CN103397868A - Skid-mounted integrated process device for coal bed gas drainage and production wells and method for applying skid-mounted integrated process device - Google Patents

Skid-mounted integrated process device for coal bed gas drainage and production wells and method for applying skid-mounted integrated process device Download PDF

Info

Publication number
CN103397868A
CN103397868A CN2013103125269A CN201310312526A CN103397868A CN 103397868 A CN103397868 A CN 103397868A CN 2013103125269 A CN2013103125269 A CN 2013103125269A CN 201310312526 A CN201310312526 A CN 201310312526A CN 103397868 A CN103397868 A CN 103397868A
Authority
CN
China
Prior art keywords
valve
skid
liquid level
fluid reservoir
process device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2013103125269A
Other languages
Chinese (zh)
Inventor
刘克军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PUYANG TAIHE OIL & GAS ENGINEERING Co Ltd
Original Assignee
PUYANG TAIHE OIL & GAS ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PUYANG TAIHE OIL & GAS ENGINEERING Co Ltd filed Critical PUYANG TAIHE OIL & GAS ENGINEERING Co Ltd
Priority to CN2013103125269A priority Critical patent/CN103397868A/en
Publication of CN103397868A publication Critical patent/CN103397868A/en
Pending legal-status Critical Current

Links

Images

Abstract

The invention discloses a skid-mounted integrated process device for coal bed gas drainage and production wells and a method for applying the skid-mounted integrated process device, and belongs to a drainage and production construction technology for coal bed gas of coal mines. The skid-mounted integrated process device comprises a body, a liquid storage tank, double water meters, a liquid drainage regulator, a pressure gauge, a filter, a valve, a gas meter, a flow regulating valve, a breathing liquid level regulating valve, a float ball, an outlet blowdown integrated valve, a blowdown valve and a water outlet valve which are connected with one another to form the skid-mounted integrated process device; the liquid storage tank is mounted on the body, the liquid drainage regulator is mounted on the outside of the liquid storage tank, and the double water meters are mounted between the liquid storage tank and the liquid drainage regulator; the pressure gauge, the filter, the valve, the gas meter and the flow regulating valve are sequentially mounted on a gas exhausting pipeline of the body from right to left; the breathing liquid level regulating valve and the outlet blowdown integrated valve are mounted in the liquid storage tank, the outlet blowdown integrated valve is connected onto a tank body, and the blowdown valve and the water outlet valve are mounted on the outlet blowdown integrated valve. The skid-mounted integrated process device and the method have the advantage that shortcomings in the prior art are overcome.

Description

Coal bed gas extraction well skid integrated flow device and application process
  
Technical field: the row who the present invention relates to the colliery coal bed gas adopts construction technology, especially coal bed gas extraction well skid integrated flow device and application process.
Background technology: in the row of coal bed gas adopts work progress, two phase separator and row's sampled-current journey are the piths of row fief face facility, usually after eliminator, are being divided into two, gas circuit and water route, and conventional two phase separator is expensive, difficulty of processing is large, and the design of flow process is lack of standardization.
summary of the invention: the purpose of this invention is to provide coal bed gas extraction well skid integrated flow device and application process that a kind of integrated gas circuit and water route are integrated, it has overcome the shortcoming that present technology exists, the object of the present invention is achieved like this, it is by body, fluid reservoir, water meter, the discharge opeing adjuster, pressure meter, strainer, valve, gas meter, flow control valve, the type of respiration Liquid level adjusting valve, ball float, outlet blowdown integral valve, blowoff valve, water goes out valve and is formed by connecting, fluid reservoir is installed on body, in the outside of fluid reservoir, the discharge opeing adjuster is installed, fluid reservoir, the centre of discharge opeing adjuster is installed with the two-way water meter, order is installed with pressure meter, strainer, valve, gas meter, flow control valve from right to left on the body extract duct, type of respiration Liquid level adjusting valve and outlet blowdown integral valve are installed in fluid reservoir, on tank body, are connecting outlet blowdown integral valve, on outlet blowdown integral valve, blowoff valve and outlet valve are installed.
Application process of the present invention is: when liquid level in fluid reservoir descended, ball float descended, and abdicates respiration channel, realizes respiratory function, and a small amount of gas can be realized exchange by passage; When liquid level in fluid reservoir progressively raises, when ball float rises to precalculated position, close respiration channel, increased discharge pressure, prevent that liquid level from continuing the generation that rising causes excessive tank; For the large characteristics of the aquifer yield excursion of coal bed gas extraction well, designed the two-way water meter measurement, in the situation that flow is very little, use the single channel metering; In the ever-increasing situation of flow, two-way measures simultaneously, and in order to guarantee accurate measurement, the coefficient of fullness when the adjustable discharge opeing adjuster in front and back has improved water meter measurement, guarantee accurate measurement.
Meaning of the present invention is: the present invention has simplified cyclone separator arrangement, make it become not pressure resistant vessel, and integrated gas circuit and water route are integrated, small and exquisite convenient, installation and transportation are easy to maintenance, and are with low cost, facilitate electronics collection and artificial collection of various data, shorten job site flow process processing and connect hours, improved the construction timeliness; Improved measuring accuracy; Greatly improved the flow measurement scope; Reduced the operation of adjusting flow meter; Coefficient of fullness while having improved water meter measurement, guarantee accurate measurement; The dismounting of water meter and change convenient; Due to the design of outlet blowdown integral valve, the on-the-spot connection water entrance that only needs gets final product, faster convenience.
Accompanying drawing explanation: Fig. 1 is the structural representation of coal bed gas extraction well skid integrated flow device, in figure 1, body 2, fluid reservoir 3, water meter 4, discharge opeing adjuster 5, pressure meter 6, strainer 7, valve 8, gas meter 9, flow control valve
Fig. 2 is the structural representation of type of respiration Liquid level adjusting valve, in figure 10, type of respiration Liquid level adjusting valve 11, ball float
Fig. 3 is the structural representation of type of respiration Liquid level adjusting valve, in figure 10, type of respiration Liquid level adjusting valve 11, ball float
Fig. 4 is the structural representation of outlet blowdown integral valve, in figure 12, outlet blowdown integral valve 13, blowoff valve 14, water go out valve
The specific embodiment: embodiment 1, the present invention are gone out valve 14 and are formed by connecting by body 1, fluid reservoir 2, water meter 3, discharge opeing adjuster 4, pressure meter 5, strainer 6, valve 7, gas meter 8, flow control valve 9, type of respiration Liquid level adjusting valve 10, ball float 11, outlet blowdown integral valve 12, blowoff valve 13, water, fluid reservoir 2 is installed on body 1, in the outside of fluid reservoir 2, discharge opeing adjuster 4 is installed, the centre of fluid reservoir 2 and discharge opeing adjuster 4 is installed with two-way water meter 3; Order is installed with pressure meter 5, strainer 6, valve 7, gas meter 8, flow control valve 9 from right to left on body 1 extract duct.
Embodiment 2, type of respiration Liquid level adjusting valve 10 and outlet blowdown integral valve 12 are installed in fluid reservoir 2, ball float 11 is installed on type of respiration Liquid level adjusting valve 10; On outlet blowdown integral valve 12, blowoff valve 13 and outlet valve 14 are installed.
Embodiment 3, application process of the present invention are: when the interior liquid level of fluid reservoir 2 descended, ball float 11 descended, and abdicates respiration channel, realizes respiratory function, and a small amount of gas can be realized exchange by passage; When the interior liquid level of fluid reservoir 2 progressively raises, when ball float 11 rises to precalculated position, close respiration channel, increased discharge pressure, prevent that liquid level from continuing the generation that rising causes excessive tank; For the large characteristics of the aquifer yield excursion of coal bed gas extraction well, designed 3 meterings of two-way water meter, in the situation that flow is very little, use the single channel metering; In the ever-increasing situation of flow, two-way measures simultaneously, and in order to guarantee accurate measurement, the coefficient of fullness when the adjustable discharge opeing adjuster in front and back has improved water meter measurement, guarantee accurate measurement.
  

Claims (3)

1. coal bed gas extraction well skid integrated flow device, it is by body (1), fluid reservoir (2), water meter (3), discharge opeing adjuster (4), pressure meter (5), strainer (6), valve (7), gas meter (8), flow control valve (9), type of respiration Liquid level adjusting valve (10), ball float (11), outlet blowdown integral valve (12), blowoff valve (13), water goes out valve (14) and is formed by connecting, it is characterized in that: fluid reservoir (2) is installed on body (1), in the outside of fluid reservoir (2), discharge opeing adjuster (4) is installed, the centre of fluid reservoir (2) and discharge opeing adjuster (4) is installed with two-way water meter (3), order is installed with pressure meter (5), strainer (6), valve (7), gas meter (8), flow control valve (9) from right to left on body (1) extract duct.
2. coal bed gas extraction well skid integrated flow device according to claim 1, it is characterized in that: type of respiration Liquid level adjusting valve (10) and outlet blowdown integral valve (12) are installed in fluid reservoir (2), ball float (11) is installed on type of respiration Liquid level adjusting valve (10); On outlet blowdown integral valve (12), blowoff valve (13) and outlet valve (14) are installed.
3. the application process of the described coal bed gas extraction well of claim 1 skid integrated flow device, it is characterized in that: when liquid level in fluid reservoir (2) descended, ball float (11) descended, and abdicates respiration channel, realize respiratory function, a small amount of gas can be realized exchange by passage; When in fluid reservoir (2), liquid level progressively raise, ball float (11), while rising to precalculated position, was closed respiration channel, has increased discharge pressure, prevented that liquid level from continuing the generation that rising causes excessive tank; For the large characteristics of the aquifer yield excursion of coal bed gas extraction well, designed two-way water meter (3) metering, in the situation that flow is very little, use the single channel metering; In the ever-increasing situation of flow, two-way measures simultaneously, and in order to guarantee accurate measurement, the coefficient of fullness when the adjustable discharge opeing adjuster in front and back has improved water meter measurement, guarantee accurate measurement.
CN2013103125269A 2013-07-24 2013-07-24 Skid-mounted integrated process device for coal bed gas drainage and production wells and method for applying skid-mounted integrated process device Pending CN103397868A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013103125269A CN103397868A (en) 2013-07-24 2013-07-24 Skid-mounted integrated process device for coal bed gas drainage and production wells and method for applying skid-mounted integrated process device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013103125269A CN103397868A (en) 2013-07-24 2013-07-24 Skid-mounted integrated process device for coal bed gas drainage and production wells and method for applying skid-mounted integrated process device

Publications (1)

Publication Number Publication Date
CN103397868A true CN103397868A (en) 2013-11-20

Family

ID=49561562

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013103125269A Pending CN103397868A (en) 2013-07-24 2013-07-24 Skid-mounted integrated process device for coal bed gas drainage and production wells and method for applying skid-mounted integrated process device

Country Status (1)

Country Link
CN (1) CN103397868A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110578510A (en) * 2019-09-11 2019-12-17 中国石油集团川庆钻探工程有限公司长庆井下技术作业公司 three-phase separator system for gas well liquid drainage process and use method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN200993004Y (en) * 2006-12-12 2007-12-19 中国石油天然气股份有限公司 Separator oil-gas continuousautomatic metering device
US20100200242A1 (en) * 2009-02-11 2010-08-12 George Joel Rodger Method and apparatus for centrifugal separation
CN201972684U (en) * 2011-03-30 2011-09-14 北京万普隆能源技术有限公司 Measuring device for production fluid of coal-bed gas well
RU2439316C2 (en) * 2010-04-05 2012-01-10 Общество с ограниченной ответственностью " Актуальные технологии нефтеотдачи " Measurement method of oil and associated gas flow rates in oil wells
CN102720480A (en) * 2012-06-16 2012-10-10 大安市创新机械工程技术有限责任公司 Liquid-gas separation meter for oil well
CN203043795U (en) * 2013-01-29 2013-07-10 襄阳航生石化环保设备有限公司 Coking decoking waste gas treatment device
CN203043770U (en) * 2012-11-30 2013-07-10 珠海华信净化设备有限公司 Zero gas emission device for gas-liquid separator

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN200993004Y (en) * 2006-12-12 2007-12-19 中国石油天然气股份有限公司 Separator oil-gas continuousautomatic metering device
US20100200242A1 (en) * 2009-02-11 2010-08-12 George Joel Rodger Method and apparatus for centrifugal separation
RU2439316C2 (en) * 2010-04-05 2012-01-10 Общество с ограниченной ответственностью " Актуальные технологии нефтеотдачи " Measurement method of oil and associated gas flow rates in oil wells
CN201972684U (en) * 2011-03-30 2011-09-14 北京万普隆能源技术有限公司 Measuring device for production fluid of coal-bed gas well
CN102720480A (en) * 2012-06-16 2012-10-10 大安市创新机械工程技术有限责任公司 Liquid-gas separation meter for oil well
CN203043770U (en) * 2012-11-30 2013-07-10 珠海华信净化设备有限公司 Zero gas emission device for gas-liquid separator
CN203043795U (en) * 2013-01-29 2013-07-10 襄阳航生石化环保设备有限公司 Coking decoking waste gas treatment device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110578510A (en) * 2019-09-11 2019-12-17 中国石油集团川庆钻探工程有限公司长庆井下技术作业公司 three-phase separator system for gas well liquid drainage process and use method
CN110578510B (en) * 2019-09-11 2023-12-05 中国石油天然气集团有限公司 Three-phase separator system for gas well drainage process and use method

Similar Documents

Publication Publication Date Title
CN201705330U (en) Mobile oil well multi-phase flow meter
CN203257407U (en) Oil well mouth metering device
CN201522299U (en) Device for measuring gas extraction flow
CN102808609B (en) U-shaped tubular single well producing rate metering device
CN104314551A (en) Automatic multiphase flow measurement device for well selection
CN103397868A (en) Skid-mounted integrated process device for coal bed gas drainage and production wells and method for applying skid-mounted integrated process device
CN204877441U (en) Thin oil metering device
CN203403870U (en) Skid-mounted integrated process device of coalbed methane production well
CN204300688U (en) LNG immersed pump pump pit level control system
CN203742578U (en) Oil-gas-water three-phase high-rotational-flow respective measurement device
CN205619974U (en) Laboratory is with physical simulation high accuracy three -phase metering device
CN203441471U (en) Oil well single well automatic oil gauging device
CN203961951U (en) Oil extraction metering device
CN204359767U (en) Desulfurization slurry measurement mechanism
CN203452767U (en) Automatic metering device for oil well tipping bucket
RU124309U1 (en) INSTALLATION FOR MEASURING THE DEBIT OF OIL WELL PRODUCTS
CN207351875U (en) Automatic feeding water formula salt spray test chamber
CN202250022U (en) Oil-gas separated metering system
CN206192420U (en) Drainage volume's device is returned to precise measurement fracturing
CN202483548U (en) Oil measuring separator
CN103868554A (en) Water pipe flow measuring device
CN205619981U (en) A compound meter for hydraulic system
CN203581720U (en) Single-well oil tank metering device
RU123837U1 (en) INSTALLATION FOR MEASURING THE DEBIT OF OIL WELL PRODUCTS
CN204113270U (en) A kind of liquid automatic on-line metering device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20131120