CN103513170B - Laborsaving porcelain insulator zero-value live-detection electrospark fork tool - Google Patents

Laborsaving porcelain insulator zero-value live-detection electrospark fork tool Download PDF

Info

Publication number
CN103513170B
CN103513170B CN201310502490.0A CN201310502490A CN103513170B CN 103513170 B CN103513170 B CN 103513170B CN 201310502490 A CN201310502490 A CN 201310502490A CN 103513170 B CN103513170 B CN 103513170B
Authority
CN
China
Prior art keywords
insulating
detection
fork
porcelain insulator
spark fork
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310502490.0A
Other languages
Chinese (zh)
Other versions
CN103513170A (en
Inventor
朱义东
郝建成
韩洪刚
王飞
张忠瑞
姜常胜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Liaoning Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Liaoning Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Electric Power Research Institute of State Grid Liaoning Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201310502490.0A priority Critical patent/CN103513170B/en
Publication of CN103513170A publication Critical patent/CN103513170A/en
Application granted granted Critical
Publication of CN103513170B publication Critical patent/CN103513170B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Insulators (AREA)

Abstract

本发明涉及一种电力系统检测工具,尤其涉及一种省力瓷绝缘子零值带电检测火花叉工具,是高压输电线路瓷绝缘子零值带电检测工具。它是在绝缘操作杆的前端部连接有金属火花叉放电间隙;在绝缘操作杆的前部连接有固定环;固定环中由绝缘绳穿过,并且绝缘绳的一端连接有永磁铁。本发明通过将传统绝缘子带电检测用火花叉前端通过绝缘绳悬挂牵引的方式,减小因火花叉力矩给作业人员造成的劳动强度;同时减少火花叉前端抖动的问题,提高定位的准确性。另外,通过永磁铁吸附铁塔的方式同利用钩悬挂的方式相比而言,本发明还具有操作方便,且结构简单的优点。可以大大的提高带电作业人员的工作效率,并且使作业人员人身的安全性得到了保证。

The invention relates to a power system detection tool, in particular to a labor-saving porcelain insulator zero-value electrification detection spark fork tool, which is a high-voltage transmission line porcelain insulator zero-value electrification detection tool. The metal spark fork discharge gap is connected to the front end of the insulating operating rod; a fixing ring is connected to the front of the insulating operating rod; an insulating rope passes through the fixing ring, and a permanent magnet is connected to one end of the insulating rope. The invention reduces the labor intensity caused by the moment of the spark fork to the operator by suspending and pulling the front end of the spark fork used for the live detection of the traditional insulator through the insulating rope; at the same time, it reduces the vibration of the front end of the spark fork and improves the accuracy of positioning. In addition, compared with the method of using the hook to hang the iron tower through the permanent magnet, the present invention also has the advantages of convenient operation and simple structure. It can greatly improve the work efficiency of live workers and ensure the personal safety of workers.

Description

省力瓷绝缘子零值带电检测火花叉工具Labor-saving porcelain insulator zero value live detection spark fork tool

技术领域 technical field

本发明涉及一种电力系统检测工具,尤其涉及一种省力瓷绝缘子零值带电检测火花叉工具,是高压输电线路瓷绝缘子零值带电检测工具。 The invention relates to a power system detection tool, in particular to a labor-saving porcelain insulator zero-value electrification detection spark fork tool, which is a high-voltage transmission line porcelain insulator zero-value electrification detection tool.

背景技术 Background technique

目前,因输电线路停电计划较少,对瓷绝缘子进行带电检测工作已经十分普及,带电检测一般采用火花叉方法进行,即利用良好绝缘子片上存在电压分布,火花叉将该片绝缘子短路后会发生声响,以判断绝缘子是否零值。该方法是目前最为有效的带电判断绝缘子零值方法。但该方法需要工人上塔手持3m-5m长的绝缘杆进行操作(220kV-500kV依据塔窗结构而异),火花叉产生的力和力矩会使工人十分疲劳,且因绝缘杆过长,在人员疲劳状态下绝缘杆前端抖动不好定位,疲劳作业易成为危险的因素,使工作人员的人身安全存在潜在的安全隐患。 At present, due to the lack of power outage plans for transmission lines, the live detection of porcelain insulators has become very popular. The live detection is generally carried out by the spark fork method, that is, using the voltage distribution on the good insulator sheet, the spark fork short-circuits the insulator and there will be a sound , to judge whether the insulator is zero value. This method is currently the most effective method for judging the zero value of an insulator when it is charged. However, this method requires workers to go up the tower and hold a 3m-5m long insulating rod to operate (220kV-500kV varies according to the structure of the tower window), the force and moment generated by the spark fork will make the workers very tired, and because the insulating rod is too long, In the state of personnel fatigue, the vibration of the front end of the insulating rod is not easy to locate, and the fatigue operation is easy to become a dangerous factor, which makes the personal safety of the staff a potential safety hazard.

发明内容 Contents of the invention

为了克服传统火花叉间隙测试给工人带来的大劳动强度和操作的不方便性,本发明提供一种省力瓷绝缘子零值带电检测火花叉工具。其目的是提供一种结构简单,使用安全可靠,并且可以减小火花叉力矩给工人造成的劳动强度,减少火花叉前端晃动,提高定位的准确性的一种火花叉工具。 In order to overcome the large labor intensity and inconvenient operation brought to workers by the traditional spark fork gap test, the present invention provides a labor-saving ceramic insulator zero-value charged detection spark fork tool. The purpose is to provide a spark fork tool which is simple in structure, safe and reliable in use, can reduce the labor intensity caused by the moment of the spark fork to workers, reduce the shaking of the front end of the spark fork, and improve the accuracy of positioning.

本发明解决其技术问题所采用的技术方案是: The technical solution adopted by the present invention to solve its technical problems is:

省力瓷绝缘子零值带电检测火花叉工具,是在绝缘操作杆的前端部连接有金属火花叉放电间隙;在绝缘操作杆的前部连接有固定环;固定环中由绝缘绳穿过,并且绝缘绳的一端连接有永磁铁。 The spark fork tool for labor-saving porcelain insulator zero-value live detection is connected with a metal spark fork discharge gap at the front end of the insulating operating rod; a fixing ring is connected at the front of the insulating operating rod; the insulating rope passes through the fixing ring and is insulated One end of the rope is connected with a permanent magnet.

所述的固定环安装在距离金属火花叉放电间隙3cm~5cm的位置的绝缘操作杆上。 The fixing ring is installed on the insulating operating rod at a distance of 3 cm to 5 cm from the discharge gap of the metal spark fork.

所述的固定环金属固定环。 The fixing ring is a metal fixing ring.

所述的永磁铁对铁的吸附力介于100N~200N。 The adsorption force of the permanent magnet to iron is between 100N and 200N.

所述的缘绳为蚕丝绝缘绳。 The edge rope is silk insulating rope.

所述的缘绳为Φ5mm~Φ15mm的蚕丝绝缘绳。 The edge rope is a silk insulating rope of Φ5mm-Φ15mm.

所述的缘绳为Φ10mm的蚕丝绝缘绳。 Described edge rope is the silk insulating rope of Φ 10mm.

所述的固定环为圆形、方形、长方形、椭圆形或异型结构中的一种。 The fixing ring is one of circular, square, rectangular, elliptical or special-shaped structures.

本发明的优点及有益效果是:通过将传统绝缘子带电检测用火花叉前端通过绝缘绳悬挂牵引的方式,减小因火花叉力矩给作业人员造成的劳动强度;同时减少火花叉前端抖动的问题,提高定位的准确性。另外,通过永磁铁吸附铁塔的方式同利用钩悬挂的方式相比而言,本发明还具有操作方便,且结构简单的优点。可以大大的提高带电作业人员的工作效率,并且使作业人员人身的安全性得到了保证。 The advantages and beneficial effects of the present invention are: by hanging and pulling the front end of the spark fork used for the live detection of traditional insulators through the insulating rope, the labor intensity caused by the moment of the spark fork to the operator is reduced; at the same time, the problem of shaking at the front end of the spark fork is reduced, Improve positioning accuracy. In addition, compared with the method of using the hook to hang the iron tower through the permanent magnet, the present invention also has the advantages of convenient operation and simple structure. It can greatly improve the work efficiency of live workers, and ensure the personal safety of workers.

附图说明 Description of drawings

下面结合附图和实施例对本发明进一步详细的说明。 The present invention will be described in further detail below in conjunction with the accompanying drawings and embodiments.

图1是本发明的整体结构示意图; Fig. 1 is the overall structural representation of the present invention;

图2是前端固定金属环的横向部放大视图。 Fig. 2 is an enlarged view of the lateral portion of the front-end fixing metal ring.

图中:绝缘绳1,绝缘操作杆2,金属火花叉放电间隙3,永磁铁4,固定环5。 In the figure: an insulating rope 1, an insulating operating rod 2, a metal spark fork discharge gap 3, a permanent magnet 4, and a fixing ring 5.

具体实施方式 detailed description

实施例1: Example 1:

本发明是一种省力瓷绝缘子零值带电检测火花叉工具,如图1所示,本发明是在绝缘操作杆2的前端部连接有金属火花叉放电间隙3,在绝缘操作杆2的前部连接有固定环5;固定环5中由Φ10mm的蚕丝绝缘绳1穿过,并且蚕丝绝缘绳1的一端连接有强磁力的永磁铁4。蚕丝绝缘绳1的尾绳沿着绝缘操作杆2引至工人操作处并留有一定绳长裕度,在具体操作时要视检测绝缘子情况而定。 The present invention is a spark fork tool for labor-saving porcelain insulator zero-value charged detection. As shown in FIG. A fixed ring 5 is connected; a Φ10mm silk insulating rope 1 passes through the fixing ring 5, and one end of the silk insulating rope 1 is connected with a permanent magnet 4 with strong magnetic force. The tail rope of silk insulating rope 1 is led to the workman's operation place along insulating operation bar 2 and leaves certain rope length margin, will be decided according to detection insulator situation during concrete operation.

本发明中所述的固定环5的结构为长方型结构。 The structure of the fixing ring 5 described in the present invention is a rectangular structure.

所述的金属固定环5安装在距离金属火花叉放电间隙33cm-5cm的位置的绝缘操作杆2上。所述的永磁铁4对铁的吸附力介于100N~200N。 The metal fixing ring 5 is installed on the insulating operating rod 2 at a distance of 33cm-5cm from the discharge gap of the metal spark fork. The adsorption force of the permanent magnet 4 to iron is between 100N and 200N.

具体实施时,先在火花叉间隙测试工具的绝缘杆前端,距离火花叉3cm-5cm位置安装固定环,将一端连接强磁力的永磁铁4,该永磁铁4对铁的吸附力介于100N~200N为宜的Φ10mm蚕丝绝缘绳穿过该环,尾绳沿着绝缘杆引至工人操作处并留有一定绳长裕度,视检测绝缘子情况而定。在上塔后工人首先举杆将磁铁吸附至被测绝缘子上方铁塔横担上,并逐步放松牵引绳,使得火花叉前端下落至被测的瓷绝缘子处,工人用一只手同时握紧绝缘杆和尾绳,另一只手同时控制火花叉进行带电检测零值的操作。作业过程中绝缘绳处于绷紧状态,仅在需要上下移动火花叉时,将通过绝缘绳收紧或放松即可。作业结束后,将绝缘绳收紧,火花叉上升到磁铁位置附近,用力拉绝缘杆和绳索,则磁铁从铁塔脱落,即完成作业收工。为确保安全作业前应保证绝缘杆和绳索绝缘良好。 During specific implementation, first install a fixing ring at the front end of the insulating rod of the spark fork gap test tool, 3cm-5cm away from the spark fork, and connect one end to a permanent magnet 4 with strong magnetic force. The permanent magnet 4 has an adsorption force of 100N to iron 200N Φ10mm silk insulation rope should pass through the ring, and the tail rope should be led to the worker's operation place along the insulation rod with a certain rope length margin, depending on the condition of the insulator to be tested. After going up the tower, the worker first raises the pole to attract the magnet to the cross arm of the iron tower above the insulator under test, and gradually loosens the traction rope, so that the front end of the spark fork falls to the porcelain insulator under test, and the worker holds the insulating rod with one hand at the same time And the tail rope, the other hand controls the spark fork at the same time to perform the operation of live detection zero value. During the operation, the insulating rope is in a tight state, and only when the spark fork needs to be moved up and down, it can be tightened or loosened through the insulating rope. After the work is over, tighten the insulating rope, the spark fork rises to the vicinity of the magnet position, pull the insulating rod and rope hard, and the magnet falls off the iron tower, and the work is completed. In order to ensure safe operation, the insulation rod and rope should be well insulated.

使用时需要注意,在上塔后工人首先举杆将磁铁吸附至被测绝缘子上方铁塔横担上,并逐步放松蚕丝绝缘绳1,使得金属火花叉放电间隙3前端下落至被测的瓷绝缘子处,工人用一只手同时握紧绝缘杆2和蚕丝绝缘绳1尾绳,另一只手同时控制绝缘杆2进而控制金属火花叉放电间隙3进行带电检测零值的操作。作业过程中蚕丝绝缘绳1处于绷紧状态,仅在需要上下移动火花叉时,将通过绝缘绳收紧或放松即可。作业结束后,将绝缘绳收紧,火花叉上升到磁铁所在位置附近,用力拉绝缘杆和绳索,则磁铁从铁塔脱落,即完成作业收工。 When using, it should be noted that after going up the tower, the worker first lifts the pole to attract the magnet to the iron tower cross arm above the insulator under test, and gradually loosens the silk insulating rope 1, so that the front end of the metal spark fork discharge gap 3 falls to the porcelain insulator under test , The worker grasps the insulation rod 2 and the silk insulation rope 1 tail rope with one hand at the same time, and the other hand simultaneously controls the insulation rod 2 and then controls the metal spark fork discharge gap 3 to perform the operation of live detection zero value. Silk insulating rope 1 is in taut state during operation, only when needing to move spark fork up and down, will tighten up or loosen by insulating rope and get final product. After the work is finished, the insulating rope is tightened, the spark fork rises to the vicinity of the position of the magnet, and the insulating rod and rope are pulled hard, the magnet falls off the iron tower, and the work is completed.

为保证安全,绝缘绳索和绝缘杆应在作业前确认绝缘性能良好,并保证足够安全距离和安全长度。 In order to ensure safety, insulation ropes and insulation rods should be confirmed to have good insulation performance before operation, and a sufficient safety distance and safety length should be ensured.

实施例2: Example 2:

本发明在具体实施时,所述的金属固定环5安装在距离金属火花叉放电间隙33cm、32cm、31cm、30cm、29cm、28cm、27cm、26cm、25cm、24cm、23cm、22cm、21cm、20cm、19cm、18cm、17cm、16cm、15cm、14cm、13cm、12cm、11cm、10cm、9cm、8cm、7cm、6cm及5cm中的任意一个数值的位置的绝缘操作杆2上均可以。 When the present invention is implemented, the metal retaining ring 5 is installed at a distance of 33cm, 32cm, 31cm, 30cm, 29cm, 28cm, 27cm, 26cm, 25cm, 24cm, 23cm, 22cm, 21cm, 20cm, 19cm, 18cm, 17cm, 16cm, 15cm, 14cm, 13cm, 12cm, 11cm, 10cm, 9cm, 8cm, 7cm, 6cm and 5cm in the insulation operating rod 2 of the position of any numerical value.

本发明所述的缘绳1为Φ5mm、Φ6mm、Φ7mm、Φ8mm、Φ9mm、Φ11mm、Φ12mm、Φ13mm、Φ14mm及Φ15mm中的任意一数值范围的蚕丝绝缘绳。 The edge rope 1 of the present invention is a silk insulating rope in any one of Φ5mm, Φ6mm, Φ7mm, Φ8mm, Φ9mm, Φ11mm, Φ12mm, Φ13mm, Φ14mm and Φ15mm.

本发明中所述的固定环5在具体实施时可以生产为圆形或方形或长方形或椭圆形或其它异型结构中的一种均在本发明保护范围之内。 The fixing ring 5 described in the present invention can be produced as a circle, a square, a rectangle, an ellipse or one of other special-shaped structures during specific implementation, all of which are within the protection scope of the present invention.

其它同实施例1相同。 Others are identical with embodiment 1.

Claims (3)

  1. The most laborsaving porcelain insulator zero-value live-detection electrospark fork tool, is to connect in the leading section of insulating bar (2) to have metal sparks fork discharging gap (3);It is characterized in that: have retainer ring (5) in anterior connection of insulating bar (2);Retainer ring (5) is passed by insulating cord (1), and one end connection of insulating cord (1) has permanent magnet (4);On the insulating bar (2) of the position that described retainer ring (5) is arranged on distance metal sparks fork discharging gap (3) 3cm~5cm;Described retainer ring (5) is metal material;Described permanent magnet (4) to the absorption affinity of iron between 100N~200N;The described silk insulating cord that insulating cord (1) is Φ 5mm~Φ 15mm.
  2. Laborsaving porcelain insulator zero-value live-detection electrospark fork tool the most according to claim 1, is characterized in that: the described silk insulating cord that insulating cord (1) is Φ 10mm.
  3. Laborsaving porcelain insulator zero-value live-detection electrospark fork tool the most according to claim 1, is characterized in that: described retainer ring (5) be circular, square, oval or abnormally-structured in one.
CN201310502490.0A 2013-10-23 2013-10-23 Laborsaving porcelain insulator zero-value live-detection electrospark fork tool Active CN103513170B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310502490.0A CN103513170B (en) 2013-10-23 2013-10-23 Laborsaving porcelain insulator zero-value live-detection electrospark fork tool

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310502490.0A CN103513170B (en) 2013-10-23 2013-10-23 Laborsaving porcelain insulator zero-value live-detection electrospark fork tool

Publications (2)

Publication Number Publication Date
CN103513170A CN103513170A (en) 2014-01-15
CN103513170B true CN103513170B (en) 2016-09-07

Family

ID=49896205

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310502490.0A Active CN103513170B (en) 2013-10-23 2013-10-23 Laborsaving porcelain insulator zero-value live-detection electrospark fork tool

Country Status (1)

Country Link
CN (1) CN103513170B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105676090A (en) * 2016-03-01 2016-06-15 国网辽宁省电力有限公司丹东供电公司 Live-line detection zero-value tester for porcelain insulator

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1043993A (en) * 1988-12-29 1990-07-18 西安交通大学 Potential testing device for single-end connect insulator
CN2439030Y (en) * 2000-08-25 2001-07-11 方冬青 Micro-electronic insulator zero-detection device
CN1352396A (en) * 2000-11-13 2002-06-05 苏州市增华电子成套设备厂 Insualtor detector and using method
CN202018491U (en) * 2010-12-23 2011-10-26 保定供电公司 Tool for testing zero value of insulator chain
CN203705588U (en) * 2013-10-23 2014-07-09 国家电网公司 Labor-saving spark fork tool for zero value live-line detection of porcelain insulator

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201385028Y (en) * 2009-04-15 2010-01-20 张超 Hand-held electrified insulation cleaning machine

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1043993A (en) * 1988-12-29 1990-07-18 西安交通大学 Potential testing device for single-end connect insulator
CN2439030Y (en) * 2000-08-25 2001-07-11 方冬青 Micro-electronic insulator zero-detection device
CN1352396A (en) * 2000-11-13 2002-06-05 苏州市增华电子成套设备厂 Insualtor detector and using method
CN202018491U (en) * 2010-12-23 2011-10-26 保定供电公司 Tool for testing zero value of insulator chain
CN203705588U (en) * 2013-10-23 2014-07-09 国家电网公司 Labor-saving spark fork tool for zero value live-line detection of porcelain insulator

Also Published As

Publication number Publication date
CN103513170A (en) 2014-01-15

Similar Documents

Publication Publication Date Title
CN103066526B (en) A kind of ground connection line method and separated earthing instrument for ultra-high-tension power transmission line
CN104505766B (en) The instrument and method of a kind of charged for replacement transformer station 500kV strain insulator strings
CN106099760A (en) The unmanned plane delivery system hanging insulated working rope is thrown for cord circuit livewire work of transmitting electricity
CN203352049U (en) Overhead line pulling-up assisting device
CN103606858A (en) Switched type arrestor taking and hanging tool
CN105158653A (en) Automatic and retractable type insulation tool alternating-current withstand voltage test device and system thereof
CN101588028A (en) Conducting wire supporter for electrified pole operation
CN202094539U (en) Insulating rod for hanging and dismantling line clamping machine
CN104767050B (en) Hook type personal security line
CN102185267B (en) 66KV ground potential hot-line make-and-break bypassing method
CN103513170B (en) Laborsaving porcelain insulator zero-value live-detection electrospark fork tool
CN203705588U (en) Labor-saving spark fork tool for zero value live-line detection of porcelain insulator
CN106785521A (en) A kind of combined type ground wire group
CN104836149A (en) A tool and method for removing foreign matter from a split conductor of a high-voltage line
CN203135307U (en) Temporary insulating holder for electrically connecting drainage wire
CN203300835U (en) Novel wire clamp
CN203150833U (en) Universal hook for ground lead
CN103532040A (en) Special tool and method for fixing middle-phase bypass jumper during 10kV hot-line working
CN203932825U (en) In 10kV power distribution network, charged vertical bottle is changed device
CN203085783U (en) 10kV overhead line fixed-point installation grounding device
CN203617617U (en) Switched type arrestor taking and hanging tool
CN204089033U (en) A kind of based on the two-way remover under the wire foreign-matter electrical of rope ladder head
CN204144790U (en) Two cross-arm conductor leading supports fixed insulation device
CN203299234U (en) Switch test wiring rod
CN103107428B (en) Fixed point connection method for targeted installation grounding device via overhead line 10 kv overhead line

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant