CN103457514B - Dual-mode solar photovoltaic power generation system - Google Patents
Dual-mode solar photovoltaic power generation system Download PDFInfo
- Publication number
- CN103457514B CN103457514B CN201310387650.1A CN201310387650A CN103457514B CN 103457514 B CN103457514 B CN 103457514B CN 201310387650 A CN201310387650 A CN 201310387650A CN 103457514 B CN103457514 B CN 103457514B
- Authority
- CN
- China
- Prior art keywords
- switch
- power
- power generation
- energy storage
- subsystem
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/50—Photovoltaic [PV] energy
- Y02E10/56—Power conversion systems, e.g. maximum power point trackers
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E70/00—Other energy conversion or management systems reducing GHG emissions
- Y02E70/30—Systems combining energy storage with energy generation of non-fossil origin
Landscapes
- Supply And Distribution Of Alternating Current (AREA)
- Charge And Discharge Circuits For Batteries Or The Like (AREA)
Abstract
双模太阳能光伏发电系统,由分布式光伏发电子系统、储能子系统、负荷、集成管理子系统四个部分组成。本发明以储能子系统装置为能量缓冲公共平台,以集成管理子系统为综合管理平台,对分布式太阳能光伏发电实施最大化效率发电、最大化经济效益运行、安全化需求响应的统一优化目标。
The dual-mode solar photovoltaic power generation system consists of four parts: distributed photovoltaic power generation subsystem, energy storage subsystem, load, and integrated management subsystem. In the present invention, the energy storage subsystem device is used as the energy buffer public platform, and the integrated management subsystem is used as the comprehensive management platform to implement a unified optimization goal of maximizing efficiency power generation, maximizing economic benefit operation, and safe demand response for distributed solar photovoltaic power generation .
Description
技术领域 technical field
本发明涉及一种双模太阳能光伏发电系统,尤其是涉及一种主要应用于建设在城市、园区、社区等的建筑物上的分布式屋顶光伏电站的双模太阳能光伏发电系统。 The present invention relates to a dual-mode solar photovoltaic power generation system, in particular to a dual-mode solar photovoltaic power generation system mainly applied to distributed rooftop photovoltaic power stations built on buildings in cities, parks, communities, etc.
背景技术 Background technique
太阳能发电、风力发电、潮汐能发电等可再生能源发电,为解决人类社会日益紧张的能源危机和环境污染问题,提供了一条可供选择的解决思路和办法。 以太能光伏发电为例,随着近年来全世界装机规模的日益扩大,正成为可再生能源利用的重要技术手段。 Solar power generation, wind power generation, tidal power generation and other renewable energy power generation provide an alternative solution idea and method to solve the increasingly tense energy crisis and environmental pollution problems in human society. Taking solar photovoltaic power generation as an example, with the increasing installed capacity in the world in recent years, it is becoming an important technical means for the utilization of renewable energy.
太阳能光伏发电可以简单分为两种方式,一种是集中式的太阳能光伏电站,通过建设集中连片的几十兆瓦乃至几百兆瓦规模的大型太阳能光伏发电站,将太阳能采集转换成电能,经过大电网的输送和调配,提供给用户使用。集中式的太阳能光伏电站,由于太阳能发电具有间隙性和不稳定性的特点,往往对电网造成很大冲击,对电网的安全造成不利影响;而且集中式的能源生产方法,仍然没有摆脱传统电能的生产使用模式,导致大量的宝贵电能在多级的转换和长距离的输送过程中产生大量的不可逆损耗。还有一种是分散式的太阳能光伏电站,规模在几个兆瓦乃至几个千瓦不等,一般建设在建筑屋顶或靠近用户的地面等。分散式的太阳能光伏电站,靠近用户侧,不需要高压差转换和输送,过程的中损耗减少了,新能源的利用效率有提高。但是,由于太阳能发电仍然是间隙的和不稳定的,对用户的电能质量可能造成不利影响;而且即发即用,不能需求响应;当发生电网故障情况下,分散式的太阳能光伏电站也必须停止运行,不能达到离网自治的目标。 Solar photovoltaic power generation can be simply divided into two ways, one is centralized solar photovoltaic power station, through the construction of large-scale solar photovoltaic power stations with a scale of tens of megawatts or even hundreds of megawatts in a concentrated and contiguous manner, solar energy is collected and converted into electrical energy , after the transmission and deployment of the large power grid, it is provided to users. Centralized solar photovoltaic power plants, due to the intermittent and unstable characteristics of solar power generation, often have a great impact on the power grid and adversely affect the security of the power grid; and the centralized energy production method still does not get rid of the limitations of traditional electric energy. The production and use mode leads to a large amount of irreversible loss of a large amount of precious electric energy in the process of multi-level conversion and long-distance transmission. There is also a decentralized solar photovoltaic power station, ranging in size from several megawatts to several kilowatts, and is generally built on the roof of a building or on the ground close to the user. Distributed solar photovoltaic power plants, close to the user side, do not require high-voltage differential conversion and transmission, the loss in the process is reduced, and the utilization efficiency of new energy is improved. However, since solar power generation is still intermittent and unstable, it may have a negative impact on the user's power quality; and it can be used immediately, and cannot respond to demand; when a grid failure occurs, the decentralized solar photovoltaic power station must also stop running, the goal of off-grid autonomy cannot be achieved.
现有的技术方案中,一般采用通过配置储能系统的方式,将分布式太阳能光伏发电系统,建设成为一个分布式的太阳能光伏发电和储能一体化的综合系统,以解决新能源不稳定的问题,又可以解决离网自治的问题。但是,由于需要配置较大规模的储能系统,导致成本上升。 In the existing technical solutions, the distributed solar photovoltaic power generation system is generally built into a distributed integrated system of solar photovoltaic power generation and energy storage by configuring the energy storage system to solve the problem of unstable new energy. problem, and can solve the problem of off-grid autonomy. However, due to the need to configure a large-scale energy storage system, the cost has increased.
发明内容 Contents of the invention
本发明要解决的技术问题是,克服现有技术存在的上述缺陷,提供一种能源利用率高,工作稳定的双模太阳能光伏发电系统。 The technical problem to be solved by the present invention is to overcome the above-mentioned defects in the prior art and provide a dual-mode solar photovoltaic power generation system with high energy utilization rate and stable operation.
本发明解决其技术问题所采用的技术方案是:双模太阳能光伏发电系统,由分布式光伏发电子系统、储能子系统、负荷、集成管理子系四个部分组成; The technical solution adopted by the present invention to solve the technical problem is: a dual-mode solar photovoltaic power generation system, which consists of four parts: a distributed photovoltaic power generation subsystem, an energy storage subsystem, a load, and an integrated management subsystem;
所述分布式光伏发电子系统包括太阳能电池阵列、直流配电柜、光伏逆变器,太阳能电池阵列与直流配电柜电连接,直流配电柜通过开关K1与光伏逆变器电连接,光伏逆变器通过开关K2与交流配电柜电连接,交流配电柜通过开关K0外接市电;分布式光伏发电子系统主要实现采集太阳能转变为直流电能,并进一步转换为交流电能。 The distributed photovoltaic power generation subsystem includes a solar cell array, a DC power distribution cabinet, and a photovoltaic inverter. The solar cell array is electrically connected to the DC power distribution cabinet, and the DC power distribution cabinet is electrically connected to the photovoltaic inverter through a switch K1. The inverter is electrically connected to the AC power distribution cabinet through the switch K2, and the AC power distribution cabinet is connected to the external mains power through the switch K0; the distributed photovoltaic power generation sub-system mainly realizes the conversion of solar energy into DC power and further conversion into AC power.
所述负荷作为用能部分,包括不可中断供电的一类负荷(如应急照明灯)和能中断供电的二类负荷(如空调),交流配电柜通过开关K4、开关K7与二类负荷电连接,交流配电柜通过开关K4、开关K8与一类负荷电连接; The load, as the energy-consuming part, includes a class I load that cannot interrupt power supply (such as emergency lighting) and a class II load that can interrupt power supply (such as an air conditioner). Connection, the AC power distribution cabinet is electrically connected to a type of load through switch K4 and switch K8;
所述储能子系统包括电池堆和双向储能逆变器,电池堆通过开关K5与双向储能逆变器双向电连接,双向储能逆变器通过开关K6与交流配电柜双向电连接;储能子系统作为能量和功率的缓冲平台,用于存储太阳能电量,通过双向储能逆变器进一步馈送至电网利用,同时将一部分电能量作为后备,在市电发生故障不能供电情况下,释放出来给一类负荷应急供电。 The energy storage subsystem includes a battery stack and a bidirectional energy storage inverter, the battery stack is bidirectionally electrically connected to the bidirectional energy storage inverter through a switch K5, and the bidirectional energy storage inverter is bidirectionally electrically connected to the AC power distribution cabinet through a switch K6 ; The energy storage subsystem is used as a buffer platform for energy and power, which is used to store solar power, which is further fed to the grid for use through a bidirectional energy storage inverter. At the same time, a part of the electric energy is used as a backup. Released to provide emergency power supply to a class of loads.
集成管理子系统实施对整个双模太阳能光伏发电系统的管理控制,指挥系统工作在各模式下,实现能量采集、生产、转换、应急供电、储能子系统管理、存储能量释放等功能。 The integrated management subsystem implements the management and control of the entire dual-mode solar photovoltaic power generation system, and the command system works in various modes to realize functions such as energy collection, production, conversion, emergency power supply, energy storage subsystem management, and stored energy release.
所述集成管理子系统包括市电监测模块、新能源监测模块、BMS监测模块、阶梯电价数据库、负荷监测模块和工作模式决策模块,市电监测模块、新能源监测模块、BMS监测模块、阶梯电价数据库和负荷监测模块均与工作模式决策模块双向电连接,新能源监测模块与分布式光伏发电子系统双向电相连,BMS监测模块与储能子系统双向电相连,负荷监测模块与负荷双向电相连,市电监测模块与交流配电柜双向电连接。 The integrated management subsystem includes a mains power monitoring module, a new energy monitoring module, a BMS monitoring module, a ladder electricity price database, a load monitoring module and a working mode decision-making module, a mains electricity monitoring module, a new energy monitoring module, a BMS monitoring module, and a ladder electricity price Both the database and the load monitoring module are electrically connected to the working mode decision-making module in two directions, the new energy monitoring module is electrically connected to the distributed photovoltaic power generation subsystem in two directions, the BMS monitoring module is electrically connected to the energy storage subsystem in two directions, and the load monitoring module is electrically connected to the load in two directions , the mains monitoring module is electrically connected to the AC power distribution cabinet in two directions.
市电监测模块,主要监测市电的电压、电流、功率、功率因素等电能质量相关信息。BMS监测模块,主要监测储能子系统的电压、电流、温度、SOC(充电状态)、SOH(健康状态)等信息。阶梯电价数据库存储当前的阶梯电价数据。负荷监测模块,监测负荷的用能情况,应急情况下实现非一类负荷的切除。新能源监测模块主要监测分布式光伏发电子系统的输入电压、输入电流、输入功率、输出电压、输出电流、输出功率、太阳能辐照度等信息。 The mains monitoring module mainly monitors information related to power quality such as voltage, current, power, and power factor of the mains. The BMS monitoring module mainly monitors the voltage, current, temperature, SOC (state of charge), SOH (state of health) and other information of the energy storage subsystem. The ladder electricity price database stores the current ladder electricity price data. The load monitoring module monitors the energy consumption of loads and realizes the removal of non-class loads in emergency situations. The new energy monitoring module mainly monitors the input voltage, input current, input power, output voltage, output current, output power, solar irradiance and other information of the distributed photovoltaic power generation subsystem.
所述工作模式决策模块所决定的工作模式有:光伏并网发电模式、平滑工作模式、光伏移峰模式和离网自治模式。 The working modes determined by the working mode decision-making module include: photovoltaic grid-connected power generation mode, smooth working mode, photovoltaic peak shifting mode and off-grid autonomous mode.
所述储能子系统的容量设置为:大于2倍一类负荷应急所需能量、小于10倍一类负荷应急所需能量;储能子系统功率的设置为:取1.5倍一类负荷启动最大功率、1.2倍光伏发电阵列最大功率两者之间的最大值,作为储能子系统的最小功率;取3倍一类负荷启动最大功率与1.5倍光伏发电阵列最大功率两者之间的最小值,作为储能子系统的最大功率;由于储能子系统功率取1.5倍一类负荷启动最大功率与1.2倍光伏发电阵列最大功率两者之间的最大值,作为储能子系统的最小功率,因而可以满足储能子系统对太阳能光伏发电功率平衡需求,同时可以满足应急情况下一类负荷用电启动功率的需求。对储能子系统的最大功率进行规定,是为了满足成本投入和经济性的需求。储能子系统容量在2倍至10倍一类负荷应急所需求能量之间,即能满足应急供电所需,同时还有一定的富余容量来满足光伏发电量移峰需求,储能子系统成本不会过高,控制在合理范围。 The capacity of the energy storage subsystem is set to be: more than 2 times the emergency energy required by the first-class load, and less than 10 times the emergency energy required by the first-class load; The maximum value between the power and 1.2 times the maximum power of the photovoltaic power generation array is taken as the minimum power of the energy storage subsystem; the minimum value between the maximum power of 3 times the maximum power of the first-class load and 1.5 times the maximum power of the photovoltaic power generation array is taken , as the maximum power of the energy storage subsystem; since the power of the energy storage subsystem takes the maximum value between 1.5 times the maximum power of a first-class load and 1.2 times the maximum power of the photovoltaic power generation array, as the minimum power of the energy storage subsystem, Therefore, it can meet the demand of the energy storage subsystem for the power balance of solar photovoltaic power generation, and at the same time, it can meet the demand for the starting power of a type of load in emergency situations. The purpose of specifying the maximum power of the energy storage subsystem is to meet the requirements of cost input and economy. The capacity of the energy storage subsystem is between 2 times and 10 times the emergency energy required by the first-class load, that is, it can meet the needs of emergency power supply, and there is still a certain surplus capacity to meet the peak shifting demand of photovoltaic power generation. The cost of the energy storage subsystem Not too high, controlled within a reasonable range.
市电非高峰时段,储能子系统SOC(充电状态)处于高位状态运行, SOC(充电状态)控制在70%~90%;当市电高价时段,储能子系统SOC(充电状态)处于低位状态运行,优选的SOC(充电状态)控制在20%~50%,此时SOC最低状态下储能子系统带电量大于1.5倍一类负荷应急所需能量。通过储能子系统谷存峰放,最大限度降低峰值市电量的使用,同时将光伏发电的能量实现最大经济价值。 During non-peak hours of mains power, the SOC (state of charge) of the energy storage subsystem operates at a high level, and the SOC (state of charge) is controlled at 70% to 90%; when the price of mains power is high, the SOC (state of charge) of the energy storage subsystem is at a low level State-of-the-art operation, the optimal SOC (state of charge) is controlled at 20%~50%. At this time, the charge of the energy storage subsystem in the lowest SOC state is greater than 1.5 times the emergency energy required by the first-class load. Through the energy storage subsystem, the valley storage and peak discharge can minimize the use of peak electricity, and at the same time realize the maximum economic value of the energy of photovoltaic power generation.
在太阳日出和日落前的一段时间内,太阳的辐射照度较低,一般分布式光伏发电子系统发电功率小于光伏逆变器额定功率的5%,此时光伏逆变器逆变效率低甚至不能启动,而且电能质量也很差,这个时段直接将光伏所发电量存储在储能子系统中,提高了太阳能光伏发电的整体发电效率。 During the period of time before sunrise and sunset, the sun's irradiance is low, and the power generated by the distributed photovoltaic power generation subsystem is generally less than 5% of the rated power of the photovoltaic inverter. At this time, the inverter efficiency of the photovoltaic inverter is low or even It cannot be started, and the power quality is also very poor. During this period, the photovoltaic power generation is directly stored in the energy storage subsystem, which improves the overall power generation efficiency of solar photovoltaic power generation.
定义某时刻分布式光伏发电子系统的发电功率为P1;定义同一时刻负荷用电功率为P2;定义光伏逆变器额定功率为P3,则各种工作模式需满足的条件依次描述如下: Define the generating power of the distributed photovoltaic power generation sub-system at a certain moment as P1; define the load power at the same moment as P2; define the rated power of the photovoltaic inverter as P3, then the conditions that need to be met in various operating modes are described in turn as follows:
光伏并网发电模式下必须满足的条件有:(1)分布式光伏发电子系统的发电功率P1/负荷用电功率P2小于0.2;(2)电价为高峰段电价;(3)市电正常;(4)分布式光伏发电子系统的发电功率P1/ 光伏逆变器额定功率P3大于0.05;该模式下开关状态:开关K0、开关K4、开关K5、开关K6、开关K7、开关K8、开关K1、开关K2闭合, 开关K3断开; The conditions that must be met in the photovoltaic grid-connected power generation mode are: (1) the power generation P1/load power P2 of the distributed photovoltaic power generation subsystem is less than 0.2; (2) the electricity price is the peak price; (3) the city power is normal; ( 4) The power generation P1 of the distributed photovoltaic power generation subsystem/the rated power P3 of the photovoltaic inverter is greater than 0.05; the switch status in this mode: switch K0, switch K4, switch K5, switch K6, switch K7, switch K8, switch K1, The switch K2 is closed, and the switch K3 is opened;
平滑工作模式下必须满足的条件有:(1)分布式光伏发电子系统的发电功率P1/负荷用电功率P2大于0.2;(2)电价为高峰电价;(3)市电正常;(4)分布式光伏发电子系统的发电功率P1/ 光伏逆变器额定功率P3大于0.05;该模式下开关状态:开关K0、开关K4、开关K5、开关K6、开关K7、开关K8、开关K1、开关K2闭合,开关K3断开; The conditions that must be met in the smooth working mode are: (1) the power generation P1/load power P2 of the distributed photovoltaic power generation subsystem is greater than 0.2; (2) the electricity price is the peak electricity price; (3) the mains power is normal; (4) the distribution The power generation power P1 of the type photovoltaic power generation subsystem/the rated power P3 of the photovoltaic inverter is greater than 0.05; the switch state in this mode: switch K0, switch K4, switch K5, switch K6, switch K7, switch K8, switch K1, switch K2 are closed , the switch K3 is disconnected;
光伏移峰模式下必须满足的条件有:(1)电价为非高峰时段电价或分布式光伏发电子系统的发电功率P1/ 光伏逆变器额定功率P3小于0.05;(2)市电正常;该模式下的开关状态:开关K0、开关K5、开关K6、开关K8、开关K7、开关K4、开关K3闭合, 开关K1、开关K2断开; The conditions that must be met in the photovoltaic peak-shifting mode are: (1) the electricity price is the electricity price during off-peak hours or the power generation P1 of the distributed photovoltaic power generation subsystem/the rated power P3 of the photovoltaic inverter is less than 0.05; (2) the mains power is normal; Switch state in mode: switch K0, switch K5, switch K6, switch K8, switch K7, switch K4, switch K3 are closed, switch K1, switch K2 is open;
离网自治模式下必须满足的条件有:(1)市电不正常;该模式下的开关状态:开关K4、开关K6、开关K8、开关K5、开关K3闭合, 开关K0、开关K1、开关K2、开关K7断开。 The conditions that must be met in the off-grid autonomous mode are: (1) The mains power is abnormal; the switch status in this mode: switch K4, switch K6, switch K8, switch K5, switch K3 are closed, switch K0, switch K1, switch K2 , The switch K7 is disconnected.
本发明以储能子系统装置为能量缓冲公共平台,以集成管理子系统为综合管理平台,对分布式太阳能光伏发电实施最大化效率发电、最大化经济效益运行、安全化需求响应的统一优化目标。 In the present invention, the energy storage subsystem device is used as the energy buffer public platform, and the integrated management subsystem is used as the comprehensive management platform to implement the unified optimization goal of maximizing efficiency power generation, maximizing economic benefit operation, and safe demand response for distributed solar photovoltaic power generation .
与现有技术相比,本发明的双模太阳能光伏发电系统具有以下的优点:(1)基于储能子系统的能量缓冲和功率缓冲功能,实现了分布式光伏发电子系统平滑接入和并网运行;(2)基于储能子系统的能量缓冲和功率缓冲公共平台,以及全系统管理协调,实现了分布式光伏发电子系统的离网自治运行,满足应急需求;(3)通过利用弱光发电,提高了分布式光伏发电的整体效率,增加了光伏发电量;(4)通过将部分太阳能所发电量转移至高峰时段使用,提高了分布式光伏发电的经济效益,提高了经济性。 Compared with the prior art, the dual-mode solar photovoltaic power generation system of the present invention has the following advantages: (1) Based on the energy buffering and power buffering functions of the energy storage subsystem, the distributed photovoltaic power generation subsystem is smoothly connected and paralleled. (2) Based on the energy buffer and power buffer public platform of the energy storage subsystem, as well as the management and coordination of the whole system, the off-grid autonomous operation of the distributed photovoltaic power generation subsystem is realized to meet the emergency needs; (3) through the use of weak Photovoltaic power generation improves the overall efficiency of distributed photovoltaic power generation and increases the amount of photovoltaic power generation; (4) By transferring part of the power generated by solar energy to use during peak hours, the economic benefits of distributed photovoltaic power generation are improved and the economy is improved.
附图说明 Description of drawings
图1是本发明实施例双模太阳能光伏发电系统结构框图; Fig. 1 is a structural block diagram of a dual-mode solar photovoltaic power generation system according to an embodiment of the present invention;
图2是本发明实施例双模太阳能光伏发电系统运行决策框图。 Fig. 2 is a block diagram of the operation decision-making of the dual-mode solar photovoltaic power generation system according to the embodiment of the present invention.
具体实施方式 Detailed ways
下面结合附图详细说明本发明的实施方法。 The implementation method of the present invention will be described in detail below in conjunction with the accompanying drawings.
参照图1本发明由四个部分组成:分布式光伏发电子系统、储能子系统、负荷、集成管理子系统。 Referring to Figure 1, the present invention consists of four parts: distributed photovoltaic power generation subsystem, energy storage subsystem, load, and integrated management subsystem.
所述分布式光伏发电子系统包括太阳能电池阵列、直流配电柜、光伏逆变器,太阳能电池阵列与直流配电柜电连接,直流配电柜通过开关K1与光伏逆变器电连接,光伏逆变器通过开关K2与交流配电柜电连接,交流配电柜通过开关K0外接市电;分布式光伏发电子系统主要实现采集太阳能转变为直流电能,并进一步转换为交流电能。 The distributed photovoltaic power generation subsystem includes a solar cell array, a DC power distribution cabinet, and a photovoltaic inverter. The solar cell array is electrically connected to the DC power distribution cabinet, and the DC power distribution cabinet is electrically connected to the photovoltaic inverter through a switch K1. The inverter is electrically connected to the AC power distribution cabinet through the switch K2, and the AC power distribution cabinet is connected to the external mains power through the switch K0; the distributed photovoltaic power generation sub-system mainly realizes the conversion of solar energy into DC power and further conversion into AC power.
所述负荷作为用能部分,分为不可中断供电的一类负荷(如应急照明灯)和可以中断供电的二类负荷(如空调),交流配电柜通过开关K4、开关K7与二类负荷电连接,交流配电柜通过开关K4、开关K8与一类负荷电连接;。 The load, as the energy-consuming part, is divided into a type of load that cannot interrupt power supply (such as emergency lighting) and a type II load that can interrupt power supply (such as an air conditioner). The AC power distribution cabinet communicates with the type II load through switch K4 and switch K7. Electrically connected, the AC power distribution cabinet is electrically connected to a type of load through switch K4 and switch K8;
所述储能子系统包括电池堆和双向储能逆变器,电池堆通过开关K5与双向储能逆变器双向电连接,双向储能逆变器通过开关K6与交流配电柜双向电连接;储能子系统作为能量和功率的缓冲平台,可以存储太阳能电量,也可以通过双向储能逆变器进一步馈送至电网利用,同时将一部分电能量作为后备,在市电发生故障不能供电情况下,释放出来给一类负荷应急供电。 The energy storage subsystem includes a battery stack and a bidirectional energy storage inverter, the battery stack is bidirectionally electrically connected to the bidirectional energy storage inverter through a switch K5, and the bidirectional energy storage inverter is bidirectionally electrically connected to the AC power distribution cabinet through a switch K6 ; As a buffer platform for energy and power, the energy storage subsystem can store solar power, and can also be further fed to the grid for use through a bidirectional energy storage inverter. At the same time, a part of the electric energy is used as a backup. , released to provide emergency power supply to a class of loads.
集成管理子系统实施对整个双模太阳能光伏发电系统的管理控制,指挥系统工作在各模式下,实现能量采集、生产、转换、应急供电、储能子系统管理、存储能量释放等功能。 The integrated management subsystem implements the management and control of the entire dual-mode solar photovoltaic power generation system, and the command system works in various modes to realize functions such as energy collection, production, conversion, emergency power supply, energy storage subsystem management, and stored energy release.
所述集成管理子系统包括市电监测模块、新能源监测模块、BMS监测模块、阶梯电价数据库、负荷监测模块和工作模式决策模块,市电监测模块、新能源监测模块、BMS监测模块、阶梯电价数据库和负荷监测模块均与工作模式决策模块双向电连接,新能源监测模块与分布式光伏发电子系统双向电相连,BMS监测模块与储能子系统双向电相连,负荷监测模块与负荷双向电相连,市电监测模块与交流配电柜双向电连接。 The integrated management subsystem includes a mains power monitoring module, a new energy monitoring module, a BMS monitoring module, a ladder electricity price database, a load monitoring module and a working mode decision-making module, a mains electricity monitoring module, a new energy monitoring module, a BMS monitoring module, and a ladder electricity price Both the database and the load monitoring module are electrically connected to the working mode decision-making module in two directions, the new energy monitoring module is electrically connected to the distributed photovoltaic power generation subsystem in two directions, the BMS monitoring module is electrically connected to the energy storage subsystem in two directions, and the load monitoring module is electrically connected to the load in two directions , the mains monitoring module is electrically connected to the AC power distribution cabinet in two directions.
市电监测模块,主要监测市电的电压、电流、功率、功率因素等电能质量相关信息。BMS监测模块,主要监测储能子系统的电压、电流、温度、SOC(充电状态)、SOH(健康状态)等信息。阶梯电价数据库存储当前的阶梯电价数据。负荷监测模块,监测负荷的用能情况,应急情况下实现非一类负荷的切除。新能源监测模块主要监测分布式光伏发电子系统的输入电压、输入电流、输入功率、输出电压、输出电流、输出功率、太阳能辐照度等信息。 The mains monitoring module mainly monitors information related to power quality such as voltage, current, power, and power factor of the mains. The BMS monitoring module mainly monitors the voltage, current, temperature, SOC (state of charge), SOH (state of health) and other information of the energy storage subsystem. The ladder electricity price database stores the current ladder electricity price data. The load monitoring module monitors the energy consumption of loads and realizes the removal of non-class loads in emergency situations. The new energy monitoring module mainly monitors the input voltage, input current, input power, output voltage, output current, output power, solar irradiance and other information of the distributed photovoltaic power generation subsystem.
所述储能子系统的容量设置为:大于2倍一类负荷应急所需能量、小于10倍一类负荷应急所需能量;储能子系统功率的设置为:取1.5倍一类负荷启动最大功率、1.2倍光伏发电阵列最大功率两者之间的最大值,作为储能子系统的最小功率;取3倍一类负荷启动最大功率与1.5倍光伏发电阵列最大功率两者之间的最小值,作为储能子系统的最大功率;由于储能子系统功率取1.5倍一类负荷启动最大功率与1.2倍光伏发电阵列最大功率两者之间的最大值,作为储能子系统的最小功率,因而可以满足储能子系统对太阳能光伏发电功率平衡需求,同时可以满足应急情况下一类负荷用电启动功率的需求。对储能子系统的最大功率进行规定,是为了满足成本投入和经济性的需求。储能子系统容量在2倍至10倍一类负荷应急所需求能量之间,即能满足应急供电所需,同时还有一定的富余容量来满足光伏发电量移峰需求,储能子系统成本不会过高,控制在合理范围。 The capacity of the energy storage subsystem is set to be: more than 2 times the emergency energy required by the first-class load, and less than 10 times the emergency energy required by the first-class load; The maximum value between the power and 1.2 times the maximum power of the photovoltaic power generation array is taken as the minimum power of the energy storage subsystem; the minimum value between the maximum power of 3 times the maximum power of the first-class load and 1.5 times the maximum power of the photovoltaic power generation array is taken , as the maximum power of the energy storage subsystem; since the power of the energy storage subsystem takes the maximum value between 1.5 times the maximum power of a first-class load and 1.2 times the maximum power of the photovoltaic power generation array, as the minimum power of the energy storage subsystem, Therefore, it can meet the demand of the energy storage subsystem for the power balance of solar photovoltaic power generation, and at the same time, it can meet the demand for the starting power of a type of load in emergency situations. The purpose of specifying the maximum power of the energy storage subsystem is to meet the requirements of cost input and economy. The capacity of the energy storage subsystem is between 2 times and 10 times the emergency energy required by the first-class load, that is, it can meet the needs of emergency power supply, and there is still a certain amount of surplus capacity to meet the peak shifting demand of photovoltaic power generation. The cost of the energy storage subsystem Not too high, controlled within a reasonable range.
图2是本发明实施例双模太阳能光伏发电系统运行决策框图,是集成管理子系统的核心运行逻辑。下面结合图2来说明系统的各种运行状态和模式。 Fig. 2 is a block diagram of the operation decision-making of the dual-mode solar photovoltaic power generation system according to the embodiment of the present invention, which is the core operation logic of the integrated management subsystem. Various operating states and modes of the system are described below in conjunction with FIG. 2 .
所述工作模式决策模块所决定的工作模式有:光伏并网发电模式、平滑工作模式、光伏移峰模式和离网自治模式。 The working modes determined by the working mode decision-making module include: photovoltaic grid-connected power generation mode, smooth working mode, photovoltaic peak shifting mode and off-grid autonomous mode.
定义某时刻分布式光伏发电子系统的发电功率为P1,本实施例中即为太阳能光伏阵列发电功率;定义同一时刻负荷用电功率为P2;定义光伏逆变器额定功率为P3。则各种工作模式需满足的条件依次描述如下。 Define the power generation power of the distributed photovoltaic power generation subsystem at a certain moment as P1, which is the power generation power of the solar photovoltaic array in this embodiment; define the power consumption of the load at the same time as P2; define the rated power of the photovoltaic inverter as P3. The conditions to be met by various working modes are described in turn as follows.
光伏并网发电模式:该模式下必须满足的条件有(1)分布式光伏发电子系统的发电功率P1/负荷用电功率P2小于0.2;(2)电价为高峰段电价;(3)市电正常;(4)分布式光伏发电子系统的发电功率P1/ 光伏逆变器额定功率P3大于0.05。该模式下开关状态:开关K0、开关K4、开关K5、开关K6、开关K7、开关K8、开关K1、开关K2闭合, 开关K3断开。该工作模式下具有以下特点:分布式光伏发电子系统的发电功率P1/ 光伏逆变器额定功率P3大于0.05,表明光照条件良好,光伏逆变器能正常启动进行MPPT(最大效率点跟踪)最大效率工作发电;分布式光伏发电子系统的发电功率P1/负荷用电功率P2小于0.2,表明负荷用电需求大,太阳能发电功率占总供给的比例低,不易对负荷用电安全造成不良影响;电价为高峰时段电价,太阳能所发出的电能得到最大经济价值利用;市电正常,太阳能并网发电的必要条件。 Photovoltaic grid-connected power generation mode: the conditions that must be met in this mode are (1) the power generation P1/load power P2 of the distributed photovoltaic power generation subsystem is less than 0.2; (2) the electricity price is the peak price; (3) the city power is normal ; (4) The power generation P1 of the distributed photovoltaic power generation subsystem/the rated power P3 of the photovoltaic inverter is greater than 0.05. Switch state in this mode: switch K0, switch K4, switch K5, switch K6, switch K7, switch K8, switch K1, switch K2 are closed, switch K3 is open. This working mode has the following characteristics: the power generation P1 of the distributed photovoltaic power generation subsystem/the rated power P3 of the photovoltaic inverter is greater than 0.05, indicating that the lighting conditions are good, and the photovoltaic inverter can start normally to perform MPPT (maximum efficiency point tracking) maximum Efficient power generation; the power generation P1/load power P2 of the distributed photovoltaic power generation subsystem is less than 0.2, indicating that the load demand is large, and the proportion of solar power generation to the total supply is low, which is not likely to cause adverse effects on the safety of load power consumption; electricity price It is the electricity price during peak hours, and the electric energy generated by solar energy can be used with the maximum economic value; the mains power is normal, and the necessary condition for solar grid-connected power generation.
平滑工作模式:该模式下必须满足的条件有(1)分布式光伏发电子系统的发电功率P1/负荷用电功率P2大于0.2;(2)电价为高峰电价;(3)市电正常;(4)分布式光伏发电子系统的发电功率P1/ 光伏逆变器额定功率P3大于0.05。该模式下开关状态:开关K0、开关K4、开关K5、开关K6、开关K7、开关K8、开关K1、开关K2闭合,开关K3断开。该工作模式下具有以下特点:分布式光伏发电子系统的发电功率P1/ 光伏逆变器额定功率P3大于0.05,表明光照条件良好,光伏逆变器能正常启动进行MPPT(最大效率点跟踪)最大效率工作发电;分布式光伏发电子系统的发电功率P1/负荷用电功率P2大于0.2,表明负荷用电需求小,太阳能发电功率占总供给的比例高,可能对负荷用电安全造成不良影响,因此需要用储能系统进行功率的平滑,双向储能逆变器工作;电价为高峰段电价,太阳能所发出的电能得到最大经济价值利用;市电正常,太阳能并网发电的必要条件。 Smooth working mode: the conditions that must be met in this mode are (1) the power generation P1/load power P2 of the distributed photovoltaic power generation subsystem is greater than 0.2; (2) the electricity price is the peak electricity price; (3) the utility power is normal; (4) ) The power generation P1 of the distributed photovoltaic power generation subsystem/the rated power P3 of the photovoltaic inverter is greater than 0.05. Switch state in this mode: switch K0, switch K4, switch K5, switch K6, switch K7, switch K8, switch K1, switch K2 are closed, switch K3 is open. This working mode has the following characteristics: the power generation P1 of the distributed photovoltaic power generation subsystem/the rated power P3 of the photovoltaic inverter is greater than 0.05, indicating that the lighting conditions are good, and the photovoltaic inverter can start normally to perform MPPT (maximum efficiency point tracking) maximum Efficient power generation; the power generation P1/load power P2 of the distributed photovoltaic power generation subsystem is greater than 0.2, indicating that the load demand is small, and the proportion of solar power generation to the total supply is high, which may have a negative impact on the safety of load power consumption. The energy storage system needs to be used to smooth the power, and the two-way energy storage inverter works; the electricity price is the peak period electricity price, and the electric energy generated by the solar energy can be used with the maximum economic value; the mains power is normal, and the necessary condition for solar grid-connected power generation.
光伏移峰模式:该模式下必须满足的条件有(1)电价为非高峰时段电价或分布式光伏发电子系统的发电功率P1/ 光伏逆变器额定功率P3小于0.05;(2)市电正常。该模式下的开关状态:开关K0、开关K5、开关K6、开关K8、开关K7、开关K4、开关K3闭合, 开关K1、开关K2断开。该工作模式下具有以下特点:电价为平价时段,太阳能所发出的电能不能得到最大经济价值利用,因此将太阳能所发的电能存储在储能子系统中,待电价高峰时段再对负荷进行供电,减少高峰时段市电的使用量,发挥了太阳能最大的经济价值;市电正常,太阳能并网发电的必要条件。 Photovoltaic peak-shifting mode: The conditions that must be met in this mode are (1) the electricity price is the electricity price during off-peak hours or the power generation P1 of the distributed photovoltaic power generation subsystem/the rated power P3 of the photovoltaic inverter is less than 0.05; (2) the mains power is normal . Switch state in this mode: switch K0, switch K5, switch K6, switch K8, switch K7, switch K4, switch K3 are closed, switch K1, switch K2 is open. This working mode has the following characteristics: the electricity price is at a par price period, and the electricity generated by the solar energy cannot be utilized with the maximum economic value. Therefore, the electricity generated by the solar energy is stored in the energy storage subsystem, and the load is supplied with power after the peak electricity price period. Reduce the usage of mains power during peak hours, and maximize the economic value of solar energy; normal mains power is a necessary condition for solar grid-connected power generation.
特别的一种情况,当分布式光伏发电子系统的发电功率P1/ 光伏逆变器额定功率P3小于0.05,表明光照条件较差,光伏逆变器此时可能无法正常启动进行MPPT(最大效率点跟踪)最大效率工作发电,或者即便是能正常启动,但是逆变发电的效率也很低,此时,可以通过储能子系统直接对太阳能电能进行存储,低功率小电流情况下,储能子系统的充电效率反而更高,因此可以实现即使是在弱光条件下,仍然能够实现分布式光伏发电子系统的发电并存储在电池储能系统中。这样利用太阳能整体发电能力可以提高5%以上。 In a special case, when the power generation P1 of the distributed photovoltaic power generation subsystem/the rated power P3 of the photovoltaic inverter is less than 0.05, it indicates that the lighting conditions are poor, and the photovoltaic inverter may not be able to start normally at this time to perform MPPT (Maximum Efficiency Point Tracking) maximum efficiency working power generation, or even if it can start normally, but the efficiency of inverter power generation is also very low, at this time, the solar energy can be directly stored through the energy storage subsystem. On the contrary, the charging efficiency of the system is higher, so even under low light conditions, the power generation of the distributed photovoltaic power generation subsystem can still be realized and stored in the battery energy storage system. In this way, the overall power generation capacity of solar energy can be increased by more than 5%.
离网自治模式:该模式下必须满足的条件(1)市电不正常。该模式下的开关状态:开关K4、开关K6、开关K8、开关K5、开关K3闭合, 开关K0、开关K1、开关K2、开关K7断开。该工作模式下具有以下特点:市电不正常,在储能子系统的能量调配和缓冲作用下,分布式光伏发电子系统与储能子系统共同给一类负荷提供应急电能,保障重要负荷的用电需求和用电安全。 Off-grid autonomous mode: Conditions that must be met in this mode (1) Mains power is abnormal. Switch state in this mode: switch K4, switch K6, switch K8, switch K5, switch K3 are closed, switch K0, switch K1, switch K2, switch K7 are open. This working mode has the following characteristics: when the mains power is abnormal, under the energy allocation and buffering of the energy storage subsystem, the distributed photovoltaic power generation subsystem and the energy storage subsystem jointly provide emergency power to a class of loads to ensure the safety of important loads. Electricity demand and electricity safety.
总之,与现有技术相比,本发明所提供的楼宇储能应急节能系统,具有以下的特点和优点: In a word, compared with the prior art, the building energy storage emergency energy-saving system provided by the present invention has the following characteristics and advantages:
(1)基于储能子系统的能量缓冲和功率缓冲功能,实现了分布式光伏发电系统平滑接入和并网运行; (1) Based on the energy buffering and power buffering functions of the energy storage subsystem, the smooth access and grid-connected operation of the distributed photovoltaic power generation system are realized;
(2)基于储能子系统的能量缓冲和功率缓冲公共平台,以及全系统管理协调,实现了分布式光伏发电子系统的离网自治运行,满足应急需求; (2) Based on the energy buffer and power buffer public platform of the energy storage subsystem, as well as the management and coordination of the whole system, the off-grid autonomous operation of the distributed photovoltaic power generation subsystem is realized to meet the emergency needs;
(3)通过利用弱光发电,提高了分布式光伏发电的整体效率,增加了光伏发电量; (3) By using weak light to generate electricity, the overall efficiency of distributed photovoltaic power generation is improved, and the amount of photovoltaic power generation is increased;
(4)通过将部分太阳能所发电量转移至高峰时段使用,提高了分布式光伏发电的经济效益,提高了经济性。 (4) By transferring part of the power generated by solar energy to use during peak hours, the economic benefits of distributed photovoltaic power generation are improved, and the economy is improved.
以上所述仅是本发明的优选的实施方式,应当指出,对于本技术领域的普通技术人员来说,在不脱离本发明原理的前提下,还可以做出若干改进和修饰,这些改进和修饰也应该视为本发明的保护范围。 The above is only a preferred embodiment of the present invention, it should be pointed out that for those of ordinary skill in the art, without departing from the principle of the present invention, some improvements and modifications can also be made, these improvements and modifications It should also be regarded as the protection scope of the present invention.
Claims (2)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201310387650.1A CN103457514B (en) | 2013-08-31 | 2013-08-31 | Dual-mode solar photovoltaic power generation system |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201310387650.1A CN103457514B (en) | 2013-08-31 | 2013-08-31 | Dual-mode solar photovoltaic power generation system |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN103457514A CN103457514A (en) | 2013-12-18 |
| CN103457514B true CN103457514B (en) | 2015-05-20 |
Family
ID=49739567
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201310387650.1A Active CN103457514B (en) | 2013-08-31 | 2013-08-31 | Dual-mode solar photovoltaic power generation system |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN103457514B (en) |
Families Citing this family (15)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN103840486B (en) * | 2014-03-07 | 2015-12-30 | 广东志成冠军集团有限公司 | A kind of control method of photovoltaic power supply system grid connection of accumulation energy type |
| CN104167799B (en) * | 2014-08-29 | 2017-10-17 | 阳光电源股份有限公司 | A kind of charge-discharge system, method and photovoltaic generating system |
| CN104362747A (en) * | 2014-11-05 | 2015-02-18 | 芜湖中艺企业管理咨询有限公司 | Intelligent photovoltaic micro-grid energy monitoring management device |
| CN106329555B (en) * | 2015-06-26 | 2019-10-11 | 比亚迪股份有限公司 | Photovoltaic energy storage microgrid system and control method of photovoltaic energy storage microgrid system |
| CN106981929A (en) * | 2017-06-07 | 2017-07-25 | 合肥励仙电力工程有限公司 | A kind of energy-conserving and environment-protective wireless remote monitoring system of electric substation communicated based on GPRS |
| CN110071521B (en) | 2018-01-23 | 2021-09-03 | 台达电子企业管理(上海)有限公司 | Power distribution equipment and power distribution method |
| CN109038647A (en) * | 2018-07-09 | 2018-12-18 | 广东铨镁能源集团有限公司 | Photovoltaic energy oxygen system and its electric energy management method |
| CN110112775B (en) * | 2019-05-07 | 2023-11-14 | 中国电力科学研究院有限公司 | A micro-energy network system with distributed energy storage |
| CN110350579B (en) * | 2019-07-10 | 2022-12-27 | 青海黄河上游水电开发有限责任公司光伏产业技术分公司 | Multi-energy-storage-battery operation model capable of achieving smooth photovoltaic output |
| CN113690878B (en) * | 2021-08-03 | 2023-11-21 | 北京京能能源技术研究有限责任公司 | A microgrid three-cut control method |
| CN114772815B (en) * | 2022-05-10 | 2023-08-15 | 中建三局绿色产业投资有限公司 | Photovoltaic power generation sewage treatment integrated equipment and control method thereof |
| CN115000986A (en) * | 2022-05-16 | 2022-09-02 | 国网湖北省电力有限公司随州供电公司 | Energy management method and system for light storage power generation system supporting dual-mode operation |
| WO2024110775A1 (en) * | 2022-11-22 | 2024-05-30 | Solargik Ltd | Methods and systems for smoothing output of a solar energy system |
| CN116683730B (en) * | 2023-05-26 | 2023-12-05 | 中节能(监利)太阳能科技有限公司 | A photovoltaic centralized inverter power generation system and device |
| CN120511756A (en) * | 2025-06-10 | 2025-08-19 | 安徽中科长越科技有限公司 | Photovoltaic hair increasing system |
Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN101345500A (en) * | 2008-05-16 | 2009-01-14 | 广东志成冠军集团有限公司 | Photovoltaic power generation system with grid-connected power generation, independent power generation and UPS functions |
| CN102361328A (en) * | 2011-10-25 | 2012-02-22 | 中国科学技术大学 | Wind and light complement distributed micro-grid system for comprehensively utilizing commercial power |
| CN102570455A (en) * | 2012-01-12 | 2012-07-11 | 天津市电力公司 | Intelligent microgrid power-supply system |
| CN103138636A (en) * | 2011-11-28 | 2013-06-05 | 北汽福田汽车股份有限公司 | Hybrid power supply system for photovoltaic off network, photovoltaic combined network and energy storage |
Family Cites Families (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| EP2325970A3 (en) * | 2009-11-19 | 2015-01-21 | Samsung SDI Co., Ltd. | Energy management system and grid-connected energy storage system including the energy management system |
-
2013
- 2013-08-31 CN CN201310387650.1A patent/CN103457514B/en active Active
Patent Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN101345500A (en) * | 2008-05-16 | 2009-01-14 | 广东志成冠军集团有限公司 | Photovoltaic power generation system with grid-connected power generation, independent power generation and UPS functions |
| CN102361328A (en) * | 2011-10-25 | 2012-02-22 | 中国科学技术大学 | Wind and light complement distributed micro-grid system for comprehensively utilizing commercial power |
| CN103138636A (en) * | 2011-11-28 | 2013-06-05 | 北汽福田汽车股份有限公司 | Hybrid power supply system for photovoltaic off network, photovoltaic combined network and energy storage |
| CN102570455A (en) * | 2012-01-12 | 2012-07-11 | 天津市电力公司 | Intelligent microgrid power-supply system |
Also Published As
| Publication number | Publication date |
|---|---|
| CN103457514A (en) | 2013-12-18 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN103457514B (en) | Dual-mode solar photovoltaic power generation system | |
| CN211790784U (en) | An integrated charging station for optical storage and charging | |
| CN103441520B (en) | Micro-grid distribution type new energy storage system | |
| CN107508303B (en) | Micro-grid-oriented modular energy storage device optimal configuration and control method | |
| CN101640427B (en) | Photovoltaic off-grid charging system for electric car | |
| WO2023029335A1 (en) | Parameter configuration method and terminal for photovoltaic storage and charging system | |
| CN106505615A (en) | A power supply system for electric vehicle charging station based on independent microgrid | |
| CN202586481U (en) | Micro electrical network intelligent balanced charging and power supply system | |
| Jia et al. | Architecture design for new AC-DC hybrid micro-grid | |
| CN103248064A (en) | Composite energy charging energy storage system and method thereof | |
| CN105186549A (en) | V2G system based on direct-current micro-grid | |
| CN108667117A (en) | A shared charging treasure device based on photovoltaic power generation at bus stops | |
| CN110061515A (en) | A kind of energy storage monitoring device of the zinc-iron flow battery applied to photovoltaic power generation field | |
| CN203406827U (en) | Dual-mode solar photovoltaic power generation device | |
| CN202997585U (en) | Household solar energy grid connected generation system | |
| CN104167781A (en) | Wind-solar complementary power generation and energy storage control system | |
| CN203406664U (en) | Micro-grid distributed new energy storage device | |
| CN115352311A (en) | An energy management method for an optical storage charging and discharging system | |
| CN111740439A (en) | A control method based on the integrated microgrid system of optical storage and charging | |
| CN104953927A (en) | Novel solar and diesel hybrid power generation system | |
| CN207475204U (en) | A kind of energy-storage system available for photovoltaic generation | |
| CN108418201A (en) | A master-slave control system for a DC microgrid energy storage device | |
| CN209200677U (en) | Novel household micro-grid | |
| Gao et al. | Design and Simulation of 500kw Wind-solar Complementary Microgrid | |
| CN205017247U (en) | Light stores up joint power generation facility |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| EE01 | Entry into force of recordation of patent licensing contract |
Application publication date: 20131218 Assignee: Shenzhen Advanced Energy Storage Technology Co Ltd Assignor: Shenzhen National Engineering Research Center of Advanced Energy Storage Materials Co., Ltd. Contract record no.: 2015440020297 Denomination of invention: Dual-mode solar photovoltaic power generation system Granted publication date: 20150520 License type: Common License Record date: 20150814 |
|
| LICC | "enforcement, change and cancellation of record of contracts on the licence for exploitation of a patent or utility model" | ||
| EE01 | Entry into force of recordation of patent licensing contract |
Application publication date: 20131218 Assignee: Foshan Ying Chi net new energy technology Co. Ltd Assignor: Shenzhen National Engineering Research Center of Advanced Energy Storage Materials Co., Ltd. Contract record no.: 2016440020080 Denomination of invention: Dual-mode solar photovoltaic power generation system Granted publication date: 20150520 License type: Common License Record date: 20160905 |
|
| LICC | "enforcement, change and cancellation of record of contracts on the licence for exploitation of a patent or utility model" |