CN103613003A - Pulley-type suspension device of large load high-place operation nacelle - Google Patents
Pulley-type suspension device of large load high-place operation nacelle Download PDFInfo
- Publication number
- CN103613003A CN103613003A CN201310414244.XA CN201310414244A CN103613003A CN 103613003 A CN103613003 A CN 103613003A CN 201310414244 A CN201310414244 A CN 201310414244A CN 103613003 A CN103613003 A CN 103613003A
- Authority
- CN
- China
- Prior art keywords
- pulley
- suspension
- hitch
- large load
- nacelle
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 239000000725 suspension Substances 0.000 title claims abstract description 34
- 239000002965 rope Substances 0.000 claims abstract description 34
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 23
- 239000010959 steel Substances 0.000 claims abstract description 23
- 241001236653 Lavinia exilicauda Species 0.000 claims description 27
- 238000009434 installation Methods 0.000 claims description 8
- 230000005540 biological transmission Effects 0.000 claims description 5
- 238000010276 construction Methods 0.000 abstract description 2
- 239000007787 solid Substances 0.000 description 2
- 238000004804 winding Methods 0.000 description 2
- 241001236644 Lavinia Species 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
Abstract
The invention provides a pulley-type suspension device of a large load high-place operation nacelle. The suspension device comprises a suspension mechanism and an elevator mounting rack. The suspension mechanism is composed of a pulley, suspension racks, connection sleeves, front beams, upper standing columns, inserted links, a front base, middle beams, obliquely-drawn steel wire ropes, rope sheaves, back beams, a back base and balancing weights. The suspension mechanism is arranged in a parallel structure. The mounting rack is composed of a safe lock mounting clamp, a safe lock guide rope sheave, an elevator mounting clamp, a crossbeam and a standing column. The mounting rack and the suspension mechanism form a whole suspension device. In the suspension device, through reasonable arrangement and structural design, the loading condition of the suspension mechanism is improved through the pulley, the problems caused by designed three-suspension or multi-suspension complex platform structures because of insufficient strengthen of a suspension mechanism of a large load nacelle is solved, and the self weight of nacelle structure is reduced. Compared with existing suspension mechanisms, the suspension device is convenient to disassemble and assemble, has a simple in structure and good mechanical properties, and can meet construction requirements of a large load high-place operation nacelle to a greater extent.
Description
Technical field
The present invention relates to aerial work basket pulley-type suspension gear in technical field of buildings, especially relate to large load, large span aerial work basket for the aerial work basket pulley-type suspension gear of large load high-rise working.
Background technology
Along with the fast development of the industries such as China's building curtain wall, Steel Structure Installation, aerial work basket is as the important component part of high-altitude construction equipment, and the use in the building operation such as curtain wall installation, elevator installation is increasingly extensive.At present, the curtain wall that monolithic weight surpasses 500kg increases gradually, and the load-carrying capacity of domestic existing aerial work basket is mostly between 250kg ~ 800kg, the large load aerial work basket that load carrying ability surpasses 3000kg still belongs to blank, outstanding day by day to the demand of large load aerial work basket.Suspension gear, as the anchor fitting of the whole equipment of aerial work basket, bears main working load, reliability and security when its structural strength and rigidity are determining aerial work basket work.The present invention carries out innovative design to important load bearing component suspension gear, meeting on the whole basis requiring, obtain improved pulley-type hitch device, for research and development and the technological advance of large load aerial work basket lays the foundation, the design and R&D of like product is had to certain directive significance.
Summary of the invention
The object of this invention is to provide a kind of large load aerial work basket pulley-type suspension gear, it is applicable to large load, large span aerial work basket.
