CN103527231A - 巷道支护试验用相似模拟模型的制备方法 - Google Patents

巷道支护试验用相似模拟模型的制备方法 Download PDF

Info

Publication number
CN103527231A
CN103527231A CN201310543404.0A CN201310543404A CN103527231A CN 103527231 A CN103527231 A CN 103527231A CN 201310543404 A CN201310543404 A CN 201310543404A CN 103527231 A CN103527231 A CN 103527231A
Authority
CN
China
Prior art keywords
anchor
preparation
analog
steel form
base plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310543404.0A
Other languages
English (en)
Other versions
CN103527231B (zh
Inventor
巩思园
王桂峰
窦林名
李振雷
曹安业
贺虎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Mining and Technology CUMT
Original Assignee
China University of Mining and Technology CUMT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Mining and Technology CUMT filed Critical China University of Mining and Technology CUMT
Priority to CN201310543404.0A priority Critical patent/CN103527231B/zh
Publication of CN103527231A publication Critical patent/CN103527231A/zh
Application granted granted Critical
Publication of CN103527231B publication Critical patent/CN103527231B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

一种巷道支护试验用相似模拟模型的制备方法,其特征是包括以下步骤:1)在倾斜放置的、带有巷道形状的钢模板中进行铺料,铺料到按相似比缩小的锚网索间距时,布设锚杆、锚索相似材料件,随后继续铺料,高度到上述锚网索间距,再次布设锚杆、锚索相似材料件,如此往复,直至相似模型规定厚度,干燥后拆去模板和泡沫板;2)在相似模拟试验架上铺料到一定厚度,取出带有巷道的块体竖直放置在相似模拟试验架上;3)在块体周围继续铺料,按照相似理论铺设到指定高度;4)调节锁具,给锚杆、锚索施加预紧力,然后布设金属网和支架相似材料件。本发明制作简单,造价低廉,利用多个钢模板同时制作块体,能够满足模型试验中批量使用的要求,模型铺设快,实验效率高。

Description

巷道支护试验用相似模拟模型的制备方法
技术领域
本发明涉及一种矿山技术,尤其是一种矿山巷道支护试验技术,具体地说是一种巷道支护试验用相似模拟模型的制备方法。
背景技术
 如何确保矿山安全高效开采成为关系到国家能源安全的重大问题。目前,随着煤炭开采深度的增加和开采范围的增大,冲击矿压灾害已经波及我国大部分矿区,其发生的频次和烈度愈加增大,危害程度越来越严重,已成为我国矿产资源开采过程中一个急需解决的难题。冲击矿压表现为聚集在煤岩体中的弹性能突然、猛烈释放,动力将煤岩抛向巷道或采场,使煤岩体强烈震动和破坏,造成巷道堵塞、设备损毁和人员伤亡等灾难。冲击矿压以其机理复杂性、发生突然性和破坏剧烈性对煤矿安全高效生产构成巨大威胁。
冲击主要发生在巷道。大量现场实践表明,合理的支护设计是防治冲击矿压的有效方法。冲击矿压巷道的支护问题是冲击矿压研究的主要内容之一,研究冲击矿压巷道支护理论和方法,为现场动力灾害严重的巷道支护设计提供理论依据,是一项关系深部煤炭资源安全高效开采的重要课题。相似模拟模型试验是研究地下工程施工过程规律的有效方法,也是一种研究冲击矿压巷道支护的重要手段。
模型试验是根据相似理论,将矿山工程转换为室内模型进行试验模拟的。现在的矿山工程相似模型采取在试验架上逐层铺料,干燥后开挖巷道的施做方法。这种方法因模拟巷道空间窄,锚杆、锚索布设困难,难以模拟实际工程中的巷道支护,限制了相似模拟在支护试验方面的推广和应用,特别是在冲击矿压巷道支护设计方面没有发挥有效作用。
发明内容
本发明的目的是针对现有的巷道模拟试验用模型制造中存在的锚杆、锚索布设困难,影响试验准确性的问题,设计一种利用模板作为介质制备试验块体,再将试验块体在试验架上进行安装的巷道支护试验用相似模拟模型的制备方法。
本发明的技术方案是:
一种巷道支护试验用相似模拟模型的制备方法,其特征是它包括以下步骤:
首先,设计一种巷道主体钢模板,该钢模块由底板3、外壳4、内壳1和泡沫板2组成,内壳1的外形与巷道形状等比例缩小后安装在底板3的中心位置处,泡沫板2包裹在内壳1的表面以便于锚杆和锚索的尾部插入其中,外壳4沿底板3的外沿布置用于约束所铺设材料与底板的形状相同;
第二步,在上述的钢模板上铺料,在底料高度铺设到按相似比缩小的锚网索间距时,布设锚杆和锚索相似材料件,同时使锚杆和锚索相似材料件的尾部插入泡沫板2中;
第三步,在锚杆和锚索相似材料件上继续铺料,高度到上述锚网索间距时,重复第二步,直到得到所需厚度的、与底板3外形相一致的、中间形成有巷道的相似模型,干燥后拆去钢模板和钢模板上的泡沫板,得到带有巷道的块体;
第四步,在相似模拟试验架上铺料到设定的厚度,将第三步所得的相似块体竖直放置在相似模拟试验架上,并在块体周围继续铺料到试验规定的高度;
最后,给锚杆和锚索相似材料件的尾部施加预紧力,然后布设锚网和支架相似材料件即完成整个巷道的相似模型的制备,即可进入下一步的试验。
在钢模板上进行铺料时,单一相似材料时,不需倾向放置;多层相似材料时,应将钢模板倾斜放置,倾斜的角度为10-70度。
本发明的有益效果:
1、本发明的锚杆、锚索布设方便,有效地改善了矿山工程模型试验的支护手段,提高了试验结果的可靠性。
2、本发明制作简单,造价低廉,利用多个钢模板同时制作块体,能够满足模型试验中批量使用的要求,模型铺设快,实验效率高。
3、本发明解决了现有相似模拟模型施做方法中锚杆、锚索布设困难,难以模拟矿山工程中锚杆、锚索支护的问题,使支护更加接近实际工程,更有实用价值。
附图说明
图1是本发明的拱形巷道钢模板结构示意图。
图2是本发明带有巷道的块体放置在相似模拟试验架的示意图。
图3是本发明的锚网、支架布设示意图。
图中:1.内壳、2.泡沫板、3.底板、4.外壳、5.试验架、6. 块体、7.锚杆、锚索相似材料件、8. 锚网相似材料件、9.支架相似材料件。
具体实施方式
下面结合附图和实施例对本发明作进一步的说明。
    如图1-3所示。
一种巷道支护试验用相似模拟模型的制备方法,它包括以下步骤:
首先,设计一种如图1所示的巷道主体钢模板(拱形),该钢模块由底板3、外壳4、内壳1和泡沫板2组成,内壳1的外形与巷道形状等比例缩小后安装在底板3的中心位置处,泡沫板2包裹在内壳1的表面以便于锚杆和锚索的尾部插入其中,外壳4沿底板3的外沿布置用于约束所铺设材料与底板的形状相同;
第二步,铺设多层相似材料时,将图1所示的钢模块倾斜放置(倾斜的角度可为10-70度),在上述的钢模板上按现有的模型制作方法铺料底料(相似材料),在底料高度铺设到按相似比缩小的锚网索间距时,按需模拟的巷道支护的设计参数布设锚杆和锚索相似材料件7,同时使锚杆和锚索似材料件7的尾部插入泡沫板2中;在钢模板上进行单一相似材料铺料时,不需倾向放置;多层相似铺料时,应将钢模板倾斜放置,倾斜的角度为10-70度。
第三步,在锚杆和锚索相似材料件7上继续铺料,高度到上述锚网索间距时,重复第二步,直到得到所需厚度的、与底板3外形相一致的、中间形成有巷道的相似模型,干燥后拆去钢模板和钢模板上的泡沫板2,得到带有巷道的块体6;
第四步,在相似模拟试验架5上按现有方法铺料到设定的厚度,将第三步所得的相似块体6竖直放置在相似模拟试验架上,并在块体周围继续铺料到试验规定的高度,如图2;
最后,给锚杆和锚索相似材料件7的尾部施加预紧力,然后布设锚网相似材料件8和支架相似材料件9即完成整个巷道的相似模型的制备,如图3所示,即可进入下一步的试验。
本发明未涉及部分均与现有技术相同或可采用现有技术加以实现。

Claims (2)

1.一种巷道支护试验用相似模拟模型的制备方法,其特征是它包括以下步骤:
首先,设计一种巷道主体钢模板,该钢模块由底板(3)、外壳(4)、内壳(1)和泡沫板(2)组成,内壳(1)的外形与巷道形状按相似比缩小后安装在底板(3)的中心位置处,泡沫板(2)包裹在内壳(1)的表面以便于锚杆和锚索的尾部插入其中,外壳(4)沿底板(3)的外沿布置用于约束所铺设材料与底板的形状相同;
第二步,在上述的钢模板上铺料,在底料高度铺设到按相似比缩小的锚网索间距时,布设锚杆和锚索相似材料件,同时使锚杆和锚索相似材料件的尾部插入泡沫板(2)中;
第三步,在锚杆和锚索相似材料件上继续铺料,高度到上述锚网索间距时,重复第二步,直到得到所需厚度的、与底板外形相一致的、中间形成有巷道的相似模型,干燥后拆去钢模板和钢模板上的泡沫板,得到带有巷道的块体;
第四步,在相似模拟试验架上铺料到设定的厚度,将第三步所得的相似块体竖直放置在相似模拟试验架上,并在块体周围继续铺料到试验规定的高度;
最后,给锚杆和锚索相似材料件的尾部施加预紧力,然后布设锚网和支架相似材料件即完成整个巷道的相似模型的制备,即可进入下一步的试验。
2.根据权利要求1所述的制备方法,其特征是在钢模板上进行铺料时,单一相似材料时,不需倾向放置;多层相似材料时,应将钢模板倾斜放置,倾斜的角度为10-70度。
CN201310543404.0A 2013-11-06 2013-11-06 巷道支护试验用相似模拟模型的制备方法 Expired - Fee Related CN103527231B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310543404.0A CN103527231B (zh) 2013-11-06 2013-11-06 巷道支护试验用相似模拟模型的制备方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310543404.0A CN103527231B (zh) 2013-11-06 2013-11-06 巷道支护试验用相似模拟模型的制备方法

Publications (2)

Publication Number Publication Date
CN103527231A true CN103527231A (zh) 2014-01-22
CN103527231B CN103527231B (zh) 2015-09-30

Family

ID=49929539

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310543404.0A Expired - Fee Related CN103527231B (zh) 2013-11-06 2013-11-06 巷道支护试验用相似模拟模型的制备方法

Country Status (1)

Country Link
CN (1) CN103527231B (zh)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105096727A (zh) * 2015-08-28 2015-11-25 王新丰 矿井巷道组合支护系统仿真模型
CN107727501A (zh) * 2017-10-31 2018-02-23 河南理工大学 一种锚杆内嵌锚固的巷道围岩压缩承载实验方法
CN108152184A (zh) * 2016-12-02 2018-06-12 中国石油天然气股份有限公司 一种基于缝内流动规律的支撑剂导流能力试验方法
CN108760370A (zh) * 2018-06-07 2018-11-06 山东科技大学 多角度倾斜岩层巷道支护相似模拟试验装置及试验方法
CN109444377A (zh) * 2018-12-11 2019-03-08 河南理工大学 相似材料模拟实验巷道预留装置及其巷道成型方法
CN110057526A (zh) * 2019-05-30 2019-07-26 安徽理工大学 模拟巷道受载荷实验台
CN113062738A (zh) * 2021-04-09 2021-07-02 安徽理工大学 一种平面相似模拟实验中的煤层的开挖方法

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1932169A (zh) * 2006-09-29 2007-03-21 北京交通大学 隧道结构、围岩及地下水相互作用的模拟试验台
CN201650298U (zh) * 2009-11-27 2010-11-24 同济大学 模拟隧道全断面开挖的平面应变式模型试验装置
RU2425223C1 (ru) * 2009-12-14 2011-07-27 Государственное образовательное учреждение высшего профессионального образования "Санкт-Петербургский государственный горный институт имени Г.В. Плеханова (технический университет)" Способ моделирования на моделях из эквивалентных материалов проявлений горного давления в выработках
CN103105310A (zh) * 2013-01-22 2013-05-15 北京工业大学 模拟地铁盾构隧道施工引发地层变形的试验装置及方法
CN203132854U (zh) * 2013-01-22 2013-08-14 北京工业大学 一种模拟地铁盾构隧道施工引发地层变形的试验装置
CN203149979U (zh) * 2013-04-11 2013-08-21 山东科技大学 可旋转式相似材料模拟试验台

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1932169A (zh) * 2006-09-29 2007-03-21 北京交通大学 隧道结构、围岩及地下水相互作用的模拟试验台
CN201650298U (zh) * 2009-11-27 2010-11-24 同济大学 模拟隧道全断面开挖的平面应变式模型试验装置
RU2425223C1 (ru) * 2009-12-14 2011-07-27 Государственное образовательное учреждение высшего профессионального образования "Санкт-Петербургский государственный горный институт имени Г.В. Плеханова (технический университет)" Способ моделирования на моделях из эквивалентных материалов проявлений горного давления в выработках
CN103105310A (zh) * 2013-01-22 2013-05-15 北京工业大学 模拟地铁盾构隧道施工引发地层变形的试验装置及方法
CN203132854U (zh) * 2013-01-22 2013-08-14 北京工业大学 一种模拟地铁盾构隧道施工引发地层变形的试验装置
CN203149979U (zh) * 2013-04-11 2013-08-21 山东科技大学 可旋转式相似材料模拟试验台

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105096727A (zh) * 2015-08-28 2015-11-25 王新丰 矿井巷道组合支护系统仿真模型
CN108152184A (zh) * 2016-12-02 2018-06-12 中国石油天然气股份有限公司 一种基于缝内流动规律的支撑剂导流能力试验方法
CN107727501A (zh) * 2017-10-31 2018-02-23 河南理工大学 一种锚杆内嵌锚固的巷道围岩压缩承载实验方法
CN107727501B (zh) * 2017-10-31 2019-11-08 河南理工大学 一种锚杆内嵌锚固的巷道围岩压缩承载实验方法
CN108760370A (zh) * 2018-06-07 2018-11-06 山东科技大学 多角度倾斜岩层巷道支护相似模拟试验装置及试验方法
CN108760370B (zh) * 2018-06-07 2023-11-24 山东科技大学 多角度倾斜岩层巷道支护相似模拟试验装置及试验方法
CN109444377A (zh) * 2018-12-11 2019-03-08 河南理工大学 相似材料模拟实验巷道预留装置及其巷道成型方法
CN110057526A (zh) * 2019-05-30 2019-07-26 安徽理工大学 模拟巷道受载荷实验台
CN110057526B (zh) * 2019-05-30 2024-02-13 安徽理工大学 模拟巷道受载荷实验台
CN113062738A (zh) * 2021-04-09 2021-07-02 安徽理工大学 一种平面相似模拟实验中的煤层的开挖方法

Also Published As

Publication number Publication date
CN103527231B (zh) 2015-09-30

Similar Documents

Publication Publication Date Title
CN103527231B (zh) 巷道支护试验用相似模拟模型的制备方法
Zhang et al. Enhancement of gas drainage efficiency in a special thick coal seam through hydraulic flushing
CN103321654B (zh) 柔性气囊处理煤矿巷道冒顶的方法
Yu et al. Field investigations of high stress soft surrounding rocks and deformation control
Lu et al. Three-dimensional physical model experiment of mining-induced deformation and failure characteristics of roof and floor in deep underground coal seams
Zhang et al. An innovative non-pillar coal-mining technology with automatically formed entry: a case study
CN105675840A (zh) 动压巷道支护物理模型试验装置及方法
CN104832178A (zh) 一种厚煤层分层部分充填采煤方法
Xie et al. Stability analysis of integral load-bearing structure of surrounding rock of gob-side entry retention with flexible concrete formwork
CN206681764U (zh) 一种煤矿巷道顶板模拟锚杆支护装置
CN110082227A (zh) 模拟动载荷刀柱式残采区煤柱群稳定的试验仪及其方法
CN109446602B (zh) 一种地面垂直钻孔抽采特厚煤层瓦斯的数值试验方法
CN105021796A (zh) 用于模拟充填型断层破碎带岩体的试验方法
CN204386632U (zh) 大倾角煤层顶板破碎带人工底板及假顶设施
LI et al. Experimental research on strata movement and fracture dynamic evolution of double pressure-relief mining in coal seams group
Luan et al. Stability control and quick retaining technology of gob-side entry: a case study
Wang et al. Improving stress environment in development entries through an alternate longwall mining layout
CN205210083U (zh) 一种用于采矿相似材料模拟实验开挖的模型
CN204064816U (zh) 煤矿巷道围岩裂隙演化过程仿真实验台
CN106157792B (zh) 铁矿露天转井采岩体跨落的模拟装置及方法
CN206115852U (zh) 铁矿露天转井采岩体跨落的模拟装置
CN204612945U (zh) 煤矿巷道顶板三向受力综合仿真实验装置
CN106546419A (zh) 一种物理模拟实验锚杆/索机械化支护方法
CN111894601A (zh) 过地质构造煤层巷道围岩结构及其超前改性掘进的方法
CN204510251U (zh) 采动区输电线路塔基抗变形吸能结构

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150930

Termination date: 20161106

CF01 Termination of patent right due to non-payment of annual fee