CN103520904A - Billiard table whole stone slab and manufacturing method thereof - Google Patents

Billiard table whole stone slab and manufacturing method thereof Download PDF

Info

Publication number
CN103520904A
CN103520904A CN201310510623.9A CN201310510623A CN103520904A CN 103520904 A CN103520904 A CN 103520904A CN 201310510623 A CN201310510623 A CN 201310510623A CN 103520904 A CN103520904 A CN 103520904A
Authority
CN
China
Prior art keywords
billiard table
slabstone
stone slab
frame die
whole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310510623.9A
Other languages
Chinese (zh)
Other versions
CN103520904B (en
Inventor
刘政
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changde Hunan Province City Imperial Crown Pool Table Head Factory
Original Assignee
Changde Hunan Province City Imperial Crown Pool Table Head Factory
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changde Hunan Province City Imperial Crown Pool Table Head Factory filed Critical Changde Hunan Province City Imperial Crown Pool Table Head Factory
Priority to CN201310510623.9A priority Critical patent/CN103520904B/en
Publication of CN103520904A publication Critical patent/CN103520904A/en
Application granted granted Critical
Publication of CN103520904B publication Critical patent/CN103520904B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention discloses a billiard table whole stone slab and a manufacturing method of the billiard table whole stone slab. The manufacturing method includes the steps that a layer of slab rubber separation die is laid on a bottom die of a working table; a metal frame die is arranged on the slab rubber separation die; meshed reinforcing ribs are arranged in the frame die; cement gravels are poured into the frame die; after the cement gravels are solidified, the frame die is removed, and the billiard table whole stone slab is obtained after the billiard table stone slab is turned over. The billiard table whole stone slab has the advantages that the stone slab tabletop is free of joints and good in flatness, and not prone to cracking due to the fact that the reinforcing ribs are arranged in the stone slab; a billiard table can be wholly moved after being installed, and therefore the phenomenon that the stone slab needs to be installed and debugged again because the stone slab is not flat due to dislocation can be avoided; over-exploitation of natural stone resources is relieved, production cost of the billiard table is reduced, and the billiard table which is low in cost, good in quality, durable and suitable for games and entertainment is provided for broad consumers.

Description

Whole slabstone of a kind of billiard table and preparation method thereof
[technical field] the present invention relates to sports equipment, relates to particularly whole slabstone of a kind of billiard table and preparation method thereof.
[background technology] billiard ball are pandemic graceful indoor sport motions in the world, the kind of billiard table is more, what have competes for specialty, have for amusement and recreation, what its table top generally adopted is natural stone slab, though it is high that natural stone slab table top has hardness, the advantages such as density is large, but in processing and use procedure, there is following defect: one, billiard table stone slab table top is generally spliced by 3 or polylith natural stone slab, seam is obvious, use after a period of time because of natural distortion, collision easily produces dislocation out-of-flatness, need to carry out after dismantling the flatness adjustment of table top.Two, the billiard table of polylith slabstone splicing can not be moved or short-distance movement after installing, otherwise can make the dislocation of slabstone table top lose flatness, must re-start installation and debugging.Three, natural stone slab poor toughness, crisp and natural fracture sometimes, when billiard table cushions being installed exerting oneself locking screw screw mandrel, the phenomenon that easily occurs pulling open slabstone, causes larger economic loss and trouble.Four, lithotome is because of heavy easy fracture, and inconvenience is exploited, is processed into whole billiard table stone slab, and resource-constrained, and cost of winning is high, and the billiard table of manufacture is expensive, can not meet the demand of consumers in general to these sports and entertainment selection.
The problems referred to above that [summary of the invention] the present invention exists in order to solve existing natural billiard table stone slab, provide whole slabstone of a kind of billiard table and preparation method thereof.
The whole slabstone of this billiard table, is characterized in that, is the whole slabstone forming with cement pouring, is provided with installing hole on stone surface, and slabstone inside is provided with netted reinforcing rib; Slabstone inside is also provided with securing member, and securing member is comprised of nut and support.
In described slabstone, between every two securing members, be connected with reinforcement.
The end of described fastener bracket is provided with barb.
In described fastener bracket, be provided with screw thread.
The side of described slabstone is provided with Protective edging, is provided with the lead screw hole corresponding with securing member nut on Protective edging, is also provided with clench nail on Protective edging, and the end of clench nail is provided with barb.
The preparation method of the whole slabstone of billiard table, it is characterized in that, on smooth workbench bed die, lay one deck offset plate every mould, the frame die of metal is set on mould at offset plate, use bolt fixing metal locking piece for four jiaos of frame die, six sack positions at the whole slabstone of billiard table arrange sack wooden model, the side of frame die is also provided with a plurality of lead screw hole, in lead screw hole, inserting lead screw is connected with the nut of securing member, in frame die, be provided with netted reinforcement, to casting cement sandstone in frame die, wooden model is inserted in position at the installing hole of the whole slabstone of billiard table, after cement solidifies, remove lead screw, wooden model and frame die, by the whole slabstone upset of billiard table.
In order to improve the impact resistance of the whole slabstone of billiard table, in frame die during casting cement sandstone, first in frame die inner side, Protective edging is set, lead screw is connected with the nut of securing member through the lead screw hole on Protective edging.
Advantage of the present invention: 1, slabstone table top is whole plate, without seam, flatness is good, standard degree is high, good toughness is solid steady, inside establish reinforcement and make slabstone be not easy fracture.2, billiard table can integrated moving after installing, and there will not be dislocation to cause slabstone out-of-flatness, and need to reinstall the phenomenon of debugging.3, long-distance the keeping flat or edge-on transportation of energy after billiard table installation, no longer needs specialty that the on-the-spot installation of master worker is installed, and has saved greatly the costs such as manpower.4, adopt smooth workbench bed die and vertical frame die can well guarantee flatness and the standard degree of the whole slabstone of billiard table, exempted heavy exploitation and the attrition process operation of natural stone slab.5, securing member is set in cement and is connected with reinforcement, has improved the Tensile strength of slabstone, and the phenomenon that has occurred pulling open slabstone while having avoided up hill and dale natural billiard table stone slab that limit, storehouse lead screw is installed, has greatly reduced economic loss.6, alleviated the exhaustive exploitation of natural stone resource, reduced the production cost of billiard table, for consumers in general provide one good and cheap, durable in use, be applicable to the billiard table of match and amusement and recreation.
[accompanying drawing explanation]
Fig. 1 is the internal structure schematic diagram of the whole slabstone of billiard table
Fig. 2 is the structural representation of manufacturing the whole slabstone mould of billiard table
Fig. 3 is the die side view of manufacturing the whole slabstone of billiard table
Fig. 4 is the fastener constructions schematic diagram of embodiment mono-
Fig. 5 is the fastener constructions schematic diagram of embodiment bis-
Fig. 6 is the connection diagram of lead screw and securing member
Fig. 7 is the scheme of installation of Protective edging
In figure: 1, the whole slabstone of billiard table, 2, securing member, 3, reinforcement, 4, cement, 5, installing hole, 6, wooden model, 7, workbench bed die, 8, frame die, 9, sack wooden model, 10, offset plate is every mould, 11, metal locking part, 12, bolt, 13, lead screw, 14, lead screw hole, 15, support, 16, barb, 17, screw thread, 18, nut, 19, Protective edging, 20, clench nail.
[specific embodiment] is described below enforcement of the present invention below in conjunction with accompanying drawing:
Embodiment mono-:
With reference to Fig. 1, Fig. 2, Fig. 3, Fig. 4 and Fig. 6, on smooth workbench bed die 7, lay one deck offset plate every mould 10, the frame die 8 of metal is set on mould 10 at offset plate, use bolt 12 fixing metal locking pieces 11 for four jiaos of frame die 8, six sack positions at the whole slabstone 1 of billiard table arrange sack wooden model 9, the side of frame die 8 is also provided with a plurality of lead screw hole 14, the interior insertion lead screw 13 in lead screw hole 14 is connected with the nut 18 of securing member 2, the end of the support 15 of securing member 2 is provided with barb 16, in frame die 8, be provided with netted reinforcement 3, to the interior casting cement sandstone 4 of frame die 8, wooden model 6 is inserted in position at the installing hole 5 of the whole slabstone 1 of billiard table, after cement 4 solidifies, remove lead screw 13, metal locking part 11, frame die 8, sack wooden model 9 and wooden model 6, securing member 2, reinforcement 3 is set in cement 4, by whole slabstone 1 upset of billiard table.
Embodiment bis-:
With reference to Fig. 1, Fig. 2, Fig. 3, Fig. 5, Fig. 6 and Fig. 7, on smooth workbench bed die 7, lay one deck offset plate every mould 10, the frame die 8 of metal is set on mould 10 at offset plate, use bolt 12 fixing metal locking pieces 11 for four jiaos of frame die 8, frame die 8 inner sides arrange Protective edging 19, on Protective edging 19, be provided with clench nail 20, in clench nail 20 ends, be provided with barb 16, on Protective edging 19, be provided with lead screw hole 14, six sack positions at the whole slabstone 1 of billiard table arrange sack wooden model 9, the side of frame die 8 is also provided with a plurality of lead screw hole 14, the interior insertion lead screw 13 in lead screw hole 14 is connected with the nut 18 of securing member 2 through Protective edging 19, on the support 15 of securing member 2, be provided with screw thread 17, between the securing member 2 of every two opposite faces, with reinforcement 3, connect, in frame die 8, be provided with netted reinforcement 3, to the interior casting cement sandstone 4 of frame die 8, wooden model 6 is inserted in position at the installing hole 5 of the whole slabstone 1 of billiard table, after cement 4 solidifies, remove lead screw 13, metal locking part 11, frame die 8, sack wooden model 9 and wooden model 6, securing member 2, reinforcement 3, clench nail 20 is set in cement 4, by whole slabstone 1 upset of billiard table.
What more than record is only the preferred embodiments of the present invention, certainly can not limit with this interest field of the present invention, and the equivalent variations of therefore doing according to the claims in the present invention, still belongs to the scope that the present invention is contained.

Claims (7)

1. the whole slabstone of billiard table, is characterized in that, is the whole slabstone forming with cement pouring, is provided with installing hole on stone surface, and slabstone inside is provided with netted reinforcing rib; Slabstone inside is also provided with securing member, and securing member is comprised of nut and support.
2. the whole slabstone of a kind of billiard table according to claim 1, is characterized in that, in described slabstone, between every two securing members, is connected with reinforcement.
3. the whole slabstone of a kind of billiard table according to claim 1 and 2, is characterized in that, the end of described fastener bracket is provided with barb.
4. the whole slabstone of a kind of billiard table according to claim 1 and 2, is characterized in that, in described fastener bracket, is provided with screw thread.
5. the whole slabstone of a kind of billiard table according to claim 1, it is characterized in that, the side of described slabstone is provided with Protective edging, is provided with the lead screw hole corresponding with securing member nut on Protective edging, on Protective edging, be also provided with clench nail, the end of clench nail is provided with barb.
6. the preparation method of the whole slabstone of billiard table described in a claim 1, it is characterized in that, on smooth workbench bed die, lay one deck offset plate every mould, the frame die of metal is set on mould at offset plate, use bolt fixing metal locking piece for four jiaos of frame die, six sack positions at billiard table stone slab arrange sack wooden model, the side of frame die is also provided with a plurality of lead screw hole, in lead screw hole, inserting lead screw is connected with the nut of securing member, in frame die, be provided with netted reinforcement, to casting cement sandstone in frame die, wooden model is inserted in position at the installing hole of billiard table stone slab, after cement solidifies, remove lead screw, wooden model and frame die, by billiard table stone slab upset.
7. the preparation method of the whole slabstone of billiard table according to claim 6, is characterized in that, in frame die during casting cement sandstone, first in frame die inner side, Protective edging is set, and lead screw is connected with the nut of securing member through the lead screw hole on Protective edging.
CN201310510623.9A 2013-10-26 2013-10-26 A kind of billiard table entirety slabstone and preparation method thereof Active CN103520904B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310510623.9A CN103520904B (en) 2013-10-26 2013-10-26 A kind of billiard table entirety slabstone and preparation method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310510623.9A CN103520904B (en) 2013-10-26 2013-10-26 A kind of billiard table entirety slabstone and preparation method thereof

Publications (2)

Publication Number Publication Date
CN103520904A true CN103520904A (en) 2014-01-22
CN103520904B CN103520904B (en) 2016-05-18

Family

ID=49923477

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310510623.9A Active CN103520904B (en) 2013-10-26 2013-10-26 A kind of billiard table entirety slabstone and preparation method thereof

Country Status (1)

Country Link
CN (1) CN103520904B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113663315A (en) * 2021-07-19 2021-11-19 贵州晨春石业有限公司 Billiard table stone plate and processing technology thereof
CN115745653A (en) * 2022-11-16 2023-03-07 秦皇岛易成模塑有限公司 Billiard table top plate and manufacturing method thereof

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB190827977A (en) * 1908-12-23 1909-04-29 Karl Albert August Bracher Improvements in and relating to the Beds of Billiard and the like Tables.
CN1131050A (en) * 1995-11-28 1996-09-18 李亚军 Billiard table made of white marble
CN2322469Y (en) * 1997-09-30 1999-06-09 乔元栩 Billiards table
CN1568865A (en) * 2003-07-21 2005-01-26 杜贤骥 A set of furniture, method for assembling them to a ping pang table or a billiard table and special materials for same table
US20050124427A1 (en) * 2003-12-05 2005-06-09 Nottage Craig W. Games table and playing surface for a games table
CN1724815A (en) * 2004-07-23 2006-01-25 郑士元 Metal net composition board and its making method
CN201135757Y (en) * 2007-11-28 2008-10-22 汤柏钦 Novel billiard table
CN201135758Y (en) * 2008-01-14 2008-10-22 吕剑都 Table board of billiard ball table
CN201415047Y (en) * 2009-06-11 2010-03-03 北京星伟体育用品有限公司 Bag edge structure of bagatelle table
CN202005397U (en) * 2011-03-24 2011-10-12 张翔 Table tennis table made of prefabricated reinforced concrete
CN103267057A (en) * 2013-05-13 2013-08-28 山东高唐智泰金马量仪科技有限公司 Lock nut, lock structure using lock nut and method for mounting lock structure
CN203494142U (en) * 2013-10-26 2014-03-26 湖南省常德市皇冠桌球台总厂 Billiard table integrated slate board

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB190827977A (en) * 1908-12-23 1909-04-29 Karl Albert August Bracher Improvements in and relating to the Beds of Billiard and the like Tables.
CN1131050A (en) * 1995-11-28 1996-09-18 李亚军 Billiard table made of white marble
CN2322469Y (en) * 1997-09-30 1999-06-09 乔元栩 Billiards table
CN1568865A (en) * 2003-07-21 2005-01-26 杜贤骥 A set of furniture, method for assembling them to a ping pang table or a billiard table and special materials for same table
US20050124427A1 (en) * 2003-12-05 2005-06-09 Nottage Craig W. Games table and playing surface for a games table
CN1724815A (en) * 2004-07-23 2006-01-25 郑士元 Metal net composition board and its making method
CN201135757Y (en) * 2007-11-28 2008-10-22 汤柏钦 Novel billiard table
CN201135758Y (en) * 2008-01-14 2008-10-22 吕剑都 Table board of billiard ball table
CN201415047Y (en) * 2009-06-11 2010-03-03 北京星伟体育用品有限公司 Bag edge structure of bagatelle table
CN202005397U (en) * 2011-03-24 2011-10-12 张翔 Table tennis table made of prefabricated reinforced concrete
CN103267057A (en) * 2013-05-13 2013-08-28 山东高唐智泰金马量仪科技有限公司 Lock nut, lock structure using lock nut and method for mounting lock structure
CN203494142U (en) * 2013-10-26 2014-03-26 湖南省常德市皇冠桌球台总厂 Billiard table integrated slate board

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113663315A (en) * 2021-07-19 2021-11-19 贵州晨春石业有限公司 Billiard table stone plate and processing technology thereof
CN115745653A (en) * 2022-11-16 2023-03-07 秦皇岛易成模塑有限公司 Billiard table top plate and manufacturing method thereof

Also Published As

Publication number Publication date
CN103520904B (en) 2016-05-18

Similar Documents

Publication Publication Date Title
CN204492190U (en) Aluminum alloy mould plate back cord fastening devices
CN103520904B (en) A kind of billiard table entirety slabstone and preparation method thereof
CN103495279B (en) A kind of billiard table stone slab and preparation method thereof
CN203494142U (en) Billiard table integrated slate board
CN102661047B (en) Pouring method of building insulation external wall and fastener used in same
CN203494144U (en) Whole billiard table slate board with frame
CN203494143U (en) Billiard table slate board
CN202937003U (en) Aluminium alloy easy-dismounting formwork for buildings
CN205591553U (en) Building templates integrated configuration
CN206554324U (en) Realize that the Stone brick component of comprehensive fixation is assembled into the structure of wall, dam body
CN104675127B (en) A kind of building sleeve pipe pre-embedding clamp device
CN203947637U (en) A kind of syndeton of Glass Rib
CN104759089B (en) Combined billiard table slate board and manufacturing method thereof
CN203701586U (en) Ring beam shaping device
CN203876019U (en) Pore-forming member manufacturing preformed hole of precast concrete component
CN103924489B (en) City the rail manual dismantling device external member of double-layer vibration damping fastener and using method thereof
CN206234303U (en) A kind of compound spiral limit spring
CN205077868U (en) Reinforcement aluminum alloy template K spacer pin subassembly for board
CN207453119U (en) Wallboard and beam connection component and walling system
CN202124934U (en) Connecting device for reinforced concrete beam and shear wall
CN205135108U (en) Novel safety fence
CN204040301U (en) The building block of a kind of loop beam forms
CN204212293U (en) Vertical curtain wall cross beam and bar jointing structure
CN204436189U (en) Pine door leaf
CN204418607U (en) A kind of claying board

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant