CN103416344B - The purification of industrialized fish pond discharge cycle and drainage - Google Patents

The purification of industrialized fish pond discharge cycle and drainage Download PDF

Info

Publication number
CN103416344B
CN103416344B CN201210160148.2A CN201210160148A CN103416344B CN 103416344 B CN103416344 B CN 103416344B CN 201210160148 A CN201210160148 A CN 201210160148A CN 103416344 B CN103416344 B CN 103416344B
Authority
CN
China
Prior art keywords
water
discharge
purification
pipeline
crawl
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210160148.2A
Other languages
Chinese (zh)
Other versions
CN103416344A (en
Inventor
张民良
陈钢毅
刘基兴
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JINLUN (TIANJIN) PRECISION MACHINERY CO Ltd
Original Assignee
JINLUN (TIANJIN) PRECISION MACHINERY CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JINLUN (TIANJIN) PRECISION MACHINERY CO Ltd filed Critical JINLUN (TIANJIN) PRECISION MACHINERY CO Ltd
Priority to CN201210160148.2A priority Critical patent/CN103416344B/en
Publication of CN103416344A publication Critical patent/CN103416344A/en
Application granted granted Critical
Publication of CN103416344B publication Critical patent/CN103416344B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

Industrialized fish pond discharge cycle of the present invention purifies and drainage comprises purifying processor, water purification, sewage, crawl, discharge-channel, to water purification pipeline, water purification water return pipeline, blowdown abandon waterpipe, plug pipe and transition conduit.Native system is provided with discharge-channel in the side in fishpond, and discharge-channel adds upper cover plate operative employee and just can walk about thereon.Water in fishpond can complete sequence of operations by the plug osculum of the bottom discharge hole of crawl, pipeline, left and right draining platform and transition conduit, cycle water plug pipe can being utilized as valve meeting under the prerequisite of fishpond hydration reason water level, crawl water out being returned the requirement of purifying processor as renewable water; Cycle water plug pipe can also be utilized to meet emptying fishpond water to the requirement of water purification water return pipeline; Can also when there is dead fish in fishpond, utilize and abandon water plug pipe and meet emptying fishpond water and abandon waterpipe requirement to blowdown, reach and increase substantially cultivation density, the object of increasing economic efficiency.

Description

The purification of industrialized fish pond discharge cycle and drainage
Technical field
The invention belongs to technical field of aquaculture, relate to the purification of industrialized fish pond discharge cycle and drainage, particularly can ensure fishpond predetermined water level, realize the circulating water treatment of crawl and the discharge of waste water, renewable water is made to control to continue use by filtration, biochemistry, sterilization and temperature, nugatory waste water, such as carry disease germs water, polluted water is directly discharged, reach saving water source, preventing pollution water causes bacterium to spread initiation fish kills, increases substantially cultivation density, the object of increasing economic efficiency.
Background technology
Current existing industrialized fish pond discharge cycle purifies and in drainage, its water purification water return pipeline, blowdown abandon waterpipe and drain valve complex structure, the easy contamination of pipeline, and cost is higher, and operation easier is large, maintenance difficult.
Summary of the invention
For above many disadvantages, the present invention proposes and solve in-problem technical scheme.
A kind of industrialized fish pond discharge cycle purification and drainage, industrialized fish pond circulation draining and drainage comprise purifying processor, crawl, discharge-channel, to water purification pipeline, water purification water return pipeline, blowdown abandon waterpipe, plug pipe and transition conduit, be connected in parallel on discharge-channel at a series of crawl, in discharge-channel, bottom is arranged side by side water purification water return pipeline and waterpipe is abandoned in blowdown; Discharge-channel both sides are provided with left and right draining platform, and the horizontal plane of left and right draining platform is provided with vertical osculum, the osculum of left and right draining platform emit horizontal plane lower than the lowest part of crawl, and abandon waterpipe higher than water purification water return pipeline and blowdown; The osculum threeway of left and right draining platform is communicated with transition conduit; The bottom of each crawl is provided with discharge orifice, and discharge orifice is communicated with by the osculum of pipeline with nearest side draining platform; Being provided with at each osculum of left and right draining platform can the plug pipe of plug, seals between plug pipe and osculum; Each crawl is cycle water plug pipe at the coconnected plug pipe of water purification water return pipeline side draining platform, abandons the coconnected plug pipe of waterpipe side draining platform for abandoning water plug pipe in blowdown; Water purification water return pipeline near the osculum of left and right draining platform and blowdown are abandoned waterpipe and are all had water inlet, and osculum is communicated with this water inlet.
Native system is provided with discharge-channel in the side in fishpond, and discharge-channel adds upper cover plate operative employee and just can walk about thereon.Water in fishpond can complete sequence of operations by the plug osculum of the bottom discharge hole of crawl, pipeline, left and right draining platform and transition conduit, cycle water plug pipe can being utilized as valve meeting under the prerequisite of fishpond hydration reason water level, crawl water out being returned the requirement of purifying processor as renewable water; Cycle water plug pipe can also be utilized to meet emptying fishpond water to the requirement of water purification water return pipeline; Can also when there is dead fish in fishpond, utilize and abandon water plug pipe and meet emptying fishpond water and abandon waterpipe requirement to blowdown.
As further scheme, two row crawls are connected in parallel on the both sides of discharge-channel.The water source that the purification of a set of discharge cycle and drainage can be utilized like this to meet two row fishponds controls, and reduces investment.
As further scheme, described water purification pipeline of giving comprises main line, bye-pass and water-supply valve, main line is arranged on the cover plate of discharge-channel and water purification water return pipeline and blowdown and abandons between waterpipe, main line is communicated with crawl by bye-pass with water-supply valve, and the floss hole of water-supply valve is on crawl top.By the cover plate bottom being arranged on discharge-channel to water purification pipeline, arrange like this and save space, when particularly the both sides of discharge-channel being connected in parallel on for two row crawls, can supplying water to two row crawls simultaneously, save pipeline investment.The program can avoid fishpond Water Spreading pipeline, can also show streamflow regime.
As further scheme, described water purification water return pipeline is the U-shaped channel structure of opening, and the corner of the two bottom sides wall of channel is fillet, the drainage grade 0.5% ~ 5% of this U-shaped channel.Be provided with drainage grade 0.5% ~ 5% to be conducive to avoiding mud to deposit in channel, prevent bacteria breed.
As further scheme, it be opening is U-shaped channel structure that waterpipe is abandoned in described blowdown, and the corner of the two bottom sides wall of channel is fillet, and this U-shaped channel is provided with drainage grade 0.5% ~ 5%.Be provided with drainage grade 0.5% ~ 5% to be conducive to avoiding mud to deposit in channel, prevent bacteria breed.
As further scheme, described water purification water return pipeline is plastic conduit, the drainage grade 0.5% ~ 5% of water purification water return pipeline.
As further scheme, arranging between two adjacent crawls at the give bye-pass of the discharge water purification of water purification pipeline and the water-supply valve on crawl top, this pipeline comprises slip-knot connecting bend.This pipeline slip-knot connecting bend can reverse any one that floss hole is communicated with in two adjacent crawls.The program can the pipeline of two-way water purification be intake simultaneously, meets the large discharge of one of them fishpond needs.
As further scheme, described is arranging between two adjacent crawls at the main line of the discharge water purification of water purification pipeline of giving on crawl top, main line UNICOM bye-pass, this bye-pass is communicated with two valves by threeway, and each Valved discharge mouth is communicated with two adjacent crawls respectively.The program can be divided into a road bye-pass from main line, and supply water to two adjacent fishponds, pipeline is fairly simple, reduces cost simultaneously.
As further scheme, the cycle water plug pipe that each osculum of the draining platform of water purification water return pipeline side is provided with, cycle water plug pipe emit mouth of a river height identical with the water surface elevation that crawl keeps.This programme utilizes the cycle water plug pipe of proper height to meet fishpond hydration reason water level as valve.
As further scheme, described water purification water return pipeline is provided with a sector crosssection lid in U-shaped channel structure, near plug osculum, leave water stream channel.Water purification water return pipeline is provided with lid in U-shaped channel structure, can close water purification water return pipeline to greatest extent further, corrodes to reduce ambient contamination.But to drainage channel be left near plug pipe.
As further scheme, being provided with in the discharge orifice bottom described crawl can the drainpipe of plug, can the height of drainpipe of plug consistent with the water level that fishpond sets, can the drainpipe of plug and discharge orifice, pipeline communication.The program makes to ensure the stable of fishpond water level when plug pipeline.
As further scheme, being provided with in the discharge orifice bottom described crawl can the drainpipe of plug, and the height of drainpipe is consistent with the water level that fishpond sets, and this tube wall of water inlet pipe of plug can circumferentially be provided with a series of water guide through hole.The program tackles fish when making discharge water.
The general using method of the purification of this industrialized fish pond discharge cycle and drainage is:
When the fish normal growth stage, the plug pipe of each fishpond on water purification water return pipeline side draining platform is cycle water plug pipe; Plug pipe on waterpipe side draining platform is abandoned for abandoning water plug pipe in blowdown; Cycle water plug pipe emit mouth of a river height identical with the water surface elevation that crawl keeps.When water purification is by entering crawl to the main line of water purification pipeline, bye-pass and water-supply valve, what exceed cycle water plug pipe when the fishpond water surface emits the mouth of a river, water in fishpond overflows to outside cycle water plug pipe, flow in the U-shaped channel structure of water purification water return pipeline, return purifying processor and carry out purified treatment.Purifying processor water purification out flows to crawl endlessly, and crawl water is out renewable water, and renewable water flows in water purification water return pipeline endlessly, returns purifying processor by water purification water return pipeline.
Circulation like this, completes fishpond discharge cycle, meets the requirement of fish growth.
Crawl be there is to the diseases such as dead fish when needing fishpond water directly to discharge, adopt following operation, take out abandoning water plug pipe from the plug osculum of draining platform, the water in disease fishpond, from the drainpipe the discharge orifice bottom crawl, enters blowdown by pipeline and abandons waterpipe discharge.
Industrialized fish pond discharge cycle purification of the present invention and drainage beneficial effect are compared with prior art:
1, the industrialized fish pond discharge cycle that the present invention proposes purifies and drainage can adapt to various ways crawl, and improve the recycling utilization efficiency of water, particularly cultivated by static state and become flowing water culture, due to can purifying processor be utilized, control constantly to provide high-quality water purification by filtration, biochemistry, sterilization and temperature, substantially increase cultivation density;
2, can discharge rapidly for the polluted water that disease occurs, be conducive to the diffusion and the development that control disease, be that fish growth environment is greatly improved, the coefficient that survives of fish significantly promotes.
3, contain the purification of industrialized fish pond discharge cycle and drainage manufacturing process is simple, make efficiency improves and cost reduces compared with prior art, device fabrication cost and operation easier and labor strength reduce; There is no evaporating, emitting, dripping or leaking of liquid or gas phenomenon, reliable, improve operating condition, remarkable in economical benefits.
Accompanying drawing explanation
Fig. 1 surveys view as the outward appearance axle of the purification of industrialized fish pond discharge cycle and drainage;
Fig. 2 is that the axle of the purification of industrialized fish pond discharge cycle and drainage pipeline surveys view, does not show crawl, water purification water return pipeline, blowdown abandon waterpipe;
Fig. 3 is the A-A profile of Fig. 1; The bottom showing crawl be provided with discharge orifice, discharge cycle purification and drainage insert row water hole, cycle water plug pipe, abandon water plug pipe, transition conduit, abandon waterpipe etc. to water purification pipeline, water purification water return pipeline and blowdown;
Fig. 4 is the B-B profile of Fig. 1, shows to the main line of water purification pipeline, bye-pass and water-supply valve;
Fig. 5 is the C-C profile of Fig. 1, and the U-shaped channel structure showing water purification water return pipeline is provided with a lid.
Wherein: 1-crawl, 2-abandons water plug pipe, 3-main line, 4-transition conduit, 5-bye-pass, 6-cycle water plug pipe, 6a-elbow, 7-water-supply valve, 8-slip-knot connecting bend, 9-floss hole, 10-threeway, 11-water purification water return pipeline, waterpipe is abandoned in 12-blowdown, 13-drain valve, and 14-can the drainpipe of plug, 15-cover plate, 16-discharge-channel, 17-left and right draining platform 17a-osculum, 18-discharge orifice, 19-pipeline, 20-lid.
Embodiment
Below in conjunction with accompanying drawing, industrialized fish pond discharge cycle purification of the present invention and drainage are further described.
The purification of a kind of industrialized fish pond discharge cycle and drainage is shown in Fig. 1 ~ 5, industrialized fish pond circulation draining and drainage comprise purifying processor (do not have in figure and have display), crawl, discharge-channel, to water purification pipeline, water purification water return pipeline, blowdown abandon waterpipe, plug pipe and transition conduit, be connected in parallel on discharge-channel 16 at a series of crawl 1, in discharge-channel, bottom is arranged side by side water purification water return pipeline 11 and waterpipe 12 is abandoned in blowdown; Discharge-channel both sides are provided with left and right draining platform 17, the horizontal plane of left and right draining platform is provided with vertical osculum 17a, the osculum of left and right draining platform emit horizontal plane lower than the lowest part of crawl, and abandon waterpipe higher than water purification water return pipeline and blowdown; The osculum threeway 10 of left and right draining platform is communicated with transition conduit 4 with elbow 6a; The bottom of each crawl is provided with discharge orifice 18, and discharge orifice is by the osculum of pipeline 19 with nearest side draining platform 17a is communicated with; Being provided with at each osculum of left and right draining platform can the plug pipe of plug, seals between plug pipe and osculum; Each crawl is cycle water plug pipe 6 at the coconnected plug pipe of water purification water return pipeline side draining platform, abandons the coconnected plug pipe of waterpipe side draining platform for abandoning water plug pipe 2 in blowdown; Water purification water return pipeline 11 near the osculum of left and right draining platform and blowdown are abandoned waterpipe 12 and are all had water inlet, and osculum is communicated with this water inlet.Left and right draining platform makes with concrete, and transition conduit 4 is communicated with elbow 6a with the pipeline 19 be poured in this concrete, threeway 10.
The both sides that two row crawls 1 are connected in parallel on discharge-channel 16 are all shown in figure.
Fig. 2 more clearly find out the layout of components of system as directed pipeline, the osculum 17a that described left and right draining platform is provided with is that the threeway 10 made from the plastics be poured in this concrete and elbow 6a are formed, all plug pipes are also that plastics are made, plug Guan Jun exposes plug in hole threeway 10 or elbow 6a's, and plug pipe and threeway 10 or exposing between hole of elbow 6a seal.
Main line 3, bye-pass 5 and water-supply valve 7 is comprised to water purification pipeline, main line is arranged on the cover plate 15 of discharge-channel and water purification water return pipeline 12 and blowdown and abandons between waterpipe 11, main line is communicated with crawl by bye-pass with water-supply valve, and the floss hole of water-supply valve is on crawl top.
Water purification water return pipeline 11 is the U-shaped channel structure of opening, and U-shaped channel structure adopts concrete manufacture, and the corner of the two bottom sides wall of channel is fillet, the drainage grade 1% of this U-shaped channel.
Certain water purification water return pipeline also can with plastic tube manufacture (in figure not display).Which kind of material that don't work all needs perforate near the osculum of left and right draining platform, and the water come up to make osculum flows into naturally.
Arranging on a crawl at the floss hole 9 of water purification pipeline of giving on crawl top, this pipeline floss hole is communicated with crawl.
Arranging between two adjacent crawls at the pipeline of the discharge water purification of water purification pipeline of giving on crawl top, this pipeline comprises slip-knot connecting bend 8.
Right side shows two adjacent crawls and feeds water at a node bye-pass in the drawings.Concrete scheme described is arranging between two adjacent crawls 1 on crawl top to the main line 3 of the discharge water purification of water purification pipeline, main line 3 UNICOM bye-pass 5, this bye-pass is communicated with two water-supply valves 7 by threeway 10, and each Valved discharge mouth is communicated with two adjacent crawls respectively.Each crawl is shown separately with bye-pass feedwater one by one in the left side of drawing.
The cycle water plug pipe 6 that each osculum of the draining platform of water purification water return pipeline side is provided with, cycle water plug pipe emit mouth of a river height identical with the water surface elevation that crawl 1 keeps.
Show water purification water return pipeline 11 at Fig. 5 in U-shaped channel structure, be provided with a lid 20, lid leaves water stream channel near osculum.
Being provided with in discharge orifice bottom crawl can the drainpipe 14 of plug, can the height of drainpipe of plug consistent with the water level that fishpond sets, can the drainpipe 14 of plug be communicated with discharge orifice 18, pipeline 19.
Obviously, the relevant technologies feature in various embodiment can reasonably exchange and omit within the scope of rights protection.

Claims (10)

1. an industrialized fish pond discharge cycle purification and drainage, comprise purifying processor, crawl, discharge-channel, to water purification pipeline, water purification water return pipeline, blowdown abandon waterpipe, plug pipe and transition conduit, it is characterized in that, a series of crawl (1) is connected in parallel on discharge-channel (16), and in discharge-channel, bottom is arranged side by side water purification water return pipeline (11) and waterpipe (12) is abandoned in blowdown; Discharge-channel both sides are provided with left and right draining platform (17), the horizontal plane of left and right draining platform is provided with vertical osculum (17a), the osculum of left and right draining platform emit horizontal plane lower than the lowest part of crawl, and abandon waterpipe higher than water purification water return pipeline and blowdown; The osculum threeway (10) of left and right draining platform is communicated with transition conduit (4) with elbow (6a); The bottom of each crawl is provided with discharge orifice (18), and discharge orifice is communicated with the osculum (17a) of nearest side draining platform by pipeline (19); Being provided with at each osculum of left and right draining platform can the plug pipe of plug, seals between plug pipe and osculum; Each crawl is cycle water plug pipe (6) at the coconnected plug pipe of water purification water return pipeline side draining platform, abandons the coconnected plug pipe of waterpipe side draining platform for abandoning water plug pipe (2) in blowdown; Water purification water return pipeline (11) near the osculum of left and right draining platform and blowdown are abandoned waterpipe (12) and are all had water inlet, and osculum is communicated with this water inlet.
2. industrialized fish pond discharge cycle purification according to claim 1 and drainage, it is characterized in that, two row crawls (1) are connected in parallel on the both sides of discharge-channel (16).
3. industrialized fish pond discharge cycle purification according to claim 1 and drainage, it is characterized in that, described water purification pipeline of giving comprises main line (3), bye-pass (5) and water-supply valve (7), main line is arranged on the cover plate (15) of discharge-channel and water purification water return pipeline (11) and blowdown and abandons between waterpipe (12), main line is communicated with crawl by bye-pass with water-supply valve, and the floss hole (9) of water-supply valve is on crawl top.
4. industrialized fish pond discharge cycle purification according to claim 1 and drainage, it is characterized in that, the U-shaped channel structure that described water purification water return pipeline (11) is opening, the corner of the two bottom sides wall of channel is fillet, the drainage grade 0.5% ~ 5% of this U-shaped channel.
5. industrialized fish pond discharge cycle purification according to claim 1 and 2 and drainage, it is characterized in that, described water purification water return pipeline (11) is plastic conduit, the drainage grade 0.5% ~ 5% of water purification water return pipeline.
6. industrialized fish pond discharge cycle purification according to claim 2 and drainage, is characterized in that, the pipeline of the discharge water purification of water purification pipeline of giving on crawl top is arranged between two adjacent crawls, and this pipeline comprises slip-knot connecting bend (8).
7. industrialized fish pond discharge cycle purification according to claim 3 and drainage, it is characterized in that, the main line (3) of the discharge water purification of water purification pipeline of giving on crawl top is arranged between two adjacent crawls (1), main line (3) is communicated with a bye-pass (5), this bye-pass is communicated with two water-supply valves (7) by threeway (10), and each water-supply valve floss hole is communicated with two adjacent crawls respectively.
8. industrialized fish pond discharge cycle purification according to claim 1 and 2 and drainage, it is characterized in that, the cycle water plug pipe (6) that each osculum of the draining platform of water purification water return pipeline side is provided with, cycle water plug pipe emit mouth of a river height identical with the water surface elevation that crawl (1) keeps.
9. industrialized fish pond discharge cycle purification according to claim 4 and drainage, it is characterized in that, described water purification water return pipeline (11) is provided with a lid (20) in U-shaped channel structure, and lid leaves water stream channel near osculum.
10. industrialized fish pond discharge cycle purification according to claim 1 and drainage, it is characterized in that, being provided with in discharge orifice bottom described crawl can the drainpipe (14) of plug, can the height of drainpipe of plug consistent with the water level that fishpond sets, can the drainpipe (14) of plug be communicated with discharge orifice (18), pipeline (19).
CN201210160148.2A 2012-05-23 2012-05-23 The purification of industrialized fish pond discharge cycle and drainage Active CN103416344B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210160148.2A CN103416344B (en) 2012-05-23 2012-05-23 The purification of industrialized fish pond discharge cycle and drainage

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210160148.2A CN103416344B (en) 2012-05-23 2012-05-23 The purification of industrialized fish pond discharge cycle and drainage

Publications (2)

Publication Number Publication Date
CN103416344A CN103416344A (en) 2013-12-04
CN103416344B true CN103416344B (en) 2016-02-10

Family

ID=49642153

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210160148.2A Active CN103416344B (en) 2012-05-23 2012-05-23 The purification of industrialized fish pond discharge cycle and drainage

Country Status (1)

Country Link
CN (1) CN103416344B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103535312A (en) * 2012-07-13 2014-01-29 津伦(天津)精密机械股份有限公司 Factory-like fishpond water draining circulation purification and blow down system
CN105557616A (en) * 2014-10-20 2016-05-11 津伦(天津)精密机械股份有限公司 Multifunctional circulating, purifying and blowdown system for factory fishpond drainage
CN104365514B (en) * 2014-10-30 2017-06-13 陈宏� A kind of eel industrial aquaculture system
CN106386902A (en) * 2016-08-31 2017-02-15 山东胜伟园林科技有限公司 Acetic starch-containing rooting agent and preparation method thereof
CN109220978A (en) * 2018-11-12 2019-01-18 中国水产科学研究院渔业机械仪器研究所 Terrace-type cultivating pool bottom and upper water column circulation exchange system and its working method

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1440647A (en) * 2003-02-24 2003-09-10 山东省日照市水产研究所 High-yield breeding method and breeding pond for Japanese prawn
CN101215069A (en) * 2008-01-18 2008-07-09 兰泽桥 Industrialization ecological treatment circulation utilization system for fish culture waste water
CN101445309A (en) * 2008-12-23 2009-06-03 兰泽桥 High-efficiency ecological fish farming installation for farming fishes with purified recirculated water
CN101548655A (en) * 2008-12-20 2009-10-07 河北科技师范学院 Ecological closed cycle water fish-cultivating method
CN101891342A (en) * 2010-07-12 2010-11-24 湛江恒兴南方海洋科技有限公司 Circulating water culture system
GB2472032A (en) * 2009-07-22 2011-01-26 Questor Group C Culturing pool for algae
CN201733730U (en) * 2010-04-15 2011-02-09 宁波海能渔业发展有限公司 Grouper factory circulating water aquaculture device
CN102334459A (en) * 2010-07-20 2012-02-01 上海海洋大学 Circulating water aquaculture system

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2864372B2 (en) * 1996-10-29 1999-03-03 株式会社海耕エンジニア Recirculating aquarium for fish
US20080202998A1 (en) * 2007-02-23 2008-08-28 Kuo-Tang Tseng Sewage treatment system for breeding system
KR100889497B1 (en) * 2007-09-13 2009-03-19 박주형 Recirculating fish culture system including water circulating tank

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1440647A (en) * 2003-02-24 2003-09-10 山东省日照市水产研究所 High-yield breeding method and breeding pond for Japanese prawn
CN101215069A (en) * 2008-01-18 2008-07-09 兰泽桥 Industrialization ecological treatment circulation utilization system for fish culture waste water
CN101548655A (en) * 2008-12-20 2009-10-07 河北科技师范学院 Ecological closed cycle water fish-cultivating method
CN101445309A (en) * 2008-12-23 2009-06-03 兰泽桥 High-efficiency ecological fish farming installation for farming fishes with purified recirculated water
GB2472032A (en) * 2009-07-22 2011-01-26 Questor Group C Culturing pool for algae
CN201733730U (en) * 2010-04-15 2011-02-09 宁波海能渔业发展有限公司 Grouper factory circulating water aquaculture device
CN101891342A (en) * 2010-07-12 2010-11-24 湛江恒兴南方海洋科技有限公司 Circulating water culture system
CN102334459A (en) * 2010-07-20 2012-02-01 上海海洋大学 Circulating water aquaculture system

Also Published As

Publication number Publication date
CN103416344A (en) 2013-12-04

Similar Documents

Publication Publication Date Title
CN103416344B (en) The purification of industrialized fish pond discharge cycle and drainage
CN104649530B (en) A kind of aquaculture processes the method that excrement is dirty
CN204714671U (en) The device of a kind of aquaculture process excrement dirt
CN205584981U (en) Water planting plant partition wall planting device
CN101857310B (en) Automatic backwashing biological filtering pond
CN103392532B (en) Flower, bird and fish ornamental cabinet
CN205865545U (en) Circulated formula heats drinking bowl of raising pigs
CN204796429U (en) Food disinfection and purification cleaning machine
CN208814729U (en) A kind of sewage treatment plant tail water advanced treatment system
CN104291519B (en) Integrated life sewage treatment plant
CN204335576U (en) Multi-functional industrialized fish pond discharge cycle purification and drainage
CN203040368U (en) Livestock breeding device
CN209234690U (en) A kind of concealed circulating filtration fish jar
CN208850458U (en) A kind of multi-purpose recirculation system
CN105557616A (en) Multifunctional circulating, purifying and blowdown system for factory fishpond drainage
CN204540414U (en) A kind of ecological fish bowl without changing water
CN103535312A (en) Factory-like fishpond water draining circulation purification and blow down system
CN207061905U (en) A kind of sanitary wastewater storage pool
CN206525364U (en) A kind of multifunctional ecological landscape fish jar
CN201995423U (en) Fecal-sewage draining system for livestock and poultry breeding machine
CN215957836U (en) Ecological-imitation water circulation culture pond for spiny eels
CN105981667B (en) A kind of industrial circulating water high density stereo ecological cultivating system
CN103979737A (en) System for purifying sewage in urban rivers and lakes
CN105110474B (en) A kind of landscape type village sewage is collected and processing system
CN210125296U (en) Biological deodorization filter

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent for invention or patent application
CB02 Change of applicant information

Address after: 300384 Tianjin New Technology Industrial Park Huayuan Industrial Zone Xinmao science and Technology Park C1 a D unit

Applicant after: Jinlun (Tianjin) Precision Machinery Co., Ltd.

Address before: 300384 Tianjin Binhai New Area of Tianjin New Technology Industrial Park Haitai Huayuan Industrial Zone Branch Street No. 3

Applicant before: Jinlun (Tianjin) Precision Machinery Co., Ltd.

COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 300384 BINHAI NEW DISTRICT, TIANJIN TO: 300384 NANKAI, TIANJIN

C14 Grant of patent or utility model
GR01 Patent grant