CN103573235A - Immovable string acidizing pressure-reducing injection-increasing process method for water injection well - Google Patents

Immovable string acidizing pressure-reducing injection-increasing process method for water injection well Download PDF

Info

Publication number
CN103573235A
CN103573235A CN201310531337.0A CN201310531337A CN103573235A CN 103573235 A CN103573235 A CN 103573235A CN 201310531337 A CN201310531337 A CN 201310531337A CN 103573235 A CN103573235 A CN 103573235A
Authority
CN
China
Prior art keywords
water injection
water
injection well
acidifying
process method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310531337.0A
Other languages
Chinese (zh)
Other versions
CN103573235B (en
Inventor
任雁鹏
蒋文学
李勇
徐洋
范杰
马托
王兴建
何举涛
安全成
付振银
周然
武龙
汪小宇
金娜
韩婧婧
孟庆聪
荆建春
王玉功
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Petroleum Corp
CNPC Chuanqing Drilling Engineering Co Ltd
Original Assignee
CNPC Chuanqing Drilling Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CNPC Chuanqing Drilling Engineering Co Ltd filed Critical CNPC Chuanqing Drilling Engineering Co Ltd
Priority to CN201310531337.0A priority Critical patent/CN103573235B/en
Publication of CN103573235A publication Critical patent/CN103573235A/en
Application granted granted Critical
Publication of CN103573235B publication Critical patent/CN103573235B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses a fixed tubular column acidification pressure reduction and injection increase process method for a water injection well, which comprises the following steps: a. mixing 0.3-3 parts of weak acid acidizing fluid and 99.7-97 parts of injected water in a volume ratio; b. injecting the mixed liquid into a water inlet pipeline in a drip injection mode; c. stopping injecting the mixed liquid when the set injection allocation amount is reached and the pressure of the water injection well is reduced to 90% of the pressure of water injection before construction; the weak acid acidification solution is as follows: the composite material comprises the following components in percentage by weight: acid liquor: 10-30%; a stabilizer: 2-8%; corrosion inhibitor: 1-5%; surfactant : 6.5-17%; the balance of distilled water. The method expands the acidification blockage removal radius of the water injection well, relieves the scaling near the shaft of the water injection well and prolongs the effective period of the water injection well; continuous mixing and acidification of the fixed pipe column are realized, and the construction process is simplified; the water injection acidification is synchronously carried out without influencing the normal production of the water well.

Description

Fixed tubular column acidifying step-down augmented injection process method for water injection well
 
Technical field
The present invention relates to water injection well step-down augmented injection process method and technology field, particularly relate to a kind of low permeability oil field sandstone oil reservoir water injection well acidifying step-down augmented injection that makes, acidification to dispel block radius is large, period of validity increases, be mixed continuously acidifying and water filling of fixed tubular column synchronously carried out, and do not affect the step-down augmented injection process method of normal production.
Background technology
In the process of LOW PERMEABILITY OILFIELD DEVELOPMENT, with the decay of stratum energy, pass through waterflood enhanced recovery at present, for example publication number is CN202250005U, the Chinese patent literature that open day is on May 30th, 2012 discloses a kind of water injection well step-down augmented injection device, be applied to water injection well in oil fields, in water injection well, inject surfactant.Between water injection well distributing room for water injection and wellhead of water injection well, there is high pressure water injection pipeline; The entrance of explosive box is fixed with pipeline, is in series with successively a low pressure valve, an electrodynamic pump and a valve on pipeline, can step-down augmented injection medicament be injected in explosive box by electrodynamic pump.Outlet at explosive box is connected with tapping line, is connected with gate valve, driven high voltage ratio dosing pump and ball-and-seat on tapping line in turn, and the other end of tapping line is communicated with high pressure water injection pipeline.Effect is: can continuously to water injection well, inject step-down augmented injection medicament by a certain percentage, can reduce the injection pressure of wellhead of water injection well; Can adjust the injection rate of driven high voltage ratio dosing pump simultaneously.
But in water injection well manufacturing process, due to being incompatible of injected water and formation water, can be in the slow fouling of water injection well pit shaft and near wellbore zone, cause that injection pressure progressively raises, injection allocation amount reduces, and finally change water injection well high pressure into and short, and corresponding oil well energy is not enough.
Water injection well is implemented acidifying measure need to stop water filling successively, and tubing string is changed in pressure release, plays lower tubular column, acid filling, and closing well, the row of returning, plays lower tubular column, 7~14 days consuming time.Corresponding well group oil well output successively decreases obviously during this period, therefore for the series of problems of current low permeability oil field sandstone oil reservoir water injection well acidizing treatment, be necessary to research and develop a kind of fixed tubular column acidifying step-down augmented injection process method for water injection well, make water injection well implement the acidifying measure normal water filling of water injection well simultaneously, keep corresponding oil-well strata pressure, step-down augmented injection and water filling are synchronously carried out.
Summary of the invention
The present invention is intended to for the existing defect of above-mentioned prior art and deficiency, a kind of fixed tubular column acidifying step-down augmented injection process method for water injection well is provided, this method has expanded water injection well acidification to dispel block radius, has alleviated near the fouling of water injection well pit shaft, has extended water injection well period of validity; Realize the fixed tubular column acidifying that is mixed continuously, simplified working procedure; Water filling acidifying does not synchronously affect well and normally produces.
The present invention is by adopting following technical proposals to realize:
By a fixed tubular column acidifying step-down augmented injection process method, it is characterized in that step is as follows:
A, in volume ratio, get 0.3~3 part of faint sour acidifying solution and mix with 99.7~97 parts of injected waters;
B, by drop injection mode, mixed liquor is injected in back with water inlet line;
C, when reach the injection allocation amount of setting and water injection well pressure decreased to water injection pressure before construction 90% time, stop injecting mixed liquor;
Described faint sour acidifying solution is: by weight percentage, its component is:
Acid solution: 10 ~ 30%;
Stabilizing agent: 2 ~ 8%;
Corrosion inhibiter: 1 ~ 5%;
Surfactant: 6.5 ~ 17%;
Surplus is distilled water.
After c step, also has d step: back with water inlet line is adjusted into normal water filling state.
Described back with water inlet line is water injection well six drifting mouths.
In described a step and b step, by faint sour acidifying solution skid-mounted device, faint sour acidifying solution and the mixed merga pass drop injection mode of injected water are injected in back with water inlet line.
Described faint sour acidifying solution skid-mounted device is to embody the high-pressure plunger pump (EATON-VICKERS Eton Vickers PFB5 plunger displacement pump) that ball-and-seat performance is master.
Consisting of of described acid solution: A component: butanedioic acid; Any combination of one or more in B component: PBTCA, HPAA, BHMTPMPA or HDTMPA; With the weight percent meter in acidifying solution, A component accounts for 5 ~ 10%, B component and accounts for 5 ~ 20%.
Described stabilizing agent is comprised of citric acid and ascorbic acid, and with the weight percent meter in acidifying solution, citric acid percentage by weight is 1 ~ 3%; Ascorbic acid percentage by weight is 1 ~ 5%.
Described corrosion inhibiter is propilolic alcohol.
Described surfactant is comprised of alcohol ether carboxylate, OPEO and fluorocarbon surfactant, with the weight percent meter in acidifying solution, alcohol ether carboxylate percentage by weight is 5 ~ 10%, OPEO percentage by weight is 1 ~ 5%, and fluorocarbon surfactant percentage by weight is 0.5 ~ 2%.
The SR18Y fluorocarbon surfactant that described fluorocarbon surfactant can select Shaanxi Sen Rui Science and Technology Ltd. to produce.·
Described PBTCA is 2-phosphate-1; 2; 4-butane tricarboxylate; described HPAA is 2-HPAA; described BHMTPMPA is two 1; 6-hexylidene triamine five methylenephosphonic acids, described HDTMPA is hexamethylene diamine four methylenephosphonic acids, the product that all can adopt Shandong calm and peaceful water treatment Co., Ltd to produce.
Compared with prior art, beneficial effect of the present invention shows:
One, adopt tri-steps of abc of the present invention to carry out fixed tubular column acidifying step-down augmented injection process, expanded water injection well acidification to dispel block radius, alleviate near the fouling of water injection well pit shaft, extend water injection well period of validity; Realize the fixed tubular column acidifying that is mixed continuously, simplified working procedure; Water filling acidifying does not synchronously affect well and normally produces.And be in particular in:
1, reduce tubing string in fracturing work process and removed number of times, simplified working procedure, saved construction operation cost;
2, reduced operation consuming time during corresponding oil-well strata energy successively decrease;
3, acidifying solution adopts point to be instilled into water injection well to make water filling acidifying synchronously not affect well normally to produce.
Two,, in this process, specifically select " acid solution: 10 ~ 30%; Stabilizing agent: 2 ~ 8%; Corrosion inhibiter: 1 ~ 5%; Surfactant: 6.5 ~ 17%; Surplus is distilled water " the such proportioning of special ratios, the water injection well of formation has good surface and interface tension force and rock core displacement performance with the faint sour acidifying solution of fixed tubular column, has certain inhibition and corrosion performance.
Three, this technique has realized the nearly pit shaft of oil field sandstone oil reservoir injection well (0m ~ 3m) fouling and has stopped up releasing, also can remove pit shaft 3m ~ 30m fouling simultaneously and stop up, and expands water injection well acidification to dispel block radius, alleviates near the fouling of water injection well pit shaft, extends water injection well period of validity; Realize the fixed tubular column acidifying that is mixed continuously, simplified working procedure; Water filling acidifying does not synchronously affect well and normally produces; Water injection well is played to de-plugging step-down augmented injection object.
Four, one or several in butanedioic acid of the present invention and (PBTCA, HPAA, BHMTPMPA, HDTMPA) can slowly dissolve deep fouling obstruction, and can delay reservoir secondary fouling obstruction, delay water injection well pressure fast rise; Citric acid and ascorbic acid energy chelating acid solution produce metal ion to reservoir rock, obstruction dirt and oil pipe corrosion, suppress acid sludge and produce; Fluorocarbon surfactant can reduce faint sour acidifying solution diagram of system surface tension; Alcohol ether carboxylate (AEC-9), OPEO and fluorocarbon surfactant can reduce faint sour acidifying solution energy interfacial tension under synergy.
The specific embodiment
Embodiment 1
As preferred forms of the present invention, the invention discloses a kind of fixed tubular column acidifying step-down augmented injection process method for water injection well, its step is as follows:
A, in volume ratio, get 0.3~3 part of faint sour acidifying solution and mix with 99.7~97 parts of injected waters;
B, by drop injection mode, mixed liquor is injected in back with water inlet line;
C, when reach the injection allocation amount of setting and water injection well pressure decreased to water injection pressure before construction 90% time, stop injecting mixed liquor;
Described faint sour acidifying solution is: by weight percentage, its component is:
Acid solution: 10 ~ 30%;
Stabilizing agent: 2 ~ 8%;
Corrosion inhibiter: 1 ~ 5%;
Surfactant: 6.5 ~ 17%;
Surplus is distilled water.
Described acid solution is one or several in butanedioic acid and (PBTCA, HPAA, BHMTPMPA, HDTMPA), wherein, butanedioic acid percentage by weight is 5 ~ 10%, one or several weight summation percentages in (PBTCA, HPAA, BHMTPMPA, HDTMPA) are 5 ~ 20%, and (PBTCA, HPAA, BHMTPMPA, HDTMPA) is Shandong calm and peaceful water treatment Co., Ltd and produces.Described stabilizing agent is citric acid and ascorbic acid, and wherein, citric acid percentage by weight is 1 ~ 3%; Ascorbic acid percentage by weight is 1 ~ 5%.Described corrosion inhibiter is that its percentage by weight of propilolic alcohol is 1 ~ 5%.Described surfactant is alcohol ether carboxylate (AEC-9), OPEO and fluorocarbon surfactant, wherein, alcohol ether carboxylate (AEC-9) percentage by weight is 5 ~ 10%, OPEO percentage by weight is 1 ~ 5%, fluorocarbon surfactant percentage by weight is 0.5 ~ 2%, and fluorocarbon surfactant is the SR18Y fluorocarbon surfactant that Shaanxi Sen Rui Science and Technology Ltd. produces.
Certainly, in this example, can also adopt other faint sour acidifying solutions of the prior art.
Embodiment 2-on-the-spot application example of the present invention
The first step: fixed tubular column acidifying solution material and corollary equipment are carried to on-the-spot corresponding water injection well assigned address;
Second step: add fixed tubular column acidifying solution material in faint sour acidifying solution skid-mounted device;
The 3rd step: to water injection well closing well 0.5 hour, then open wellhead of water injection well anti-flushing well gate and carry out anti-flushing well, the well-flushing water yield arrives a well hold after after closes all gates of all water injection well six drifting mouths.
The 4th step: faint sour acidifying solution skid-mounted device is connected to and is injected in water injection well six drifting mouths (back with water inlet line).
The 5th step: the logical head valve of water injection well six is adjusted into normal water filling state.
The 6th step: open faint sour acidifying solution skid-mounted device switch, adjust faint sour acidifying solution skid-mounted device switch ratio, make faint sour acidifying solution by faint sour acidifying solution skid-mounted device, with injected water, adopt drop mode to inject in water injection well six drifting mouths (back with water inlet line) with 3%.
The 7th step: water injection well is total to water filling number of days 62 days, water filling every day 30m in construction period 3/ day, inject faint sour acidifying solution 1860m 3, water injection well reach injection allocation amount water injection well pressure decreased to water injection pressure before construction 90% time, stop noting faint sour acidifying solution skid-mounted device and faint sour acidifying solution;
The 8th step: by all valve closings of water injection well six drifting mouth, remove faint sour acidifying solution skid-mounted device connector, the logical head valve of water injection well six is adjusted into normal water filling state.
Embodiment 3-another on-the-spot application example of the present invention
The first step: fixed tubular column acidifying solution material and corollary equipment are carried to on-the-spot corresponding water injection well assigned address;
Second step: to water injection well closing well 0.5 hour, with 350 type well-washing truck water injection well anti-flushing wells, the well-flushing water yield arrives a well hold after after closes all gates of all water injection well six drifting mouths.
The 3rd step: add fixed tubular column acidifying solution material in faint sour acidifying solution skid-mounted device, faint sour acidifying solution skid-mounted device is connected to and is injected in water injection well six drifting mouths (back with water inlet line).
The 4th step: the logical head valve of water injection well six is adjusted into normal water filling state.
The 5th step: open faint sour acidifying solution skid-mounted device switch, adjust faint sour acidifying solution skid-mounted device switch ratio, make faint sour acidifying solution by faint sour acidifying solution skid-mounted device, with injected water, adopt drop mode to inject in water injection well six drifting mouths (back with water inlet line) with 0.3%.
The 6th step: water injection well is total to water filling number of days 88 days, water filling every day 25m in construction period 3/ day, inject faint sour acidifying solution 2200m 3, water injection well arrive water injection pressure before injection allocation amount the construction of water injection well pressure decreased 90% time, stop noting faint sour acidifying solution skid-mounted device and faint sour acidifying solution;
The 7th step: by all valve closings of water injection well six drifting mouth, remove faint sour acidifying solution skid-mounted device connector, the logical head valve of water injection well six is adjusted into normal water filling state.

Claims (9)

1. a fixed tubular column acidifying step-down augmented injection process method for water injection well, is characterized in that step is as follows:
A, in volume ratio, get 0.3~3 part of faint sour acidifying solution and mix with 99.7~97 parts of injected waters;
B, by drop injection mode, mixed liquor is injected in back with water inlet line;
C, when reach the injection allocation amount of setting and water injection well pressure decreased to water injection pressure before construction 90% time, stop injecting mixed liquor;
Described faint sour acidifying solution is: by weight percentage, its component is:
Acid solution: 10 ~ 30%;
Stabilizing agent: 2 ~ 8%;
Corrosion inhibiter: 1 ~ 5%;
Surfactant: 6.5 ~ 17%;
Surplus is distilled water.
2. fixed tubular column acidifying step-down augmented injection process method for water injection well according to claim 1, is characterized in that: after c step, also have d step: back with water inlet line is adjusted into normal water filling state.
3. fixed tubular column acidifying step-down augmented injection process method for water injection well according to claim 1 and 2, is characterized in that: described back with water inlet line is water injection well six drifting mouths.
4. fixed tubular column acidifying step-down augmented injection process method for water injection well according to claim 3, is characterized in that: in described a step and b step, by faint sour acidifying solution skid-mounted device, faint sour acidifying solution and the mixed merga pass drop injection mode of injected water are injected in back with water inlet line.
5. fixed tubular column acidifying step-down augmented injection process method for water injection well according to claim 4, is characterized in that: described faint sour acidifying solution skid-mounted device is to embody the high-pressure plunger pump that ball-and-seat performance is master.
6. fixed tubular column acidifying step-down augmented injection process method for water injection well according to claim 1, is characterized in that: the consisting of of described acid solution: A component: butanedioic acid; Any combination of one or more in B component: PBTCA, HPAA, BHMTPMPA or HDTMPA; With the weight percent meter in acidifying solution, A component accounts for 5 ~ 10%, B component and accounts for 5 ~ 20%.
7. fixed tubular column acidifying step-down augmented injection process method for water injection well according to claim 1, is characterized in that: described stabilizing agent is comprised of citric acid and ascorbic acid, and with the weight percent meter in acidifying solution, citric acid percentage by weight is 1 ~ 3%; Ascorbic acid percentage by weight is 1 ~ 5%.
8. fixed tubular column acidifying step-down augmented injection process method for water injection well according to claim 1, is characterized in that: described corrosion inhibiter is propilolic alcohol.
9. fixed tubular column acidifying step-down augmented injection process method for water injection well according to claim 1, it is characterized in that: described surfactant is comprised of alcohol ether carboxylate, OPEO and fluorocarbon surfactant, with the weight percent meter in acidifying solution, alcohol ether carboxylate percentage by weight is 5 ~ 10%, OPEO percentage by weight is 1 ~ 5%, and fluorocarbon surfactant percentage by weight is 0.5 ~ 2%.
CN201310531337.0A 2013-11-01 2013-11-01 Immovable string acidizing pressure-reducing injection-increasing process method for water injection well Active CN103573235B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310531337.0A CN103573235B (en) 2013-11-01 2013-11-01 Immovable string acidizing pressure-reducing injection-increasing process method for water injection well

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310531337.0A CN103573235B (en) 2013-11-01 2013-11-01 Immovable string acidizing pressure-reducing injection-increasing process method for water injection well

Publications (2)

Publication Number Publication Date
CN103573235A true CN103573235A (en) 2014-02-12
CN103573235B CN103573235B (en) 2016-06-15

Family

ID=50045877

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310531337.0A Active CN103573235B (en) 2013-11-01 2013-11-01 Immovable string acidizing pressure-reducing injection-increasing process method for water injection well

Country Status (1)

Country Link
CN (1) CN103573235B (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105735962A (en) * 2016-01-30 2016-07-06 山东省鲁南地质工程勘察院 Paleozoic carbonate heat storage reservoir chemical fracturing well flushing technique
CN105952431A (en) * 2016-04-21 2016-09-21 中国石油天然气股份有限公司 Method for removing blockage by immobile pipe column
CN108775236A (en) * 2018-08-15 2018-11-09 宁夏朔光石油科技有限公司 The increasing injection process of water injection well and its application
CN110410048A (en) * 2019-07-02 2019-11-05 中国石油天然气股份有限公司 Method for prolonging acidification validity period
CN110700804A (en) * 2019-10-09 2020-01-17 中国石油天然气股份有限公司 Method for adding antihypertensive and augmented injection medicament
CN111502598A (en) * 2019-01-31 2020-08-07 中国石油天然气股份有限公司 Acidification blockage removing method
CN114856514A (en) * 2021-02-03 2022-08-05 中国石油天然气股份有限公司 Water injection device and method for water injection well

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1526913A (en) * 2003-03-07 2004-09-08 群 里 Oil field oil-water well unblocking and injection increasing method and the apparatus for implementing the same method
US20100167963A1 (en) * 2007-06-12 2010-07-01 Olav Martin Selle Well treatment
CN102828734A (en) * 2012-09-13 2012-12-19 西南石油大学 Offshore oilfield water injection well online one-step-process acidification technology

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1526913A (en) * 2003-03-07 2004-09-08 群 里 Oil field oil-water well unblocking and injection increasing method and the apparatus for implementing the same method
US20100167963A1 (en) * 2007-06-12 2010-07-01 Olav Martin Selle Well treatment
CN102828734A (en) * 2012-09-13 2012-12-19 西南石油大学 Offshore oilfield water injection well online one-step-process acidification technology

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
万彬 等: "表面活性剂降压增注技术现场应用效果分析", 《江汉石油职工大学学报》, vol. 21, no. 6, 30 November 2008 (2008-11-30) *

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105735962A (en) * 2016-01-30 2016-07-06 山东省鲁南地质工程勘察院 Paleozoic carbonate heat storage reservoir chemical fracturing well flushing technique
CN105952431A (en) * 2016-04-21 2016-09-21 中国石油天然气股份有限公司 Method for removing blockage by immobile pipe column
CN105952431B (en) * 2016-04-21 2018-08-10 中国石油天然气股份有限公司 Method for removing blockage by immobile pipe column
CN108775236A (en) * 2018-08-15 2018-11-09 宁夏朔光石油科技有限公司 The increasing injection process of water injection well and its application
CN108775236B (en) * 2018-08-15 2020-06-26 宁夏朔光石油科技有限公司 Pressure-reducing and injection-increasing process method for water injection well and application thereof
CN111502598A (en) * 2019-01-31 2020-08-07 中国石油天然气股份有限公司 Acidification blockage removing method
CN110410048A (en) * 2019-07-02 2019-11-05 中国石油天然气股份有限公司 Method for prolonging acidification validity period
CN110410048B (en) * 2019-07-02 2022-03-29 中国石油天然气股份有限公司 Method for prolonging acidification validity period
CN110700804A (en) * 2019-10-09 2020-01-17 中国石油天然气股份有限公司 Method for adding antihypertensive and augmented injection medicament
CN110700804B (en) * 2019-10-09 2022-01-04 中国石油天然气股份有限公司 Method for adding antihypertensive and augmented injection medicament
CN114856514A (en) * 2021-02-03 2022-08-05 中国石油天然气股份有限公司 Water injection device and method for water injection well

Also Published As

Publication number Publication date
CN103573235B (en) 2016-06-15

Similar Documents

Publication Publication Date Title
CN103573235B (en) Immovable string acidizing pressure-reducing injection-increasing process method for water injection well
CN102703045B (en) Multi-slug composite pressure decreasing and injection increasing agent for ultra-low permeability oil field
US9738824B2 (en) Tight gas stimulation by in-situ nitrogen generation
CN100516457C (en) Chemical pulse compound unplugging method
CN104295275A (en) Deep blockage removal and injection increase method for water injection well of medium-and-high-permeability sandstone reservoir
CN202866800U (en) Horizontal well plugging simulation experiment device
CA2688987A1 (en) System, method, and apparatus for post-fracture treatment
CN103321606A (en) Water plugging shielding method for low-permeability fractured reservoir oil well
CN103806885B (en) Stratum chemical heat production deep blockage removing method of injection and production system
CN103571453B (en) Immovable string weak acid acidizing fluid for water injection well and preparation method thereof
CN200975233Y (en) Down-hole slow corroding antisludging equipment for oil gas field
CN101993685A (en) Composite scale inhibitor
CN104632124B (en) Deep well sandstone reservoir plugging method with serious pollution
CN110344809B (en) Horizontal well intersegment multi-slit temporary plugging acidification method
CN104232041B (en) A kind of oil-water well strong corrosion acidifying unblocking liquid of low leak-off and preparation method thereof
CN103306645B (en) Horizontal well the pressure of the drill splits completion tubular column and technique thereof
CN102643635A (en) Oil field stratum water injection increasing agent
CN106593358B (en) Device for releasing medicament in pumping well in relay manner
CN101691838B (en) Ultralow permeability oil filed water injection well multicomponent chemical microemulsion pressure reduction and injection gain method
CN107905767A (en) Water injection well cleaning and scale prevention online acidification method
CN102767353A (en) Comprehensive mining technology of drowned well
CN103422842A (en) Oil well plugging, adjusting and washing process
CN104481475A (en) Oil well carbon dioxide carbonated water throughput production increasing method
CN104343428A (en) Method for verifying formation scaling of water injection well
CN109630066A (en) The method of low-permeability oilfield high-water-cut oil-producing well water blockoff and acidification integration of operation

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20201117

Address after: 100007 Dongcheng District, Dongzhimen, China, North Street, No. 9 Oil Mansion, No.

Patentee after: CHINA NATIONAL PETROLEUM Corp.

Patentee after: CNPC Chuanqing Drilling Engineering Co.,Ltd.

Address before: The 1 section of No. 3 company Chuanqing Drilling Technology Information Office Chenghua District Green Road 610051 Chengdu City, Sichuan Province

Patentee before: CNPC Chuanqing Drilling Engineering Co.,Ltd.