CN103474144A - Metal shell cast bus and method for manufacturing same - Google Patents
Metal shell cast bus and method for manufacturing same Download PDFInfo
- Publication number
- CN103474144A CN103474144A CN2013103980242A CN201310398024A CN103474144A CN 103474144 A CN103474144 A CN 103474144A CN 2013103980242 A CN2013103980242 A CN 2013103980242A CN 201310398024 A CN201310398024 A CN 201310398024A CN 103474144 A CN103474144 A CN 103474144A
- Authority
- CN
- China
- Prior art keywords
- metal
- flange
- shell
- vacuum
- pouring
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Casting Or Compression Moulding Of Plastics Or The Like (AREA)
- Gas-Insulated Switchgears (AREA)
Abstract
本发明公开了一种金属外壳浇注母线及其制作方法。金属外壳浇注母线包括:多个标准单元段;以及连接组件;其中任一个标准单元段包括:内导体;金属外壳;中间绝缘层;其中连接组件包括:内连接组件;外连接组件;以及中间连接绝缘层。另外还公开了一种金属外壳浇注母线的制作方法。本发明通过上述技术方案使得金属外壳浇注母线的组装更便捷,大大缩短了设计生产周期,节省成本。且连接组件中的外连接组件既是模具也承担机械应力,在浇注绝缘材料时无需脱模,并且使用中可以接地,运行更加安全可靠。
The invention discloses a cast bus bar with a metal shell and a manufacturing method thereof. The cast metal busbar includes: multiple standard unit sections; and connection components; any standard unit section includes: inner conductor; metal shell; intermediate insulation layer; the connection components include: internal connection components; external connection components; and intermediate connections Insulation. In addition, it also discloses a manufacturing method of the cast bus bar with metal casing. Through the above technical proposal, the invention makes the assembly of the metal casing cast busbar more convenient, greatly shortens the design and production cycle, and saves costs. Moreover, the external connecting component in the connecting component is not only a mold but also bears mechanical stress, and there is no need to demould when pouring the insulating material, and it can be grounded during use, making the operation safer and more reliable.
Description
技术领域technical field
本发明涉及电力传输系统中的金属封闭母线领域,特别涉及一种金属外壳浇注母线及其制作方法。The invention relates to the field of metal-enclosed busbars in power transmission systems, in particular to a metal-cased cast busbar and a manufacturing method thereof.
背景技术Background technique
金属封闭母线产品是电力传输系统中不可或缺的基础设备,其连接发电机出口与变压器、断路器、变电柜等设备,广泛应用于水电、火电、风电、核电等各种发电厂、变电站及大型工矿企业的配电系统。Metal-enclosed busbar products are indispensable basic equipment in power transmission systems. They connect generator outlets with transformers, circuit breakers, and transformer cabinets, and are widely used in various power plants and substations such as hydropower, thermal power, wind power, and nuclear power. And the power distribution system of large industrial and mining enterprises.
传统产品主要分为共箱封闭母线和离线封闭母线两大类,前者主要应用于容量较小机组和厂用等分支回路中,而后者主要应用于大容量机组和主回路中。这两大类产品又分别有多种分支和改进型产品,其绝缘介质都是空气,即使新兴的用于更大容量机组的强迫风冷离相封闭母线的绝缘介质也是空气。Traditional products are mainly divided into two categories: common box closed busbar and offline closed busbar. The former is mainly used in small-capacity units and plant branch circuits, while the latter is mainly used in large-capacity units and main circuits. These two categories of products have various branches and improved products respectively, and their insulation medium is air, even the insulation medium of the newly emerging forced air-cooled isolated phase-enclosed busbars used in larger capacity units is also air.
尽管在绝缘介质为气体的母线产品中,有的采用了绝缘性能优良的六氟化硫气体取代空气,提高了产品的产品的耐压等级,缩小了产品尺寸,但是在实际应用中需要用微正压系统使外部气体无法进入内导体,且在微正压系统充气后一段时间,气体会泄露完毕,需随时监控并启动微正压系统以补充气体,否则一旦发生外部气体入侵,会造成母线的绝缘性能低下,且不易根据电流的大小做出适应性地调整,成本高。Although in the busbar products whose insulating medium is gas, some use sulfur hexafluoride gas with excellent insulating properties to replace air, which improves the withstand voltage level of the product and reduces the size of the product, but in practical applications it is necessary to use micro The positive pressure system prevents external gas from entering the inner conductor, and after a period of time after the micro positive pressure system is inflated, the gas will leak completely. It is necessary to monitor and start the micro positive pressure system at any time to replenish the gas, otherwise, once the external gas invades, it will cause the busbar The insulation performance of the insulation is low, and it is not easy to make adaptive adjustments according to the magnitude of the current, and the cost is high.
环氧树脂浇注母线的树脂层既承担着电气主绝缘的作用,还同时担负着承受机械应力的作用。传统的浇注母线为三相浇注成一体结构,电压等级低的产品无需外壳,即无磁场屏蔽;电压等级高的产品通常会有金属外壳,但金属外壳是将三相导体密封到一起,相当于传统的共箱封闭母线结构,其金属外壳的磁场屏蔽作用较弱。因此,三相间无电磁屏蔽结构,导体电流会产生邻近效应,无论有无外壳结构,浇注母线外部的感应磁场都不可忽略,且随着导体电流的增加而增大,其载流能力在向更大电流发展时,也将受到外部磁场因素的制约。The resin layer of the epoxy resin cast busbar not only bears the role of electrical main insulation, but also bears the role of bearing mechanical stress. The traditional cast bus bar is a three-phase cast integrated structure. Products with low voltage levels do not need casings, that is, no magnetic field shielding; products with high voltage levels usually have metal casings, but the metal casings seal the three-phase conductors together, which is equivalent to The shielding effect of the magnetic field of the metal shell of the traditional common-box enclosed busbar structure is weak. Therefore, there is no electromagnetic shielding structure between the three phases, and the conductor current will produce a proximity effect. No matter whether there is a shell structure or not, the induced magnetic field outside the cast busbar cannot be ignored, and as the conductor current increases, its current-carrying capacity is increasing. When a large current develops, it will also be restricted by external magnetic field factors.
发明内容Contents of the invention
为了解决现有技术的问题,本发明一方面提供了一种金属外壳浇注母线,其包括:多个标准单元段;以及连接组件,连接于任意相邻两个所述标准单元段;其中,任一个所述标准单元段包括:内导体;金属外壳,套设于所述内导体的周向外侧;以及以浇注方式将绝缘材料填充于所述内导体和所述金属外壳之间而形成的中间绝缘层;其中,所述连接组件包括:内连接组件,连接于相邻两个所述标准单元段的内导体以使相邻两个所述标准单元段的内导体连通;设置有第一法兰、第二法兰和连接外壳的外连接组件,所述第一法兰和所述第二法兰分别套接于相邻两个所述标准单元段的金属外壳上,所述连接外壳的各面分别固定连接于所述第一法兰和所述第二法兰之间以将相邻两个所述标准单元段的金属外壳连通;以及以浇注形式将所述绝缘材料填充于所述内连接组件和外连接组件之间而形成的中间连接绝缘层。In order to solve the problems of the prior art, the present invention provides a cast metal busbar on the one hand, which includes: a plurality of standard unit sections; and a connecting component connected to any two adjacent standard unit sections; wherein, any One of the standard unit segments includes: an inner conductor; a metal shell, which is sheathed on the circumferential outside of the inner conductor; Insulation layer; wherein, the connection assembly includes: an internal connection assembly, connected to the inner conductors of two adjacent standard cell segments so that the inner conductors of the two adjacent standard cell segments are connected; a first method is provided flange, a second flange and an external connecting assembly of the connecting shell, the first flange and the second flange are respectively sleeved on the metal shells of two adjacent standard unit sections, and the connecting shell Each surface is respectively fixedly connected between the first flange and the second flange so as to connect the metal shells of two adjacent standard unit segments; and filling the insulating material in the casting form The intermediate connection insulating layer formed between the internal connection component and the external connection component.
在如上所述的金属外壳浇注母线中,优选,所述内连接组件包括连接板和螺栓;所述连接板的两端分别连接于相邻两个所述标准单元段的内导体,所述螺栓将所述连接板的两端分别固定于所述内导体上。In the cast metal busbar as described above, preferably, the internal connection assembly includes a connecting plate and bolts; both ends of the connecting plate are respectively connected to the inner conductors of two adjacent standard unit sections, and the bolts The two ends of the connecting plate are respectively fixed on the inner conductor.
在如上所述的金属外壳浇注母线中,优选,所述连接外壳包括上顶面金属板、前侧面金属板、下侧面金属板和后侧面金属板;所述上顶面金属板、所述前侧面金属板、所述下侧面金属板和所述后侧面金属板的两端分别与所述第一法兰和所述第二法兰通过螺栓连接。In the casting bus bar with a metal shell as described above, preferably, the connection shell includes an upper top metal plate, a front side metal plate, a lower side metal plate and a rear side metal plate; the upper top metal plate, the front Two ends of the side metal plate, the lower side metal plate and the rear side metal plate are respectively connected to the first flange and the second flange by bolts.
在如上所述的金属外壳浇注母线中,优选,所述标准单元段还包括支持结构,所述支持结构设置于所述金属外壳的外侧。In the cast busbar with a metal casing as described above, preferably, the standard unit section further includes a supporting structure, and the supporting structure is arranged on the outside of the metal casing.
在如上所述的金属外壳浇注母线中,优选,所述绝缘材料为环氧树脂。In the casting bus bar with a metal casing as described above, preferably, the insulating material is epoxy resin.
在如上所述的金属外壳浇注母线中,优选,所述内导体垂直于内导体轴线的截面为矩形,所述金属外壳垂直于金属外壳轴线的截面为方形。In the cast bus bar with a metal shell as described above, preferably, the cross section of the inner conductor perpendicular to the axis of the inner conductor is rectangular, and the cross section of the metal shell perpendicular to the axis of the metal shell is square.
在如上所述的金属外壳浇注母线中,优选,所述金属外壳和所述连接外壳的材质相同,所述连接板和所述内导体的材质相同;内导体的材料可以为铜、铝及新型的铜包铝,而金属外壳的材料也可以为铜、铝及新型的铜包铝,但基于成本考虑,所述金属外壳和所述连接外壳的材质优选均为铝。In the casting bus bar with a metal shell as described above, preferably, the material of the metal shell and the connecting shell is the same, and the material of the connecting plate and the inner conductor is the same; the material of the inner conductor can be copper, aluminum and new Copper-clad aluminum, and the material of the metal shell can also be copper, aluminum and new copper-clad aluminum, but based on cost considerations, the materials of the metal shell and the connecting shell are preferably aluminum.
本发明另一方面提供了一种上述金属外壳浇注母线的制作方法,所述制作方法包括:Another aspect of the present invention provides a method for manufacturing the metal-cased cast busbar, the method comprising:
步骤S10,将标准单元段的两端部裸露出一定长度的内导体;Step S10, exposing inner conductors of a certain length at both ends of the standard unit segment;
步骤S20,采用内连接组件将相邻两个所述标准单元段端部裸露出的内导体连接,从而导通相邻两个所述标准单元段的内导体;Step S20, using an internal connection component to connect the exposed inner conductors at the ends of two adjacent standard cell segments, so as to conduct the inner conductors of the two adjacent standard cell segments;
步骤S30,将第一法兰套接于相邻两个所述标准单元段之一的金属外壳,将第二法兰套接于另一个标准单元段的金属外壳,将连接外壳上顶面以外的其它各面分别连接于所述第一法兰和所述第二法兰之间,从而形成上端无盖的浇注模具;Step S30, the first flange is socketed on the metal casing of one of the two adjacent standard unit segments, the second flange is socketed on the metal casing of the other standard cell segment, and the top surface of the connecting casing is The other faces of each are respectively connected between the first flange and the second flange, thereby forming a casting mold with no cover at the upper end;
步骤S40,将与所述连接外壳上顶面形状相同且带有浇注口的临时上盖盖设于所述浇注模具上端,然后采用浇注工艺将混合好的浇注料浇注于所述内连接组件与所述连接外壳之间,形成中间连接绝缘层;Step S40, covering the upper end of the casting mold with a temporary upper cover having the same shape as the top surface of the connecting shell and having a sprue, and then using a pouring process to pour the mixed pouring material on the inner connection component and An intermediate connection insulating layer is formed between the connection shells;
步骤S50,浇注后去掉所述临时上盖,将连接外壳的上顶面连接于所述第一法兰和所述第二法兰之间以形成封闭的连接外壳,待浇注料固化后形成所述金属外壳浇注母线。Step S50, remove the temporary upper cover after pouring, connect the upper top surface of the connection shell between the first flange and the second flange to form a closed connection shell, and form the castable after solidification The above-mentioned metal casing casts the busbar.
