CN103590595B - Detachable welding operation platform - Google Patents
Detachable welding operation platform Download PDFInfo
- Publication number
- CN103590595B CN103590595B CN201310625212.4A CN201310625212A CN103590595B CN 103590595 B CN103590595 B CN 103590595B CN 201310625212 A CN201310625212 A CN 201310625212A CN 103590595 B CN103590595 B CN 103590595B
- Authority
- CN
- China
- Prior art keywords
- corner bracket
- supporter
- angle steel
- otic placode
- link
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000003466 welding Methods 0.000 title claims abstract description 25
- 238000003032 molecular docking Methods 0.000 claims abstract description 15
- 229910000831 Steel Inorganic materials 0.000 claims description 41
- 239000010959 steel Substances 0.000 claims description 41
- 230000008901 benefit Effects 0.000 abstract description 3
- 230000003014 reinforcing effect Effects 0.000 description 5
- 238000010586 diagram Methods 0.000 description 3
- 238000000034 method Methods 0.000 description 3
- 238000005452 bending Methods 0.000 description 2
- 239000002184 metal Substances 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000037237 body shape Effects 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 238000000354 decomposition reaction Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 238000000465 moulding Methods 0.000 description 1
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The invention provides a kind of detachable welding operation platform, comprising: is connected also vertical the first supporter of placing and the second supporter respectively with the beam body of required docking, and across the landing slab be arranged between the first supporter and the second supporter.The first corner bracket that first supporter and the second supporter are all identical by structure and the second corner bracket mutually dock and form.First corner bracket and the second corner bracket dock thus form the strong point, and beam body is connected with the strong point.The present invention while quick flexible assembling, for staff provides a stable lifting docking operation environment.Advantage of the present invention: structure is simple, safety and stability.
Description
Technical field
The present invention relates to a kind of jig system, particularly relate to a kind of detachable welding operation platform for long-span steel pipe docking.
Background technology
Current large-span steel pipe truss wants segmental hoisting, overhead connection to connect usually, needs to weld the end of two sections of truss, now for ease of operative, just need to arrange overhead welding temporary operating platform after aerial docking.
The usual way of overhead welding operating platform has two kinds:
Way be the reinforcing cage that adopts the rod member such as reinforcing bar weld to be formed as an operating desk, single reinforcing cage is wherein suspended on steel pipe truss or two reinforcing cages connect the both sides riding over steel pipe truss by rod member, and this just makes operating desk stability be difficult to guarantee;
Another kind of way is welded on steel pipe truss by the operating desk that reinforcing cage is formed again.Although this kind of way ensure that the stability of operating desk to a certain extent, because a large amount of welding processes can make steel pipe truss mother metal be easy to sustain damage, and in fact, the dismounting dumb also uneconomical in fact of this type of operating desk.
Lack one at present and can ensure the stability of operating platform own, high-altitude operation platform agent structure mother metal being caused to welding damage can be reduced again.
Summary of the invention
For overcoming the defect existing for prior art, now provide a kind of detachable welding operation platform, while quick flexible assembling, for staff provides a stable lifting docking operation environment.Platform comprises: be connected with the two ends of the beam body of required docking respectively and vertical the first supporter of placing and the second supporter; And across the landing slab be arranged between the first supporter and the second supporter.
Beneficial effect of the present invention is:
1) draw materials at any time and to utilize in construction very general angle steel as support, and form the structure of similar truss;
2) between tripod, flat board can be laid fast, to form platform;
3) connect each assembly by quick bolt, avoid welding damage.
The further improvement of the present invention's detachable welding operation platform is,
The first corner bracket that first supporter and the second supporter are all identical by structure and the second corner bracket mutually dock and form;
First corner bracket and the second corner bracket dock thus form the strong point, and the two ends of beam body are connected with the strong point.
The further improvement of the present invention's detachable welding operation platform is,
First corner bracket and the second corner bracket comprise the first angle steel, the second angle steel and diagonal member respectively, and are connected to form a triangle body;
First angle steel horizontal positioned also has the first link and the second link;
Second angle steel is vertically placed and is had upper link and lower link, and the first link of lower link and the first angle steel is affixed;
The two ends of diagonal member are connected with the second link and upper link respectively.
The further improvement of the present invention's detachable welding operation platform is,
Landing slab through triangle body, and is placed on the first angle steel;
The two ends of the second angle steel are provided with Bolted angle connection hole, and the first corner bracket is connected by Bolted angle connection hole bolt with the second corner bracket.
The further improvement of the present invention's detachable welding operation platform is,
Otic placode and the docking of the second engaging lug crab bolt is connected by first between first corner bracket and the second corner bracket;
First connects otic placode is connected with the Bolted angle connection hole of the second angle steel upper end, to form the described strong point;
Second connects otic placode is connected with the Bolted angle connection hole of the second angle steel lower end;
Beam body is connected otic placode with first and connects.
The further improvement of the present invention's detachable welding operation platform is,
First connection otic placode is connected otic placode and is provided with the otic placode connecting hole consistent with Bolted angle connection hole hole count with second.
Advantage of the present invention: structure is simple, safety and stability.
Accompanying drawing explanation
Fig. 1 is the overall structure schematic diagram of the detachable welding operation platform of the present invention;
Fig. 2 is the STRUCTURE DECOMPOSITION schematic diagram of the detachable welding operation platform of the present invention;
Fig. 3 is the supporting frame schematic diagram of the detachable welding operation platform of the present invention.
Detailed description of the invention
For the benefit of to the understanding of structure of the present invention, be described below in conjunction with drawings and Examples.
With reference to shown in Fig. 1, the invention provides a kind of detachable welding operation platform, while quick flexible assembling, for staff provides a stable lifting docking operation environment.Platform comprises: be vertically positioned over bottom surface supporting component 2, for supporting whole platform; And by the bottom deck assembly 3 that supporting component 2 tiling is arranged, supporting component 2 is fixed and supports the required beam body 1 docked.
Below the comparatively preferred vibrational power flow of the present invention:
Shown in composition graphs 1 to Fig. 3, supporting component 2 is made up of two supporters 20 being connected to beam body 1 two ends, is respectively the first supporter and the second supporter, arranges bottom deck assembly 30 between the first supporter and the second supporter, is specially two pieces of landing slabs.
The structure of two supporters 20 is identical, is docked respectively form by two corner brackets.Wherein, corner bracket specifically comprise horizontal positioned the first angle steel 201, the second angle steel 202 vertically placed and respectively with the diagonal member 203 of the first angle steel 201 and the second Bolted angle connection.First angle steel 201 has the first link and the second link, and the second angle steel 202 has upper link and lower link, lower link and the first link affixed.Two angle steel affixed can one bending is affixed forms, also can be previously be welded.
The two ends of diagonal member 203 are connected with the upper link of the second angle steel 202 and the second link of the first angle steel 201 respectively, with this, form a triangle body.Bottom deck assembly 30, namely two pieces of landing slabs, through triangle body, and be all placed on the first angle steel.
The lower end of vertical angle steel is provided with row's Bolted angle connection hole 204, and the upper end of vertical angle steel is provided with row's Bolted angle connection hole 205 equally.Otic placode 206 bolt can be connected by second between the tripod of docking to connect, also directly can carry out bolt docking.Second connection otic placode 206 offers the otic placode connecting hole 207 consistent with Bolted angle connection hole 204 hole count.
And the beam body 1 of required lifting docking, then the strong point formed after otic placode 10 is fixedly connected on the docking of bipod support body is connected by first in Fig. 2.First connects the lower end that otic placode 10 is arranged at beam body 1.
Below specific embodiment of the invention process:
With welding or affixed two angle steel of mode of bending and molding, two angle steel are mutually vertical, form first angle steel 201 and second angle steel 202 of Fig. 3, and weld a diagonal member 203.Offer row's Bolted angle connection hole respectively at the upper and lower side of the second angle steel 202, be the Bolted angle connection hole 204 in Fig. 3 and Bolted angle connection hole 205.Thus, the corner bracket of two triangle body shapes is formed.
Afterwards, first arrange one second in the position, Bolted angle connection hole 204 of triangle support body lower end and connect otic placode 206, and by this second connection otic placode 206, bolt docks two corner brackets, like this, just defines an independently supporter 20.Arrange parallel for two identical supporters 20 again, just form the first supporter in Fig. 2 and the second supporter.Finally, the supporter 20 arranged lays landing slab 30, landing slab 30, through the triangle body in corner bracket, is stood for during operated by personnel.
After supporting component 2 is provided with, first at the both sides, lower end of required lifting docking beam body 1 affixed one first connection otic placode 10 respectively.Then, staff, on landing slab 30, is bolted the position, Bolted angle connection hole 205 in corner bracket upper end first of both sides the connection otic placode 10 respectively, completes whole implementation process with this.
Below embodiment is to invention has been detailed description by reference to the accompanying drawings, and those skilled in the art can make many variations example to the present invention according to the above description.Thus, some details in embodiment should not form limitation of the invention, the present invention by the scope that defines using appended claims as protection domain.
Claims (5)
1. a detachable welding operation platform, is characterized in that, comprising:
Be connected with the beam body of required docking respectively and vertical the first supporter of placing and the second supporter, the first corner bracket that described first supporter and described second supporter are all identical by structure and the second corner bracket mutually dock and form, described first corner bracket and described second corner bracket dock thus form the strong point, and described beam body is connected with the described strong point; And
Across the landing slab be arranged between described first supporter and the second supporter.
2. detachable welding operation platform according to claim 1, is characterized in that,
Described first corner bracket and the second corner bracket comprise the first angle steel, the second angle steel and diagonal member respectively, and are connected to form a triangle body;
Described first angle steel horizontal positioned also has the first link and the second link;
Described second angle steel is vertically placed and is had upper link and lower link, and the first link of described lower link and described first angle steel is affixed;
The two ends of described diagonal member are connected with described second link and described upper link respectively.
3. detachable welding operation platform according to claim 2, is characterized in that:
Described landing slab through described triangle body, and is placed on described first angle steel;
The two ends of described second angle steel are provided with Bolted angle connection hole, and described first corner bracket is connected by described Bolted angle connection hole bolt with the second corner bracket.
4. detachable welding operation platform according to claim 3, is characterized in that:
Otic placode and the docking of the second engaging lug crab bolt is connected by first between described first corner bracket and the second corner bracket;
Described first connects otic placode is connected with the Bolted angle connection hole of the second angle steel upper end, to form the described strong point;
Described second connects otic placode is connected with the Bolted angle connection hole of described second angle steel lower end;
Described beam body and described first is connected otic placode and connects.
5. detachable welding operation platform according to claim 4, is characterized in that:
Described first connection otic placode is connected otic placode and is all provided with the otic placode connecting hole consistent with described Bolted angle connection hole hole count with second.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201310625212.4A CN103590595B (en) | 2013-11-28 | 2013-11-28 | Detachable welding operation platform |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201310625212.4A CN103590595B (en) | 2013-11-28 | 2013-11-28 | Detachable welding operation platform |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN103590595A CN103590595A (en) | 2014-02-19 |
| CN103590595B true CN103590595B (en) | 2015-11-18 |
Family
ID=50080895
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201310625212.4A Active CN103590595B (en) | 2013-11-28 | 2013-11-28 | Detachable welding operation platform |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN103590595B (en) |
Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2006070485A (en) * | 2004-08-31 | 2006-03-16 | Kunimoto Co Ltd | Scaffold plate support bracket |
| CN102489904A (en) * | 2011-11-14 | 2012-06-13 | 铜陵市弘润机电有限责任公司 | Welding support |
| CN102817468A (en) * | 2012-08-15 | 2012-12-12 | 中建钢构有限公司 | Portable detachable structural steel operating platform |
| CN202745352U (en) * | 2012-05-24 | 2013-02-20 | 浙江精工钢结构有限公司 | Combined-type high-altitude operation platform easy for assembly and disassembly |
| CN202954551U (en) * | 2012-12-05 | 2013-05-29 | 中建六局建设发展有限公司 | Simple steel reinforcement cage for high-altitude welding |
| CN203223003U (en) * | 2013-05-08 | 2013-10-02 | 北京城建精工钢结构工程有限公司 | Detachable triangular jig frame for steel truss assembling |
-
2013
- 2013-11-28 CN CN201310625212.4A patent/CN103590595B/en active Active
Patent Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2006070485A (en) * | 2004-08-31 | 2006-03-16 | Kunimoto Co Ltd | Scaffold plate support bracket |
| CN102489904A (en) * | 2011-11-14 | 2012-06-13 | 铜陵市弘润机电有限责任公司 | Welding support |
| CN202745352U (en) * | 2012-05-24 | 2013-02-20 | 浙江精工钢结构有限公司 | Combined-type high-altitude operation platform easy for assembly and disassembly |
| CN102817468A (en) * | 2012-08-15 | 2012-12-12 | 中建钢构有限公司 | Portable detachable structural steel operating platform |
| CN202954551U (en) * | 2012-12-05 | 2013-05-29 | 中建六局建设发展有限公司 | Simple steel reinforcement cage for high-altitude welding |
| CN203223003U (en) * | 2013-05-08 | 2013-10-02 | 北京城建精工钢结构工程有限公司 | Detachable triangular jig frame for steel truss assembling |
Also Published As
| Publication number | Publication date |
|---|---|
| CN103590595A (en) | 2014-02-19 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN203845689U (en) | Indoor assembleable large equipment lifting device | |
| CN103174300B (en) | Viscous damper installation construction method | |
| JP6101556B2 (en) | Material transfer device | |
| CN201961967U (en) | Detachable and movable type portal frame | |
| JP2016142097A (en) | Portable hoist unit and horizontal member dismantling method | |
| CN209081301U (en) | A kind of special section structure | |
| CN204023429U (en) | The support system of helistop | |
| CN103590595B (en) | Detachable welding operation platform | |
| CN204024084U (en) | Easy unloading type triangular pipe truss just spells moulding bed | |
| CN203021207U (en) | Large-load multifunctional gantry crane capable of being flexibly spliced | |
| CN105152004B (en) | Hoisting device for reinforcing beam of top surface inside box-shaped coal conveying gallery road | |
| KR20140000687U (en) | Stiffener jig of a ship's block or a pffshore structure's block | |
| CN103754770B (en) | Hoisting device for reinforcement cage | |
| CN217998426U (en) | A kind of steel support tie beam hanging plate of subway station | |
| CN206476060U (en) | Combination IMOA type cargo containment system mounting platforms for ultralow temperature liquefied gas carrier | |
| CN104806012A (en) | Large-scale high-altitude bearing cantilever beam device and construction method thereof | |
| CN204002841U (en) | A kind of outrigger formula mobile formwork for support of tunnel wall pouring construction | |
| CN113668831B (en) | A movable cantilevered scaffolding | |
| CN201128882Y (en) | Lifting and supporting brackets integrated construction device for bridge arch rib | |
| CN106192751B (en) | A kind of suspension bridge vice saddle fixing tool | |
| CN210064968U (en) | Height-adjustable portal crane | |
| JP6153735B2 (en) | Horizontal piping unit construction method | |
| JP6959055B2 (en) | Main pillar material replacement method | |
| CN204299011U (en) | The supporting construction of high-low bay floor support plate | |
| CN104973524B (en) | Cable bridge inverted-type installation system on overhead vertical structural body |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant |