CN103422462B - 试验用导管架的码头安装工艺 - Google Patents

试验用导管架的码头安装工艺 Download PDF

Info

Publication number
CN103422462B
CN103422462B CN201310363317.7A CN201310363317A CN103422462B CN 103422462 B CN103422462 B CN 103422462B CN 201310363317 A CN201310363317 A CN 201310363317A CN 103422462 B CN103422462 B CN 103422462B
Authority
CN
China
Prior art keywords
test
jacket
harbour
hawser
attachment structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201310363317.7A
Other languages
English (en)
Other versions
CN103422462A (zh
Inventor
陈广宁
张有慧
宋峥嵘
李强
刘俊斐
苗蕾
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Offshore Oil Corp CNOOC
Offshore Oil Engineering Co Ltd
Offshore Oil Engineering Qingdao Co Ltd
Original Assignee
China National Offshore Oil Corp CNOOC
Offshore Oil Engineering Co Ltd
Offshore Oil Engineering Qingdao Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China National Offshore Oil Corp CNOOC, Offshore Oil Engineering Co Ltd, Offshore Oil Engineering Qingdao Co Ltd filed Critical China National Offshore Oil Corp CNOOC
Priority to CN201310363317.7A priority Critical patent/CN103422462B/zh
Publication of CN103422462A publication Critical patent/CN103422462A/zh
Application granted granted Critical
Publication of CN103422462B publication Critical patent/CN103422462B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)

Abstract

一种试验用导管架的码头安装工艺,采用以下安装步骤:一:将一支撑框架布置在码头上;二:在试验用导管架下部一侧安装数个防撞件;三:将缆绳的一端固定在试验用导管架的上部,缆绳的另一端临时固定在试验用导管架的挂靠结构上;四:将试验用导管架吊装就位于设定位置;五:在试验用导管架的挂靠结构上放上配重块;并挂靠在码头的边上;六:将临时固定缆绳系在码头的系揽桩上,紧固后,再撤去吊绳及吊机。本发明能够将试验用导管架直接挂靠在码头上,不仅使测试环境与真实应用环境一致,提高了各项试验数据的准确性和新产品实际应用测试的可靠度;而且,还克服试验用导管架的海上安装费用较高的缺点,降低了试验用导管架海上安装费用及试验成本。

Description

试验用导管架的码头安装工艺
技术领域
本发明涉及导管架的安装工艺,尤其涉及一种试验用导管架的码头安装工艺,属于海洋石油工程领域。
背景技术
海洋工程行业的进步依赖于不断研发的各种海洋工程新产品,而新产品的研发和实际应用测试均需要在处于复杂海洋环境的导管架上来完成,这不仅要通过运输、打桩、吊装等复杂工序进行导管架的海上安装与固定,工程量较大;而且,由于海上安装、固定及实际测试的费用及难度较高、周期较长及不便于拆除等因素,导致海上试验的成本较高。
为了改变在海上安装导管架进行测试存在的上述缺点,通常的做法是在试验室中进行各项试验数据测试和新产品的实际应用测试;即:将一试验用导管架直接放置在试验室内的试验水池中,然后,再对其进行各种试验。但由于试验室中的环境条件与实际的海洋环境条件存在很大的差别,因此,试验数据和实际应用测试存在一定的不准确性,这就导致开发的新产品存在不能满足真实海洋环境下使用需求的风险,不仅不能完全准确的指导各种海洋工程新产品的开发和完成新产品的实际应用测试,浪费了试验时间,增加了试验成本,而且延迟了新产品的开发,影响了我国海洋工程行业的发展。
发明内容
本发明的主要目的在于克服现有工艺存在的上述缺点,而提供一种试验用导管架的码头安装工艺,其能够将试验用导管架直接挂靠在码头上,不仅使测试环境与真实应用环境一致,提高了各项试验数据的准确性和新产品实际应用测试的可靠度;而且,还克服了试验用导管架的海上安装费用较高的缺点,降低了试验用导管架海上安装费用及试验成本;同时,拆除方便;为各种海洋工程产品的开发提供了技术保障。
本发明的目的是由以下技术方案实现的:
一种试验用导管架的码头安装工艺,其特征在于:试验用导管架的安装步骤如下:
第一步:将一支撑框架布置在码头上;
第二步:在试验用导管架下部一侧安装数个防撞件;
第三步:将缆绳的一端固定在试验用导管架的上部一端,而缆绳的另一端临时固定在试验用导管架的挂靠结构上;
第四步:将试验用导管架吊装就位于设定位置;
第五步:在试验用导管架的挂靠结构上放上配重块;将试验用导管架挂靠在码头的边上;
第六步:将临时固定在试验导管架挂靠结构上的缆绳系在码头的系揽桩上紧固后,再撤去吊绳及吊机。
所述支撑框架为:由工字钢及钢板连接而成的框架式结构。
所述防撞件为:橡胶护垫。
所述挂靠结构为:由工字钢及钢板连接而成的框架式结构
所述配重块为:水泥滑道块、混凝土块、铁块或者其它能够提供重力的结构。
本发明的有益效果:本发明由于采用上述技术方案,其能够将试验用导管架直接挂靠在码头上,不仅使测试环境与真实应用环境一致,提高了各项试验数据的准确性和新产品实际应用测试的可靠度;而且,还克服试验用导管架的海上安装费用较高的缺点,降低了试验用导管架海上安装费用及试验成本;同时,拆除方便;为各种海洋工程产品的开发提供了技术保障。
附图说明:
图1为本发明试验用导管架的结构形式示意图。
图2为本发明支撑框架就位示意图。
图3为本发明试验用导管架安装防撞件示意图。
图4为本发明试验用导管架吊装前缆绳固定示意图。
图5为本发明试验用导管架吊装就位示意图。
图6为本发明试验用导管架挂靠结构加配重块示意图。
图7为本发明试验用导管架通过缆绳紧固在系揽桩上,并撤掉吊绳示意图。
图中主要标号说明:
1支撑框架、2试验用导管架、3防撞件、4缆绳、5挂靠结构、6配重块、7系揽桩、8吊绳、9码头。
具体实施方式
如图1所示,首先,在陆地上建造试验用导管架2,并将试验用导管架2运至到码头9上准备进行安装,其具体安装步骤如下:
第一步:如图2所示,将支撑框架1布置在码头9上;
第二步:如图3所示,在试验用导管架2下部一侧采用螺栓连接方式安装数个防撞件3;
第三步:如图4所示,将缆绳4的一端采用捆扎或者卸扣连接的方式永久固定在试验用导管架2的上部一端,而缆绳4的另一端同样采用捆扎或者卸扣连接的方式临时固定在试验用导管架2的挂靠结构5上;
第四步:如图5所示,通过挂在吊机上的吊绳8将试验用导管架2吊装就位于设定位置;
第五步:如图6所示,在试验用导管架2的挂靠结构5上放上配重块6;其是根据杠杆原理,利用配重块6将试验用导管架2挂靠在码头9的边上;
第六步:如图7所示,将临时固定在试验用导管架2挂靠结构5上的缆绳4系在码头9的系揽桩7上紧固后,再将吊绳8及吊机撤去,进一步增强其稳定性和安全性。
上述支撑框架1为:由工字钢及钢板采用焊接或螺栓连接方式连接而成的框架式结构。
上述防撞件3为:具有缓冲性能的橡胶护垫。
上述挂靠结构5为:由工字钢及钢板采用焊接或螺栓连接方式连接而成的框架式结构。
上述配重块6为:水泥滑道块、混凝土块、铁块或者其它能够提供重力的结构。
安装好后的试验用导管架2,便可以在其上进行各种相关试验了。
上述试验用导管架、系揽桩为现有技术,未作说明的技术为现有技术。
以上所述,仅是本发明的较佳实施例而已,并非对本发明作任何形式上的限制,凡是依据本发明的技术实质对以上实施例所作的任何简单修改、等同变化与修饰,均仍属于本发明技术方案的范围内。

Claims (1)

1.一种试验用导管架的码头安装工艺,其特征在于:试验用导管架的安装步骤如下:
第一步:将一支撑框架布置在码头上;
第二步:在试验用导管架下部一侧安装数个防撞件;
第三步:将缆绳的一端固定在试验用导管架的上部一端,而缆绳的另一端临时固定在试验用导管架的挂靠结构上;
第四步:将试验用导管架吊装就位于设定位置;
第五步:在试验用导管架的挂靠结构上放上配重块;将试验用导管架挂靠在码头的边上;
第六步:将临时固定在试验导管架挂靠结构上的缆绳系在码头的系揽桩上紧固后,再撤去吊绳及吊机;
上述支撑框架为:由工字钢及钢板连接而成的框架式结构;
上述防撞件为:橡胶护垫;
上述挂靠结构为:由工字钢及钢板连接而成的框架式结构;
上述配重块为:水泥滑道块、混凝土块、铁块或者其它能够提供重力的结构。
CN201310363317.7A 2013-08-20 2013-08-20 试验用导管架的码头安装工艺 Expired - Fee Related CN103422462B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310363317.7A CN103422462B (zh) 2013-08-20 2013-08-20 试验用导管架的码头安装工艺

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310363317.7A CN103422462B (zh) 2013-08-20 2013-08-20 试验用导管架的码头安装工艺

Publications (2)

Publication Number Publication Date
CN103422462A CN103422462A (zh) 2013-12-04
CN103422462B true CN103422462B (zh) 2015-08-05

Family

ID=49647811

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310363317.7A Expired - Fee Related CN103422462B (zh) 2013-08-20 2013-08-20 试验用导管架的码头安装工艺

Country Status (1)

Country Link
CN (1) CN103422462B (zh)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104890824B (zh) * 2015-06-10 2017-03-08 中船黄埔文冲船舶有限公司 一种导管架下水驳船摇臂翻转试验方法
CN107741245A (zh) * 2017-09-22 2018-02-27 中国海洋石油总公司 海洋试验装置

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006316495A (ja) * 2005-05-12 2006-11-24 Kobe Steel Ltd 橋脚基礎構造とその施工方法
CN101666098A (zh) * 2009-08-03 2010-03-10 天津大学 板格形导管架预制构件桩基结构及采用该桩基结构的码头
CN102409650A (zh) * 2011-09-23 2012-04-11 中国海洋石油总公司 一种浅水海洋导管架平台的安装方法
CN202298591U (zh) * 2011-09-23 2012-07-04 中国海洋石油总公司 一种浅水导管架平台

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7976244B2 (en) * 2007-03-20 2011-07-12 Keating Joseph W Method and system for constructing and installing docks
BE1020071A5 (nl) * 2011-07-11 2013-04-02 Geosea N V Werkwijze voor het verschaffen van een fundering voor een zich op hoogte bevindende massa, en een positioneerframe voor het uitvoeren van de werkwijze.

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006316495A (ja) * 2005-05-12 2006-11-24 Kobe Steel Ltd 橋脚基礎構造とその施工方法
CN101666098A (zh) * 2009-08-03 2010-03-10 天津大学 板格形导管架预制构件桩基结构及采用该桩基结构的码头
CN102409650A (zh) * 2011-09-23 2012-04-11 中国海洋石油总公司 一种浅水海洋导管架平台的安装方法
CN202298591U (zh) * 2011-09-23 2012-07-04 中国海洋石油总公司 一种浅水导管架平台

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
外海开敞水域码头结构新型式;程泽坤等;《水运工程》;20110131(第01期);第124页左栏第1行至125页右栏第10行 *

Also Published As

Publication number Publication date
CN103422462A (zh) 2013-12-04

Similar Documents

Publication Publication Date Title
CN101538844B (zh) 水深大于2米的大型海上风电场建设的施工方法
CN202745060U (zh) 一种适用于深水井口平台导管架水下超长钢桩的水上起桩翻身机构
CN104480865A (zh) 一种大型钢沉井精确定位方法
CN102433890B (zh) 海上漂浮式风机基础及其定位系统
CN104727336A (zh) 浅海风电场大型单管桩基础施工方法
CN210315612U (zh) 吊箱与桩过孔的上拉式快速封底结构
CN111688876A (zh) 一种漂浮式风电基础结构及其施工安装方法
CN203427999U (zh) 一种自升式连体潜标测量系统
CN203626273U (zh) 一种适用于斜面幕墙的施工装置
CN104627331A (zh) 一种风力发电浮式基础
CN107600326A (zh) 一种用于深海浮标的可释放式重力锚系统
CN103422462B (zh) 试验用导管架的码头安装工艺
CN201746845U (zh) 一种适用于海洋工程的桩基式基础结构
CN104369838B (zh) 自升式连体潜标测量系统
Cao et al. Design of a novel installation device for a subsea production system
CN101538845B (zh) 水深小于2米的大型海上风电场建设的施工方法
CN104088307A (zh) 一种桩基竖向承载力的检测方法
CN204023540U (zh) 一种钻探平台
CN107651566B (zh) 一种起重机波浪补偿功能验证方法
CN102206938A (zh) 一种新的海上平台上部组块安装方法
CN202787291U (zh) 一种主墩钢套箱现场双机并排抬吊施工结构
CN202609773U (zh) 插销式吊点
CN207700140U (zh) 一种便于船只上岸下水的堤岸结构
CN100458362C (zh) 水下传感器链的快速布放装置
CN204821997U (zh) 一种适用于半潜平台防台风的码头系泊系统

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 100010 Chaoyangmen North Street, Dongcheng District, Dongcheng District, Beijing

Co-patentee after: OFFSHORE OIL ENGINEERING Co.,Ltd.

Patentee after: CHINA NATIONAL OFFSHORE OIL Corp.

Co-patentee after: OFFSHORE OIL ENGINEERING (QINGDAO) Co.,Ltd.

Address before: 100010 Chaoyangmen North Street, Dongcheng District, Dongcheng District, Beijing

Co-patentee before: OFFSHORE OIL ENGINEERING Co.,Ltd.

Patentee before: CHINA NATIONAL OFFSHORE OIL Corp.

Co-patentee before: OFFSHORE OIL ENGINEERING (QINGDAO) Co.,Ltd.

CP01 Change in the name or title of a patent holder
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150805

CF01 Termination of patent right due to non-payment of annual fee