For achieving the above object, the present invention is achieved through the following technical solutions the present invention:
Hitch is mainly comprised of pulley, hanger bracket, adapter sleeve, front-axle beam, upper pillar stand, inserted link, front stall, central sill, oblique pull steel rope, rope sheave, the back rest, back seat, counterweight; Elevator mounting frame is mainly comprised of safety lock mounting clamp, safety lock sheave, steel rope tight pulley, hoist installation folder, crossbeam and column.It is characterized in that: the load cable passing from gig during work is walked around the pulley of safety lock sheave and hitch front-axle beam and is fixed on elevator mounting frame steel rope tight pulley and clips with rope clamp, motor drives friction wheel rotating by transmission device, force the dynamic load of gig band upwards climb or move downward along steel rope along steel rope, realize the lifting of high-rise working suspension platform.
Before hitch, two groups of hanger brackets of beam end are bolted, while being fixed on elevator mounting frame steel rope tight pulley when the load cable passing from gig is walked around the pulley of safety lock sheave and hitch front-axle beam, application fixed pulley component principle, to outside mechanism, carry and be uniformly distributed in hitch frame, reach and improve hitch stressing conditions, improve the object of hitch load-carrying capacity.
Compared with prior art, the present invention has the following advantages and effect:
the hitch of the present invention's design, by rational deployment, utilizes the principle of pulley component, reduces the external bearer of single traditional hitch and single wire rope, has improved the intensity of suspension gear;
by the layout of hitch and erecting frame, solved large load hanging basket because of three suspension centres or many suspension centres complex platform structure problem that hitch undercapacity designs, platform structure is simplified, alleviated the deadweight of barrel structure;
suspension gear has the features such as easy accessibility, structure stress is good, synchronism is strong, improves more the lifting load ability of aerial work basket.
Accompanying drawing explanation
Fig. 1 aerial work basket pulley-type of the present invention hitch whole 3D solid structural representation of constructing.
Fig. 2 aerial work basket pulley-type of the present invention hitch 3D solid structural representation.
The concrete schematic layout pattern of Fig. 3 middle pulley of the present invention.
The front stall scheme of installation of hitch in Fig. 4 the present invention.
In Fig. 5 the present invention, steel rope is at erecting frame schematic layout pattern.
The specific embodiment
In Fig. 1, aerial work basket is divided into five major parts, is respectively hitch 20, safety lock 22, elevator mounting frame 23, gig 24 and suspension platform 25.Two groups of pulley-type hitches and suspension platform reasonable Arrangement during work, the load cable 21 passing from gig is walked around the pulley of safety lock sheave and hitch front-axle beam and is fixed on elevator mounting frame steel rope tight pulley and clips with rope clamp, motor drives friction wheel rotating by transmission device, force the dynamic load of gig band upwards climb or move downward along steel rope along steel rope, realize the lifting of aerial work basket suspension platform.Because load cable is walked around the pulley of hitch front-axle beam, half that the speed that load is risen and declined is Hoist Speed, thus reduced dynamic impulsion platform structure being brought because hoisting, braking.
As hitch in Fig. 2 is comprised of pulley 1, hanger bracket 2, adapter sleeve 3, front-axle beam 4, upper pillar stand 5, inserted link 6, front stall 7, central sill 8, oblique pull steel rope 9, rope sheave 10, the back rest 11, back seat 12, counterweight 13.A pulley 1 is settled in two groups of structure front-axle beam placed side by side 4 ends, 2 of two hanger brackets of pulley 1 and front-axle beam 4 ends are with bolts, the load cable passing from gig during work is walked around the pulley of hitch front-axle beam 1 and is fixed on elevator mounting frame, motor drives friction wheel rotating by transmission device, force the dynamic load of gig band upwards climb or move downward along steel rope along steel rope, realize the lifting of high-rise working suspension platform.
If Fig. 3 is the concrete schematic layout pattern of pulley, the fixed pulley 1 of winding work steel rope is connected with hanger bracket 2 by bolt, and hanger bracket 2 is also bolted with front-axle beam 4, and this layout can complete the transmission of power well.
As the front stall scheme of installation that Fig. 4 is hitch, inserted link 6 inserts front stall 7, with bolts.Standard is simple, easy to operate.
