CN103388338A CN2013103142315A CN201310314231A CN103388338A CN 103388338 A CN103388338 A CN 103388338A CN 2013103142315 A CN2013103142315 A CN 2013103142315A CN 201310314231 A CN201310314231 A CN 201310314231A CN 103388338 A CN103388338 A CN 103388338A
Authority
CN
China
Prior art keywords
slurries
water glass
phosphoric acid
soil
sealing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2013103142315A
Other languages
English (en)
Other versions
CN103388338B (zh
Inventor
杨公正
白枝奉
唐文周
刘振华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 16th Bureau Group Co Ltd
Beijing Rail Transit Engineering Construction Co Ltd of China Railway 16th Bureau Group Co Ltd
Original Assignee
China Railway 16th Bureau Group Co Ltd
Beijing Rail Transit Engineering Construction Co Ltd of China Railway 16th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 16th Bureau Group Co Ltd, Beijing Rail Transit Engineering Construction Co Ltd of China Railway 16th Bureau Group Co Ltd filed Critical China Railway 16th Bureau Group Co Ltd
Priority to CN201310314231.5A priority Critical patent/CN103388338B/zh
Publication of CN103388338A publication Critical patent/CN103388338A/zh
Application granted granted Critical
Publication of CN103388338B publication Critical patent/CN103388338B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

本发明公开了一种新型快速止水及土体改良的方法,其特征在于:步骤如下:1)止水;止水的步骤为:a、确定止水位置;b、利用钻机钻孔;c、配置浆液;d、注入水玻璃和磷酸浆液止水;e、注入水玻璃和水泥浆液补强;2)土体加固改良;土体加固改良的步骤为:a、孔位放样;b、钻孔;c、利用注浆机进行注浆;d、提升喷杆直到注浆结束;e、移至下一孔位。本发明提高了缩短隧道开挖前土体加固施工工期,针对基坑开挖出现的漏水状况能及时止水,固结硬化时间容易调整,设计硬化时间长的浆材也具有很高强度,高效安全,节约成本。另外,本发明渗透性良好,而且浆材不流失、固结后不收缩,硬化剂无毒,对地下水不会造成污染。

Description

一种新型快速止水及土体改良的方法
技术领域
本发明属于隧洞和基坑止水及土体改良技术领域,具体地说,涉及一种新型快速止水及土体改良的方法。
背景技术
在基坑或隧道开挖过程中,存在漏水漏沙的情况。现阶段针对该种情况,一般采取钻孔灌注聚氨酯的方式来进行封堵。但是,聚氨酯发泡过程较慢难于控制,对于较大的涌水涌沙情况,较难处理,且注浆过程大量聚氨酯随水流出,浪费严重。同时聚氨酯强度较低,存在二次涌水涌沙的风险。
在隧道开挖之前,要对开挖范围及周边的土体进行改良,以满足开挖的条件。现阶段针对该种情况,一般采用单重管、双重管、三重管旋喷桩。传统的旋喷桩施工缓慢,浆液凝结速度较慢,且在粉砂等土层成桩效果较差。
发明内容
本发明要解决的技术问题是克服上述缺陷,提供一种提高对于严重基坑漏水点封堵的效率及安全性、缩短隧道开挖前土体加固施工工期、节省成本、固结硬化时间容易调整的新型快速止水及土体改良的方法。
为解决上述问题,本发明所采用的技术方案是:
一种新型快速止水及土体改良的方法,其特征在于:步骤如下:
1)、止水;
止水的步骤为:a、确定止水位置;b、利用钻机钻孔;c、配置水玻璃和磷酸浆液、水玻璃和水泥浆液;d、注入水玻璃和磷酸浆液止水;e、注入水玻璃和水泥浆液补强;
2)、土体加固改良;
土体加固改良的步骤为:a、孔位放样;b、钻机在桩位点钻孔;c、利用注浆机进行注浆;d、逐步提升注浆机的喷杆,直到注浆结束;e、将钻机和注浆机移至下一孔位。
作为一种改进,所述止水中的定位是在出水口上方后退1~2m的位置,确定为钻孔位置。
作为一种改进,所述水玻璃和磷酸浆液中,磷酸为50-70%浓度磷酸,磷酸和水玻璃的体积比为1:5-2:5。
作为一种改进,所述水玻璃和水泥浆液中,水玻璃和水泥浆的体积比为1:1-1:4。
作为一种改进,所述土体加固改良中,利用钻机钻孔;将钻机移至桩位点,进行钻孔,施工中控制桩位偏差≤5cm,控制垂直度≤3‰。
作为一种改进,所述土体加固改良中,注浆分为限制性浆液和渗透填充性浆液,先注限制性浆液控制注浆范围,再注渗透填充性浆液进行补强;所述限制性浆液为水玻璃和磷酸浆液,渗透填充性浆液为水玻璃和水泥浆液。
作为一种改进,所述磷酸和水玻璃浆液的体积比为1:5时的凝固时间为10s;磷酸和水玻璃浆液的体积比为2:5时的凝固时间为3s。
由于采用了上述技术方案,与现有技术相比,本发明通过调节材料的浓度可以随意改变材料固结硬化的时间。本发明止水时只要对出水口稍作处理,较大的出水口也较容易处理。本发明用于注浆时通过调节浆液浓度,对土体进行加固改良,增强土体的密实度、强度、抗渗性、耐水性等,大大缩短加固之后开挖的时间。
本发明反应迅速,先注磷酸与水玻璃迅速反应形成结晶将出水口封堵之后,再注水玻璃与水泥迅速反应固结硬化,进行补强,强度较高,避免水压变大之后造成出水口重复出水。
本发明渗透性良好、在有流动水的地层也有较强的固结性能,地层适应性强,在粉砂、粉土等地层中,对土体的改良效果远远好于旋喷桩。本发明用于土体改良加固时,由于浆液注入时不会反浆,浆液利用率高,比传统的旋喷桩工艺大大节省了是材料,同时在密实度较高。
本发明提高了对于严重基坑漏水点封堵的效率及安全性,缩短隧道开挖前土体加固施工工期,节省成本,同时,固结硬化时间容易调整,设计硬化时间长的浆材也具有很高强度。另外,本发明渗透性良好,特别是对微细砂层的渗透性优易,地层中有流动水的情况下也具有很强的固结性能,而且浆材不流失、固结后不收缩,硬化剂无毒,对地下水不会造成污染。
具体实施方式
实施例:
一种新型快速止水及土体改良的方法,步骤如下:
1)、止水;
止水的步骤为:
a、确定止水位置,是在出水口上方后退1~2m的位置,确定为钻孔位置。
b、利用钻机钻孔。
c、配置水玻璃和磷酸浆液、水玻璃和水泥浆液。所述水玻璃和磷酸浆液中,磷酸为50-70%浓度磷酸,磷酸和水玻璃的体积比为1:5-2:5。所述水玻璃和水泥浆液中,水玻璃和水泥浆的体积比为1:1-1:4。
d、注入体积比为1:5-2:5的水玻璃和磷酸浆液止水。
e、注入体积比为1:1-1:4的水玻璃和水泥浆液补强。
2)、土体加固改良;
土体加固改良的步骤为:
a、桩位放样,确定桩位点。
b、钻机在桩位点钻孔,利用钻机钻孔;将钻机移至桩位点,进行钻孔,施工中控制桩位偏差≤5cm,控制垂直度≤3‰。
c、利用注浆机进行注浆。,注浆分为限制性浆液和渗透填充性浆液,先注限制性浆液控制注浆范围,再注渗透填充性浆液进行补强;所述限制性浆液为水玻璃和磷酸浆液,渗透填充性浆液为水玻璃和水泥浆液。在实际的使用中,所述磷酸和水玻璃浆液的体积比为1:5时的凝固时间为10s;磷酸和水玻璃浆液的体积比为2:5时的凝固时间为3s。
d、逐步提升注浆机的喷杆,直到注浆结束。
e、将钻机和注浆机移至下一孔位。
本发明通过调节材料的浓度可以随意改变材料固结硬化的时间。本发明止水时只要对出水口稍作处理,较大的出水口也较容易处理。本发明用于注浆时通过调节浆液浓度,对土体进行加固改良,增强土体的密实度、强度、抗渗性、耐水性等,大大缩短加固之后开挖的时间。
本发明反应迅速,先注磷酸与水玻璃迅速反应形成结晶将出水口封堵之后,再注水玻璃与水泥迅速反应固结硬化,进行补强,强度较高,避免水压变大之后造成出水口重复出水。
本发明渗透性良好、在有流动水的地层也有较强的固结性能,地层适应性强,在粉砂、粉土等地层中,对土体的改良效果远远好于旋喷桩。本发明用于土体改良加固时,由于浆液注入时不会反浆,浆液利用率高,比传统的旋喷桩工艺大大节省了是材料,同时在密实度较高。
以上实施例仅用以说明本发明的技术方案,而非对其限制,尽管参照前述实例施例对本发明进行了详细的说明,本领域的普通技术人员应当理解,其依据可以对前述各实施例记载的技术方案进行修改,或对其部分技术特征进行等同替换,而这些修改或替换,并不使相应技术方案的本质脱离本发明技术方案的精神和范畴。

Claims (7)

1.一种新型快速止水及土体改良的方法,其特征在于:步骤如下:
1)、止水;
止水的步骤为:a、确定止水位置;b、利用钻机钻孔;c、配置水玻璃和磷酸浆液、水玻璃和水泥浆液;d、注入水玻璃和磷酸浆液止水;e、注入水玻璃和水泥浆液补强;
2)、土体加固改良;
土体加固改良的步骤为:a、孔位放样;b、钻机在桩位点钻孔;c、利用注浆机进行注浆;d、逐步提升注浆机的喷杆,直到注浆结束;e、将钻机和注浆机移至下一孔位。
2.根据权利要求1中所述的新型快速止水及土体改良的方法,其特征在于:所述止水中的定位是在出水口上方后退1~2m的位置,确定为钻孔位置。
3.根据权利要求1中所述的新型快速止水及土体改良的方法,其特征在于:所述水玻璃和磷酸浆液中,磷酸为50-70%浓度磷酸,磷酸和水玻璃的体积比为1:5-2:5。
4.根据权利要求3中所述的新型快速止水及土体改良的方法,其特征在于:所述水玻璃和水泥浆液中,水玻璃和水泥浆的体积比为1:1-1:4。
5.根据权利要求1中所述的新型快速止水及土体改良的方法,其特征在于:所述土体加固改良中,利用钻机钻孔;将钻机移至桩位点,进行钻孔,施工中控制桩位偏差≤5cm,控制垂直度≤3‰。
6.根据权利要求1中所述的新型快速止水及土体改良的方法,其特征在于:所述土体加固改良中,注浆分为限制性浆液和渗透填充性浆液,先注限制性浆液控制注浆范围,再注渗透填充性浆液进行补强;所述限制性浆液为水玻璃和磷酸浆液,渗透填充性浆液为水玻璃和水泥浆液。
7.根据权利要求6中所述的新型快速止水及土体改良的方法,其特征在于:所述磷酸和水玻璃浆液的体积比为1:5时的凝固时间为10s;磷酸和水玻璃浆液的体积比为2:5时的凝固时间为3s。
CN201310314231.5A 2013-07-24 2013-07-24 一种新型快速止水及土体改良的方法 Active CN103388338B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310314231.5A CN103388338B (zh) 2013-07-24 2013-07-24 一种新型快速止水及土体改良的方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310314231.5A CN103388338B (zh) 2013-07-24 2013-07-24 一种新型快速止水及土体改良的方法

Publications (2)

Publication Number Publication Date
CN103388338A true CN103388338A (zh) 2013-11-13
CN103388338B CN103388338B (zh) 2015-10-14

Family

ID=49532751

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310314231.5A Active CN103388338B (zh) 2013-07-24 2013-07-24 一种新型快速止水及土体改良的方法

Country Status (1)

Country Link
CN (1) CN103388338B (zh)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104500108A (zh) * 2014-12-11 2015-04-08 中铁十九局集团有限公司 隧道基底返水点处理方法
CN105971637A (zh) * 2015-03-12 2016-09-28 中铁隆工程集团有限公司 Wss工法在富水砂层盾构端头加固中的应用
CN105971638A (zh) * 2015-03-12 2016-09-28 中铁隆工程集团有限公司 Wss工法在富水砂层盾构换刀加固中的应用
CN107382254A (zh) * 2017-08-01 2017-11-24 中铁工程装备集团技术服务有限公司 一种适用于盾构工法的新型注浆材料
CN107439196A (zh) * 2017-08-30 2017-12-08 中国冶集团有限公司 注浆式深层沙土栽种带综合改良方法
CN111236281A (zh) * 2020-02-24 2020-06-05 广州万构建筑工程设计有限公司 一种钢板桩围堰的止水方法
CN111691903A (zh) * 2020-06-02 2020-09-22 中铁十五局集团第三工程有限公司 一种管幕法支护结构的施工方法
CN114351740A (zh) * 2022-01-14 2022-04-15 成都华阳建筑股份有限公司 一种高水位地下室承压降水井的封堵方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008150774A (ja) * 2006-12-14 2008-07-03 Dream Dome Lab:Kk 高・低濃度2ステップグラウト工法
CN101891445A (zh) * 2010-07-19 2010-11-24 北京市市政工程研究院 复合式衬砌隧道壁后注浆粘土浆液及其注浆方法
CN102400694A (zh) * 2011-10-28 2012-04-04 上海市第一市政工程有限公司 盾构隧道与矿山法隧道结合部的加固方法
CN102493498A (zh) * 2011-12-29 2012-06-13 荣盛建设工程有限公司 一种地基的施工工艺
CN103089301A (zh) * 2011-11-01 2013-05-08 北京市政建设集团有限责任公司 一种竖井内地下水疏堵结合的注浆加固施工工艺

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008150774A (ja) * 2006-12-14 2008-07-03 Dream Dome Lab:Kk 高・低濃度2ステップグラウト工法
CN101891445A (zh) * 2010-07-19 2010-11-24 北京市市政工程研究院 复合式衬砌隧道壁后注浆粘土浆液及其注浆方法
CN102400694A (zh) * 2011-10-28 2012-04-04 上海市第一市政工程有限公司 盾构隧道与矿山法隧道结合部的加固方法
CN103089301A (zh) * 2011-11-01 2013-05-08 北京市政建设集团有限责任公司 一种竖井内地下水疏堵结合的注浆加固施工工艺
CN102493498A (zh) * 2011-12-29 2012-06-13 荣盛建设工程有限公司 一种地基的施工工艺

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
刘帅: "浅埋暗挖隧道穿越饱水砾砂层渗流_应力耦合分析及其注浆支护研究", 《中国优秀硕士学位论文全文数据库(电子期刊)》, 30 June 2013 (2013-06-30) *

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104500108A (zh) * 2014-12-11 2015-04-08 中铁十九局集团有限公司 隧道基底返水点处理方法
CN105971637A (zh) * 2015-03-12 2016-09-28 中铁隆工程集团有限公司 Wss工法在富水砂层盾构端头加固中的应用
CN105971638A (zh) * 2015-03-12 2016-09-28 中铁隆工程集团有限公司 Wss工法在富水砂层盾构换刀加固中的应用
CN107382254A (zh) * 2017-08-01 2017-11-24 中铁工程装备集团技术服务有限公司 一种适用于盾构工法的新型注浆材料
CN107439196A (zh) * 2017-08-30 2017-12-08 中国冶集团有限公司 注浆式深层沙土栽种带综合改良方法
CN111236281A (zh) * 2020-02-24 2020-06-05 广州万构建筑工程设计有限公司 一种钢板桩围堰的止水方法
CN111691903A (zh) * 2020-06-02 2020-09-22 中铁十五局集团第三工程有限公司 一种管幕法支护结构的施工方法
CN111691903B (zh) * 2020-06-02 2022-03-11 中铁十五局集团第三工程有限公司 一种管幕法支护结构的施工方法
CN114351740A (zh) * 2022-01-14 2022-04-15 成都华阳建筑股份有限公司 一种高水位地下室承压降水井的封堵方法

Also Published As

Publication number Publication date
CN103388338B (zh) 2015-10-14

Similar Documents

Publication Publication Date Title
CN103388338B (zh) 一种新型快速止水及土体改良的方法
CN103334770B (zh) 一种长大反坡隧道超高水压富水破碎带施工方法
CN103899323B (zh) 一种盾构穿越铁路站场的施工方法
CN104453946B (zh) 一种软弱围岩隧道修建的超前加固施工方法
CN101694096B (zh) 一种用于动水条件下砂层地基的注浆处理方法
CN104929114A (zh) 一种高压旋喷桩止水帷幕施工装置及其方法
CN100510274C (zh) 利用双液注浆法封闭水平旋喷桩孔口的施工方法
CN103953365A (zh) 一种隧道单、双液浆交替注浆加固工艺及其装置
CN101560764B (zh) 间隔式高压旋喷注浆封堵勘察孔的方法
CN104631480B (zh) 采用高压旋喷桩机进行深基坑止水帷幕施工的方法
CN108086296B (zh) 动静联合注浆地基加固工法
CN204753574U (zh) 一种高压旋喷桩止水帷幕施工装置
CN101173516A (zh) 注浆帷幕法防治大直径深孔钻孔灌注桩漏浆和坍孔的方法
CN101525881A (zh) 岩溶地层桩孔护壁构造及桩孔施工方法
CN105155541A (zh) 一种集水坑的双液浆封闭施工方法
CN109680675A (zh) 一种可动态控制注浆量和硬化时机的土体注浆加固方法
CN105731978B (zh) 一种用于细砂层顶进涵掌子面加固的注浆浆液及注浆方法
CN105178285A (zh) 一种扩大岩土注浆加固和防渗堵塞范围的方法
CN207974823U (zh) 一种深孔注浆的注浆管路结构
CN107366282A (zh) 一种隧道拱脚局部高压旋喷桩加固技术
CN102493403A (zh) 一种堆石坝变形控制技术
CN204491646U (zh) 一种高水位地区围护体堵漏装置
CN103174135B (zh) 不达标后注浆灌注桩的修补方法
CN110185453A (zh) 一种盾构区间端头水平加固的施工方法
CN106677161A (zh) 既有盾构矩形隧道软土基底处理方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant