CN103388045B - Pneumatic transmission system for dry dedusting of thick ash in converter gas - Google Patents
Pneumatic transmission system for dry dedusting of thick ash in converter gas Download PDFInfo
- Publication number
- CN103388045B CN103388045B CN201310264541.0A CN201310264541A CN103388045B CN 103388045 B CN103388045 B CN 103388045B CN 201310264541 A CN201310264541 A CN 201310264541A CN 103388045 B CN103388045 B CN 103388045B
- Authority
- CN
- China
- Prior art keywords
- ash
- pneumatic
- pipe
- valve
- warehouse
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P10/00—Technologies related to metal processing
- Y02P10/25—Process efficiency
Landscapes
- Fluidized-Bed Combustion And Resonant Combustion (AREA)
Abstract
本发明涉及一种转炉煤气干法除尘粗灰气力输送系统,包括高效余热回收换热器(1)、水平链式输送机(2)、卸灰主管(3)、气动三通分料器(5)、第一卸灰支管(8)、第二卸灰支管(13)、第一仓泵(11)、第二仓泵(16)、气力输送管(24)和粗灰仓(25);第一仓泵(11)、第二仓泵(16)和粗灰仓(25)通过气力输送管(24)相连。本发明采用高效余热回收换热器采用间接换热的方式,无直喷水,彻底解决了蒸发冷却器易板结的问题,也解决了水滴引起的内置链式输送机卡灰的问题。使用高效余热回收换热器后,既能大量回收荒煤气中的余热,又能除尘,节能又环保。
The invention relates to a pneumatic conveying system for converter gas dry dust removal and coarse ash, which includes a high-efficiency waste heat recovery heat exchanger (1), a horizontal chain conveyor (2), an ash unloading main pipe (3), and a pneumatic three-way distributor ( 5), the first ash unloading branch pipe (8), the second ash unloading branch pipe (13), the first warehouse pump (11), the second warehouse pump (16), the pneumatic conveying pipe (24) and the coarse ash bin (25) ; The first warehouse pump (11), the second warehouse pump (16) and the coarse ash warehouse (25) are connected through a pneumatic conveying pipe (24). The invention adopts the high-efficiency waste heat recovery heat exchanger and adopts the indirect heat exchange method without direct spraying of water, which completely solves the problem that the evaporative cooler is easy to harden, and also solves the problem of ash stuck in the built-in chain conveyor caused by water droplets. After using the high-efficiency waste heat recovery heat exchanger, it can not only recover a large amount of waste heat in the raw gas, but also remove dust, which is energy-saving and environmentally friendly.
Description
技术领域technical field
本发明涉及环保设备领域,更具体地说,涉及一种转炉煤气干法除尘粗灰气力输送系统。The invention relates to the field of environmental protection equipment, in particular to a coarse ash pneumatic conveying system for converter gas dry dedusting.
背景技术Background technique
随着环保意识的不断加强,新建及改建的转炉大多采用干法除尘。干法除尘现有的粗灰输送技术是:蒸发冷却器内喷水降尘,收集的粗灰通过内置链式输送机、气动插板阀和气动双层翻板阀在重力作用下送至转炉主厂房内的粗灰仓,加湿后由汽车外运综合利用。With the increasing awareness of environmental protection, most newly built and rebuilt converters use dry dust removal. The existing coarse ash conveying technology for dry dust removal is: spray water in the evaporative cooler to reduce dust, and the collected coarse ash is sent to the main converter under the action of gravity through the built-in chain conveyor, pneumatic flapper valve and pneumatic double flap valve. The coarse ash bin in the factory building is transported by car for comprehensive utilization after humidification.
干法除尘现有的粗灰输送技术主要存在的问题:一是蒸发冷却器易板结,喷水控制不好时会有水滴析出,导致内置链式输送机卡灰,进而影响转炉正常生产;二是粗灰的贮灰及运灰受场地和距离的限制;三是粗灰加湿不均匀,导致卸灰时到处扬尘,污染环境。The main problems of the existing coarse ash conveying technology for dry dust removal are as follows: first, the evaporative cooler is easy to harden, and water droplets will precipitate when the water spray control is not good, which will cause the built-in chain conveyor to get stuck and affect the normal production of the converter; First, the storage and transportation of coarse ash are limited by the site and distance; the third is that the humidification of coarse ash is not uniform, resulting in dust everywhere during ash unloading and polluting the environment.
发明内容Contents of the invention
本发明要解决的技术问题在于,针对现有技术的上述缺陷,提供一种转炉煤气干法除尘粗灰气力输送系统。The technical problem to be solved by the present invention is to provide a coarse ash pneumatic conveying system for converter gas dry dust removal in view of the above-mentioned defects of the prior art.
本发明解决其技术问题所采用的技术方案是:构造一种转炉煤气干法除尘粗灰气力输送系统,包括高效余热回收换热器、水平链式输送机、卸灰主管、气动三通分料器、第一卸灰支管、第二卸灰支管、第一仓泵、第二仓泵、气力输送管和粗灰仓;The technical solution adopted by the present invention to solve the technical problem is: construct a converter gas dry dust removal coarse ash pneumatic conveying system, including a high-efficiency waste heat recovery heat exchanger, a horizontal chain conveyor, an ash unloading main pipe, and a pneumatic three-way material distribution system. device, the first ash unloading branch pipe, the second ash unloading branch pipe, the first warehouse pump, the second warehouse pump, the pneumatic conveying pipe and the coarse ash bin;
所述高效余热回收换热器侧面设有高效换热管,所述水平链式输送机水平设置在所述高效余热回收换热器下方;The side of the high-efficiency waste heat recovery heat exchanger is provided with high-efficiency heat exchange tubes, and the horizontal chain conveyor is horizontally arranged under the high-efficiency waste heat recovery heat exchanger;
所述第一仓泵和第二仓泵安装在所述水平链式输送机的下方,所述水平链式输送机的卸灰口和气动三通分料器入口通过所述卸灰主管连接,所述卸灰主管上设有气动插板阀;The first warehouse pump and the second warehouse pump are installed below the horizontal chain conveyor, the ash discharge port of the horizontal chain conveyor and the inlet of the pneumatic three-way distributor are connected through the ash discharge main pipe, The ash unloading main pipe is provided with a pneumatic slide valve;
所述第一仓泵通过所述第一卸灰支管与所述气动三通分料器连接,所述第一卸灰支管上设有第一手动插板阀和第一气动双闸板阀,所述第一仓泵上设有第一真空压力释放阀;The first warehouse pump is connected to the pneumatic three-way distributor through the first ash unloading branch pipe, and the first ash unloading branch pipe is provided with a first manual slide valve and a first pneumatic double gate valve, The first warehouse pump is provided with a first vacuum pressure relief valve;
所述第二仓泵通过所述第二卸灰支管与所述气动三通分料器连接,所述第二卸灰支管上设有第二手动插板阀和第二气动双闸板阀,所述第二仓泵上设有第二真空压力释放阀;The second warehouse pump is connected to the pneumatic three-way distributor through the second ash unloading branch pipe, and the second ash unloading branch pipe is provided with a second manual slide valve and a second pneumatic double gate valve , the second warehouse pump is provided with a second vacuum pressure release valve;
所述气力输送管与储气罐连接,所述储气罐的入口与第一氮气管连接,所述第一氮气管的入口和氮气总管相连;所述第一仓泵、第二仓泵和粗灰仓通过气力输送管相连;The pneumatic conveying pipe is connected with the gas storage tank, the inlet of the gas storage tank is connected with the first nitrogen pipe, and the inlet of the first nitrogen pipe is connected with the nitrogen main pipe; the first storehouse pump, the second storehouse pump and the The coarse ash bin is connected by a pneumatic conveying pipe;
所述第一仓泵底部设有第一流化装置,所述第一仓泵与所述储气罐之间设有第一气动球阀,所述第一仓泵与所述气力输送管之间设有第三气动双闸板阀;A first fluidization device is provided at the bottom of the first warehouse pump, a first pneumatic ball valve is provided between the first warehouse pump and the air storage tank, and a first pneumatic ball valve is provided between the first warehouse pump and the pneumatic conveying pipe. There is a third pneumatic double gate valve;
所述第二仓泵底部设有第二流化装置,所述第二仓泵与所述储气罐之间设有第二气动球阀,所述第二仓泵与所述气力输送管之间设有第四气动双闸板阀;A second fluidization device is provided at the bottom of the second warehouse pump, a second pneumatic ball valve is provided between the second warehouse pump and the air storage tank, and a second pneumatic ball valve is provided between the second warehouse pump and the pneumatic conveying pipe. Equipped with the fourth pneumatic double gate valve;
所述储气罐出口的氮气管分为两路,一路与所述第一流化装置及气力输送管连接,另一路与所述第二流化装置及气力输送管连接;The nitrogen pipe at the outlet of the gas storage tank is divided into two paths, one path is connected with the first fluidization device and the pneumatic conveying pipe, and the other path is connected with the second fluidization device and the pneumatic conveying pipe;
所述粗灰仓顶部设有仓顶布袋除尘器和第三真空压力释放阀,所述粗灰仓下锥斗内设有第三流化装置,所述粗灰仓底部的下锥斗的卸灰口和第三手动插板阀入口相连,所述第三手动插板阀出口和星型卸灰阀入口相连;The top of the coarse ash bin is equipped with a cloth bag dust collector and a third vacuum pressure release valve, and a third fluidization device is installed in the lower cone of the coarse ash bin. The ash port is connected to the inlet of the third manual flapper valve, and the outlet of the third manual flapper valve is connected to the inlet of the star-shaped ash unloading valve;
所述氮气总管还与第二氮气管入口相连,所述第二氮气管出口分为两路,一路与第三流化装置连接,另一路与仓顶布袋除尘器连接;The nitrogen main pipe is also connected to the inlet of the second nitrogen pipe, and the outlet of the second nitrogen pipe is divided into two paths, one path is connected to the third fluidization device, and the other path is connected to the bag filter on the top of the warehouse;
第二氮气管和第三流化装置之间设调压阀和电磁阀。A pressure regulating valve and an electromagnetic valve are arranged between the second nitrogen pipe and the third fluidization device.