If Fig. 5 is elevator mounting frame schematic diagram, mainly by hoist installation folder 14, safety lock sheave 15, steel rope tight pulley 16, column 17, crossbeam 18 and safety lock mounting clamp 19, formed.The load cable passing from gig is walked around safety lock sheave 15, through safety lock, walk around again the pulley of hitch front-axle beam and get back to erecting frame steel rope tight pulley 16, utilize rope clamp to clamp, structure has been avoided the mutual winding of load cable, reduce the bearing load of single wire rope, when being beneficial to platform safety lifting, improved the life-span of steel rope.After all parts are got all the ready, with reference to accompanying drawing, install.
Claims (2)
1. large load aerial work basket pulley-type suspension gear, it comprises hitch and elevator mounting frame, and hitch is mainly comprised of pulley (1), hanger bracket (2), adapter sleeve (3), front-axle beam (4), upper pillar stand (5), inserted link (6), front stall (7), central sill (8), oblique pull steel rope (9), rope sheave (10), the back rest (11), back seat (12), counterweight (13); Elevator mounting frame is mainly comprised of safety lock mounting clamp (14), safety lock sheave (15), steel rope tight pulley (16), hoist installation folder (17), crossbeam (18) and column (19), it is characterized in that: during work, the pulley (1) that the load cable passing from gig is walked around safety lock sheave (15) and hitch front-axle beam is fixed on elevator mounting frame tight pulley (16), and utilizes rope clamp to clamp; Work drive motor drives friction wheel rotating by transmission device, makes gig band moving platform upwards climb or move downward along steel rope, realizes the lifting of high-rise working suspension platform.
2. large load aerial work basket pulley-type suspension gear according to claim 1, it is characterized in that: front-axle beam (4) the two groups of hanger brackets in end (2) are bolted, steel rope rope sheave is arranged between two groups of hanger brackets (2), realize uniform minute of bear external force in two groups of tradition hitch frames, reach the object of improving hitch structure stress.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310414244.XA CN103613003A (en) | 2013-09-12 | 2013-09-12 | Pulley-type suspension device of large load high-place operation nacelle |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310414244.XA CN103613003A (en) | 2013-09-12 | 2013-09-12 | Pulley-type suspension device of large load high-place operation nacelle |
Publications (1)
Publication Number | Publication Date |
---|---|
CN103613003A true CN103613003A (en) | 2014-03-05 |
Family
ID=50163733
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310414244.XA Pending CN103613003A (en) | 2013-09-12 | 2013-09-12 | Pulley-type suspension device of large load high-place operation nacelle |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103613003A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104495646A (en) * | 2014-12-31 | 2015-04-08 | 徐州建机工程机械有限公司 | Novel tower crane balance arm pull rod structure |
CN105152052A (en) * | 2015-09-22 | 2015-12-16 | 中国三冶集团有限公司 | Glass curtain wall component lifting device and glass curtain wall component installing method |
CN106437124A (en) * | 2016-08-24 | 2017-02-22 | 无锡科通工程机械制造有限公司 | Adjustable large-scale hanging basket device |
CN110424689A (en) * | 2019-07-22 | 2019-11-08 | 东莞市建工集团有限公司 | A kind of Environment-friendlyexterior exterior wall paint constructing device and its construction technology |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102009930A (en) * | 2010-12-01 | 2011-04-13 | 沈阳建筑大学 | Installation rack for height operation platform elevator |
CN202080836U (en) * | 2011-04-13 | 2011-12-21 | 无锡市小天鹅建筑机械有限公司 | Material lifting equipment for aerial operation |
CN102556878A (en) * | 2010-12-31 | 2012-07-11 | 葫芦岛市凯斯科技发展有限公司 | Lifting basket for special corners |
CN102602797A (en) * | 2012-03-24 | 2012-07-25 | 无锡久一重工机械有限公司 | Lifting frame for lifting basket |
CN102616673A (en) * | 2012-04-14 | 2012-08-01 | 无锡科通工程机械制造有限公司 | Chimney electric baskets of power generation project |
CN102951545A (en) * | 2011-08-24 | 2013-03-06 | 天津市庆泰建筑机械有限公司 | Connecting piece for fixing safety lock on hanging basket |
CN203048464U (en) * | 2013-01-11 | 2013-07-10 | 江苏申锡建筑机械有限公司 | Multifunctional hoisting device |
-
2013
- 2013-09-12 CN CN201310414244.XA patent/CN103613003A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102009930A (en) * | 2010-12-01 | 2011-04-13 | 沈阳建筑大学 | Installation rack for height operation platform elevator |
CN102556878A (en) * | 2010-12-31 | 2012-07-11 | 葫芦岛市凯斯科技发展有限公司 | Lifting basket for special corners |
CN202080836U (en) * | 2011-04-13 | 2011-12-21 | 无锡市小天鹅建筑机械有限公司 | Material lifting equipment for aerial operation |
CN102951545A (en) * | 2011-08-24 | 2013-03-06 | 天津市庆泰建筑机械有限公司 | Connecting piece for fixing safety lock on hanging basket |
CN102602797A (en) * | 2012-03-24 | 2012-07-25 | 无锡久一重工机械有限公司 | Lifting frame for lifting basket |
CN102616673A (en) * | 2012-04-14 | 2012-08-01 | 无锡科通工程机械制造有限公司 | Chimney electric baskets of power generation project |
CN203048464U (en) * | 2013-01-11 | 2013-07-10 | 江苏申锡建筑机械有限公司 | Multifunctional hoisting device |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104495646A (en) * | 2014-12-31 | 2015-04-08 | 徐州建机工程机械有限公司 | Novel tower crane balance arm pull rod structure |
CN105152052A (en) * | 2015-09-22 | 2015-12-16 | 中国三冶集团有限公司 | Glass curtain wall component lifting device and glass curtain wall component installing method |
CN106437124A (en) * | 2016-08-24 | 2017-02-22 | 无锡科通工程机械制造有限公司 | Adjustable large-scale hanging basket device |
CN110424689A (en) * | 2019-07-22 | 2019-11-08 | 东莞市建工集团有限公司 | A kind of Environment-friendlyexterior exterior wall paint constructing device and its construction technology |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101537976B (en) | Dual-tower-mast giant self-lifting crane and following-carrying lifting method thereof | |
CN103613003A (en) | Pulley-type suspension device of large load high-place operation nacelle | |
EP3569550B1 (en) | Lift | |
CN102198914A (en) | Working platform for installing wind generating set | |
CN201376848Y (en) | Large-scale double-tower automatic-elevation hoisting equipment | |
CN201713229U (en) | Steel box girder cable-loaded crane for suspension bridge construction | |
CN103288002A (en) | Simple combination portal upper-air heavy-article hoisting device | |
CN201786010U (en) | Elevating platform for construction use | |
CN203284126U (en) | Simple composite gantry high-altitude weight hoisting device | |
CN105173983A (en) | People and goods dual-purpose vertical-transportation building construction elevator | |
CN201385974Y (en) | Overhead traction-driven construction elevator | |
CN206667458U (en) | The constructing device of vestibule system steel structure girder | |
CN203451184U (en) | Large-load high-position operation hanging basket suspension mechanism | |
CN109969912A (en) | A kind of elevator of double counterweight hangings | |
CN106861882A (en) | The method that ball mill has bad luck lifting in building | |
CN210480530U (en) | Elevator shaft traction overhead two-to-one suspension ratio construction elevator | |
CN205873739U (en) | Tower machine structure and tower machine that climbs for super high -rise building | |
CN101863423B (en) | Steel box beam cable carrying lifter for construction of suspension bridge | |
CN204474224U (en) | There is the steel rope double end anchor fitting of micro-equilibrium function | |
CN110185250A (en) | A kind of nacelle construction device | |
CN201850027U (en) | Traction passenger elevator without counter weight | |
CN205099168U (en) | Elevator without engine room | |
CN204676872U (en) | A kind of lifting scaffold hoisting mechanism | |
CN203383494U (en) | Hanging basket balance weight supporting structure | |
CN216787879U (en) | Interlayer complex special-shaped aluminum veneer curtain wall construction structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C12 | Rejection of a patent application after its publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20140305 |