CN103472778B - Intelligent control management system between skyscraper electrical equipment - Google Patents
Intelligent control management system between skyscraper electrical equipment Download PDFInfo
- Publication number
- CN103472778B CN103472778B CN201310387661.XA CN201310387661A CN103472778B CN 103472778 B CN103472778 B CN 103472778B CN 201310387661 A CN201310387661 A CN 201310387661A CN 103472778 B CN103472778 B CN 103472778B
- Authority
- CN
- China
- Prior art keywords
- electrical equipment
- sensor
- skyscraper
- room
- management system
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Air Conditioning Control Device (AREA)
- Ventilation (AREA)
Abstract
Intelligent control management system between a kind of skyscraper electrical equipment,, in central control room (CCR), computer system is installed, it comprises master server, standby server, display and communication network device, install intelligent monitor, sensor, communication module and ventilation drying equipment in monitoring cabinet between the every one deck electrical equipment of skyscraper, described intelligent monitor is connected with sensor and carries out data acquisition; Described sensor comprises temperature sensor, camera, humidity sensor, gas concentration sensor and voltage, current sensor; Various control execution unit is also provided with in equipment room, intelligent monitor transmits data to the computer system of central control room (CCR) by network transmission module, or the instruction that reception control center issues, and perform steering order, temperature between electrical equipment, humidity, harmful gas concentration are monitored, make it in critical field, thus ensure that in skyscraper between electrical equipment electrical equipment safety, reliably run.
Description
Technical field
The present invention relates to control treatment system between a kind of skyscraper electrical equipment, particularly the temperature between skyscraper electrical equipment, humidity, harmful gas, fire hazard are carried out to the computer management system of centralized detecting and control.
Background technology
Along with the increase of urban population, construction speed is accelerated, and construction land is nervous, forces big and medium-sized cities to be built and constantly develops to high level.Although the construction of skyscraper can solve the problems such as urban land anxiety effectively, skyscraper is also with and is served unfavorable factor, except having an impact to the living environment of people, also produces larger impact to a large amount of electrical equipments be installed with in skyscraper.Some unfavorable factors that skyscraper environment brings mainly contain: high temperature, low temperature, moisture, mould and harmful toy, thunder and lightning, fire hazard, electrostatic, electromagnetic interference (EMI) etc.In order to ensure that electrical equipment holds reliable function and the adaptive faculty to environment in the continuation of insurance of these environment relayings, just different protection countermeasure must be taked according to its different installation environment.Although electrical equipment is in Design and manufacture, just consider the installation environment of product and feature and take some safeguard procedures, but concerning the design in several serious fires person of construction work, also must according to environmental characteristic special in skyscraper, reasonably select different electronic machines & apparatus, in order to improve electrical, reliability that power supply-distribution system runs and there is rational economic and technique level.
Being generally every layer between current skyscraper electrical equipment establishes between one, in order to save space, become vertical row design (generally running through all floors), area be approximately 2-5 ㎡/, so be also called electric well, in skyscraper electrical equipment due to the electric equipment installed and circuit more, so control temperature, humidity and fire prevention, anticreep just more strict than low-rise building, for south China, Guangxi, Guangdong, Hunan, Sichuan, Guizhou, the feature of the weathers such as Hainan be that spring, there was dampness in the air and summer and autumn temperature high, the changeable condensation causing equipment of spring temperature, summer and autumn high temperature and equipment heating produce temperature rise, easily cause equipment failure (as device damage) and accidents caused hidden danger (as leakage fire).
Also have, some place in skyscraper is provided with steam, the equipment of hot duct or some dissipating high temperature, electrical equipment is in its vicinity installed and circuit all will be subject to the impact of hyperthermia radiation environment to some extent, its serviceable life is greatly reduced, in addition, of some electrical equipments itself is as transformer, the equipment such as diesel emergency generating set also give out high temperature, natural ventilation and radiating condition very poor, if do not taked forced draft measure, larger on the impact of electrical equipment, the capacity of switch can be made to reduce, electrothermal relay misoperation, the technical feature of electron device is destroyed.When electrical equipment and circuit work for a long time in high temperature environments, insulating material can be made to soften, so dry and cracked; When road is short-circuited, as can not be protection switch made in time to trip, the outer jacket of insulated conductor will be caused to melt, catch fire, and then cause large-scale fire failure.
And northern, as some severe cold areas of northern China, the low temperature environment caused winter, makes the insulating material of electrical equipment shrink, hardening or embrittlement, and the electric property of oil switch and oil-filled electric equipment and mechanical property reduce.Fire fighting water system in skyscraper can freeze because of the low temperature in winter.If do not taked effective antifreezing measures, water pipe from freezing crack seepage will be caused, leading to great electric equipment accident.
About wet gas environments, except above-mentioned said weather condition, the place that water plant in skyscraper, basement or water vapor are larger, the inside electric appliance installed near moist steam can permeate and be diffused into, serious meeting makes the inside of electrical equipment or outside condensation form moisture film, metal surface heavy corrosion, these components and parts electric properties can be caused to decline, the insulation resistance of material surface is fallen and insulate breakdown, the strength of materials reduces, dielectric loss angle increases, the malfunctioning and electric contact loose contact of components and parts etc.
Electrical equipment makes moist and can make the decreasing insulating of equipment, insulating material accelerated deterioration.According to MEDIUM THEORY, ambient humidity increase can make the corresponding increase of dielectric conductivity, relative dielectric constant, medium consumpting angle tgδ, and breakdown field strength reduces.In electrical equipment use procedure, its insulating element can become fragile under the action of heat, and after vibrated, its surface has tiny crackle.Again due to electrical equipment after a period of operation, will depend on certain dust on its surface, after making moist between electrical equipment, moisture will make the dust be attached on these crackles bring crack into.Under the acting in conjunction of moisture and dust, very low voltage also may cause electric discharge phenomena, makes insulating material damaged or puncture.
Under the effect of moisture and high temperature, the metallic conductor of electrical equipment also can oxidizedly corrode (particularly when it adheres to dust), conductor connection place contact resistance is increased, causes local overheating.Particularly " going back to Nan Tian ", the effect that the metal of electrical equipment and non-metallic component can be subject to temperature, oxygen, humidity and dust common, makes the condition of work of electrical equipment more worsen, has a strong impact on the safe operation of electrical equipment.If do not take protection against the tide and temperature control measures between high-rise green building electrical equipment, the serviceable life of electrical equipment will greatly reduce.When the insulating material of electrical equipment and metallic conductor are corroded to a certain degree, if under electrical equipment is still operated in the environment of humidity and high temperature, will the electrical equipment safe operation of serious threat equipment room, also the safe operation of the consumer of entail dangers to user, and electric leakage, short circuit may be caused, cause the generation of serious electric fault and accident.Once generation electric fault, gently then can electrical equipment be damaged, heavy then cause line short to damage other consumers, even may cause circuit, equipment spontaneous combustion, cause fire failure to occur, the safety of life and property of the serious threat people.Along with the raising that development and the people of modern science and technology require intelligent building, the number of devices between electrical equipment is also being on the increase, and high-tech, the expensive proportion shared by electronic equipment are also in increase.These equipment are once break down or moisture damage, and economic loss that will be huge, seriously affects the normal Working Life of people.
In domestic open source literature, few about the relevant report of dehumidifying, temperature control treatment technology fireproof research and apply between electrical equipment.Wherein: 1), the Chongqing Electric scientific experiment research institute Liu Hua operating environment of power distribution room adjusting and control instrument describing Chongqing Electric scientific experiment research institute and Chinese DianKeYuan cooperation and jointly research and develop such as brave.This adjusting and control instrument possesses the automatic operation being specifically designed to the cool-down dehumidification equipment such as Long-distance Control power distribution room air-conditioning, exhaust fan and dehumidifier.By running experiment, demonstrate the operation that temperature controller effectively can control the equipment such as air-conditioning, reach and improve operating environment of power distribution room, alleviate the object of the workload of maintainer.2), Yuan Tong Electron Technology Co., Ltd in Xiamen opens sunlight application and runs on μ PSD3234A single-chip microcomputer that 40MHz crystal oscillator has 8051 kernels and utilize I/O port communication and AD conversion DS18B20 temperature measurement device and HM1500 temperature measurement device, and data are delivered to computing machine main website by the RS232 serial communication of single-chip microcomputer by measurement result, and export 24V DC voltage by I/O port through Darlington transistor, directly or realize the automatic measuring and controlling of transformer and distribution power station humiture again through DC/AC Control exhaust fan, dehumidifier, air-conditioning node, alarm signal etc.This systematic difference, contributes to the running environment improving transformer and distribution power station, promotes the reliable and stable operation of grid equipment.But, how to carrying out unified dehumidifying, the research of temperature control treatment technology fireproof between high-rise intelligent building electrical equipment, setting up computer control system, ensureing that electrical equipment normally runs and also not seeing that open source literature is reported.
Summary of the invention
The object of this invention is to provide a kind of computer management system of the temperature between skyscraper electrical equipment, humidity, harmful gas, fire hazard being carried out to centralized detecting and control.
Technical scheme of the present invention is as follows:
Intelligent control management system between skyscraper electrical equipment of the present invention,, in central control room (CCR), computer system is installed, it comprises master server, standby server, display and communication network device, install intelligent monitor, sensor, communication module and ventilation drying system in monitoring cabinet between the every one deck electrical equipment of skyscraper, described intelligent monitor is connected with sensor and carries out data acquisition; Described sensor comprises temperature sensor, camera, humidity sensor, gas concentration sensor and voltage, current sensor; Various control execution unit is also provided with in equipment room, intelligent monitor transmits data to the computer system of central control room (CCR) by network transmission module, or the instruction that reception control center issues, and perform steering order, temperature between electrical equipment, humidity, harmful gas concentration are monitored, makes it in critical field.
Intelligent control management system between skyscraper electrical equipment of the present invention, door lock between skyscraper electrical equipment can be monitored, when needing installation and maintenance personnel to enter between electrical equipment, central control room (CCR) is interior or can send instruction at the computing machine of estate management office, can prevent and treat unrelated person enters between electrical equipment by oneself bitting, particularly important for confidential departments like this.Prevent unrelated person from entering between electrical equipment.
Intelligent control management system between skyscraper electrical equipment of the present invention, can set up data sharing with fire-fighting system in buildings.After being combined with fire-fighting system, start air-exhausting function as smoke discharging function, the state of fire-fighting isolation valve carries out Real-Time Monitoring.
Above-described ventilation drying system comprises ventilation unit and dehydrating unit, described ventilation unit has fan blower and air exhauster, vertical ventilation is adopted to carry out inner air and outer air circulation, described dehydrating unit is contained in the import between electrical equipment, gas is dehumidified, it comprises condensation chamber and charcoal absorption room, in the middle of two Room, semiconductor refrigerating condenser and heat-barrier material are installed, condensation chamber is provided with condenser, wetly gas outlet, condensation chamber bottom and valve is housed, the air of remove portion condensate water is led to charcoal absorption room, charcoal absorption room is provided with heating radiator and activated charcoal, dry gas is discharged from the gas outlet on top, charcoal absorption room and is entered between electrical equipment, bottom, charcoal absorption room is provided with ultrasonic ultrasonic delay line memory.
Described dehumidifying and temperature controlled processes as follows: when indoor humid air enters condenser from air intake opening, moisture condensation, is discharged condensate water by valve, flow in ultrasonic ultrasonic delay line memory, be atomized under hyperacoustic effect, by air draft outdoor exhaust outlet be discharged into outdoor; Condensed air is through radiators heat, and the activated charcoal of activated charcoal moisture absorption room adsorbs wherein residual steam more simultaneously, and last heated dry air is discharged into indoor by gas outlet; This process constantly circulates, and indoor humid air is changed into dry air, i.e. dehumidification process.When between electrical equipment temperature more outdoor high time, steam can not in indoor condensation, and temperature is elevated to a certain degree, needs cooling, will valve-off, from gas outlet discharge after the air entered from air intake opening is cooled, is transmitted back to indoor; The heat of heating radiator then by atomization air draft outdoor exhaust outlet be rejected to outdoor, heat activated charcoal carries out activated charcoal reactivation process simultaneously; This process and process of refrigerastion.When needs heat, can control the direct current input reversal of poles of semiconductor cooler, process of refrigerastion just changes heating operations into
Between above-described central control room (CCR) and electrical equipment, the intelligent monitor software of monitoring cabinet adopts " industrial configuration software " development platform to design, use programmable logic controller (PLC) (PLC), communication mode takes industrial-controlled general line RS485, TCP/IP and wireless digital (ZigBee) forwarder, temperature sensor, camera, humidity sensor, gas concentration sensor and voltage, current sensor all adopt Intelligence sensor.Be transferred to Surveillance center after data acquisition, center control computer and PLC are according to the change Automated condtrol of data, and fire hydrant automatic control switch adopts solenoid valve.
The computer system of installing in central control room (CCR) of the present invention, has master server and standby server, can ensure master server just in case when breaking down, cut-in stand-by server at once, to ensure the security of operation of building electrical equipment.
Outstanding substantive distinguishing features of the present invention and significant progress:
1, system application is wide, is applicable to polytype building, and particularly dehumidifying, temperature control and fire-fighting system are closely as one, and process of vertically ventilating, multi-mode control the collection control techniques combined, and make system be in energy conservation model all the time.System not only monitors the parameter such as humidity, temperature between electrical equipment, also detects the parameter such as voltage, electric current of CO, CO2, smog, low-voltage distribution cabinet, and the fire between further prevention apparatus occurs.Controll plant needs running in 24 hours, and horizontal dehumidification system is the central air conditioner system utilizing building, do not mate from time running aspect, and fan coil easily condense and affect below equipment safety system can with fire-fighting system combine after, air-exhausting function can do smoke discharging function, the state of fire-fighting isolation valve can Real-Time Monitoring, increases the reliability of fire-fighting system.
2, avoid distributed system (referring to for the dehumidifier arranged independent between individual equipment) energy consumption high problem, avoid horizontal dehumidification system and the unmatched problem of controll plant.Distributed system cannot be monitored according to the demand of controll plant and object environment situation (open/close state as equipment room door), in addition system do not mate with controll plant (for 2-5 ㎡/ civilian dehumidifier little), system availability is low, and energy consumption is high.
3, the present invention can improve the working environment of equipment room electrical equipment, the serviceable life of prolongation electrical equipment and reduce the accident rate of electrical equipment, study dehumidifying, temperature control treatment measures between high-rise green building electrical equipment, utilize Site Detection, vertically to ventilate the collection control techniques that process, multi-mode control to combine, make controll plant (between floor power distribution station, floor light current, control of temperature and humidity down together) is in critical field, avoid causing equipment failure and hidden danger, ensure the safe operation of electrical equipment between high-rise green building electrical equipment.
4, system adopts Site Detection, vertically to ventilate the collection control techniques that process, multi-mode control to combine, and makes system be in energy conservation model all the time, solves horizontal dehumidification system and the unmatched problem of controll plant.
5, the communication mode adopting ZigBee radio communication, RS485 bus and TCP/IP to combine, the operation conditions of on-line monitoring system; Use PLC to monitor in real time equipment room environment, guarantee security of operation, easy to maintenance.
6, dehumidifying of the present invention, temperature control disposal system can not only ensure that electrical equipment works at dry and suitable temperature, ensure electrical equipment safe operation, and can also realize the requirement of energy-conserving and environment-protective.Primary design according to native system: native system can save electrical equipment replacement cost, realizes dehumidifying, temperature control effect efficiently.Meanwhile, dehumidifying, temperature control device and utilize dehumidify temperature control system, the transverse direction temperature control system that dehumidifies of semiconductor refrigerating cool-down dehumidification, distributing to compare with general central air conditioner dehumidifying technology, at least can save the energy of more than 50%.Further, this system adopts intelligent control technology, greatly reduces the demand that equipment is safeguarded manpower, reduces human cost at least 50%.
7, the present invention adopts smoke transducer, camera, can monitor breaking out of fire between electrical equipment, and fire hazard is main in skyscraper and least negligible a kind of environment.Because the using function of skyscraper inside is comparatively complicated, equipment is various, there is multiple ignition source and a large amount of combustibles.In addition, electrical equipment or circuit overload operation or short circuit, lighting and heating equipment are near combustible etc., as unreasonable in designed, and add mismanagement, are easy to breaking out of fire and lead to serious consequence.Due in skyscraper once breaking out of fire, its spreading velocity of fire is fast, and evacuating personnel difficulty in building, difficulty of putting out a fire to save life and property is large, not only causes serious harm to the life of personnel in building and the safety of property, and also very big to the destructiveness of electrical equipment.
8, except above-mentioned to except temperature, humidity, gas componant, door lock and breaking out of fire, can also monitor the medium of electromagnetic intensity, corrosion and explosion danger as required.In intelligent skyscraper, have employed a large amount of microcomputers and micro computer monitoring and electric control gear, their working power is all provided by electric system.Owing to power supply network being connected to some rectifications and inverter, thus make to produce in power supply and mix the interference voltage having a large amount of higher hamonic wave (mainly second harmonic), if do not take effective interference protection measure, microcomputer and electric-control system ground wire " floating " will be caused, the faults such as logic and program confusion, deadlock and misoperation, serious meeting makes microsystem cisco unity malfunction.In addition, external electromagnetic interference (as caused electromagnetic pulse of being struck by lightning) around skyscraper or the high-frequency apparatus, radio and television emitter, microwave radiation device, high voltage overhead lines etc. of some works, section, doctor etc. that close on all can produce: raw electromagnetic radiation, make the interference that the infosystem equipment such as the electronic installation in skyscraper, computing machine, communication and audiovisual are subject in various degree, and cisco unity malfunction, as comprehensive wiring system region memory electromagnetic interference (EMI) field intensity be greater than 3V/m time, just should take anti-electromagnetic interference (EMI) measure.The communication mode that concrete embodiment also can adopt ZigBee radio communication, RS485 bus and TCP/IP to combine, the operation conditions of on-line monitoring system.
Accompanying drawing explanation
Fig. 1 is intelligent control management system general structure schematic diagram between skyscraper electrical equipment of the present invention.
System all parts sequence number is as follows:
Master server 1, standby server 2, printer 3, large screen display system 4, communication network 5, monitoring cabinet 6, testbus 7, control bus 8, blowing device 9, refrigeration plant 10, dehumidification equipment 11, exhaust equipment 12, miscellaneous equipment (smoke exhaust fire damper, gate controlled switch etc.) 13, intelligent gas sensor 14, intelligent temperature sensor 15, intelligent humidity sensor 16, Intelligent electric parameter sensors 17, other sensor (smoke-sensing switch, pyroelectric sensor etc.) 18, camera 19, cabinet door lock 20.
Due to feature and the environmental characteristic itself had of skyscraper, in intelligent skyscraper, be particularly provided with equipment and the circuit of a large amount of power equipments and infosystem, its use occasion and purposes are had nothing in common with each other, and comparatively complicated.Therefore, the present invention, devises best safeguard procedures, makes it to accomplish practicality, rationally, can ensure that the electrical equipment in skyscraper comprises infosystem device security, reliably runs very well.
Fig. 2 is that dehumidification system " dries, freezes, heats " principle schematic.
Air intake opening 21, condenser 22, semiconductor cooler 23, gas outlet 24, heating radiator 25, activated charcoal 26, gas outlet 27, ultrasonic ultrasonic delay line memory 28, outdoor exhaust outlet 29, valve 30, condensate water 31, atomization air draft 32, heat-barrier material 33.
Indoor humid air enters condenser 22 from air intake opening 21, and steam is condensed into as the globule 31, is discharged, flow in ultrasonic atomization chamber 28, be atomized under hyperacoustic effect by the pipeline under valve 30, by air draft outdoor exhaust outlet 29 be discharged into outdoor; Air after condensation (dehumidifying) is through valve 30, and heating radiator 25 adds its heating, and activated charcoal 26 adsorbs wherein residual steam more simultaneously, and last heated dry air is discharged into indoor by gas outlet 27; This process constantly circulates, and indoor humid air is changed into dry air, i.e. dehumidification process.Heat-barrier material 33 is housed between heating radiator 25 and condenser 22; When between electrical equipment temperature more outdoor high time, steam can not in indoor condensation, and temperature is elevated to a certain degree, needs cooling, will valve-off 30, discharges, be transmitted back to indoor after the air entered from air intake opening 21 is cooled from gas outlet 24; The heat of heating radiator then by atomization air draft 32 outdoor exhaust outlet 29 be rejected to outdoor, heat activated charcoal 26 carries out activated charcoal 26 reactivation process simultaneously; This process and process of refrigerastion.When needs heat, can control the direct current input reversal of poles of semiconductor cooler 23, process of refrigerastion just changes heating operations into.
Fig. 3 is the PLC monitoring software process flow diagram that the present invention adopts:
Process is as follows:
Monitoring cabinet needs to monitor the various parameters in skyscraper electrical equipment, whether normally comprise the various voltage be arranged in electrical equipment, electric current, if abnormal, start warning, when voltage, electric current are all normal, whether temperature, humidity and the gas concentration of then monitoring in electrical equipment be qualified, when temperature is abnormal, starts thermoregulating system; When humidity is abnormal, start dehumidification system; When gas is defective, such as carbon dioxide, carbon monoxide equal size abnormal (breaking out of fire) then start ventilating system, if it is too many that temperature, humidity and gas concentration exceed setting value, also will report to the police, so just can avoid causing equipment failure and hidden danger, ensure the safe operation of electrical equipment between high-rise green building electrical equipment.
Embody rule embodiment
Within 2010, unit of Nanning City has built 31 floor height buildings, electric control room is once being easy to occur trip phenomenon to the humidity in 2-4 month and 25 degree of weather, 2011, this unit entrusts the present inventor again to transform between skyscraper electrical equipment, adopt intelligent control management system of the present invention, install in central control room (CCR) and comprise main frame, master console, the computing machine that master control room display screen and router are formed, between skyscraper electrical equipment, the entrance of every one deck installs ventilation unit and dehydrating unit, dehydrating unit is arranged on air intake place, in monitoring cabinet 6, intelligent gas sensor 14 is installed, intelligent temperature sensor 15, intelligent humidity sensor 16, Intelligent electric parameter sensors 17, other sensor (smoke-sensing switch, pyroelectric sensor etc.) 18, voltage in camera and regulator cubicle 6, galvanometer connects, then by Internet Transmission in central control room (CCR), within 2011-2012 years, run 1 year mainly with coming, the wet weather in special experience 2-3 month, behaviour in service is good, there is no primary circuit trip phenomenon.
Claims (4)
1.
intelligent control management system between skyscraper electrical equipment, it is characterized in that: in central control room (CCR), computer system is installed, it comprises master server, standby server, display and communication network device, install intelligent monitor, sensor, communication module and ventilation drying system in monitoring cabinet between the every one deck electrical equipment of skyscraper, described intelligent monitor is connected with sensor and carries out data acquisition; Described sensor comprises temperature sensor, camera, humidity sensor, gas concentration sensor and voltage, current sensor; Various control execution unit is also provided with in electrical equipment, intelligent monitor transmits data to the computer system of central control room (CCR) by network transmission module, or the instruction that receiving center pulpit computing machine issues, and perform steering order, temperature between electrical equipment, humidity and harmful gas concentration are monitored, makes it in critical field;
described ventilation drying system comprises ventilation unit and dehydrating unit, and described ventilation unit has fan blower and air exhauster, adopts vertical ventilation to carry out inner air and outer air circulation; Described dehydrating unit is contained in the import between electrical equipment, air is dehumidified, it comprises condensation chamber and charcoal absorption room, in the middle of two Room, semiconductor refrigerating condenser and heat-barrier material are installed, condensation chamber is provided with condenser, wetly gas outlet, condensation chamber bottom and valve is housed, the air of remove portion condensate water is led to charcoal absorption room, charcoal absorption room is provided with heating radiator and activated charcoal, dry air is discharged from the gas outlet on top, charcoal absorption room and is entered between electrical equipment, and bottom, charcoal absorption room is provided with ultrasonic ultrasonic delay line memory.
2.
intelligent control management system between skyscraper electrical equipment according to claim 1, is characterized in that: the door lock between intelligent control management system also comprises skyscraper electrical equipment is monitored, and prevents unrelated person from entering between electrical equipment.
3.
intelligent control management system between skyscraper electrical equipment according to claim 1, is characterized in that: intelligent control management system can set up data sharing with fire-fighting system in buildings.
4.
intelligent control management system between the skyscraper electrical equipment according to any one of claim 1-3, it is characterized in that: the intelligent monitor of the monitoring cabinet between central control room (CCR) and electrical equipment uses programmable logic controller (PLC) PLC, communication mode takes industrial-controlled general line RS485, TCP/IP and wireless digital ZigBee forwarder, and temperature sensor, camera, humidity sensor, gas concentration sensor and voltage, current sensor all adopt Intelligence sensor.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310387661.XA CN103472778B (en) | 2013-08-31 | 2013-08-31 | Intelligent control management system between skyscraper electrical equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310387661.XA CN103472778B (en) | 2013-08-31 | 2013-08-31 | Intelligent control management system between skyscraper electrical equipment |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103472778A CN103472778A (en) | 2013-12-25 |
CN103472778B true CN103472778B (en) | 2016-01-20 |
Family
ID=49797669
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310387661.XA Active CN103472778B (en) | 2013-08-31 | 2013-08-31 | Intelligent control management system between skyscraper electrical equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103472778B (en) |
Families Citing this family (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104423404A (en) * | 2013-09-03 | 2015-03-18 | 国家电网公司 | Intelligent dehumidification system of electrical equipment |
CN104359196B (en) * | 2014-10-10 | 2017-01-11 | 深圳市共济科技有限公司 | Data-center-based multiple-connection air conditioner control system and implementation method |
CN106292776B (en) * | 2016-09-05 | 2019-02-01 | 建宇(上海)石油科技有限公司 | Temperature control system between a kind of electrical equipment for oil exploration |
CN106329334A (en) * | 2016-11-01 | 2017-01-11 | 河南机电高等专科学校 | Protector of assembled transformer with remote pre-warning monitoring function |
CN106502116A (en) * | 2016-12-07 | 2017-03-15 | 苏州红叶装饰工程有限公司 | The intelligent domestic system controlled using software |
CN106781212A (en) * | 2017-01-24 | 2017-05-31 | 深圳企管加企业服务有限公司 | The robot early warning system and method for a kind of combination Internet of Things |
CN107291129A (en) * | 2017-07-25 | 2017-10-24 | 杭州宇诺电子科技有限公司 | Temperature and humidity control device remote monitoring system and its temperature/humidity control method |
CN111438160B (en) * | 2020-03-20 | 2021-07-16 | 蔚复来(浙江)科技股份有限公司 | Fermentation device and method for circularly dehumidifying |
CN114326511B (en) * | 2021-12-29 | 2024-06-14 | 珠海万力达电气自动化有限公司 | Double-machine switching method of industrial and mining enterprise power centralized control system based on monitor configuration tool |
Family Cites Families (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2003212305A (en) * | 2002-01-18 | 2003-07-30 | Ishikawajima Harima Heavy Ind Co Ltd | Alarm lamp control circuit for garbage vertically conveying facility |
CN2688759Y (en) * | 2004-03-26 | 2005-03-30 | 张森林 | Intelligent water-supplying monitor for high-building |
US20120094590A1 (en) * | 2009-07-01 | 2012-04-19 | Woo-Ram Lee | Ventilation system |
CN102147597A (en) * | 2010-02-10 | 2011-08-10 | 广州大学 | Health monitoring system for structures of great building and bridge |
CN101963803B (en) * | 2010-09-09 | 2012-11-07 | 上海数字智能化系统工程有限公司 | Intelligent building integrated system |
CN202794986U (en) * | 2012-07-20 | 2013-03-13 | 浪潮创新科技有限公司 | Intelligent building data acquisition platform based on Internet of things technology |
CN102866693A (en) * | 2012-09-20 | 2013-01-09 | 杭州沃顿自动化有限公司 | Intelligent building control system based on Ethernet |
CN202777561U (en) * | 2012-10-14 | 2013-03-13 | 东北石油大学 | Automated fire fighting system for high-rise buildings |
CN203117795U (en) * | 2013-03-14 | 2013-08-07 | 滨州学院 | High-rise building floor water flow automatic control system |
CN203422658U (en) * | 2013-08-31 | 2014-02-05 | 广西华蓝设计(集团)有限公司 | Intelligent control management system for high-rise building electrical equipment room |
-
2013
- 2013-08-31 CN CN201310387661.XA patent/CN103472778B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN103472778A (en) | 2013-12-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103472778B (en) | Intelligent control management system between skyscraper electrical equipment | |
CN203422658U (en) | Intelligent control management system for high-rise building electrical equipment room | |
CN107240871B (en) | A kind of ring main unit with heat dissipation and antifogging function | |
CN104260763A (en) | Railway station comprehensive monitoring system and design method thereof | |
CN108134327A (en) | It is a kind of air-cooled except condensation system and its except condensation method | |
CN110336188A (en) | The Moistureproof dehumidification method that 10 kilovolts of casees become | |
CN110377067A (en) | Dehumidifying integral system for box type transformer | |
CN206432687U (en) | A kind of high pressure feeder pillar with dehumidification function | |
CN107086475A (en) | A kind of outer casing of box type transformer substation with noise reduction and refrigerating function | |
CN104298284A (en) | Dehumidification device for high-tension switch cabinet | |
CN205070270U (en) | Two kinds of grade voltage prepackage type transformer substations | |
CN208537993U (en) | A kind of novel transformer substation intelligent comprehensive dehumidification system | |
CN106200514A (en) | A kind of monitoring system for power system outdoor cabinet | |
CN206878361U (en) | A kind of outer casing of box type transformer substation with noise reduction and refrigerating function | |
CN103390868B (en) | A kind of buried substation of safe and intelligent | |
CN206022985U (en) | A kind of box-type substation with automatic warm humidity adjusting function | |
CN103944086A (en) | Energy-saving maintenance-free constant-temperature secondary cabinet | |
CN203490555U (en) | Automatic dehumidification system | |
CN203039265U (en) | Automatic exhaust device used for storage battery and high-pressure chamber | |
CN217692125U (en) | Intelligent dehumidification device for power switch cabinet | |
CN206370644U (en) | A kind of modified form box-type substation | |
CN207398677U (en) | A kind of protected switch cabinet | |
CN207625093U (en) | A kind of railway remote operated case change | |
CN113659476A (en) | Anti-condensation self-starting ventilation device and anti-condensation method for 10kV ring main unit | |
CN210802940U (en) | Thermodynamic system equipment health monitoring system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information |
Address after: 530011 No. 39 East China Road, the Guangxi Zhuang Autonomous Region, Nanning Applicant after: Hualan (Group) Co. Ltd. Address before: 530011 No. 39 East China Road, the Guangxi Zhuang Autonomous Region, Nanning Applicant before: Guangxi Hualan Design (Group) Co., Ltd. |
|
COR | Change of bibliographic data | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |