CN103630789A - Auxiliary experiment device for breaker failure protection - Google Patents

Auxiliary experiment device for breaker failure protection Download PDF

Info

Publication number
CN103630789A
CN103630789A CN201310702652.5A CN201310702652A CN103630789A CN 103630789 A CN103630789 A CN 103630789A CN 201310702652 A CN201310702652 A CN 201310702652A CN 103630789 A CN103630789 A CN 103630789A
Authority
CN
China
Prior art keywords
relay
auxiliary contact
series
breaker
malfunctioning
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201310702652.5A
Other languages
Chinese (zh)
Inventor
刘彪
陈进
顾军
刘新宇
艾比布勒·赛塔尔
邢占礼
安斌
黄新民
徐韬
周凡
郑斌
胡斐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
URUMQI POWER SUPPLY Co OF STATE GRID XINJIANG ELECTRIC POWER Co
State Grid Corp of China SGCC
Original Assignee
URUMQI POWER SUPPLY Co OF STATE GRID XINJIANG ELECTRIC POWER Co
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by URUMQI POWER SUPPLY Co OF STATE GRID XINJIANG ELECTRIC POWER Co, State Grid Corp of China SGCC filed Critical URUMQI POWER SUPPLY Co OF STATE GRID XINJIANG ELECTRIC POWER Co
Priority to CN201310702652.5A priority Critical patent/CN103630789A/en
Publication of CN103630789A publication Critical patent/CN103630789A/en
Pending legal-status Critical Current

Links

Images

Abstract

The invention relates to an auxiliary experiment device for breaker failure protection, comprising a light-emitting circuit, a relay ZJ and a time relay SJ, wherein two ends of coils of the time relay SJ and the relay ZJ are respectively connected with positive and negative ends of a bus of a control power supply; an auxiliary contact SJ1 and buttons SB1 and SB2, which are connected in parallel are arranged between the relay ZJ and the positive end of the bus of the control power supply in series; the auxiliary contact ZJ1 of the relay ZJ is connected between the time relay SJ and the anode of the bus of the control power supply in series; the auxiliary contacts ZJ5 and ZJ2 are respectively connected between a green lamp LD and a red lamp HD of an alarm lamp and the bus of the control power supply in the light-emitting circuit. The auxiliary experiment device can simultaneously simulate a failure starting contact, a repressing unlock contact and a bus tie breaker position contact in the failure protection debugging process of the breaker, and also can reliably return back within the set time, carries out automatic switching opening by an auxiliary experiment apparatus for breaker failure protection instead of a person. Thus, input of a worker is reduced, and the labor intensity of the worker is also reduced.

Description

Breaker fail protection assistant experiment device
Technical field
The present invention relates to a kind of breaker fail protection assistant experiment device.
Background technology
Along with intelligent grid great-leap-forward develops on a large scale, Wulumuqi Area power load constantly increased in recent years, more and more higher to power supply safety stability requirement.In electric system, because of transmission line of electricity or element fault, breaker failure tripping, while causing connected bus-bar fault, need excision or isolated fault point in time, guarantee the safety and stability continuous service of electric system.In order to guarantee the safe and stable operation of system, for important transformer station and 220kV and above transformer station, need to configure necessary breaker fail protection.
In order to guarantee power supply safety stability, guarantee breaker fail protection energy correct operation, circuit-breaker failure portection equipment is carried out to periodic inspection and just become particularly important.In checkout procedure in order to guarantee power supply reliability, often relevant primary equipment does not have a power failure, and need to open the peripheral loop relevant with operational outfit, avoid having influence on operational outfit, this time operational outfit switching value (switching value is a kind of digital quantity, its value is 0 or 1, circuit-breaker failure portection equipment needs malfunctioning startup, malfunctioning solution presses off the switching values such as lock and bus position again, the running status of judgment device is to complete its malfunctioning logic) cannot open into breaker failure device, artificially the method for short circuit realize open into, when intake is many, need many people to coordinate.This kind of method needs staff to open into accurate; open order, open in the angle of incidence, coordinate rigorous; but often because of indivedual switching values open into sequencing make mistakes or do not open into etc. reason cause the based Cb Failure Protection cannot follow procedure completion logic; the failure of an experiment; can only again test; thereby cause checking time to increase, extended failure protection idle time, reduced power supply safety stability.
Summary of the invention
The object of the present invention is to provide a kind of malfunctioning movable contact, multiple unblock contact and bus position contact of pressing of simultaneously simulating; also can reliably return at setting-up time, with breaker fail protection assistant experiment instrument replace people to automatically switch opening into breaker fail protection assistant experiment device.
The object of the present invention is achieved like this: it comprises illuminating circuit breaker fail protection assistant experiment device; relay ZJ, time relay sj; time relay sj, relay ZJ coil two ends are connected with control power source bus positive and negative terminal respectively, between relay ZJ and control power source bus positive terminal, are in series with auxiliary contact SJ1 parallel with one another and button SB1, SB2.The auxiliary contact ZJ1 of relay ZJ is series at time relay sj and controls the positive interpolar of power source bus, and auxiliary contact ZJ5, ZJ2 are series at respectively in illuminating circuit between alarm lamp green light LD and red light HD and control power source bus.
Owing to carrying out technique scheme; the application is in breaker fail protection debug process; not only can simulate malfunctioning movable contact, multiple unblock contact and the bus position contact of pressing simultaneously; also can reliably return at setting-up time; with breaker fail protection assistant experiment instrument replace people to automatically switch opening into; reduce staff's input, reduced staff's labour intensity.And this device opens order in switching value, open and coordinate rigorous, accurately in the angle of incidence, greatly improved the success ratio of breaker fail protection debugging, shortened failure protection down time, improved power supply reliability.
Accompanying drawing explanation: technical scheme of the present invention is provided by following drawings and Examples:
Fig. 1 is breaker fail protection assistant experiment device circuit figure.
Embodiment:
The present invention is not subject to the restriction of following embodiment, can determine concrete embodiment according to technical scheme of the present invention and actual conditions.
Embodiment: as shown in Figure 1; it comprises illuminating circuit breaker fail protection assistant experiment device; relay ZJ, time relay sj; time relay sj, relay ZJ coil two ends are connected with control power source bus positive and negative terminal respectively, between relay ZJ and control power source bus positive terminal, are in series with auxiliary contact SJ1 parallel with one another and button SB1, SB2.The auxiliary contact ZJ1 of relay ZJ is series at time relay sj and controls the positive interpolar of power source bus, and auxiliary contact ZJ5, ZJ2 are series at respectively in illuminating circuit between alarm lamp green light LD and red light HD and control power source bus.
ZJ1-5 is the auxiliary contact of two-position relay ZJ, and when the ZJ actuating of relay/involution, the state of ZJ1-5 switches (conducting/disconnection) thereupon.ZJ3 auxiliary contact two ends are connected to malfunctioning the opening into point of main transformer of breaker fail protection, and are in series with conversion handle SW1.The malfunctioning solution of main transformer that ZJ4 auxiliary contact two ends are connected to breaker fail protection presses off again lock and opens into point, and is in series with conversion handle SW2.
Time relay sj has auxiliary contact SJ1-3, and during the actuating of relay/involution, the state of SJ1-3 switches (conducting/disconnection) thereupon.SJ2 auxiliary contact two ends are connected to bus position in breaker fail protection and open into point, and are in series with conversion handle SW3.SJ3 auxiliary contact two ends are connected to reaying protection test instrument and can control test instrument and stop opening into point of output, and are in series with conversion handle SW4.
SW1-4, for conversion handle, controls this contact and whether accesses corresponding circuit.
Button SB1 presses off lock again for starting malfunctioning/malfunctioning solution; adopt involution button; after this button presses down, 1 positively charged, the now charged action of relay ZJ actuation coil; their corresponding normal opened contacts are closed; normally closed contact is opened (ZJ1-4 is closed, and ZJ5 opens, and red light HD is charged to be lighted); these corresponding contacts can be introduced to circuit-breaker failure portection equipment simulate the malfunctioning startup of main transformer, the malfunctioning solution of main transformer and press off again lock-switch amount and open into, control time relay SJ action message simultaneously.
SB2 button also adopts involution button; after this button presses down; 2 positively chargeds; the now charged action of relay ZJ involution coil; their corresponding normal opened contacts are opened, normally closed contact closed (ZJ1-4 opens, and green light LD is charged to be lighted); the breaker fail protection assistant experiment instrument that can reset, pilot relay ZJ and auxiliary contact return to original state.
Service condition: 1, Islqd (malfunctioning starting current) >Izd(setting valve), without the malfunctioning startup of main transformer open into, to press off lock again open, breaker fail protection is failure to actuate; In breaker fail protection, pass into normal busbar voltage; at main transformer branch road, pass into the secondary current that is greater than malfunctioning starting current setting valve; SJ time relay time of adjusting is 10 seconds, and SW1 is placed in and exits position, and SW2-4 is placed in and drops into position (the malfunctioning startup of main transformer branch road is failure to actuate).Press SB1 button; start ZJ relay; ZJ1-4 junction closure, ZJ5 open, start timing 10 seconds after SJ relay starting, when red, green light go out, breaker fail protection can not receive the malfunctioning startup of main transformer open in the situation that, breaker fail protection is failure to actuate.After 10 seconds, assistant experiment device is reset, and stops output.
,islqd (malfunctioning starting current) >Izd(setting valve), the malfunctioning startup of main transformer open into, to press off lock again open, breaker fail protection is failure to actuate; In breaker fail protection, pass into normal busbar voltage; at main transformer branch road, pass into the secondary current that is greater than malfunctioning starting current setting valve; SJ time relay time of adjusting is 10 seconds, and SW2 is placed in and exits position, and SW1, SW3, SW4 are placed in and drop into position (the malfunctioning solution of main transformer is pressed and is failure to actuate again).Press SB1 button; start ZJ relay; ZJ1-4 junction closure, ZJ5 open, start timing 10 seconds after SJ relay starting, when red, green light go out, breaker fail protection can not receive the malfunctioning solution of main transformer press off again lock open in the situation that, breaker fail protection is failure to actuate.After 10 seconds, assistant experiment device is reset, and reaying protection test instrument stops output.
,islqd (malfunctioning starting current) >Izd(setting valve), the malfunctioning startup of main transformer open into, to press off lock again open, 0.2 second breaker fail protection, with jumping main transformer branch road (malfunctioning branch road), returns with jumping successfully rear failure protection.In breaker fail protection, pass into normal busbar voltage, pass into the secondary current that is greater than malfunctioning starting current setting valve at main transformer branch road, the SJ time relay time of adjusting is 0.25 second, and SW1-4 is all placed in and drops into position.Press SB1 button, start ZJ relay, ZJ1-4 junction closure, ZJ5 open, SJ relay starts timing 0.25 second after starting, and when red, green light go out, in the time of 0.2 second, breaker fail protection is sent out with the instruction of jumping malfunctioning branch road.After 0.25 second, assistant experiment device is reset, reaying protection test instrument stops output.
,islqd (malfunctioning starting current) >Izd(setting valve), the malfunctioning startup of main transformer open into, to press off lock again open; within 0.2 second, breaker fail protection is unsuccessful with jumping main transformer branch road (malfunctioning branch road), within 0.3 second, jumps mother success, within 0.4 second, jumps malfunctioning bus.In breaker fail protection, pass into normal busbar voltage, pass into the secondary current that is greater than malfunctioning starting current setting valve at main transformer branch road, the SJ time relay time of adjusting is 0.35 second, and SW1-4 is all placed in and drops into position.Press SB1 button; start ZJ relay; ZJ1-4 junction closure, ZJ5 open, SJ relay starts timing 0.35 second after starting; when red, green light go out, in the time of 0.2 second, breaker fail protection is sent out with the instruction of jumping malfunctioning branch road; in the time of 0.3 second, send out and jump mother instruction, the SJ actuating of relay in the time of 0.35 second, ZJ relay involution coil motion, ZJ relay returns; ZJ1-4, SJ2-3 contact are by closing out, and assistant experiment device is reset, reaying protection test instrument stops output.Bus position is by closing variation, and fault is isolated.
,islqd (malfunctioning starting current) >Izd(setting valve), the malfunctioning startup of main transformer open into, to press off lock again open; 0.2 second breaker fail protection is unsuccessful with jumping main transformer branch road (malfunctioning branch road), within 0.3 second, jump mother unsuccessful, within 0.4 second, jump malfunctioning bus, within 0.5 second, jump another bus.In breaker fail protection, pass into normal busbar voltage, pass into the secondary current that is greater than malfunctioning starting current setting valve at main transformer branch road, the SJ time relay time of adjusting is 0.55 second, and SW1-4 is all placed in and drops into position.Press SB1 button; start ZJ relay; ZJ1-4 junction closure, ZJ5 open, SJ relay starts timing 0.35 second after starting; when red, green light go out, in the time of 0.2 second, breaker fail protection is sent out with jumping malfunctioning branch road unsuccessful (ZJ does not return); in the time of 0.3 second, send out and jump mother unsuccessful (SJ does not move); within 0.4 second, jump malfunctioning bus, 0. 5 seconds breaker fail protections are sent out and are jumped another bus instruction.The SJ actuating of relay in the time of 0.55 second, ZJ relay involution coil motion, ZJ relay returns, and ZJ1-4, SJ2-3 contact are by closing out, and assistant experiment device is reset, reaying protection test instrument stops output.
Above technical characterictic has formed most preferred embodiment of the present invention, and it has stronger adaptability and best implementation result, can increase and decrease according to actual needs inessential technical characterictic, meets the needs of different situations.

Claims (6)

1. a breaker fail protection assistant experiment device, it comprises illuminating circuit, relay ZJ, time relay sj, it is characterized in that: time relay sj, relay ZJ coil two ends are connected with control power source bus positive and negative terminal respectively, between relay ZJ and control power source bus positive terminal, be in series with auxiliary contact SJ1 parallel with one another and button SB1, SB2, the auxiliary contact ZJ1 of relay ZJ is series at time relay sj and controls the positive interpolar of power source bus, auxiliary contact ZJ5, ZJ2 is series at respectively in illuminating circuit alarm lamp green light LD and red light HD and controls between power source bus, ZJ1-5 is the auxiliary contact of two-position relay ZJ, time relay sj has auxiliary contact SJ1-3.
2. breaker fail protection assistant experiment device as claimed in claim 1, is characterized in that: ZJ3 auxiliary contact two ends are connected to malfunctioning the opening into point of main transformer of breaker fail protection, and are in series with handle SW1.
3. breaker fail protection assistant experiment device as claimed in claim 1, is characterized in that: the malfunctioning solution of main transformer that ZJ4 auxiliary contact two ends are connected to breaker fail protection presses off again lock and opens into point, and is in series with handle SW2.
4. breaker fail protection assistant experiment device as claimed in claim 1, is characterized in that: SJ2 auxiliary contact two ends are connected to bus position in breaker fail protection and open into point, and is in series with handle SW3.
5. breaker fail protection assistant experiment device as claimed in claim 1, is characterized in that: SJ3 auxiliary contact two ends are connected to reaying protection test instrument and can control test instrument and stop opening into point of output, and are in series with handle SW4.
6. breaker fail protection assistant experiment device as claimed in claim 1, is characterized in that: button SB1,2 presses off lock again for starting malfunctioning/malfunctioning solution, adopts involution button.
CN201310702652.5A 2013-12-19 2013-12-19 Auxiliary experiment device for breaker failure protection Pending CN103630789A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310702652.5A CN103630789A (en) 2013-12-19 2013-12-19 Auxiliary experiment device for breaker failure protection

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310702652.5A CN103630789A (en) 2013-12-19 2013-12-19 Auxiliary experiment device for breaker failure protection

Publications (1)

Publication Number Publication Date
CN103630789A true CN103630789A (en) 2014-03-12

Family

ID=50212043

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310702652.5A Pending CN103630789A (en) 2013-12-19 2013-12-19 Auxiliary experiment device for breaker failure protection

Country Status (1)

Country Link
CN (1) CN103630789A (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105261160A (en) * 2015-11-23 2016-01-20 国网辽宁省电力有限公司营口供电公司 Synthesized alarming system of miniature transformer station
CN105891639A (en) * 2016-04-22 2016-08-24 邹平县供电公司 Method of using peripheral control circuit to indicate starting of leakage protector test
CN105954626A (en) * 2016-06-22 2016-09-21 国网山东省电力公司莱芜供电公司 Portable microcomputer bus protection apparatus tester
CN106093761A (en) * 2016-06-06 2016-11-09 中国南方电网有限责任公司超高压输电公司 Extra-high voltage direct-current by-pass switch position judging method and device
CN106353672A (en) * 2016-08-19 2017-01-25 苏州宝化炭黑有限公司 Judging device for switch malfunction of operating post
CN106597208A (en) * 2017-01-24 2017-04-26 国网河南省电力公司安阳供电公司 Breaker failure start loop detection device and method
CN108020738A (en) * 2017-11-27 2018-05-11 国网安徽省电力公司黄山供电公司 A kind of hard pressing plate verification auxiliary control device of substation
CN110542826A (en) * 2019-09-23 2019-12-06 深圳供电局有限公司 On-site calibration method for failure protection starting circuit of power grid transmission line breaker

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5939602A (en) * 1995-06-06 1999-08-17 Novartis Finance Corporation DNA molecules encoding plant protoporphyrinogen oxidase and inhibitor-resistant mutants thereof
CN2844939Y (en) * 2005-11-17 2006-12-06 大庆石油管理局 Relay protection debugging load device
CN101430359A (en) * 2008-12-12 2009-05-13 宁夏电力公司吴忠供电局 Test switch simulation apparatus for automatic standby power switch equipment
CN202218008U (en) * 2011-08-12 2012-05-09 贵州电力试验研究院 Connecting structure for main transformer station failure starter and re-pressing interlock reliever
CN203929907U (en) * 2013-12-19 2014-11-05 国家电网公司 Breaker fail protection assistant experiment device

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5939602A (en) * 1995-06-06 1999-08-17 Novartis Finance Corporation DNA molecules encoding plant protoporphyrinogen oxidase and inhibitor-resistant mutants thereof
CN2844939Y (en) * 2005-11-17 2006-12-06 大庆石油管理局 Relay protection debugging load device
CN101430359A (en) * 2008-12-12 2009-05-13 宁夏电力公司吴忠供电局 Test switch simulation apparatus for automatic standby power switch equipment
CN202218008U (en) * 2011-08-12 2012-05-09 贵州电力试验研究院 Connecting structure for main transformer station failure starter and re-pressing interlock reliever
CN203929907U (en) * 2013-12-19 2014-11-05 国家电网公司 Breaker fail protection assistant experiment device

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105261160A (en) * 2015-11-23 2016-01-20 国网辽宁省电力有限公司营口供电公司 Synthesized alarming system of miniature transformer station
CN105261160B (en) * 2015-11-23 2017-03-22 国网辽宁省电力有限公司营口供电公司 Synthesized alarming system of miniature transformer station
CN105891639A (en) * 2016-04-22 2016-08-24 邹平县供电公司 Method of using peripheral control circuit to indicate starting of leakage protector test
CN105891639B (en) * 2016-04-22 2018-09-25 邹平县供电公司 It is a kind of instruction earth leakage protective device experiment peripheral control circuits, test method
CN106093761A (en) * 2016-06-06 2016-11-09 中国南方电网有限责任公司超高压输电公司 Extra-high voltage direct-current by-pass switch position judging method and device
CN106093761B (en) * 2016-06-06 2018-09-11 中国南方电网有限责任公司超高压输电公司 Extra-high voltage direct-current by-pass switch position judging method and device
CN105954626A (en) * 2016-06-22 2016-09-21 国网山东省电力公司莱芜供电公司 Portable microcomputer bus protection apparatus tester
CN106353672A (en) * 2016-08-19 2017-01-25 苏州宝化炭黑有限公司 Judging device for switch malfunction of operating post
CN106353672B (en) * 2016-08-19 2024-02-27 苏州宝化炭黑有限公司 Operation column switch failure judgment device
CN106597208A (en) * 2017-01-24 2017-04-26 国网河南省电力公司安阳供电公司 Breaker failure start loop detection device and method
CN108020738A (en) * 2017-11-27 2018-05-11 国网安徽省电力公司黄山供电公司 A kind of hard pressing plate verification auxiliary control device of substation
CN110542826A (en) * 2019-09-23 2019-12-06 深圳供电局有限公司 On-site calibration method for failure protection starting circuit of power grid transmission line breaker

Similar Documents

Publication Publication Date Title
CN103630789A (en) Auxiliary experiment device for breaker failure protection
CN101430359B (en) Test switch simulation apparatus for automatic standby power switch equipment
CN102072997B (en) Spare automatic switching logic test method for checking main transformer mutual switching mode
CN201909821U (en) Spare power automatic switching device tester
CN101009179A (en) Simple and convenient analog breaker circuit
CN103683176A (en) Automatic reclosing lock device of intelligent circuit breaker
CN105334417A (en) Portable spare power automatic switching check device
CN211826183U (en) Novel simple simulation circuit breaker
CN204481568U (en) A kind of power plant is standby throws protective device
CN106291141B (en) Automatic phase sequence identification device for three-phase power supply on construction site
CN203929907U (en) Breaker fail protection assistant experiment device
CN104034987A (en) Analog breaker
CN114089179A (en) Remote control testing device for automatic distribution network terminal circuit breaker
CN104155550A (en) Portable power switch state simulation testing device
CN102842951B (en) Low voltage loop-closing selective-tripping system
CN203350305U (en) Analog circuit breaker
CN201392370Y (en) Mimic-disconnecting switch used for protecting tester
CN201311471Y (en) Supplementary power automatic input equipment test switch simulator
CN206321718U (en) A kind of simple mimic-disconnecting switch
CN111929574B (en) Relay protection test auxiliary simulator
CN203352275U (en) Stand-by power source automatic throw-in device transmission testing instrument
CN205120850U (en) Primary equipment of transformer substation state analogue means
CN104569802B (en) A kind of intelligent substation debugging system and a disconnecting switch analog machine
CN203645293U (en) Automatic reconnecting device of intelligent breaker
CN203039356U (en) 10kV inlet wire protection monitoring device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20140312