CN103452076A - Ecological restoration method learning from nature - Google Patents

Ecological restoration method learning from nature Download PDF

Info

Publication number
CN103452076A
CN103452076A CN2013104630706A CN201310463070A CN103452076A CN 103452076 A CN103452076 A CN 103452076A CN 2013104630706 A CN2013104630706 A CN 2013104630706A CN 201310463070 A CN201310463070 A CN 201310463070A CN 103452076 A CN103452076 A CN 103452076A
Authority
CN
China
Prior art keywords
landform
stone
district
nature
local
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2013104630706A
Other languages
Chinese (zh)
Other versions
CN103452076B (en
Inventor
张成梁
赵廷宁
李百炼
王恩来
荣立明
王亚刚
杨翠霞
郭娇
张翘楚
王成尘
Original Assignee
张成梁
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 张成梁 filed Critical 张成梁
Priority to CN201310463070.6A priority Critical patent/CN103452076B/en
Publication of CN103452076A publication Critical patent/CN103452076A/en
Application granted granted Critical
Publication of CN103452076B publication Critical patent/CN103452076B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention relates to the technical field of ecological restoration, in particular to an ecological restoration method learning from nature. According to the ecological restoration method learning from nature, the modern 3S technology is applied, on the basis that the conditions including the terrain of a disturbed area or the surrounding terrains, the landform, the hydrology, the weather, the climate and the like are understood and surveyed in detail, the computer analog technology is utilized, a human-induced restoration model approximate to the natural geographical pattern is designed, and construction is conducted according to the designed model. The landscape restored according to the ecological restoration method is matched with the surroundings, a slope constantly keeps stable, water and soil are protected and retained to the maximum extent, an original ecology environment is provided for local microorganisms, plants and animals. Learning from nature comprises the aspects of landform reshaping, manual soil body building, selection of plant species, construction of the vegetation structure, faunas, and microbiotas and the like. Learning from nature is mainly expressed by the similarity between the landform and a landform existing before disturbance, the phenomenon that local materials are used for building of a new soil body, reestablishment of the local vegetation, and establishment of the local faunas and the local microbiotas.

Description

Knowledge natural, ecological restorative procedure
Technical field
The present invention relates to the ecological recovery technical field, be specially a kind of ecological restoring method of imitating nature.
Background technology
Traditional restoration of the ecosystem pattern, be generally the design of land of " level is trapezoidal domatic, straight canal draining ", and its artificial trace is obvious, view and surrounding enviroment after reparation are inharmonious, and the landform diversity is few, domatic unstable, soil and water conservation effect is bad, needs long-term artificial maintenance, and expense is also higher.
Summary of the invention
The problems referred to above that the present invention exists in order to solve traditional restoration of the ecosystem pattern, provide a kind of knowledge natural, ecological restorative procedure.
The present invention adopts following technical approach to realize:
A kind of knowledge natural, ecological restorative procedure, comprise the steps:
(1), the following major parameter in district to be repaired after employing conventional method acquisition disturbance: drainage area, basin length, basin grandient, the basin direction, the basin dispersed elevation, basin dendritic drainage, cheuch length, the gradient, wriggle degree, breadth depth ratio, longitudinal section, cross section, ridge line is to the distance of ditch valley head, the riverbed material;
Above-mentioned major parameter input Geofluv software is formulated to design scheme, reparation district topography and geomorphology after disturbance is imitated to the global design of physical relief landforms, design object is the topography and geomorphology before district's disturbance is repaired in simulation, perhaps the initial land form landforms of district's periphery without disturbance are repaired in simulation, build the domatic and water system of a long-term stability to repairing district, for animal, plant, the microorganism of repairing district provides a multifarious growth of landform, living space.
(2), according to design scheme, construct
A, arrangement landform: filled out pad, smooth, soil body carrying according to design scheme to repairing district by a bulldozer under GPS controls, reach the landform requirement of design scheme;
Build by laying body footpath, slope flow path after b, landform have arranged, body footpath, slope flow path is comprised of many jagged sumps and cranky discharge conduit;
C, domatic rainwater preserve: along slope body isohypse excavation horizontal ditch, fill stone;
D, earth's surface form a complete basin mutually be connected with upstream and downstream and peripheral landform after reinventing work and completing, and then will show Tu Pu and overlay on the ground of putting in order;
Cave, gap, Testis nest are piled up with stone in e, the zone of perching wild animal;
F, loose table soil, retaining increase moisture in the soil;
G, the indigenous plant that is chosen in diameter 30km scope carry out mixed seeding, intermingle repairing district, carry out vegetation recovery;
H, after planting with local hay, cover; Perhaps, it is domatic that stone matter Mountain area adopts stone to cover, thickness 5-10cm; Perhaps, coal field adopts gangue as cladding material, and the gangue cladding thickness 5-7cm of easy-weathering is difficult for the gangue cladding thickness 10-12cm broken up;
I, maintenance.
The knowledge nature, learn to natural, and take is the teacher naturally.Knowledge natural, ecological restorative procedure is worshipped nature, the artificial ecology recovery technique that the simulating nature succession of herbaceous carries out exactly.Wherein a most important theory is exactly simulating nature, and especially natural landform, landforms, the hydrology, ecology etc. build harmony between man and nature, relies on nature, the artificial restoration of the ecosystem process promoted.Apply modern 3S technology, to repair that the conditions such as district (perturbing area) or peripheral landform, landforms, the hydrology, meteorology, weather are understood in detail and the basis investigated on, utilize computer modeling technique, design a kind of artificial repairing model of approximate Natural geographic pattern, and according to a kind of ecological recovery method that designs a model and construct.View after reparation is coordinated mutually with surrounding enviroment, and domatic maintaining a long-term stability protected retaining soil to greatest extent, for microorganism of one's native land, vegetation and animal provide an ecosystem environment.The knowledge nature comprises that topography and geomorphology reinvents, the artificial soil body is constructed, floristics, vegetation structure, fauna, microbiota etc., main manifestations is the similitude before topography and geomorphology and disturbance, the new soil body builds gathering materials on the spot of material, the reconstruction of native vegetation, indigenous animal, microbiota build.
The 3S technology is remote sensing technology (Remote sensing, RS), geographical information system (Geography informationsystems, GIS) and global positioning system (Global positioning systems, GPS) general designation, that space technology, sensor technology, satellite fix combine with airmanship and computer technology, mechanics of communication, the modern information technologies that spatial information is gathered, processes, manages, analyzes, expresses, propagates and applies that multidisciplinary height is integrated.In this method, the 3S technology is for the geographical coordinate location; When area is larger, reference area, height above sea level measuring and calculating etc.; Control Construction traffic.
The advantage of the inventive method is as follows:
1, use the comparable Traditional Ecological restorative procedure of the method saving investment more than 10%.In landform arrangement process, 80~90% expense flower is in the migration of the soil body, and last landform is moulded the fraction that only accounts for rehabilitation expense.And work progress can take full advantage of slope, can save the backfilling of earthwork expense.
2, generally do not need to do over again after the construction of employing this law, do not need for a long time artificial maintenance yet, greatly reduce maintenance cost.
Although 3 the method can increase the difficulty that discharge conduit is built, channel is built expense slightly to be increased, and takes full advantage of the chad in the soil body, can reduce again the expense that trench digging and channel are mated formation.
4, the footpath flow path if be connected mutually with periphery nature footpath flow path, often needs detailed measurement, accurate design.
The present invention is reasonable in design, and after the project implementation, soil water content improves a lot.Table soil covers and has been able to take the rainfall of meeting in 100 years, reaches design standard; The retaining pool has withstood the runoff test of meeting heavy rain in 200 years.Its erosion intensity is close without disturbance region with periphery.
The scope of application: be applicable to land reclamation, highway, railway construction, coal and mining activities, water and soil conservation etc. relate to landform and arrange, the field that landform is reinvented.
specific implementation method
Below specific embodiments of the invention are elaborated.
A kind of knowledge natural, ecological restorative procedure, comprise the steps:
(1), the topography and geomorphology in an area is the result of long-term endogenetic and exogenic force effect, is to adapt to for a long time this regional product, is the most stable, the most reliable topography and geomorphology.The important content of knowledge natural, ecological reparation is the knowledge nature of topography and geomorphology.
Geofluv mTsoftware, by imported from America, is a kind of technical software to disturbance soil topography and geomorphology Configuration design, under the CAD platform, moves.Geofluv mTsoftware provides a topographic map drawing function, and the two-dimensional coordinate data that field is recorded imports software, but software can generate one, has the common topographic map that general character is used.This topographic map has the writing function of conventional topographic map.The Geofluv design of land is based on a kind of knowledge physical relief landforms design that a technical software of disturbance soil topography and geomorphology Configuration design is carried out, the design scheme output of using 3DMAX to complete design.
The following major parameter in district to be repaired after employing those skilled in the art's conventional method acquisition disturbance: drainage area, basin length, basin grandient, the basin direction, the basin dispersed elevation, basin dendritic drainage, cheuch length, the gradient, wriggle degree, breadth depth ratio, longitudinal section, cross section, ridge line is to the distance of ditch valley head, the riverbed material.For example, obtain the drainage area method: measure with professional tool from topographic map; Obtain the basin length method: measure with professional tool, when area is little, also can directly use tape measuring from topographic map; Obtain basin direction method: on topographic map, can measure, also available compass or transit are measured; Obtain the sinuous degree method of cheuch: by measuring the air line distance of raceway groove entrance and exit on topographic map, then measure the path between the raceway groove entrance and exit, both calculate according to correlation formula; Etc..
Above-mentioned major parameter input Geofluv software is formulated to design scheme, reparation district topography and geomorphology after disturbance is imitated to the global design of physical relief landforms, design object is the topography and geomorphology before district's disturbance is repaired in simulation, perhaps the initial land form landforms of district's periphery without disturbance are repaired in simulation, build the domatic and water system of a long-term stability to repairing district, for animal, plant, the microorganism of repairing district provides a multifarious growth of landform, living space.
(2), according to design scheme, construct
A, arrangement landform: filled out pad, smooth, soil body carrying according to design scheme to repairing district by a bulldozer under GPS controls, reach the landform requirement of design scheme, substantially reach embankment and excavation balance.
Specific as follows:
Gather materials on the spot, make the best use of everything.Dregs based on local, discarded object carry out physics, chemistry, biological treatment, meet the rear soil body that builds vegetation generation succession of plant growth needs.
Compacting: to native stone than the stone matter dregs mechanical ramming that is less than 25%, 40 tons of road roller layered rollings, 50cm is one deck; Reduce large space, improve little space and hollow billet space, reach the raising field capacity, increase the purpose of soil moisture.
The quality improvement: add emplastic in the gravel of thick sclerotin, ratio is calculated with boxshear apparatus accurately.As storage household garbage screening soil, mud, loess etc., the stickiness additive is controlled at 30% and is advisable, and adds to cause too much domatic unstablely, and potential landslide occurs.
Sorting: in landform arrangement process, dregs is carried out to mechanical sorting, according to particle size, classification is used, and 20cm bulk stone is used for building the terraced fields stone ridge, and 10-20cm stone dress gabion is built retaining wall; The following dregs of 10cm is applicable to vegetation construction.
Build by laying body footpath, slope flow path after b, landform have arranged, body footpath, slope flow path is comprised of many jagged sumps and cranky discharge conduit.Discharge conduit can adopt gravel, and the gravel of channel increases the roughness of runoff channel, has improved the infiltration rate of heavy rain; The channel protective materials is gathered materials on the spot and is selected slabstone, gravel, flexible protective System Assurance channel long-lasting and exempt from maintenance.Footpath fails to be convened for lack of a quorum and retains or all infiltrate in the flow process in cranky path because of stone, no longer needs other to retain facility.The cranky discharge conduit of knowledge nature, the prolongation of footpath flow path has increased infiltrating the time of heavy rain.
C, domatic rainwater preserve: along slope body isohypse excavation horizontal ditch, fill stone, the width of horizontal ditch, the degree of depth and ditch spacing those skilled in the art can determine according to the average annual amount of precipitation in locality and heavy rain design strength.Horizontal ditch is used for collected rainwater, and stone is prevented and treated domatic soil body slump landfill, avoids Sediment Siltation.
D, earth's surface form a complete basin mutually be connected with upstream and downstream and peripheral landform after reinventing work and completing, and then will show Tu Pu and overlay on the ground of putting in order.The stone that landform arrangement process is sorted out is filled in the location that discharge conduit easily washes away.
Cave, gap, Testis nest are piled up with stone in e, the zone of perching wild animal.According to main large-scale indigenous animal life habit, utilize landform and stone to construct suitable cave, gap, Testis nest, for animal provides habitat.
F, loose table soil, retaining increase moisture in the soil, improve the soil moisture in root system of plant distributed area, meet the plant growth needs.
G, the indigenous plant that is chosen in diameter 30km scope carry out mixed seeding, intermingle repairing district, carry out vegetation recovery.
Indigenous plant is long-term result of evolving in repairing district and surrounding enviroment, is result long-tested, natural selection, is the species of optimum locality, can be because of severe natural conditions death such as extreme drought, extreme severe cold.It is also the pionner of vegetation construction.Therefore, floristic screening knowledge nature, select indigenous plant, and range of choice diameter 30KM, be conducive to build regional bio-diversity, selects as much as possible many Native species mixed seeding, intermingle.Reasonably structure is the basis of stablizing succession, promotes rational vegetation level to build.Particularly be similar to the such environment of self-ignition coal gangue hill, should not carry out large slope structural reform and become, the plantation of making the best use of the situation of knowledge nature.
H, after planting with local hay, cover, for example, straw, wheat straw uniform spreading are sprinkling upon ground after planting, with embedding grass machine, grass are embedded in soil, prevent from being blown away, and embedding grass part " being erected ", the increase surface roughness, increase is infiltrated.The embedding grass ditch formed has played the effect of retaining, advantageous particularly for the sprouting of seed in ditch.
Perhaps, stone matter Mountain area, the building stones abundance, adopt stone to cover domatic, thickness 5-10cm; Stone is less, covers slightly thin; Stone is larger, covers slightly thick.
Perhaps, coal field adopts gangue as cladding material, and the gangue cladding thickness 5-7cm of easy-weathering is difficult for the gangue cladding thickness 10-12cm broken up.
I, maintenance, irrigated according to actual conditions.Be aided with suitable maintenance in the artificial early stage promoted, stage is more to rely on power of nature and function to safeguard the forward succession of vegetation.In maintenance processes, the regulation and control simulating nature target COMMUNITY CHARACTERISTICS of arbor, shrub and grass, artificial regulatory three's ratio, to forming stable structure of community.The tree body arranges, and for making plant to domatic formation defencive function to greatest extent, the plant branching height should not surpass 50cm, otherwise the rainfall meeting accumulates large water droplet on plant, and ground is impacted, destruction soil body surface structure.Therefore plant is carried out in good time, appropriate stump, pinching, determines control plant bifurcated, the sprout tillers such as dry.

Claims (2)

1. a knowledge natural, ecological restorative procedure, is characterized in that: comprise the steps:
(1), the following major parameter in district to be repaired after employing conventional method acquisition disturbance: drainage area, basin length, basin grandient, the basin direction, the basin dispersed elevation, basin dendritic drainage, cheuch length, the gradient, wriggle degree, breadth depth ratio, longitudinal section, cross section, ridge line is to the distance of ditch valley head, the riverbed material;
Above-mentioned major parameter input Geofluv software is formulated to design scheme, reparation district topography and geomorphology after disturbance is imitated to the global design of physical relief landforms, design object is the topography and geomorphology before district's disturbance is repaired in simulation, perhaps the initial land form landforms of district's periphery without disturbance are repaired in simulation, build the domatic and water system of a long-term stability to repairing district, for animal, plant, the microorganism of repairing district provides a multifarious growth of landform, living space;
(2), according to design scheme, construct
A, arrangement landform: filled out pad, smooth, soil body carrying according to design scheme to repairing district by a bulldozer under GPS controls, reach the landform requirement of design scheme;
Build by laying body footpath, slope flow path after b, landform have arranged, body footpath, slope flow path is comprised of many jagged sumps and cranky discharge conduit;
C, domatic rainwater preserve: along slope body isohypse excavation horizontal ditch, fill stone;
D, earth's surface form a complete basin mutually be connected with upstream and downstream and peripheral landform after reinventing work and completing, and then will show Tu Pu and overlay on the ground of putting in order;
Cave, gap, Testis nest are piled up with stone in e, the zone of perching wild animal;
F, loose table soil, retaining increase moisture in the soil;
G, the indigenous plant that is chosen in diameter 30km scope carry out mixed seeding, intermingle repairing district, carry out vegetation recovery;
H, after planting with local hay, cover; Perhaps, it is domatic that stone matter Mountain area adopts stone to cover, thickness 5-10cm; Perhaps, coal field adopts gangue as cladding material, and the gangue cladding thickness 5-7cm of easy-weathering is difficult for the gangue cladding thickness 10-12cm broken up;
I, maintenance.
2. knowledge natural, ecological restorative procedure according to claim 1, it is characterized in that: in the step a of step (2), gather materials on the spot, the dregs based on local, discarded object carry out physics, chemistry, biological treatment and meet after the plant growth needs soil body that builds vegetation generation succession, as follows:
Compacting: to native stone than the stone matter dregs mechanical ramming that is less than 25%, 40 tons of road roller layered rollings, 50cm is one deck;
The quality improvement: add emplastic in the gravel of thick sclerotin, ratio is calculated with boxshear apparatus accurately;
Sorting: in landform arrangement process, dregs is carried out to mechanical sorting, according to particle size, classification is used, and 20cm bulk stone is used for building the terraced fields stone ridge, and 10-20cm stone dress gabion is built retaining wall; The following dregs of 10cm is applicable to vegetation construction.
CN201310463070.6A 2013-10-08 2013-10-08 Knowledge natural, ecological restorative procedure Expired - Fee Related CN103452076B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310463070.6A CN103452076B (en) 2013-10-08 2013-10-08 Knowledge natural, ecological restorative procedure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310463070.6A CN103452076B (en) 2013-10-08 2013-10-08 Knowledge natural, ecological restorative procedure

Publications (2)

Publication Number Publication Date
CN103452076A true CN103452076A (en) 2013-12-18
CN103452076B CN103452076B (en) 2015-09-09

Family

ID=49734883

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310463070.6A Expired - Fee Related CN103452076B (en) 2013-10-08 2013-10-08 Knowledge natural, ecological restorative procedure

Country Status (1)

Country Link
CN (1) CN103452076B (en)

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104025850A (en) * 2014-06-04 2014-09-10 北京林业大学 Artificially induced vegetation restoration method for surface mining area
CN105064273A (en) * 2015-07-25 2015-11-18 山东农业大学 Constructing method for grass planting gabion ecological terrace ridge
CN106034677A (en) * 2016-06-16 2016-10-26 陈鹏娟 Gully region drought slope water and soil conservation method
CN106228610A (en) * 2016-07-25 2016-12-14 环境保护部南京环境科学研究所 Restoration of the ecosystem partition method in conjunction with dominant eco-function Yu ecological degradation degree
CN106416732A (en) * 2016-11-30 2017-02-22 水利部交通运输部国家能源局南京水利科学研究院 Rainy-region disturbance surface vegetation restoration system and method
CN107170022A (en) * 2017-06-05 2017-09-15 山西省林业科学研究院 A kind of Piling of Gangue area landforms remodeling procedure
CN107194992A (en) * 2017-06-21 2017-09-22 中国地质大学(北京) A kind of loess area large outdoors colliery refuse dump topography and geomorphology optimization method
CN109076919A (en) * 2018-07-27 2018-12-25 中国地质大学(北京) A kind of Soil Reconstruction object and its preparation method and application
CN110820766A (en) * 2019-11-13 2020-02-21 中国矿业大学 Full-life-cycle terrain remodeling method for inner soil discharge field imitating natural landforms
CN111270743A (en) * 2020-02-10 2020-06-12 湖北工业大学 Rainwater collection and utilization construction method for ecological restoration of mine wasteland
CN111386955A (en) * 2020-04-27 2020-07-10 宁夏大学 Water-retention salt-suppression yield-increase method for northern arid area land
CN111492879A (en) * 2020-04-26 2020-08-07 海南大学 Method for restoring afforestation of highly-degraded tropical forest ecological system
CN111512874A (en) * 2020-05-09 2020-08-11 海南大学 Method for rapidly restoring water storage capacity of highly-degenerated tropical forest soil
CN113841565A (en) * 2021-09-23 2021-12-28 中煤地质集团有限公司 Construction method for soil covering and grass planting in alpine regions of plateau

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20050058971A1 (en) * 2003-09-12 2005-03-17 Nicholas Bugosh Fluvial geomorphic landscape design computer software
CN2866609Y (en) * 2006-01-26 2007-02-07 张宇顺 Green side slope structure
KR100723257B1 (en) * 2006-07-08 2007-05-31 주식회사 도화종합기술공사 Landscape architecture structure of new twon building
KR100817043B1 (en) * 2007-10-12 2008-04-08 주식회사 에코탑 Method of eco-model forest
CN102758417A (en) * 2012-07-30 2012-10-31 黄海宽 Method for water control and farmland building for environmental protection through water and soil separation and water and soil separation structure
CN103190273A (en) * 2013-04-17 2013-07-10 中国科学院南京地理与湖泊研究所 Ecological renovating technical method for suburban hardened revetments

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20050058971A1 (en) * 2003-09-12 2005-03-17 Nicholas Bugosh Fluvial geomorphic landscape design computer software
CN2866609Y (en) * 2006-01-26 2007-02-07 张宇顺 Green side slope structure
KR100723257B1 (en) * 2006-07-08 2007-05-31 주식회사 도화종합기술공사 Landscape architecture structure of new twon building
KR100817043B1 (en) * 2007-10-12 2008-04-08 주식회사 에코탑 Method of eco-model forest
CN102758417A (en) * 2012-07-30 2012-10-31 黄海宽 Method for water control and farmland building for environmental protection through water and soil separation and water and soil separation structure
CN103190273A (en) * 2013-04-17 2013-07-10 中国科学院南京地理与湖泊研究所 Ecological renovating technical method for suburban hardened revetments

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
NICHOLAS BUGOSH: "A Summary of Some Land Surface and Water Quality Monitoring Results for Constructed", 《NATIONAL MEETING OF THE AMERICAN SOCIETY OF MINING AND RECLAMATION》 *
张成梁等: "美国煤矿废弃地的生态修复", 《生态学报》 *

Cited By (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104025850B (en) * 2014-06-04 2016-03-02 北京林业大学 Strip mining transformation mining area artificial induction's vegetation repair method
CN104025850A (en) * 2014-06-04 2014-09-10 北京林业大学 Artificially induced vegetation restoration method for surface mining area
CN105064273A (en) * 2015-07-25 2015-11-18 山东农业大学 Constructing method for grass planting gabion ecological terrace ridge
CN105064273B (en) * 2015-07-25 2016-11-30 山东农业大学 A kind of grass planting gabion ecology terraced fields ridge
CN106034677A (en) * 2016-06-16 2016-10-26 陈鹏娟 Gully region drought slope water and soil conservation method
CN106228610B (en) * 2016-07-25 2018-10-30 环境保护部南京环境科学研究所 In conjunction with the restoration of the ecosystem partition method of dominant eco-function and ecological degradation degree
CN106228610A (en) * 2016-07-25 2016-12-14 环境保护部南京环境科学研究所 Restoration of the ecosystem partition method in conjunction with dominant eco-function Yu ecological degradation degree
CN106416732A (en) * 2016-11-30 2017-02-22 水利部交通运输部国家能源局南京水利科学研究院 Rainy-region disturbance surface vegetation restoration system and method
CN107170022A (en) * 2017-06-05 2017-09-15 山西省林业科学研究院 A kind of Piling of Gangue area landforms remodeling procedure
CN107194992A (en) * 2017-06-21 2017-09-22 中国地质大学(北京) A kind of loess area large outdoors colliery refuse dump topography and geomorphology optimization method
CN107194992B (en) * 2017-06-21 2019-12-03 中国地质大学(北京) A kind of loess area large outdoors colliery refuse dump topography and geomorphology optimization method
CN109076919A (en) * 2018-07-27 2018-12-25 中国地质大学(北京) A kind of Soil Reconstruction object and its preparation method and application
CN110820766A (en) * 2019-11-13 2020-02-21 中国矿业大学 Full-life-cycle terrain remodeling method for inner soil discharge field imitating natural landforms
CN110820766B (en) * 2019-11-13 2021-03-19 中国矿业大学 Full-life-cycle terrain remodeling method for inner soil discharge field imitating natural landforms
CN111270743A (en) * 2020-02-10 2020-06-12 湖北工业大学 Rainwater collection and utilization construction method for ecological restoration of mine wasteland
CN111492879A (en) * 2020-04-26 2020-08-07 海南大学 Method for restoring afforestation of highly-degraded tropical forest ecological system
CN111386955A (en) * 2020-04-27 2020-07-10 宁夏大学 Water-retention salt-suppression yield-increase method for northern arid area land
CN111512874A (en) * 2020-05-09 2020-08-11 海南大学 Method for rapidly restoring water storage capacity of highly-degenerated tropical forest soil
CN113841565A (en) * 2021-09-23 2021-12-28 中煤地质集团有限公司 Construction method for soil covering and grass planting in alpine regions of plateau

Also Published As

Publication number Publication date
CN103452076B (en) 2015-09-09

Similar Documents

Publication Publication Date Title
CN103452076B (en) Knowledge natural, ecological restorative procedure
Stokes et al. Ecological mitigation of hillslope instability: ten key issues facing researchers and practitioners
Ramos et al. Nutrient losses from a vineyard soil in Northeastern Spain caused by an extraordinary rainfall event
Rogers Soil survey of Savannah river plant area, parts of Aiken, Barnwell, and Allendale counties, South Carolina
Harden Land use, soil erosion, and reservoir sedimentation in an Andean drainage basin in Ecuador
Martínez-Casasnovas et al. Influence of the EU CAP on terrain morphology and vineyard cultivation in the Priorat region of NE Spain
He et al. Guidelines for integrating ecological and biological engineering technologies for control of severe erosion in mountainous areas–A case study of the Xiaojiang River Basin, China
Gobin et al. Soil erosion assessment at the Udi‐Nsukka Cuesta (southeastern Nigeria)
CN108170879B (en) Open pit coal mine refuse dump slope near-natural remodeling method based on WEPP
Pannigrahi Irrigation systems engineering
Demek et al. Changes in land-use and the river network of the Graben Dyjsko-svratecký úval (Czech Republic) in the last 242 years
CN115989774A (en) Ecological restoration method for coal gangue slag mountain in arid region
Cai Hydrogeomorphic characteristics of streams in Bukit Timah Nature Reserve, Singapore
Harrower Mapping and dating incipient irrigation in Wadi Sana, Ḥaḍramawt (Yemen)
Contessa Terraced landscapes in Italy: state of the art and future challenges.
Das et al. Watershed management
Giambastiani et al. Modelling the Effect of Keyline Practice on Soil Erosion Control. Land 2023, 12, 100
Carson Soil survey of Rabun and Towns counties, Georgia
Casagrand Historical Changes of Channel Width in a Headwater Stream System, Mark Twain National Forest, Missouri
Tant Soil survey of Dare County, North Carolina
Udoumoh et al. Gully erosion menace in Uyo: causes, effects and control measures
Výleta et al. Monitoring and assessment of water retention measures in agricultural land
Seethapathi et al. Hydrology of small watersheds
Khadzhidi et al. Agricultural reclamation complex as a means to obtain guaranteed yields of agricultural systems
Harsiga et al. CALCULATION OF PIT 2 PRODUCED OVERBURDEN VOLUME AND THE ANALYSIS OF PREPARATION OF PIT 1 MINE VOID UTILIZATION AT SUPAT BLOCK PT. BATURONA ADIMULYA MUSI BANYUASIN, SOUTH SUMATERA

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150909

Termination date: 20181008

CF01 Termination of patent right due to non-payment of annual fee