在如上所述的制作方法中,优选,所述临时上盖上还设置有抽真空口,所述浇注工艺为真空膜浇注工艺,包括如下步骤:In the manufacturing method as described above, preferably, the temporary upper cover is also provided with a vacuum port, and the casting process is a vacuum film casting process, including the following steps:
设备安装步骤:Equipment installation steps:
用真空薄膜将盖有所述临时上盖的浇注模具全部包覆起来以使浇注模具完全密封;然后将与真空泵相连的真空管插入设置于所述临时上盖上的抽真空口中,所述抽真空口与真空管之间进行密封处理;再将与混料设备相连的注料管插入设置于所述临时上盖上的浇注口中,浇注口与注料管之间进行密封处理;Cover the casting mold covered with the temporary upper cover with a vacuum film so that the casting mold is completely sealed; then insert the vacuum tube connected to the vacuum pump into the vacuum port arranged on the temporary upper cover, and the vacuum pumping The sealing process is carried out between the mouth and the vacuum tube; then the injection pipe connected to the mixing equipment is inserted into the pouring port on the temporary upper cover, and the sealing process is carried out between the pouring port and the injection pipe;
抽真空步骤:Vacuum steps:
打开真空泵阀门,对浇注模具内部进行抽真空处理,直至达到规定的真空压力值;Open the valve of the vacuum pump to vacuumize the inside of the pouring mold until the specified vacuum pressure value is reached;
浇注步骤:Pouring steps:
将混合好的浇注料通过浇注口浇注于所述内连接组件与所述连接外壳之间,直至注满;浇注过程中,真空泵的阀门始终保持打开状态,以保证浇注模具内的压力为设定值;Pour the mixed pouring material between the inner connection assembly and the connection shell through the sprue until it is full; during the pouring process, the valve of the vacuum pump is always kept open to ensure that the pressure in the casting mold is set. value;
解除真空步骤:浇注完成后,先关闭真空泵,再拆除真空管和注料管以及真空薄膜,从而解除浇注模具的真空状态。Vacuum release step: After pouring is completed, first turn off the vacuum pump, and then remove the vacuum tube, injection tube and vacuum film, thereby releasing the vacuum state of the casting mold.
在如上所述的制作方法中,优选,所述浇注料为环氧树脂。In the above manufacturing method, preferably, the casting material is epoxy resin.
本发明实施例提供的技术方案带来的有益效果是:The beneficial effects brought by the technical solution provided by the embodiments of the present invention are:
通过设置金属外壳,提高了产品机械性能,也对环氧树脂绝缘层起到了保护作用,同时设置在浇注环氧树脂时也无需制作模具。该金属外壳浇注母线可如离相封闭母线一样,工作时在金属外壳上形成环流,对内导体产生的磁场起到良好的屏蔽作用,使得金属外壳外磁场可以忽略。铝方管浇注母线的标准单元结构较之传统浇注母线应用布置更加灵活,可根据电流大小,任意组合每相的标准单元数量,大大缩短设计生产周期。By setting the metal shell, the mechanical performance of the product is improved, and the epoxy resin insulation layer is also protected. At the same time, it is not necessary to make a mold when the epoxy resin is poured. The cast busbar in the metal casing can be like a phase-separated closed busbar, forming a circulating current on the metal casing during operation, which has a good shielding effect on the magnetic field generated by the inner conductor, so that the external magnetic field of the metal casing can be ignored. The standard unit structure of the aluminum square tube cast busbar is more flexible than the traditional cast busbar application layout. According to the current size, the number of standard units per phase can be combined arbitrarily, which greatly shortens the design and production cycle.
附图说明Description of drawings
图1是本发明实施例提供的一种金属外壳浇注母线的标准单元段的结构示意图;Fig. 1 is a schematic structural view of a standard unit section of a cast metal busbar provided by an embodiment of the present invention;
图2是本发明实施例提供的一种金属外壳浇注母线的三相标准单元段的结构示意图;Fig. 2 is a schematic structural diagram of a three-phase standard unit section of a cast metal busbar provided by an embodiment of the present invention;
图3是本发明实施例提供的一种金属外壳浇注母线中相邻两个标准单元段的连接结构示意图;Fig. 3 is a schematic diagram of the connection structure of two adjacent standard unit sections in a cast metal bus bar provided by an embodiment of the present invention;
图4是连接板与两段内导体的连接示意图;Fig. 4 is a schematic diagram of the connection between the connecting plate and the two inner conductors;
图5是本发明实施例提供的一种金属外壳浇注母线的制作方法流程示意图;Fig. 5 is a schematic flow chart of a method for manufacturing a cast metal busbar provided by an embodiment of the present invention;
其中,图中符号说明:Among them, the symbols in the figure illustrate:
1标准单元段、1 standard unit segment,
10内导体、11金属外壳、12中间绝缘层、10 inner conductor, 11 metal shell, 12 intermediate insulating layer,
13支持结构、14连接金属片、13 supporting structures, 14 connecting metal sheets,
20内连接组件、201连接板、202螺栓、20 inner connecting components, 201 connecting plate, 202 bolts,
21外连接组件、210第一法兰、211第二法兰、212连接外壳、21 external connection assembly, 210 first flange, 211 second flange, 212 connecting shell,
22中间连接绝缘层。22 intermediate connection insulating layers.
具体实施方式Detailed ways
为使本发明的目的、技术方案和优点更加清楚,下面将结合附图对本发明实施方式作进一步地详细描述。In order to make the object, technical solution and advantages of the present invention clearer, the implementation manner of the present invention will be further described in detail below in conjunction with the accompanying drawings.
参见图1至图3所示,本发明实施例提供了一种金属外壳浇注母线,其包括:多个标准单元段1;以及连接组件,其连接于任意相邻两个标准单元段1,以将多个标准单元段1组合连接在一起。Referring to Fig. 1 to Fig. 3, the embodiment of the present invention provides a metal casing cast busbar, which includes: a plurality of
其中,参见图1所示,任一个标准单元段1包括:内导体10,金属外壳11和中间绝缘层12。金属外壳11套设于内导体的周向外侧,优选地,金属外壳11的轴线与内导体10的轴线重合,金属外壳11的长度与内导体10的长度相等。将混合好的绝缘材料浇注于内导体10和金属外壳11之间以形成中间绝缘层12,浇注方式可以是真空浇注工艺,还可以是常压浇注工艺,优选地是真空膜浇注工艺,本实施例不对此进行限定,绝缘材料为阻止内导体与金属外壳导通的材料,优选为环氧树脂。Wherein, as shown in FIG. 1 , any
在实际中,内导体与金属外壳的形状可以为:垂直于内导体轴线的截面为矩形,垂直于金属外壳轴线的截面为方形;还可以为垂直于内导体轴线的截面为圆形,垂直于金属外壳轴线的截面为圆形,本实施例不对此进行限定。内导体10可以为铝母排或铜母排,本实例中采用了矩形截面铝导体,也可依据GB/T5585.1-2005《电工用铜、铝及其合金母线第一部分:铜和铜合金母线》和GB/T5585.2-2005《电工用铜、铝及其合金母线第二部分:铝和铝合金母线》选择其他截面形状和尺寸的导体。金属外壳的材质采用铝、铜、铜包铝等金属材质,为了减少成本,优选采用铝。In practice, the shape of the inner conductor and the metal shell can be: the cross section perpendicular to the axis of the inner conductor is rectangular, the cross section perpendicular to the axis of the metal shell is square; the cross section perpendicular to the axis of the inner conductor can also be circular, perpendicular to the The cross section of the metal shell axis is circular, which is not limited in this embodiment. The
该金属外壳浇注母线的中间绝缘层12采用环氧树脂作为绝缘材料,该环氧树脂既承担着电气主绝缘的作用,还同时担负着承受机械应力的作用。其能适用于各种恶劣环境,为全天候产品,可长期在零下40度环境中工作,也可埋地敷设;可在有爆炸危险、有腐蚀性液体的环境中长期工作;高温时仍可保持良好的绝缘性;环树脂不含卤素,阻燃且不会释放出有毒气体;具有很高的机械强度,耐冲击。不仅绝缘性能优良,具有较高的载流量,而且体积小、安装方便、土建基础要求不高,既不需要加热驱潮,也无须配套微正压装置来保证母线的绝缘水平。其具有安全运行30年以上无需更换维护的记录,真正实现了免维护功能。又可将内导体和金属外壳连接成一个整体,提高机械强度。The intermediate insulating
该金属外壳浇注母线的外壳采用金属外壳11,可增加该产品的机械强度,保护环氧树脂层不受侵蚀和破坏,可感应出环流屏蔽金属外壳内磁场,不会引起附近钢构等的发热,同时采用铝作为金属外壳,由于铝是热的良导体,还可以提高散热量,改善产品性能。铝外壳同时作为金属外壳,在实际应用中可以进行接地,使金属外壳部位电位为零,既可以保护人身安全,也可以避免相间短路。The shell of the cast bus bar with metal shell adopts
在实际中,每个标准单元段1的长度为1-4m,优选3m,该长度一般指的是内导体10的长度。金属外壳浇注母线的标准单元段1的数量可以根据内导体10的截面积和电流大小进行适应性地调整,由于电力传输系统中常用三相电,当该系统使用金属外壳浇注母线时,每一相由一个或多个标准单元段1组成。现有技术的浇注母线为三相浇注成一体结构,电压等级低的产品无需外壳,即无磁场屏蔽;电压等级高的产品通常会有金属外壳,但金属外壳是将三相导体密封到一起,相当于传统的共箱封闭母线结构,而本发明由于使用该金属外壳浇注母线的每一相都有一个金属外壳,且采用全连式的连接,相比于现有技术的浇注母线基本可达到金属外壳壳外磁场可忽略的效果。In practice, the length of each
参见图2所示,金属外壳浇注母线的金属外壳外侧还置有支持结构13,该支持结构13可以为环氧树脂浇注而成,也可由其他绝缘材料或金属材料制作而成,每个标准单元段由上下两块支持结构13完成支撑固定,支撑结构13上设置螺纹的预埋金属嵌件,上、下两块支撑结构13通过螺栓和连接金属片14共同实现固定作用。Referring to Fig. 2, there is also a
参见图3所示,连接组件包括:内连接组件20,外连接组件21和中间连接绝缘层22。Referring to FIG. 3 , the connection assembly includes: an
内连接组件20,其连接于相邻两个标准单元段1的内导体10以使相邻两个标准单元段的内导体10连通。The inner connecting
具体地,参见图3和图4所示,内连接组件20包括连接板201和螺栓202。连接板201的一端连接于相邻两个标准单元段中一个标准单元单元段的内导体,另一端连接于另一个标准单元段的内导体,使得相邻两个标准单元段的内导体连通,螺栓202将连接板的两端分别固定于内导体上(比如导体连接部分开有通孔,连接板上同样开有定位孔,两段内导体间离开一定距离(比如10mm)后通过螺栓、螺母分别与连接板相连接)。此外,优选螺栓在连接板上均匀布置,以使得连接板与导体连接部分接触良好,减小接触电阻。Specifically, referring to FIG. 3 and FIG. 4 , the
在其他实施例中,也可以不采用内连接组件,而是使用焊接的方法,即相邻两个标准单元段的内导体通过焊接连通,但是通过焊接使两段导体直接连接时,两导体的接触面很小,且焊接工艺也会导致接触电阻增大,会使接触部分发热严重,有发生熔焊等危险,安全性大大降低,因此更优选采用连接板螺接的连接方式。In other embodiments, it is also possible not to use the internal connection component, but to use the welding method, that is, the inner conductors of two adjacent standard unit sections are connected by welding, but when the two sections of conductors are directly connected by welding, the two conductors The contact surface is very small, and the welding process will also lead to an increase in contact resistance, which will cause serious heating of the contact part, risk of fusion welding, etc., and greatly reduce safety. Therefore, it is more preferable to use the connection method of connecting plate screw connection.
此外,优选连接板与导体为截面相同的同材质导体。首先,连接板201的材质与内导体的材质对应,例如:内导体材质为铝,则连接板材质为铝;内导体材质为铜,则连接板材质为铜。连接板形状为板状,且与内导体的形状对应,例如:内导体的形状为矩形,则连接板的形状为矩形板状;内导体的形状为圆形,则连接板的形状为弧形板状。在安装时,优选相邻两个标准单元段的各自内导体裸露出(伸出)的长度总和比连接板略长,两边导体连接部分总长大于连接板长度,是为了增加连接板的安装面积。原则上说,连接板长度越长,其与导体的接触面越大,接触越好。即连接板的左端与相邻两个标准单元段中一个(左侧)标准单元段裸露出的内导体螺接,右端与另一个(右侧)的标准单元段裸露出的内导体螺接,确保连接板以最大面积连接。In addition, it is preferable that the connecting plate and the conductor are made of the same material with the same cross-section. Firstly, the material of the connecting
外连接组件21,其包括第一法兰210、第二法兰211和连接外壳212,第一法兰210和第二法兰211分别设置于相邻两个标准单元段的金属外壳上,连接外壳212的各面分别与第一法兰210和第二法兰211固定连接以将相邻两个标准单元段的金属外壳连通,该固定连接为螺栓连接。The
将混合好的浇注料浇注于内连接组件20与外连接组件21之间以形成中间连接绝缘层22,浇注方式可以是真空浇注工艺,还可以是常压浇注工艺,优选地是真空膜浇注工艺,本实施例不对此进行限定。浇注料为阻止内连接组件与外连接组件导通的材料,优选为环氧树脂。The mixed casting material is poured between the
具体地,连接外壳212包括上顶面金属板、前侧面金属板、下侧面金属板和后侧面金属板;上顶面金属板、前侧面金属板、下侧面金属板和后侧面金属板的两端分别与第一法兰和第二法兰通过螺栓连接。连接外壳212的材质优选为铝。第一法兰和第二法兰的材质优选与金属外壳11的材质相同,比如均为铝或者均为铜。Specifically, the connecting
在本发明的另一个实施例中,提供了一种金属外壳浇注母线的制作方法,该金属外壳浇注母线为上述的金属外壳浇注母线,其制作方法如图5所示,包括:In another embodiment of the present invention, there is provided a method for manufacturing a metal-cased cast busbar. The metal-cased casted busbar is the above-mentioned metal-cased casted busbar. The manufacturing method is shown in FIG. 5 , including:
步骤S10,将标准单元段的两端部裸露出一定长度的内导体;Step S10, exposing inner conductors of a certain length at both ends of the standard unit segment;
在生产中,可以在标准单元段的金属外壳两端预留出一定长度的裸露内导体,还可以对标准单元段的金属外壳两端以及中间绝缘层进行剥离以裸露一定长度的内导体,该一定长度内导体以适于连接相邻两个标准单元段的内导体为准。In production, a certain length of exposed inner conductor can be reserved at both ends of the metal shell of the standard unit section, and the two ends of the metal shell of the standard unit section and the intermediate insulating layer can be stripped to expose a certain length of inner conductor. The inner conductor with a certain length shall be subject to the inner conductor suitable for connecting two adjacent standard unit segments.
步骤S20,采用内连接组件将相邻两个所述标准单元段端部裸露出的内导体连接,从而导通相邻两个所述标准单元段的内导体;Step S20, using an internal connection component to connect the exposed inner conductors at the ends of two adjacent standard cell segments, so as to conduct the inner conductors of the two adjacent standard cell segments;
该步骤具体包括:This step specifically includes:
将连接板和螺栓设置为内连接组件;Set connection plates and bolts as inner connection components;
将连接板的两端分别盖设于相邻两个标准单元段的裸露内导体,用螺栓将连接板的两端分别固定于裸露内导体上,在实际中,还可以对裸露的内导体进行焊接以连通相邻的标准单元段的内导体。Cover the two ends of the connecting plate on the exposed inner conductors of the two adjacent standard unit sections respectively, and fix the two ends of the connecting plate on the exposed inner conductors respectively with bolts. In practice, the exposed inner conductors can also be Weld to connect inner conductors of adjacent standard cell segments.
步骤S30,将第一法兰套接于相邻两个所述标准单元段之一的金属外壳,将第二法兰套接于另一个标准单元段的金属外壳,将连接外壳上顶面以外的其它各面分别连接于所述第一法兰和所述第二法兰之间,从而形成上端无盖的浇注模具;Step S30, the first flange is socketed on the metal casing of one of the two adjacent standard unit segments, the second flange is socketed on the metal casing of the other standard cell segment, and the top surface of the connecting casing is The other faces of each are respectively connected between the first flange and the second flange, thereby forming a casting mold with no cover at the upper end;
该步骤具体包括:This step specifically includes:
连接外壳包括上顶面金属板、前侧面金属板、下侧面金属板和后侧面金属板;The connection shell includes an upper top metal plate, a front side metal plate, a lower side metal plate and a rear side metal plate;
通过螺栓分别将下侧面金属板、前侧面金属板和后侧面金属板连接于第一法兰连接和第二法兰之间,以形成上端无盖(上端为开口)的浇注模具。The metal plate on the lower side, the metal plate on the front side and the metal plate on the rear side are respectively connected between the first flange connection and the second flange by bolts to form a casting mold with no cover at the upper end (the upper end is an opening).
步骤S40,将与连接外壳上顶面形状相同且带有浇注口和抽真空口的临时上盖盖设于所述浇注模具上端,然后采用浇注工艺将混合好的浇注料浇注于所述内连接组件与所述连接外壳之间以形成中间连接绝缘层;In step S40, a temporary upper cover having the same shape as the upper surface of the connection shell and having a pouring port and a vacuum port is placed on the upper end of the casting mold, and then the mixed castable is poured on the inner connection by a casting process Between the component and the connection shell to form an intermediate connection insulation layer;
该浇注料优选为环氧树脂,该环氧树脂包括双酚A环氧树脂,改性环氧树脂,酚醛环氧树脂,乙烯基树脂、酚醛树脂、溴化环氧树脂和液状的脂环族环氧树脂等中的一种或多种,可添加填料或不添加填料;所用的树脂还可以是聚氨酯树脂、聚酰亚胺树脂(如双马来酰亚胺(BMI)树脂)等其他可采用浇注工艺的树脂。The castable is preferably epoxy resin, which includes bisphenol A epoxy resin, modified epoxy resin, novolac epoxy resin, vinyl resin, phenolic resin, brominated epoxy resin and liquid cycloaliphatic One or more of epoxy resins, etc., with or without fillers; the resins used can also be polyurethane resins, polyimide resins (such as bismaleimide (BMI) resins), etc. Resin with casting process.
该浇注工艺优选为真空膜浇注工艺,具体操作如下:The casting process is preferably a vacuum film casting process, and the specific operations are as follows:
1)设备安装:1) Equipment installation:
用真空薄膜(比如厚度为30μm~70μm的具有一定韧性的市售真空薄膜)将盖有所述临时上盖的浇注模具全部包覆起来,并应用布等软质材料将连接外壳的四块金属板的尖锐边角处包裹,以确保真空薄膜不被破损,从而使浇注模具形成一个密封的空间;然后将与真空泵相连的真空管插入设置于所述临时上盖上的抽真空口中,抽真空口与真空管之间采用市售的密封胶条进行密封处理;再将与所述混料设备相连的注料管也插入设置于所述临时上盖上的浇注口中,薄膜上的浇注口与注料管之间采用市售的密封胶条进行密封处理;Cover the casting mold covered with the temporary cover with a vacuum film (such as a commercially available vacuum film with a thickness of 30 μm to 70 μm and a certain degree of toughness), and use soft materials such as cloth to cover the four pieces of metal connected to the shell. The sharp corners of the board are wrapped to ensure that the vacuum film is not damaged, so that the casting mold forms a sealed space; then insert the vacuum tube connected to the vacuum pump into the vacuum port provided on the temporary upper cover, and The commercially available sealing tape is used to seal the vacuum tube; the injection pipe connected to the mixing equipment is also inserted into the sprue on the temporary upper cover, and the sprue on the film is connected with the injection The tubes are sealed with commercially available sealing strips;
2)抽真空:2) Vacuuming:
关闭混料设备的注料口阀门,打开真空泵的阀门,对模具的腔体内部进行抽真空,时间为10-50s,优选为30s,然后关闭真空泵的阀门,检查是否出现因密封不当导致的漏气现象;如无漏气则打开真空泵的阀门,对真空薄膜包裹的空间进行抽真空处理,时间为1~5分钟,优选为3分钟,直至达到规定的真空压力值,比如真空数值为300~1000Pa,优选为650Pa并稳定(抽真空的时间是由模具体积和所需压力值确定的;另外,真空压力值也是根据不同树脂系统的工艺要求而定,比如也可以为700Pa,一般电气类树脂系统的工艺要求在2000Pa以内);Close the injection port valve of the mixing equipment, open the valve of the vacuum pump, and vacuum the inside of the cavity of the mold for 10-50s, preferably 30s, then close the valve of the vacuum pump to check whether there is any leakage caused by improper sealing. If there is no air leakage, open the valve of the vacuum pump and vacuumize the space wrapped by the vacuum film for 1 to 5 minutes, preferably 3 minutes, until the specified vacuum pressure value is reached, for example, the vacuum value is 300~ 1000Pa, preferably 650Pa and stable (the vacuuming time is determined by the mold volume and the required pressure value; in addition, the vacuum pressure value is also determined according to the process requirements of different resin systems, for example, it can also be 700Pa, general electrical resin The process requirement of the system is within 2000Pa);
3)浇注:3) Pouring:
待混料设备中物料混料完成后得到浇注料,即可进行浇注;打开混料设备的注料口阀门,让浇注料沿浇注口流进内连接组件与连接外壳之间,直至注满再关闭混料设备的注料口阀门,完成浇注;After the material mixing in the mixing equipment is completed, the pouring material can be obtained, and then the pouring can be carried out; open the valve of the injection port of the mixing equipment, and let the pouring material flow into the space between the inner connection component and the connecting shell along the pouring opening until it is full. Close the injection port valve of the mixing equipment to complete pouring;
浇注过程中,真空泵的阀门始终保持打开状态,以保证真空薄膜包覆空间内的压力为设定值;若浇注期间,压力值有较大变化,可通过调节真空泵的阀门来保持压力值为设定值(该设定值是300~2000Pa,比如500Pa、700Pa、900Pa、1100Pa、1300Pa、1500Pa、1700Pa、优选1000Pa以下,更优选为650Pa及其以下);During the pouring process, the valve of the vacuum pump is always kept open to ensure that the pressure in the space covered by the vacuum film is at the set value; if the pressure value changes greatly during the pouring period, the pressure value can be maintained at the set value by adjusting the valve of the vacuum pump. Fixed value (the set value is 300-2000Pa, such as 500Pa, 700Pa, 900Pa, 1100Pa, 1300Pa, 1500Pa, 1700Pa, preferably below 1000Pa, more preferably below 650Pa);
4)浇注完成后,先关闭真空泵,再拆除所有的管路和真空薄膜,以解除浇注模具的真空状态;4) After the pouring is completed, first turn off the vacuum pump, and then remove all the pipelines and vacuum films to release the vacuum state of the casting mold;
步骤S50,解除真空状态后去掉所述临时上盖,将连接外壳的上顶面金属板螺接于所述第一法兰和所述第二法兰之间以形成封闭的连接外壳,待浇注料固化后形成本发明所述的金属外壳浇注母线。Step S50, removing the temporary upper cover after releasing the vacuum state, screwing the metal plate on the upper top surface of the connecting shell between the first flange and the second flange to form a closed connecting shell, to be poured After the material is solidified, the metal casing casting busbar of the present invention is formed.
在现场安装时,只需将对应相的多个标准单元段连接起来即可组合成金属外壳浇注母线,首先,在相邻两个标准单元段的金属外壳分别套上第一法兰和第二法兰。然后,将裸露的内导体通过连接板连接成一体,并通过螺栓固定。连接段外壳包括四块铝金属板。将连接段外壳的底面和两个侧面分别与第一法兰和第二法兰螺接起来,组成一个没有上盖的简易模具。将混合好的浇注料以真空浇注工艺或常压浇注工艺或真空膜浇注工艺浇注到连接段外壳中,再将连接段外壳的上盖螺接好,待固化完全后即可,无需脱模。During on-site installation, it is only necessary to connect multiple standard unit sections of corresponding phases to form a metal casing cast busbar. First, put the first flange and the second flange on the metal casings of the two adjacent standard unit sections respectively. flange. Then, connect the exposed inner conductors into one body through the connecting plate and fix them with bolts. The connection section housing consists of four aluminum metal plates. Screw the bottom surface and two side surfaces of the shell of the connecting section with the first flange and the second flange respectively to form a simple mold without an upper cover. The mixed castable is poured into the shell of the connecting section by vacuum casting process, normal pressure pouring process or vacuum film casting process, and then the upper cover of the shell of the connecting section is screwed together. After curing is complete, there is no need to demould.
综上所述,本发明带来的有益效果如下:In summary, the beneficial effects brought by the present invention are as follows:
金属外壳浇注母线做为一种新型的环氧树脂浇注母线,除了具备体积小、载流量大、阻燃、耐化学腐蚀、免维护等一系列优点外,将金属外壳做为产品外壳,提高了产品机械性能,也对环氧树脂层起到了保护作用,同时也无需制作模具。在母线工作时,可在金属外壳上形成环流,对内导体产生的磁场起到良好的屏蔽作用,使得金属外壳外磁场可以忽略。金属外壳浇注母线由一个或多个标准单元段结构组合,使得金属外壳浇注母线生产、组装更便捷,节省成本。且应用布置更加灵活,可根据电流大小,任意组合每相的标准单元段结构数量,大大缩短了设计生产周期。且标准单元段的结构可以是直角单元还可以是T接单元等特殊单元,具体根据实际生产需要调整,满足不同客户的需求。As a new type of epoxy resin cast busbar, the metal shell cast busbar has a series of advantages such as small size, large carrying capacity, flame retardancy, chemical corrosion resistance, and maintenance-free, and the metal shell is used as the product shell, which improves the The mechanical properties of the product also protect the epoxy resin layer, and there is no need to make molds. When the bus bar is working, it can form a circulating current on the metal shell, which can shield the magnetic field generated by the inner conductor well, so that the external magnetic field of the metal shell can be ignored. The cast metal busbar is composed of one or more standard unit segments, which makes the production and assembly of the cast metal busbar more convenient and cost-saving. Moreover, the application layout is more flexible, and the number of standard unit segment structures of each phase can be combined arbitrarily according to the magnitude of the current, which greatly shortens the design and production cycle. And the structure of the standard unit section can be a right-angle unit or a special unit such as a T-joint unit, which can be adjusted according to actual production needs to meet the needs of different customers.
连接组件中的外连接组件既是模具也承担机械应力,在浇注绝缘材料时无需脱模,并且使用中可以接地,运行更加安全可靠。The external connecting component in the connecting component is not only a mold but also bears mechanical stress. It does not need to be demolded when pouring insulating materials, and it can be grounded during use, making the operation safer and more reliable.
以上所述仅为本发明的较佳实施例,并不用以限制本发明,凡在本发明的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本发明的保护范围之内。The above descriptions are only preferred embodiments of the present invention, and are not intended to limit the present invention. Any modifications, equivalent replacements, improvements, etc. made within the spirit and principles of the present invention shall be included in the protection of the present invention. within range.
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201310398024.2A CN103474144B (en) | 2013-09-04 | 2013-09-04 | Metal shell cast bus and preparation method thereof |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201310398024.2A CN103474144B (en) | 2013-09-04 | 2013-09-04 | Metal shell cast bus and preparation method thereof |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN103474144A true CN103474144A (en) | 2013-12-25 |
| CN103474144B CN103474144B (en) | 2015-11-25 |
Family
ID=49798960
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201310398024.2A Active CN103474144B (en) | 2013-09-04 | 2013-09-04 | Metal shell cast bus and preparation method thereof |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN103474144B (en) |
Cited By (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN104701793A (en) * | 2015-03-18 | 2015-06-10 | 北京电力设备总厂有限公司 | Site casting bus |
| CN105449605A (en) * | 2015-12-23 | 2016-03-30 | 湖北新昇变压器有限公司 | High-strength busbar bridge framework |
| CN106025968A (en) * | 2016-07-20 | 2016-10-12 | 国家电网公司 | Detachable fracture device for enclosure type isolated-phase bus |
| CN108599064A (en) * | 2018-05-21 | 2018-09-28 | 深圳市沃尔核材股份有限公司 | The connection method and connection structure of a kind of wind tower with two tube type bus |
| CN112615170A (en) * | 2020-12-03 | 2021-04-06 | 广东电网有限责任公司电力科学研究院 | Electric primary equipment joint and heating processing method thereof |
| CN113824307A (en) * | 2021-09-23 | 2021-12-21 | 珠海格力电器股份有限公司 | Three-phase copper bar device and servo driver |
| CN115410759A (en) * | 2021-05-27 | 2022-11-29 | 深圳市沃尔核材股份有限公司 | Integral flexible power transmission bus |
| CN116031667A (en) * | 2023-02-14 | 2023-04-28 | 浙江上加电力科技有限公司 | a terminal block |
| CN119694678A (en) * | 2024-12-27 | 2025-03-25 | 湖北兴和电力新材料股份有限公司 | Metal shell cast insulated busbar and manufacturing method thereof |
Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| GB328656A (en) * | 1927-12-13 | 1930-05-01 | Condit Electrical Mfg Corp | Improvements in or relating to electric high tension systems |
| CN1650495A (en) * | 2002-12-16 | 2005-08-03 | 三菱电机株式会社 | Insulation bus system and its connecting method of bus unit |
| CN101320873A (en) * | 2007-11-23 | 2008-12-10 | 北海银河高科技产业股份有限公司 | High-voltage great-current fixed sealing type bus connector and its production method |
| CN202084662U (en) * | 2011-06-15 | 2011-12-21 | 西安西能电器新技术发展有限公司 | Bus connector for cubicle gas-insulated metal-enclosed switchgear |
| CN202190041U (en) * | 2011-08-11 | 2012-04-11 | 沈文瑛 | Low-medium voltage full-pouring type bus duct below 17.5kV |
| CN203415282U (en) * | 2013-09-04 | 2014-01-29 | 北京电力设备总厂 | Metal shell casting busbar |
-
2013
- 2013-09-04 CN CN201310398024.2A patent/CN103474144B/en active Active
Patent Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| GB328656A (en) * | 1927-12-13 | 1930-05-01 | Condit Electrical Mfg Corp | Improvements in or relating to electric high tension systems |
| CN1650495A (en) * | 2002-12-16 | 2005-08-03 | 三菱电机株式会社 | Insulation bus system and its connecting method of bus unit |
| CN101320873A (en) * | 2007-11-23 | 2008-12-10 | 北海银河高科技产业股份有限公司 | High-voltage great-current fixed sealing type bus connector and its production method |
| CN202084662U (en) * | 2011-06-15 | 2011-12-21 | 西安西能电器新技术发展有限公司 | Bus connector for cubicle gas-insulated metal-enclosed switchgear |
| CN202190041U (en) * | 2011-08-11 | 2012-04-11 | 沈文瑛 | Low-medium voltage full-pouring type bus duct below 17.5kV |
| CN203415282U (en) * | 2013-09-04 | 2014-01-29 | 北京电力设备总厂 | Metal shell casting busbar |
Cited By (12)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN104701793A (en) * | 2015-03-18 | 2015-06-10 | 北京电力设备总厂有限公司 | Site casting bus |
| CN104701793B (en) * | 2015-03-18 | 2017-04-19 | 北京电力设备总厂有限公司 | Site casting bus |
| CN105449605A (en) * | 2015-12-23 | 2016-03-30 | 湖北新昇变压器有限公司 | High-strength busbar bridge framework |
| CN106025968A (en) * | 2016-07-20 | 2016-10-12 | 国家电网公司 | Detachable fracture device for enclosure type isolated-phase bus |
| CN108599064A (en) * | 2018-05-21 | 2018-09-28 | 深圳市沃尔核材股份有限公司 | The connection method and connection structure of a kind of wind tower with two tube type bus |
| CN108599064B (en) * | 2018-05-21 | 2024-01-09 | 深圳市沃尔核材股份有限公司 | Connection method and connection structure of two tubular buses for wind power tower |
| CN112615170A (en) * | 2020-12-03 | 2021-04-06 | 广东电网有限责任公司电力科学研究院 | Electric primary equipment joint and heating processing method thereof |
| CN115410759A (en) * | 2021-05-27 | 2022-11-29 | 深圳市沃尔核材股份有限公司 | Integral flexible power transmission bus |
| CN113824307A (en) * | 2021-09-23 | 2021-12-21 | 珠海格力电器股份有限公司 | Three-phase copper bar device and servo driver |
| CN116031667A (en) * | 2023-02-14 | 2023-04-28 | 浙江上加电力科技有限公司 | a terminal block |
| CN119694678A (en) * | 2024-12-27 | 2025-03-25 | 湖北兴和电力新材料股份有限公司 | Metal shell cast insulated busbar and manufacturing method thereof |
| CN119694678B (en) * | 2024-12-27 | 2025-07-15 | 湖北兴和电力新材料股份有限公司 | Metal shell casting insulation bus and manufacturing method thereof |
Also Published As
| Publication number | Publication date |
|---|---|
| CN103474144B (en) | 2015-11-25 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN103474144B (en) | Metal shell cast bus and preparation method thereof | |
| CN203415282U (en) | Metal shell casting busbar | |
| JP3845534B2 (en) | Switchgear | |
| CN104701793B (en) | Site casting bus | |
| CN201397713Y (en) | Tubular busbar shielding insulation sleeve | |
| CN204012555U (en) | A kind of resin pultrusion solid pouring bus groove | |
| CN103208349A (en) | Winding water-cooling gas insulating transformer | |
| CN207116176U (en) | A kind of explosion-proof oil-filled transformer | |
| CN205178403U (en) | Cable splice connecting box | |
| CN204577312U (en) | A kind of superhigh pressure GIS isolating switch Birmasil housing with three station delivery outlets | |
| CN205194492U (en) | Current inducer | |
| CN205029901U (en) | Novel explosion -proof energy -conserving electromagnetic heating stick | |
| CN104265186B (en) | A kind of protect oil pipe, the cathode protection device of internal surface of sleeve pipe and manufacture method | |
| CN204615324U (en) | Cast-in-site bus | |
| CN206742805U (en) | A kind of waterproof fireproofing bus duct | |
| CN104466848A (en) | Multi-insulation-structure pouring type middle-high voltage bus duct | |
| CN106300175B (en) | Wall bushing radiator structure and the switchgear for using the structure | |
| CN203911415U (en) | Compact-type high-protection anti-flaming bus duct and joint | |
| Guan et al. | Electromagnetic field and force analysis of three-phase enclosure type GIS bus capsule | |
| CN203896084U (en) | Three-phase asynchronous motor | |
| CN215452450U (en) | Metal box type full-insulation pouring bus | |
| CN210957715U (en) | Waterproof and fireproof bus duct system | |
| CN203521064U (en) | Turning basin-type insulator | |
| CN104835675A (en) | Ultrahigh-voltage GIS isolating switch cast aluminum alloy housing with a three-position output port | |
| CN203351331U (en) | Underground type distribution transformer |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| C53 | Correction of patent of invention or patent application | ||
| CB02 | Change of applicant information |
Address after: 102401 Beijing City, Fangshan District Liangxiang Haotian Street No. 12 Applicant after: Co., Ltd of Beijing Electrical Equipment Factory Applicant after: China Nuclear Power Engineering Co., Ltd. Address before: 102401 Beijing City, Fangshan District Liangxiang Haotian Street No. 12 Applicant before: Beijing Electric Power Equipment General Factory Applicant before: China Nuclear Power Engineering Co., Ltd. |
|
| COR | Change of bibliographic data |
Free format text: CORRECT: APPLICANT; FROM: BEIJING POWER EQUIPMENT GENERAL PLANT TO: BEIJING ELECTRIC POWER EQUIPMENT GENERAL FACTORY CO., LTD. |
|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant |