CN103590415A - 适于跨海桥梁大直径管柱基础的预制承台及其施工方法 - Google Patents

适于跨海桥梁大直径管柱基础的预制承台及其施工方法 Download PDF

Info

Publication number
CN103590415A
CN103590415A CN201310612213.5A CN201310612213A CN103590415A CN 103590415 A CN103590415 A CN 103590415A CN 201310612213 A CN201310612213 A CN 201310612213A CN 103590415 A CN103590415 A CN 103590415A
Authority
CN
China
Prior art keywords
cushion cap
bearing platform
prefabricated
prefabricated cushion
base plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201310612213.5A
Other languages
English (en)
Inventor
高宗余
张强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Major Bridge Reconnaissance and Design Institute Co Ltd
Original Assignee
China Railway Major Bridge Reconnaissance and Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Major Bridge Reconnaissance and Design Institute Co Ltd filed Critical China Railway Major Bridge Reconnaissance and Design Institute Co Ltd
Priority to CN201310612213.5A priority Critical patent/CN103590415A/zh
Publication of CN103590415A publication Critical patent/CN103590415A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

本发明涉及一种适于跨海桥梁大直径管柱基础的预制承台及其施工方法,预制承台为多箱空腹式混凝土结构,箱室与大直径管柱基础的布置统一;底板上对应管柱位置设置活动钢底板,预制承台内壁有连接钢筋。施工方法是岸边干船坞中预制承台,完成后向船坞内注水,预制承台自浮,船坞内水位和海面水位齐平时,打开船闸,牵引预制承台至墩位处;预制承台内注水下沉至临时支撑上,在预制承台顶部搭设操作平台;取下活动钢板,进行管柱下沉施工,浇筑水下封底混凝土,抽水,绑扎钢筋,浇筑承台混凝土,形成完整承台结构。本发明可节省平台搭设费用,材料利用充分;节约施工投入和时间;可和后期承台混凝土共同受力。

Description

适于跨海桥梁大直径管柱基础的预制承台及其施工方法
技术领域
本发明涉及一种适于跨海桥梁大直径管柱基础的预制承台及其施工方法。
背景技术
近几十年来,随着我国社会经济的高速发展,新建了一批跨海桥梁工程。跨海桥梁显著的特点是必需要适应多变的海洋环境。海洋环境下,巨大的风力、波浪力、潮流冲击力、冰压力和撞击力等往往会形成控制性条件。这些力基本是水平荷载。在内陆和内河环境中常用的钻孔桩基础、打入桩基础因桩径较小,国内最大的钻孔灌注桩直径在4m以内,难以承受海洋环境下巨大的水平力。而管柱基础直径可做到6~10m,抵抗水平力能力强,每一根单柱完成施工后都能独立承受水平荷载,是一种非常适合跨海桥梁的基础形式。
通常管柱基础施工需要搭设施工平台,管柱施工完成后拆除平台,安装钢制挡水围堰进行承台施工。因海上环境恶劣,平台的搭设和拆除均需要耗费大量的机械和人力。同时承台混凝土浇筑后,围堰部分钢结构无法拆除,造成材料的浪费。因此采用传统的施工方法其施工成本高,需要的机械和人力多。
针对传统管柱基础施工的缺点,发明了预制承台。预制承台可同时作为施工平台及挡水围堰使用,同时也是承台永久结构的一部分。充分发挥了结构的功能,节省施工投入,降低工程造价。
发明内容
本发明的目的是针对国内跨海大桥设计施工现状,旨在提供一种造价低,施工临时设施投入少,材料利用充分的适于跨海桥梁大直径管柱基础的预制承台及其施工方法。
本发明的实现方式为:预制承台为多箱空腹式混凝土结构,多个箱室的划分与管柱基础的布置统一;承台底板上对应管柱基础的位置设置活动钢底板,活动钢底板和承台底板之间采用螺栓连接,预制承台内壁设有连接钢筋,管柱基础的直径根据目前的工艺可做到6~10m大小。
适于跨海桥梁大直径管柱基础的预制承台的施工方法,具体步骤如下:
1)在在岸边干船坞中制造有多个箱室的预制承台,箱室的划分与管柱基础的布置统一;承台预制完成后向船坞内注水,预制承台自浮。待船坞内水位和海面水位一致时,打开船坞船闸,牵引预制承台至墩位处;
2)预制承台底板上对应管柱的位置设置活动钢底板,活动钢底板和预制承台底板之间采用螺栓连接;
3)预制承台浮运就位后,注水下沉,使预制承台下沉至临时支撑上,在预制承台顶部搭设操作平台;
4)拧开螺栓,取下活动钢底板,进行管柱基础下沉施工,管柱基础施工完成后,浇筑水下封底混凝土;
5)待封底混凝土强度达到要求后,抽干承台内的水,在承台箱室内绑扎钢筋,浇筑承台混凝土,形成完整的承台结构。
本发明有以下优点:
1、预制承台下海时可自浮,仅靠拖轮即可牵引至墩位,减少运输船舶;
2、施工时可作管柱基础下沉施工的海上作业平台,节省平台搭设费用;
3、承台混凝土浇筑时可作为外侧模板;可作为永久结构成为承台的一部分,材料利用充分;
4、可作为挡水围堰使用,不需要另外安装和拆除挡水围堰,节约施工投入和时间;
5、预制承台内壁设有连接钢筋,可和后期承台钢筋相连接,使预制承台和后期浇筑的承台混凝土形成整体结构,共同受力。
附图说明
图1为预制承台自浮状体拖拉至墩位示意图;
图2为图1中的A部分放大示意图;
图3为预制承台的平面布置图;
图4为承台浮运就位后下沉至支撑桩状态图;
图5为承台顶面铺设操作平台示意图;
图6为管柱下沉状态示意图;
图7为承台内浇筑封底混凝土示意图;
图8为承台钢筋绑扎示意图;
图9为混凝土浇筑示意图。
具体实施方式
下面结合附图对本发明进一步说明。
参照图1、2,发明的适合于跨海桥梁大直径管柱基础的预制承台为多箱空腹式混凝土结构,保证其能自浮。多个箱室的划分与管柱基础3的布置统一;预制承台底板4上对应管柱基础的位置设置活动钢底板5,活动钢底板和预制承台底板之间采用螺栓6连接,浮运时钢底板闭合,管柱施工时拧开螺栓6,取下活动钢底板5。
预制承台内壁设有连接钢筋10,可和后期承台钢筋11相连接,使预制承台1和后期浇筑的承台混凝土12形成整体结构,共同受力。
预制承台的施工方法是:
1)在岸边干船坞中制造有多个箱室的预制承台1,箱室的划分与管柱基础的布置统一;承台预制完成后向船坞内注水,使预制承台自浮。待船坞内水位和海面水位一致时,打开船坞船闸,用拖轮2牵引预制承台至墩位处;
2)参照图1、图2、图3,承台底板4上对应管柱基础3的位置设置活动钢底板5,活动钢底板和承台底板之间采用螺栓6连接;
3)参照图4,预制承台1浮运就位后,注水下沉,使预制承台1下沉至临时支撑7上。
4)参照图5,在预制承台顶部搭设操作平台8;拧开螺栓6,取下活动钢底板5,使承台内外水位保持一致。
5)参照图6,进行管柱基础3下沉施工,
6)参照图7,管柱基础施工完成后,浇筑水下封底混凝土9。
7)参照图8,待封底混凝土强度达到要求后,抽干承台内的水,在承台箱室内绑扎钢筋11,与承台内连接钢筋10连接成整体钢筋骨架。
8)参照图9,浇筑承台混凝土12,形成完整承台结构。

Claims (2)

1.适于跨海桥梁大直径管柱基础的预制承台。预制承台为多箱空腹式混凝土结构,多个箱室的划分与管柱基础的布置统一;预制承台底板上对应管柱基础的位置设置活动钢底板,活动钢底板和预制承台底板之间采用螺栓连接,预制承台内壁设有连接钢筋。管柱基础的直径根据目前的工艺可做到6~10m大小。
2.权利要求1所述的适于跨海桥梁大直径管桩基础的预制承台的施工方法,其特征在于具体步骤如下:
1)在在岸边干船坞中制造有多个箱室的预制承台,多个箱室的划分与管柱基础的布置统一;承台预制完成后向船坞内注水,预制承台自浮。待船坞内水位和海面水位一致时,打开船坞船闸,牵引预制承台至墩位处;
2)预制承台底板上对应管柱的位置设置活动钢底板,活动钢底板和预制承台底板之间采用螺栓连接;
3)预制承台浮运就位后,注水下沉,使预制承台下沉至临时支撑上,在预制承台顶部搭设操作平台;
4)拧开螺栓,取下活动钢底板,进行管柱基础下沉施工,管柱基础施工完成后,浇筑水下封底混凝土;
5)待封底混凝土强度达到要求后,抽干预制承台内的水,在承台箱室内绑扎钢筋,浇筑承台混凝土,形成完整的承台结构。
CN201310612213.5A 2013-11-26 2013-11-26 适于跨海桥梁大直径管柱基础的预制承台及其施工方法 Pending CN103590415A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310612213.5A CN103590415A (zh) 2013-11-26 2013-11-26 适于跨海桥梁大直径管柱基础的预制承台及其施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310612213.5A CN103590415A (zh) 2013-11-26 2013-11-26 适于跨海桥梁大直径管柱基础的预制承台及其施工方法

Publications (1)

Publication Number Publication Date
CN103590415A true CN103590415A (zh) 2014-02-19

Family

ID=50080717

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310612213.5A Pending CN103590415A (zh) 2013-11-26 2013-11-26 适于跨海桥梁大直径管柱基础的预制承台及其施工方法

Country Status (1)

Country Link
CN (1) CN103590415A (zh)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103993612A (zh) * 2014-05-16 2014-08-20 湖北宏联众轻钢结构房屋有限公司 一种水下混凝土承台的建造方法
CN104746526A (zh) * 2015-04-10 2015-07-01 天津市赛英工程建设咨询管理有限公司 一种带有液体管道通路的筏板基础
CN106758790A (zh) * 2017-02-06 2017-05-31 上海应用技术大学 一种桥梁下部结构施工的预制结构及施工方法
NO20160518A1 (en) * 2016-04-01 2017-10-02 Sembcorp Marine Integrated Yard Pte Ltd Seabed base structure and method for installation of same
CN109989346A (zh) * 2019-01-10 2019-07-09 中交第二航务工程局有限公司 桥梁大直径预制混凝土管柱基础及其施工方法
CN110273415A (zh) * 2019-04-25 2019-09-24 上海市政建设有限公司 预制管桩与预制基础刚性连接结构及方法
CN112922007A (zh) * 2021-03-19 2021-06-08 中铁大桥局集团有限公司 一种水上桥梁复合基础及其施工方法
CN113047330A (zh) * 2021-04-28 2021-06-29 中交第三航务工程局有限公司 一种用于海上风电的装配式高桩承台
CN116335235A (zh) * 2022-12-05 2023-06-27 广东华电清远能源有限公司 一种预制泵房的施工方法

Cited By (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103993612A (zh) * 2014-05-16 2014-08-20 湖北宏联众轻钢结构房屋有限公司 一种水下混凝土承台的建造方法
CN103993612B (zh) * 2014-05-16 2016-02-10 湖北宏联众轻钢结构房屋有限公司 一种水下混凝土承台的建造方法
CN104746526A (zh) * 2015-04-10 2015-07-01 天津市赛英工程建设咨询管理有限公司 一种带有液体管道通路的筏板基础
CN104746526B (zh) * 2015-04-10 2016-06-15 天津市赛英工程技术咨询有限公司 一种带有液体管道通路的筏板基础
US10919606B2 (en) 2016-04-01 2021-02-16 Sembcorp Marine Integrated Yard Pte. Ltd. Seabed base structure and method for installation of same
RU2719645C1 (ru) * 2016-04-01 2020-04-21 Сембкорп Марин Интегрейтид Ярд Пте Лтд. Базовое основание, опирающееся на морское дно, и способ его установки
WO2017168381A1 (en) 2016-04-01 2017-10-05 Sembcorp Marine Integrated Yard Pte Ltd. Seabed base structure and method for installation of same
NO343178B1 (en) * 2016-04-01 2018-11-26 Sembcorp Marine Integrated Yard Pte Ltd Seabed base structure and method for installation of same
JP2019511656A (ja) * 2016-04-01 2019-04-25 セムコープ マリン インテグレイテッド ヤード プライベート リミテッド 海底基礎構造体およびその設置方法
NO20160518A1 (en) * 2016-04-01 2017-10-02 Sembcorp Marine Integrated Yard Pte Ltd Seabed base structure and method for installation of same
CN106758790A (zh) * 2017-02-06 2017-05-31 上海应用技术大学 一种桥梁下部结构施工的预制结构及施工方法
CN109989346A (zh) * 2019-01-10 2019-07-09 中交第二航务工程局有限公司 桥梁大直径预制混凝土管柱基础及其施工方法
CN109989346B (zh) * 2019-01-10 2023-11-10 中交第二航务工程局有限公司 桥梁大直径预制混凝土管柱基础及其施工方法
CN110273415A (zh) * 2019-04-25 2019-09-24 上海市政建设有限公司 预制管桩与预制基础刚性连接结构及方法
CN112922007A (zh) * 2021-03-19 2021-06-08 中铁大桥局集团有限公司 一种水上桥梁复合基础及其施工方法
CN113047330A (zh) * 2021-04-28 2021-06-29 中交第三航务工程局有限公司 一种用于海上风电的装配式高桩承台
CN116335235A (zh) * 2022-12-05 2023-06-27 广东华电清远能源有限公司 一种预制泵房的施工方法
CN116335235B (zh) * 2022-12-05 2023-10-17 广东华电清远能源有限公司 一种预制泵房的施工方法

Similar Documents

Publication Publication Date Title
CN103590415A (zh) 适于跨海桥梁大直径管柱基础的预制承台及其施工方法
CN205000355U (zh) 一种箱型重力式海上风电基础结构
EP2837554A1 (en) Partially floating marine platform for offshore wind-power, bridges and marine buildings, and construction method
CN102677694B (zh) 一种海上风电潜式基础结构及其整机安装施工方法
CN106759430B (zh) 一种三个筒型基础与混凝土支撑结构的风电整机施工方法
CN106759445A (zh) 一种带裙板的复合式筒型基础及其施工方法
JPWO1995016829A1 (ja) 重力式海洋構造物の施工方法およびその構造物
CN103362113A (zh) 海上风电、桥梁和海洋建筑物局部浮力海洋平台及施工方法
CN111926850A (zh) 一种六边形海上风电筒型基础水上预制装置和方法
CN106522263B (zh) 一种四个筒型基础与混凝土支撑结构的风电整机施工方法
CN201459756U (zh) 悬挂式施工顶管竖井
CN103031853B (zh) 海底储油系统
CN201358457Y (zh) 一种干取土预应力钢筋砼筒桩成桩装置
CN202148536U (zh) 一种自浮运输的海上风电机组桶形基础
CN213897209U (zh) 一种海上风电吸力桩基础附加支撑结构
CN207295746U (zh) 一种筒型基础钢板桩组合式围堰
CN211621665U (zh) 筒外布桩复合地基-筒海上风电基础
CN221645841U (zh) 可浮运式预制承台模板的海上风电基础结构
CN102704502A (zh) 一种海上潜式箱型基础结构及其施工方法
CN201873991U (zh) 高频振压干排土灌注桩的成桩装置
CN218233552U (zh) 一种海上风电吸力桩式承台基础
CN110670618A (zh) 一种带有翼板的预制重力式吸力式沉箱基础
CN216007059U (zh) 一种地下抗浮水池
CN105089949B (zh) 一种充气运输水压桩固定式海上风电塔架基础
CN204662476U (zh) 一种箱筒型基础取水闸结构

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20140219