在本发明所述的转炉煤气干法除尘粗灰气力输送系统中,所述水平链式输送机上设有第一事故卸灰主管,所述第一事故卸灰主管上设有第四手动插板阀。In the converter gas dry dust removal coarse ash pneumatic conveying system according to the present invention, the horizontal chain conveyor is provided with a first accidental ash unloading main pipe, and a fourth manual inserting plate is provided on the first accidental ash unloading main pipe valve.
在本发明所述的转炉煤气干法除尘粗灰气力输送系统中,所述粗灰仓下锥斗上设有第二事故卸灰主管,所述第二事故卸灰主管上设有第五手动插板阀。In the converter gas dry dust removal coarse ash pneumatic conveying system according to the present invention, the second emergency ash discharge main pipe is provided on the lower cone bucket of the coarse ash bin, and the fifth manual ash discharge main pipe is provided on the second accident ash discharge main pipe. flapper valve.
在本发明所述的转炉煤气干法除尘粗灰气力输送系统中,所述第一仓泵和第二仓泵底部设有排水管。In the converter gas dry dust removal coarse ash pneumatic conveying system according to the present invention, drain pipes are arranged at the bottoms of the first and second chamber pumps.
实施本发明的转炉煤气干法除尘粗灰气力输送系统,具有以下有益效果:Implementation of the converter gas dry dedusting coarse ash pneumatic conveying system of the present invention has the following beneficial effects:
1、高效余热回收换热器采用间接换热的方式,无直喷水,彻底解决了蒸发冷却器易板结的问题,也解决了水滴引起的内置链式输送机卡灰的问题。1. The high-efficiency waste heat recovery heat exchanger adopts an indirect heat exchange method without direct spraying of water, which completely solves the problem of easy hardening of the evaporative cooler, and also solves the problem of dust stuck on the built-in chain conveyor caused by water droplets.
2、使用高效余热回收换热器后,既能大量回收荒煤气中的余热,又能除尘,节能又环保。2. After using the high-efficiency waste heat recovery heat exchanger, it can not only recover a large amount of waste heat in the raw gas, but also remove dust, which is energy-saving and environmentally friendly.
3、第一仓泵和第二仓泵可交替工作,保证输送系统的稳定性,提高了粗灰的输送能力。3. The first warehouse pump and the second warehouse pump can work alternately to ensure the stability of the conveying system and improve the conveying capacity of coarse ash.
4、粗灰仓既可以放在转炉主厂房内,也可以放在转炉主厂房外,贮灰及运灰不受场地和距离的限制。4. The coarse ash bin can be placed inside or outside the main converter building. Ash storage and transportation are not limited by site and distance.
5、本发明取消了粉尘加湿机,可采用真空吸排罐车的方式卸灰,无粉尘外溢,更环保。5. The present invention cancels the dust humidifier, and can adopt the way of vacuum suction and discharge tank truck to unload the ash, without dust spillage, and is more environmentally friendly.
附图说明Description of drawings
下面将结合附图及实施例对本发明作进一步说明,附图中:The present invention will be further described below in conjunction with accompanying drawing and embodiment, in the accompanying drawing:
图1是本发明转炉煤气干法除尘粗灰气力输送系统的结构示意图。Fig. 1 is a structural schematic diagram of the coarse ash pneumatic conveying system for converter gas dry dedusting of the present invention.
具体实施方式Detailed ways
为了对本发明的技术特征、目的和效果有更加清楚的理解,现对照附图详细说明本发明的具体实施方式。In order to have a clearer understanding of the technical features, purposes and effects of the present invention, the specific implementation manners of the present invention will now be described in detail with reference to the accompanying drawings.
如图1所示,本发明的转炉煤气干法除尘粗灰气力输送系统包括高效余热回收换热器1、水平链式输送机2、卸灰主管3和气动三通分料器5、第一卸灰支管8、第二卸灰支管13、第一仓泵11、第二仓泵16、气力输送管24、粗灰仓25。As shown in Fig. 1 , the coarse ash pneumatic conveying system for converter gas dry process dedusting of the present invention includes a high-efficiency waste heat recovery heat exchanger 1, a horizontal chain conveyor 2, an ash unloading main pipe 3, a pneumatic three-way distributor 5, a first Ash unloading branch pipe 8, second ash unloading branch pipe 13, first storehouse pump 11, second storehouse pump 16, pneumatic conveying pipe 24, coarse ash storehouse 25.
高效余热回收换热器1侧面设有高效换热管,水平链式输送机2水平设置在所述高效余热回收换热器1下方。第一仓泵11和第二仓泵16安装在水平链式输送机2的下方,的卸灰口和气动三通分料器5入口通过卸灰主管3连接,卸灰主管3上设有气动插板阀4。The high-efficiency waste heat recovery heat exchanger 1 is provided with high-efficiency heat exchange tubes on the side, and the horizontal chain conveyor 2 is horizontally arranged under the high-efficiency waste heat recovery heat exchanger 1 . The first warehouse pump 11 and the second warehouse pump 16 are installed below the horizontal chain conveyor 2, and the ash unloading port and the inlet of the pneumatic three-way distributor 5 are connected through the ash unloading main pipe 3, and the ash unloading main pipe 3 is equipped with a pneumatic Gate valve 4.
第一仓泵11通过第一卸灰支管8与气动三通分料器5连接,第一卸灰支管8上设有第一手动插板阀9和第一气动双闸板阀10。第一手动插板阀9和第一气动双闸板阀10开启时,气动三通分料器5内的粗灰通过第一卸灰支管8进入第一仓泵11内。第一仓泵11上设有第一真空压力释放阀12,可防止第一仓泵11内部压强过大。The first warehouse pump 11 is connected to the pneumatic three-way distributor 5 through the first ash unloading branch pipe 8 , and the first ash unloading branch pipe 8 is provided with a first manual slide valve 9 and a first pneumatic double gate valve 10 . When the first manual slide valve 9 and the first pneumatic double gate valve 10 are opened, the coarse ash in the pneumatic three-way distributor 5 enters the first warehouse pump 11 through the first ash unloading branch pipe 8 . The first chamber pump 11 is provided with a first vacuum pressure release valve 12, which can prevent the internal pressure of the first chamber pump 11 from being too high.
第二仓泵16通过第二卸灰支管13与气动三通分料器5连接,第二卸灰支管13上设有第二手动插板阀14和第二气动双闸板阀15。第二手动插板阀14和第二气动双闸板阀15开启时,气动三通分料器5内的粗灰通过第二卸灰支管13进入第二仓泵16内。第二仓泵16上设有第二真空压力释放阀17,可防止第二仓泵16内部压强过大。The second warehouse pump 16 is connected to the pneumatic three-way distributor 5 through the second ash discharge branch pipe 13, and the second ash discharge branch pipe 13 is provided with a second manual slide valve 14 and a second pneumatic double gate valve 15. When the second manual slide valve 14 and the second pneumatic double gate valve 15 are opened, the coarse ash in the pneumatic three-way distributor 5 enters the second warehouse pump 16 through the second ash unloading branch pipe 13 . The second chamber pump 16 is provided with a second vacuum pressure relief valve 17, which can prevent the internal pressure of the second chamber pump 16 from being too high.
气力输送管24与储气罐19连接,储气罐19的入口与第一氮气管18连接,第一氮气管18的入口和氮气总管相连,第一仓泵11、第二仓泵16和粗灰仓25通过气力输送管24相连。第一仓泵11底部设有第一流化装置,第一仓泵11与储气罐19之间设有第一气动球阀20,第一仓泵11与气力输送管24之间设有第三气动双闸板阀21。第二仓泵16底部设有第二流化装置,第二仓泵16与储气罐19之间设有第二气动球阀22,第二仓泵16与气力输送管24之间设有第四气动双闸板阀23。储气罐19出口的氮气管分为两路,一路与第一流化装置及气力输送管24连接,另一路与第二流化装置及气力输送管24连接。The pneumatic conveying pipe 24 is connected with the gas tank 19, the inlet of the gas tank 19 is connected with the first nitrogen pipe 18, the inlet of the first nitrogen pipe 18 is connected with the nitrogen main pipe, the first storehouse pump 11, the second storehouse pump 16 and the rough The ash bin 25 is connected through a pneumatic conveying pipe 24 . A first fluidization device is provided at the bottom of the first warehouse pump 11, a first pneumatic ball valve 20 is provided between the first warehouse pump 11 and the air storage tank 19, and a third pneumatic ball valve 20 is provided between the first warehouse pump 11 and the pneumatic conveying pipe 24. Double gate valve 21. A second fluidization device is provided at the bottom of the second warehouse pump 16, a second pneumatic ball valve 22 is provided between the second warehouse pump 16 and the air storage tank 19, and a fourth pneumatic ball valve 22 is provided between the second warehouse pump 16 and the pneumatic conveying pipe 24. Pneumatic double gate valve 23. The nitrogen pipe at the outlet of the gas storage tank 19 is divided into two paths, one path is connected with the first fluidizing device and the pneumatic conveying pipe 24, and the other path is connected with the second fluidizing device and the pneumatic conveying pipe 24.
粗灰仓25顶部设有仓顶布袋除尘器26和第三真空压力释放阀27。仓顶布袋除尘器26用于收集粗灰仓25顶部的灰尘。第三真空压力释放阀27用于防止粗灰仓25内部压强过大。粗灰仓25下锥斗内设有第三流化装置35,粗灰仓25下锥斗的卸灰口和第三手动插板阀28入口相连,第三手动插板阀28出口和星型卸灰阀29入口相连。The top of the coarse ash bin 25 is provided with a bin top bag filter 26 and a third vacuum pressure release valve 27 . The bag filter 26 on the top of the bin is used to collect the dust on the top of the coarse ash bin 25 . The third vacuum pressure relief valve 27 is used to prevent excessive pressure inside the coarse ash bin 25 . A third fluidization device 35 is provided in the lower cone of the coarse ash bin 25, the ash discharge port of the lower cone of the coarse ash bin 25 is connected to the inlet of the third manual flapper valve 28, and the outlet of the third manual flapper valve 28 is connected to the star-shaped Ash unloading valve 29 inlets are connected.
氮气总管还与第二氮气管32入口相连,第二氮气管32出口分为两路,一路与第三流化装置35连接,另一路与仓顶布袋除尘器26连接。The nitrogen main pipe is also connected with the inlet of the second nitrogen pipe 32, and the outlet of the second nitrogen pipe 32 is divided into two paths, one path is connected with the third fluidization device 35, and the other path is connected with the bag filter 26 on the warehouse top.
第二氮气管32和第三流化装置35之间设调压阀33和电磁阀34。A pressure regulating valve 33 and a solenoid valve 34 are provided between the second nitrogen pipe 32 and the third fluidization device 35 .
本发明中转炉煤气干法除尘粗灰气力输送系统输送粗灰的工艺流程如下:The technical process of conveying coarse ash by the converter gas dry process dedusting coarse ash pneumatic conveying system of the present invention is as follows:
高效余热回收换热器1→水平链式输送机2→卸灰口→卸灰主管3→气动插板阀4→气动三通分料器5→第一卸灰支管8/第二卸灰支管13→第一仓泵11/第二仓泵16→第三气动双闸板阀21/第四气动双闸板阀23→气力输送管24→粗灰仓25→第三手动插板阀28→星型卸灰阀29。High-efficiency waste heat recovery heat exchanger 1→horizontal chain conveyor 2→ash unloading port→ash unloading main pipe 3→pneumatic slide valve 4→pneumatic three-way distributor 5→first ash unloading branch pipe 8/second ash unloading branch pipe 13→first warehouse pump 11/second warehouse pump 16→third pneumatic double gate valve 21/fourth pneumatic double gate valve 23→pneumatic conveying pipe 24→coarse ash warehouse 25→third manual gate valve 28→ Star type ash unloading valve 29.
含尘荒煤气通过高效余热回收换热器1时,25%~35%(一般为30%)的粗颗粒粉尘在重力及离心力的作用下被捕集,落入水平链式输送机(2);粗颗粒粉尘温度为200~300℃(一般为250℃);粗颗粒粉尘堆积密度1.8~2.6t/m3;粗颗粒粉尘含水率为0。When the dust-laden raw gas passes through the high-efficiency waste heat recovery heat exchanger 1, 25% to 35% (generally 30%) of coarse dust is captured under the action of gravity and centrifugal force and falls into the horizontal chain conveyor (2) The temperature of coarse dust is 200-300°C (generally 250°C); the bulk density of coarse dust is 1.8-2.6t/m 3 ; the moisture content of coarse dust is 0.
水平链式输送机2和转炉工艺连锁,在冶炼期间周期性的运行。粗灰经水平链式输送机2卸灰口、卸灰主管3、气动插板阀4、气动三通分料器5、第一卸灰支管8、第一手动插板阀9和第一气动双闸板阀10进入第一仓泵11,第一仓泵11料满后,经第一流化装置流化后通过气力输送管24送至粗灰仓25。第一仓泵11内也可以设置料位计,通过料位计检测第一仓泵11内的粗灰量。第一仓泵11料满后,气动三通分料器5切换至第二卸灰支管13,粗灰经第二手动插板阀14和第二气动双闸板阀15进入第二仓泵16。第一仓泵11和第二仓泵16可交替工作,并互为备用,其中一个损坏时,整个系统仍然可以正常的工作,保证了输送系统的稳定性,提高了粗灰的输送能力。The horizontal chain conveyor 2 is interlocked with the converter process and runs periodically during smelting. Coarse ash passes through the horizontal chain conveyor 2 ash discharge port, ash discharge main pipe 3, pneumatic gate valve 4, pneumatic three-way distributor 5, first ash discharge branch pipe 8, first manual gate valve 9 and first pneumatic valve The double gate valve 10 enters the first warehouse pump 11. After the first warehouse pump 11 is full, it is fluidized by the first fluidization device and sent to the coarse ash warehouse 25 through the pneumatic conveying pipe 24. A material level gauge may also be arranged in the first warehouse pump 11, and the amount of coarse ash in the first warehouse pump 11 is detected by the material level gauge. After the first warehouse pump 11 is full, the pneumatic three-way distributor 5 switches to the second ash discharge branch pipe 13, and the coarse ash enters the second warehouse pump through the second manual slide valve 14 and the second pneumatic double gate valve 15 16. The first storehouse pump 11 and the second storehouse pump 16 can work alternately and serve as backups for each other. When one of them is damaged, the whole system can still work normally, ensuring the stability of the conveying system and improving the conveying capacity of coarse ash.
打开电磁阀34时,第三流化装置35喷低压氮气,可以降低粗灰仓25内粗灰的温度,也可以流化粗灰,便于卸灰。仓顶布袋除尘器26收集到的粗灰通过第二氮气管32输送至粗灰仓25底部,保证粗灰仓25内的粗灰可以快速充分的卸料,减少残留。通过调压阀33可以调节氮气的通入量。卸灰采用真空吸排罐车的方式,卸灰时无粉尘外溢,更环保。When the electromagnetic valve 34 is opened, the third fluidizing device 35 sprays low-pressure nitrogen gas, which can reduce the temperature of the coarse ash in the coarse ash bin 25, and also fluidize the coarse ash to facilitate ash unloading. The coarse ash collected by the bag filter 26 on the top of the warehouse is transported to the bottom of the coarse ash bin 25 through the second nitrogen pipe 32, so as to ensure that the coarse ash in the coarse ash bin 25 can be quickly and fully unloaded and the residue is reduced. Through the pressure regulating valve 33 can adjust the feeding amount of nitrogen. The ash unloading adopts the method of vacuum suction and discharge of tank trucks, and there is no dust spillage during ash unloading, which is more environmentally friendly.
进一步的,水平链式输送机2上设有第一事故卸灰主管6,第一事故卸灰主管6上设有第四手动插板阀7。检修时,粗灰从第一事故卸灰主管6排出。Further, the horizontal chain conveyor 2 is provided with a first emergency ash unloading supervisor 6 , and a fourth manual slide valve 7 is provided on the first emergency ash unloading supervisor 6 . During maintenance, coarse ash is discharged from the first accident ash unloading supervisor 6.
进一步的,第一仓泵11和和第二仓泵16底部也可以设置排水管,用于排出仓泵内的积水。Further, drain pipes may also be provided at the bottom of the first chamber pump 11 and the second chamber pump 16 for draining accumulated water in the chamber pumps.
进一步的,粗灰仓25下锥斗上设有第二事故卸灰主管30,第二事故卸灰主管30上设有第五手动插板阀31。粗灰仓25检修时,粗灰经粗灰仓25下锥斗事故卸灰口、第二事故卸灰主管30和第五手动插板阀31排出。Further, a second emergency ash unloading main pipe 30 is provided on the lower cone of the coarse ash bin 25 , and a fifth manual slide valve 31 is provided on the second accidental ash unloading main pipe 30 . When the coarse ash bin 25 is overhauled, the coarse ash is discharged through the cone bucket accident ash discharge port of the coarse ash bin 25, the second accident ash discharge supervisor 30 and the fifth manual slide valve 31.
进一步的,第一仓泵11和第二仓泵16材质为16MnR或Q235B或球墨铸铁或不锈钢。第一仓泵11和第二仓泵16容量:1.0~10m3;第一仓泵11和第二仓泵16数量≥1个,可多个组合使用。气力输送管24采用含锰无缝钢管,弯头、三通内衬耐磨陶瓷材料,管道弯曲半径≥10倍管道直径,管道具有防堵功能。Further, the first chamber pump 11 and the second chamber pump 16 are made of 16MnR or Q235B or ductile iron or stainless steel. The capacity of the first warehouse pump 11 and the second warehouse pump 16: 1.0-10m 3 ; the number of the first warehouse pump 11 and the second warehouse pump 16 is ≥1, and multiple combinations can be used. Pneumatic conveying pipe 24 is made of manganese-containing seamless steel pipe, and the elbow and tee are lined with wear-resistant ceramic materials. The bending radius of the pipe is ≥10 times the diameter of the pipe, and the pipe has an anti-blocking function.
第一仓泵11或第二仓泵16采用间断输送的方式,每输送一次粗灰,即为一个循环过程,每个循环分为步,以第一仓泵11输送为例:The first warehouse pump 11 or the second warehouse pump 16 adopts the mode of discontinuous delivery, and each time the coarse ash is transported, it is a cycle process, and each cycle is divided into steps. Take the first warehouse pump 11 as an example:
1、进料:第一手动插板阀9常开,第一气动双闸板阀10呈开启状态,第一气动球阀20和第三气动双闸板阀21关闭,粗灰在重力作用下进入第一仓泵11,当第一仓泵11自带的料位计检测到料满后,发出信号并通过PLC程序控制,自动关闭第一气动双闸板阀10,进料过程结束。1. Feeding: the first manual slide valve 9 is normally open, the first pneumatic double gate valve 10 is open, the first pneumatic ball valve 20 and the third pneumatic double gate valve 21 are closed, and the coarse ash enters under the action of gravity The first warehouse pump 11, when the material level gauge of the first warehouse pump 11 detects that the material is full, sends a signal and is controlled by the PLC program to automatically close the first pneumatic double gate valve 10, and the feeding process ends.
2、流化:第一气动球阀20开启,氮气从储气罐19进入第一仓泵11内的第一流化装置,第一仓泵11内的粗灰充分流化,压力不断升高,当压力升至设定工作压力时,通过PLC程序控制,自动打开第一仓泵11侧部出料口处的第三气动双闸板阀21,流化过程结束,进入输送过程。2. Fluidization: the first pneumatic ball valve 20 is opened, nitrogen enters the first fluidization device in the first warehouse pump 11 from the gas storage tank 19, the coarse ash in the first warehouse pump 11 is fully fluidized, and the pressure continues to rise. When the pressure rises to the set working pressure, the third pneumatic double gate valve 21 at the side discharge port of the first warehouse pump 11 is automatically opened through the PLC program control, the fluidization process ends and the conveying process begins.
3、输送:第三气动双闸板阀21打开后,流化均匀的气灰混合物通过气力输送管24送至粗灰仓25,此时第一仓泵11内的压力保持稳定;当第一仓泵11内的气灰混合物输送完后,气力输送管24的阻力下降,气力输送管24的压力开始降低,当降低至设定的下限压力时,则输送过程结束,进入吹扫过程,此时第一气动球阀20和第三气动双闸板阀21仍然保持在开启状态。3. Transportation: After the third pneumatic double gate valve 21 is opened, the uniformly fluidized gas-ash mixture is sent to the coarse ash bin 25 through the pneumatic conveying pipe 24, and the pressure in the first bin pump 11 is kept stable at this time; when the first After the air-ash mixture in the warehouse pump 11 is conveyed, the resistance of the pneumatic conveying pipe 24 drops, and the pressure of the pneumatic conveying pipe 24 begins to drop. At this time, the first pneumatic ball valve 20 and the third pneumatic double gate valve 21 still remain in the open state.
4、吹扫:氮气继续吹扫第一仓泵11和气力输送管24,此时第一仓泵11内无飞灰,气力输送管24内的气灰混合物逐渐减少,最后几乎全部是氮气,系统阻力继续下降并稳定一段时间后,吹扫过程结束,关闭第一气动球阀20和第三气动双闸板阀21,然后打开第一气动双闸板阀10,第一仓泵11恢复进料状态。至此,包括4步的一个输送循环结束,重新开始下一个循环。4. Purging: Nitrogen continues to purge the first warehouse pump 11 and the pneumatic conveying pipe 24. At this time, there is no fly ash in the first chamber pump 11, and the gas-ash mixture in the pneumatic conveying pipe 24 gradually decreases, and finally almost all of them are nitrogen. After the system resistance continues to drop and stabilize for a period of time, the purging process ends, close the first pneumatic ball valve 20 and the third pneumatic double gate valve 21, then open the first pneumatic double gate valve 10, and the first warehouse pump 11 resumes feeding state. So far, a conveying cycle including 4 steps ends, and the next cycle starts again.
本发明转炉煤气干法除尘粗灰气力输送系统中的转炉定义为:脱碳转炉或脱磷转炉或熔岩均化炉或不锈钢转炉。本发明的气力输送系统适用于80t~300t转炉一次烟气干法除尘粗灰的输送。其输送距离约300m,爬升高度约30m。其输送介质采用低压氮气,氮气压力≥0.6MPa。The converter in the converter gas dry dust removal coarse ash pneumatic conveying system of the present invention is defined as: a decarburization converter or a dephosphorization converter or a lava homogenizing furnace or a stainless steel converter. The pneumatic conveying system of the present invention is suitable for conveying coarse ash of primary flue gas dry dust removal of 80t-300t converters. Its conveying distance is about 300m, and its climbing height is about 30m. The conveying medium adopts low-pressure nitrogen, and the nitrogen pressure is ≥0.6MPa.
上面结合附图对本发明的实施例进行了描述,但是本发明并不局限于上述的具体实施方式,上述的具体实施方式仅仅是示意性的,而不是限制性的,本领域的普通技术人员在本发明的启示下,在不脱离本发明宗旨和权利要求所保护的范围情况下,还可做出很多形式,这些均属于本发明的保护之内。Embodiments of the present invention have been described above in conjunction with the accompanying drawings, but the present invention is not limited to the above-mentioned specific implementations, and the above-mentioned specific implementations are only illustrative, rather than restrictive, and those of ordinary skill in the art will Under the enlightenment of the present invention, many forms can also be made without departing from the gist of the present invention and the protection scope of the claims, and these all belong to the protection of the present invention.
Claims (4)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201310264541.0A CN103388045B (en) | 2013-06-28 | 2013-06-28 | Pneumatic transmission system for dry dedusting of thick ash in converter gas |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201310264541.0A CN103388045B (en) | 2013-06-28 | 2013-06-28 | Pneumatic transmission system for dry dedusting of thick ash in converter gas |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN103388045A CN103388045A (en) | 2013-11-13 |
| CN103388045B true CN103388045B (en) | 2015-04-01 |
Family
ID=49532465
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201310264541.0A Active CN103388045B (en) | 2013-06-28 | 2013-06-28 | Pneumatic transmission system for dry dedusting of thick ash in converter gas |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN103388045B (en) |
Families Citing this family (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN104928434A (en) * | 2015-06-30 | 2015-09-23 | 中冶南方工程技术有限公司 | Vanadium extracting converter primary dedusting coarse ash pneumatic conveying method |
| CN104911300A (en) * | 2015-06-30 | 2015-09-16 | 中冶南方工程技术有限公司 | System for carrying out pneumatic transport on coarse dust generated during primary dedusting of vanadium recovering converter |
| CN112029951B (en) * | 2020-08-12 | 2021-11-09 | 北京首钢自动化信息技术有限公司 | Coarse ash conveying control method and device |
Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN101451173A (en) * | 2007-11-28 | 2009-06-10 | 中冶赛迪工程技术股份有限公司 | Converter gas dry method pocket type purification and recovery process and system |
| CN201971854U (en) * | 2011-02-25 | 2011-09-14 | 辽宁环宇环保技术有限公司 | Converter gas dry method bag type recovery and purification system |
| CN102373312A (en) * | 2011-10-31 | 2012-03-14 | 中冶南方工程技术有限公司 | Primary fume dry method dedusting system of vanadium recovery converter |
| CN102653806A (en) * | 2012-05-29 | 2012-09-05 | 江苏瑞帆环保装备股份有限公司 | Electric-bag combined converter gas dry cleaning and recovering system |
| CN203373372U (en) * | 2013-06-28 | 2014-01-01 | 中冶南方工程技术有限公司 | Converter gas dry de-dusting cinder pneumatic conveying system |
-
2013
- 2013-06-28 CN CN201310264541.0A patent/CN103388045B/en active Active
Patent Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN101451173A (en) * | 2007-11-28 | 2009-06-10 | 中冶赛迪工程技术股份有限公司 | Converter gas dry method pocket type purification and recovery process and system |
| CN201971854U (en) * | 2011-02-25 | 2011-09-14 | 辽宁环宇环保技术有限公司 | Converter gas dry method bag type recovery and purification system |
| CN102373312A (en) * | 2011-10-31 | 2012-03-14 | 中冶南方工程技术有限公司 | Primary fume dry method dedusting system of vanadium recovery converter |
| CN102653806A (en) * | 2012-05-29 | 2012-09-05 | 江苏瑞帆环保装备股份有限公司 | Electric-bag combined converter gas dry cleaning and recovering system |
| CN203373372U (en) * | 2013-06-28 | 2014-01-01 | 中冶南方工程技术有限公司 | Converter gas dry de-dusting cinder pneumatic conveying system |
Also Published As
| Publication number | Publication date |
|---|---|
| CN103388045A (en) | 2013-11-13 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN203428536U (en) | Coarse-ash pneumatic conveying system for converter gas dry dedusting | |
| CN103388046B (en) | Pneumatic transmission method for dry dedusting of fine ash in converter gas | |
| CN103332458B (en) | The thin grey air-transport system of a kind of dry dedusting of converter | |
| CN103333983B (en) | Converter primary flue gas dry dedusting and cinder pneumatic transmission system | |
| CN205170899U (en) | Converter gas dry de -dusting cinder pneumatic conveying system | |
| CN103332494B (en) | Pneumatic conveying method for removing dust and crude ash in dry process of converter once flue gas | |
| CN103332493B (en) | Pneumatic conveying method for removing dust and crude ash in dry process of converter gas | |
| CN203428455U (en) | Pneumatic fine ash conveying system for converter gas dry dedusting | |
| CN103388045B (en) | Pneumatic transmission system for dry dedusting of thick ash in converter gas | |
| CN103333986B (en) | Converter coal gas dry dedusting and cinder pneumatic transmission system | |
| CN103332489B (en) | A kind of dry dedusting of converter cinder pneumatic conveying method | |
| CN103333984B (en) | Converter primary exhaust gas dry dedusting coarse ash pneumatic conveying system | |
| CN205170896U (en) | Thick grey air conveying system of converter dry process dust removal | |
| CN103333985B (en) | Converter gas dry dedusting coarse ash pneumatic conveying system | |
| CN103318648B (en) | Converter gas dry-method dedusting cinder pneumatic conveying method | |
| CN203373372U (en) | Converter gas dry de-dusting cinder pneumatic conveying system | |
| CN203373374U (en) | Pneumatic conveying system for coarse ash in dry dedusting of primary flue gas of converters | |
| CN203373375U (en) | Primary smoke dry method dedusting cinder pneumatic transmission system of revolving furnace | |
| CN103332490B (en) | Converter gas dry dedusting fine dust pneumatic transport system | |
| CN203373373U (en) | Pneumatic conveying system for coarse ash in dry dedusting of converter gas | |
| CN203428454U (en) | Fine-ash pneumatic conveying system for converter gas dry dedusting | |
| CN104911299A (en) | Method for carrying out pneumatic transport on coarse dust generated during primary dry dedusting of vanadium recovering converter | |
| CN103333982B (en) | Converter primary exhaust gas dry dedusting coarse ash pneumatic conveying method | |
| CN205170898U (en) | Thick grey air conveying system of converter dry process dust removal | |
| WO2019105109A1 (en) | Dry dedusting dust-free bulk-cement discharging method |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant |