering and bending, bend and be an angle of 90 degrees radian, then on vertical component outer wall, make equally distributed anti-skid structure;
3) on floor, punch, described through wires hole vertically runs through floor and slightly larger in diameter in penetration pipe diameter;
4) from below, floor, penetration pipe is upwards passed from through wires hole, penetration pipe upper end is above ground level;
5) through wires hole aperture is carried out to encapsulation process around;
6) unwrapping wire, determines length of cable according to wiring path, and cable knob is done to temporary marker;
7) cable weak current equipment between light current is caused next time cabling crane span structure, then pierce into penetration pipe and pass and cause assigned address from penetration pipe upper end.
2. the anti-cable wiring manufacture technique of wearing of a kind of office network according to claim 1, is characterized in that, further comprising the steps of:
The cable that cloth is put well is according to temporary marker and design and produce wiring label, and by label sticking at cable two ends.
3. the anti-cable wiring manufacture technique of wearing of a kind of office network according to claim 1, is characterized in that, described anti-skid structure comprises bulge-structure or the downward hangnail structure of tartar.
4. the anti-cable wiring manufacture technique of wearing of a kind of office network according to claim 1, is characterized in that, the length of described penetration pipe is at least 1200mm, and vertical component is reserved 100mm after passing through wires hole on the ground, below floor, to simmering and bending place, reserves 200mm.
5. the anti-cable wiring manufacture technique of wearing of a kind of office network according to claim 1, is characterized in that, the horizontal component of described penetration pipe adopts and hangs muscle and fix, described in hang muscle upper end and be fixed on base plate lower surface.
6. the anti-cable wiring manufacture technique of wearing of a kind of office network according to claim 1, is characterized in that, the aperture of described through wires hole adopts slightly expanded concrete perfusion to carry out encapsulation process.
7. the anti-cable wiring manufacture technique of wearing of a kind of office network according to claim 1, is characterized in that, the aperture of described through wires hole adopt SBS waterproof roll or
water-repellent paintcarry out encapsulation process.
8. the anti-cable wiring manufacture technique of wearing of a kind of office network according to claim 1, is characterized in that, described in the cable wiring of deploying troops on garrison duty neat and carry out colligation.
9. according to the anti-cable wiring manufacture technique of wearing of a kind of office network described in claim 1-8 any one, it is characterized in that, the upper port place of described penetration pipe is provided with wire bushing, and described wire bushing embeds in penetration pipe.
10. the anti-cable wiring manufacture technique of wearing of a kind of office network according to claim 9, is characterized in that, described wire bushing adopts polyvinyl chloride wire cover or rubber wire bushing.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201310728628.9A CN103633584B (en) | 2013-12-26 | 2013-12-26 | The counter of a kind of office network wears cable wiring manufacture technique |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201310728628.9A CN103633584B (en) | 2013-12-26 | 2013-12-26 | The counter of a kind of office network wears cable wiring manufacture technique |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN103633584A true CN103633584A (en) | 2014-03-12 |
| CN103633584B CN103633584B (en) | 2016-03-30 |
Family
ID=50214332
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201310728628.9A Active CN103633584B (en) | 2013-12-26 | 2013-12-26 | The counter of a kind of office network wears cable wiring manufacture technique |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN103633584B (en) |
Cited By (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106877249A (en) * | 2017-04-05 | 2017-06-20 | 合肥酷睿网络科技有限公司 | A kind of cable wiring manufacture method of office network |
| CN106941248A (en) * | 2017-04-05 | 2017-07-11 | 合肥酷睿网络科技有限公司 | A kind of intraoffice network installation wiring construction method |
| CN107370081A (en) * | 2017-08-09 | 2017-11-21 | 中国十七冶集团有限公司 | A kind of construction method for changing public domain electric line in building |
| CN109244958A (en) * | 2018-10-22 | 2019-01-18 | 南京信息职业技术学院 | Cable laying device and using method thereof |
| CN111490498A (en) * | 2019-01-25 | 2020-08-04 | 上海虹驰通信工程有限公司 | Wiring construction method for building office network |
| CN112189075A (en) * | 2018-05-16 | 2021-01-05 | 东莞市碧桂园房地产开发有限公司 | Construction method of house with water pipe and main body structure separated |
| CN112531588A (en) * | 2020-12-31 | 2021-03-19 | 赵双福 | Indoor electric wire saving arrangement method |
| CN112787268A (en) * | 2020-12-25 | 2021-05-11 | 广东卓维网络有限公司 | Comprehensive wiring construction method for visual equipment |
| CN117248669A (en) * | 2023-09-11 | 2023-12-19 | 江苏之上建设有限公司 | An assembled construction method for floor water and electricity pipelines |
Citations (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2002247736A (en) * | 2001-02-19 | 2002-08-30 | Nichido Denko Kk | Protector for wiring and piping |
| JP2002369333A (en) * | 2001-06-07 | 2002-12-20 | Mirai Ind Co Ltd | Pipe end fixture and its rotation holder |
| JP2003333734A (en) * | 2002-05-17 | 2003-11-21 | Misawa Homes Co Ltd | Structure of preventing dew condensation at wiring part in ceiling |
| CN101001009A (en) * | 2006-12-28 | 2007-07-18 | 许军 | Cable pipeline identification system |
| EP2157461A1 (en) * | 2008-08-21 | 2010-02-24 | CCS Technology Inc. | Preassembled optical cable and method for manufacturing preassemled optical cables |
| CN201966543U (en) * | 2010-07-30 | 2011-09-07 | 武汉达明科技有限公司 | Integrated wiring laying structure |
| CN202351480U (en) * | 2011-12-19 | 2012-07-25 | 中国移动通信集团北京有限公司 | Optical fiber head protector |
-
2013
- 2013-12-26 CN CN201310728628.9A patent/CN103633584B/en active Active
Patent Citations (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2002247736A (en) * | 2001-02-19 | 2002-08-30 | Nichido Denko Kk | Protector for wiring and piping |
| JP2002369333A (en) * | 2001-06-07 | 2002-12-20 | Mirai Ind Co Ltd | Pipe end fixture and its rotation holder |
| JP2003333734A (en) * | 2002-05-17 | 2003-11-21 | Misawa Homes Co Ltd | Structure of preventing dew condensation at wiring part in ceiling |
| CN101001009A (en) * | 2006-12-28 | 2007-07-18 | 许军 | Cable pipeline identification system |
| EP2157461A1 (en) * | 2008-08-21 | 2010-02-24 | CCS Technology Inc. | Preassembled optical cable and method for manufacturing preassemled optical cables |
| CN201966543U (en) * | 2010-07-30 | 2011-09-07 | 武汉达明科技有限公司 | Integrated wiring laying structure |
| CN202351480U (en) * | 2011-12-19 | 2012-07-25 | 中国移动通信集团北京有限公司 | Optical fiber head protector |
Non-Patent Citations (5)
| Title |
|---|
| 孙伟民: "《高等学校土建类跨专业团队毕业设计指导与实例-基于建筑设计院模式》", 30 September 2013, article "电气与智能化设计", pages: 290-292 * |
| 梁嘉强,陈晓宜: "《建筑弱电系统安装》", 30 September 2006, article "综合布线系统的施工", pages: 133-135 * |
| 蒋建春等: "《计算机网络管理理论与实践教程》", 30 September 2008, article "综合布线工程的施工", pages: 74-77 * |
| 许慈航: "综合布线管槽系统设计与施工", 《INTELLIGENT BUILDING》, no. 79, 31 March 2007 (2007-03-31), pages 50 - 52 * |
| 陈继斌,扈刚: "水平系统路由的优化设计及分析", 《INTELLIGENT BUILDING》, no. 77, 31 January 2007 (2007-01-31), pages 58 - 60 * |
Cited By (10)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106877249A (en) * | 2017-04-05 | 2017-06-20 | 合肥酷睿网络科技有限公司 | A kind of cable wiring manufacture method of office network |
| CN106941248A (en) * | 2017-04-05 | 2017-07-11 | 合肥酷睿网络科技有限公司 | A kind of intraoffice network installation wiring construction method |
| CN107370081A (en) * | 2017-08-09 | 2017-11-21 | 中国十七冶集团有限公司 | A kind of construction method for changing public domain electric line in building |
| CN112189075A (en) * | 2018-05-16 | 2021-01-05 | 东莞市碧桂园房地产开发有限公司 | Construction method of house with water pipe and main body structure separated |
| CN109244958A (en) * | 2018-10-22 | 2019-01-18 | 南京信息职业技术学院 | Cable laying device and using method thereof |
| CN109244958B (en) * | 2018-10-22 | 2023-08-08 | 南京信息职业技术学院 | Cable laying device and application method thereof |
| CN111490498A (en) * | 2019-01-25 | 2020-08-04 | 上海虹驰通信工程有限公司 | Wiring construction method for building office network |
| CN112787268A (en) * | 2020-12-25 | 2021-05-11 | 广东卓维网络有限公司 | Comprehensive wiring construction method for visual equipment |
| CN112531588A (en) * | 2020-12-31 | 2021-03-19 | 赵双福 | Indoor electric wire saving arrangement method |
| CN117248669A (en) * | 2023-09-11 | 2023-12-19 | 江苏之上建设有限公司 | An assembled construction method for floor water and electricity pipelines |
Also Published As
| Publication number | Publication date |
|---|---|
| CN103633584B (en) | 2016-03-30 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN103633584B (en) | The counter of a kind of office network wears cable wiring manufacture technique | |
| MX2011009945A (en) | Ducts to support a drop access location system for horizontal cabling in multi-dwelling unit applications. | |
| US20020148627A1 (en) | Architectural moldings for protecting, concealing and accessing indoor wiring and cables | |
| JP2011526003A (en) | Drop access location method and system for horizontal cabling in multi-family home applications | |
| CN203617640U (en) | Threading tube reversely penetrating wiring office network | |
| JP2013207878A (en) | In-wall wiring construction method and tool therefor | |
| CN107681570A (en) | A kind of design method of buildings integrative wire laying equipment room | |
| CN206878408U (en) | A kind of line box erecting device | |
| CN203961041U (en) | Fire prevention booth case | |
| CN105544908A (en) | Decorative plate for wall | |
| CN208738761U (en) | A kind of cable bridge | |
| CN201600799U (en) | A teaching and training device for building integrated wiring with a planar structure | |
| CN106485386A (en) | A kind of library's comprehensive wiring delivery receiving acceptance engineering | |
| CN203299432U (en) | Information network integration distribution box | |
| CN214575035U (en) | Over-and-under type sound lobe furred ceiling system of inhaling | |
| CN2812362Y (en) | Bending pipe | |
| CN207283086U (en) | A kind of track traffic computer room comprehensive wiring mechanism | |
| CN201966543U (en) | Integrated wiring laying structure | |
| CN203965684U (en) | Many net unification Novel optical cable fiber-dividing boxes | |
| JPH11206534A (en) | Entrance pole | |
| JP2850759B2 (en) | Wiring duct device | |
| CN220292385U (en) | A network cabinet cable management device | |
| GB2346396A (en) | Support device for cables/pipes particularly in the form of coving, skirting, or framework | |
| CN106941248A (en) | A kind of intraoffice network installation wiring construction method | |
| CN216641093U (en) | Novel prefabricated superimposed sheet and floor |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| C41 | Transfer of patent application or patent right or utility model | ||
| TA01 | Transfer of patent application right |
Effective date of registration: 20151222 Address after: 250101 Shandong city of Ji'nan province high tech Zone Shun Road No. 2000 Shun Tai Plaza No. 4 Applicant after: Shandong Iron & Steel Group Co., Ltd. Address before: 250014 Ji'nan, Lixia District, Shandong Lixia Road, No. 134 Applicant before: SHANDONG IRON & STEEL GROUP CO., LTD. |
|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant |