CN103352599B - Beat stay wire tool box - Google Patents
Beat stay wire tool box Download PDFInfo
- Publication number
- CN103352599B CN103352599B CN201310238260.8A CN201310238260A CN103352599B CN 103352599 B CN103352599 B CN 103352599B CN 201310238260 A CN201310238260 A CN 201310238260A CN 103352599 B CN103352599 B CN 103352599B
- Authority
- CN
- China
- Prior art keywords
- wire
- iron
- iron wire
- support frame
- insulating plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Suspension Of Electric Lines Or Cables (AREA)
- Reinforcement Elements For Buildings (AREA)
Abstract
本发明公开了一种打拉线工具,包括长条形的绝缘板,绝缘板的两端固定设置有把手,绝缘板的侧面一端设置用于挂放铁丝的挂丝杆,在绝缘板的侧面另一端或中部还开设有不同宽度的过线槽,在过线槽与挂丝杆之间的绝缘板的正面设置有用于支撑铁丝的支撑架,支撑架包括一与绝缘板的正面垂直的支撑杆,支撑杆上端开设有用于为铁丝导向的导向槽,绝缘板的正面还铰接有测量缠绕铁丝的双股拉线间距和双股拉线缠绕长度的伸缩尺;在绝缘板的背面固定设置有沿绝缘板长度方向的直径大于铁丝直径的金属杆。本发明具有省时省力、工作效率高、铁丝镀锌层损伤几率低,可以确定铁丝缠绕程度的特点。
The invention discloses a pulling wire tool, which comprises a strip-shaped insulating board. Handles are fixedly arranged at both ends of the insulating board. One end or the middle part is also provided with wire slots of different widths, and a support frame for supporting iron wires is provided on the front of the insulation board between the wire slot and the hanging wire rod, and the support frame includes a support rod perpendicular to the front of the insulation board , the upper end of the support rod is provided with a guide groove for guiding the iron wire, and the front of the insulating plate is also hinged with a telescopic ruler for measuring the distance between the double-strand guy wires wrapped around the iron wire and the winding length of the double-strand guy wire; A metal rod whose diameter along its length is greater than that of the wire. The invention has the characteristics of saving time and labor, high working efficiency, low probability of damage to the galvanized layer of the iron wire, and the ability to determine the winding degree of the iron wire.
Description
技术领域technical field
本发明涉及一种高低压线路安装施工用的工具,具体的说是一种适用于各种电杆拉线绑扎的打拉线工具。The invention relates to a tool for installation and construction of high and low voltage lines, in particular to a tool for pulling wires suitable for binding various electric poles.
背景技术Background technique
在输电线路施工过程中,高低压供电线路中电杆用于架设输电导线,在电杆的固定安装程序中,在将电杆竖立到地面后,还需采用拉线将电杆辅助固定。安装拉线时,拉线一端首先通过UT线夹弯曲对折后形成双股拉线,然后用铁丝将双股拉线搭接部分进行绑扎,这种过程称为“打拉线”。打拉线的现有技术是用老虎钳、扳手、大锤等多种手提工具交替使用,将镀锌的铁丝缠绕绑扎在双股拉线上。在缠绕过程中,《电气装置安装工程35kV及以下架空电力线路施工及验收规范》(GB50173-92)对于铁丝要求为:缠绕紧密均匀无缝隙、无硬弯、整齐美观,且不能伤及铁丝的镀锌层。现有的打拉线的方法费时费力,用力不够时铁丝容易滑落,缠绕质量差,用力过大时,容易破坏铁丝的镀锌层,铁丝抗锈蚀能力大大下降。另外,弯曲的双股拉线自上而下间距慢慢变小,因此在缠绕双股拉线时,不容易确定缠绕到何种程度时就可以停止缠绕,容易造成铁丝的浪费。During the construction of the transmission line, the poles in the high and low voltage power supply lines are used to erect the transmission wires. In the fixed installation procedure of the poles, after the poles are erected to the ground, the poles need to be auxiliary fixed with pull wires. When installing the guy wire, one end of the guy wire is first bent and folded in half by the UT clamp to form a double-strand guy wire, and then the overlapping part of the double-strand guy wire is bound with iron wire. This process is called "tying the guy wire". The prior art of backguy is to alternately use multiple portable tools such as vise, wrench, sledgehammer, and galvanized iron wire is wound and bound on double backguy. During the winding process, the "Code for Construction and Acceptance of 35kV and Below Overhead Power Lines for Electrical Installation Engineering" (GB50173-92) requires the iron wire to be tight and uniform without gaps, no hard bends, neat and beautiful, and cannot damage the wire. Galvanized layer. The existing method of pulling the wire is time-consuming and laborious. When the force is not enough, the iron wire is easy to slip, and the winding quality is poor. In addition, the distance between the curved double-ply stay wire gradually decreases from top to bottom, so when winding the double-ply stay wire, it is not easy to determine when the winding can be stopped, and it is easy to cause waste of iron wire.
发明内容Contents of the invention
本发明需要解决的技术问题是提供一种省时省力、工作效率高、铁丝镀锌层损伤几率低,且可以确定铁丝的缠绕程度的打拉线工具。The technical problem to be solved by the present invention is to provide a wire pulling tool that saves time and labor, has high work efficiency, has a low probability of damage to the galvanized layer of the iron wire, and can determine the winding degree of the iron wire.
为解决上述技术问题,本发明所采用的技术方案是:In order to solve the problems of the technologies described above, the technical solution adopted in the present invention is:
打拉线工具,包括长条形的绝缘板,绝缘板的两端固定设置有把手,所述绝缘板的侧面一端设置用于挂放铁丝的挂丝杆,在绝缘板的侧面另一端或中部还开设有不同宽度的过线槽,在过线槽与挂丝杆之间的绝缘板的正面设置有用于支撑铁丝的支撑架,所述支撑架包括一与绝缘板的正面垂直的支撑杆,支撑杆上端开设有用于为铁丝导向的导向槽,绝缘板的正面还铰接有测量缠绕铁丝的双股拉线间距和双股拉线缠绕长度的伸缩尺,所述伸缩尺通过销轴铰接在过线槽外侧的绝缘板的正面的端部;在绝缘板的背面固定设置有沿绝缘板长度方向的直径大于铁丝直径的金属杆。The pulling wire tool includes a strip-shaped insulating board, handles are fixedly arranged at both ends of the insulating board, a hanging wire rod for hanging iron wires is provided at one end of the side of the insulating board, and the other end or the middle part of the insulating board is also There are wire slots of different widths, and a support frame for supporting iron wires is provided on the front of the insulation board between the wire slot and the hanging wire rod. The support frame includes a support rod perpendicular to the front of the insulation board to support The upper end of the rod is provided with a guide groove for guiding the iron wire, and the front of the insulating plate is also hinged with a telescopic ruler for measuring the distance between the double-strand wires wrapped around the iron wire and the winding length of the double-strand wires, and the telescopic ruler is hinged outside the wire groove through a pin The front end of the insulation board; the back side of the insulation board is fixedly provided with a metal rod whose diameter along the length direction of the insulation board is larger than that of the iron wire.
本发明的改进在于:所述过线槽分为第一过线槽和第二过线槽,第一过线槽的宽度小于第二过线槽的宽度,第一过线槽位于第二过线槽的内侧。The improvement of the present invention is that: the wire passing slot is divided into a first wire passing slot and a second wire passing slot, the width of the first wire passing slot is smaller than that of the second wire passing slot, and the first wire passing slot is located in the second wire passing slot. inside of the trunking.
本发明的进一步改进在于:所述第一过线槽、第二过线槽、支撑架的导向槽的边缘为光滑弧状。A further improvement of the present invention is that: the edges of the first wire passing groove, the second wire passing groove, and the guide groove of the support frame are smooth and arc-shaped.
本发明的进一步改进在于:所述绝缘板侧面的挂丝杆由绕线轮取代,绕线轮通过销轴铰接在绝缘板的侧面上;所述支撑架上的导向槽被滑轮取代,滑轮横向安装在支撑架的顶端。The further improvement of the present invention is that: the hanging wire rod on the side of the insulating plate is replaced by a winding wheel, and the winding wheel is hinged on the side of the insulating plate through a pin; the guide groove on the support frame is replaced by a pulley, and the pulley is horizontally Installed on top of the support frame.
由于采用了上述技术方案,本发明取得的技术进步是:Owing to having adopted above-mentioned technical scheme, the technical progress that the present invention obtains is:
使用本发明的打拉线工具可以将铁丝均匀紧固的缠绕到拉线上,工作效率高、省时省力,不会损伤铁丝的镀锌层,且可以确定铁丝的缠绕程度的打拉线工具。本发明设有挂丝杆,在打拉线之前,首先将铁丝绕挂丝杆盘绕在挂丝杆上形成一个缠绕在挂丝杆上的铁算盘,挂丝杆与铁丝、以及铁丝之间存在一定的摩擦阻力,必须有足够的力才能拉动铁丝,从而使得铁丝在缠绕过程中始终处于绷紧状态,使得缠绕更加牢固紧密。The pulling wire tool of the present invention can evenly and tightly wind the iron wire on the pulling wire, has high working efficiency, saves time and effort, does not damage the galvanized layer of the iron wire, and is a pulling wire tool that can determine the winding degree of the iron wire. The present invention is provided with hanging wire rod, before pulling wire, at first iron wire is coiled around hanging wire rod on the hanging wire rod to form an iron abacus wound on the hanging wire rod, there is certain gap between hanging wire rod and iron wire, and iron wire Friction resistance, there must be enough force to pull the wire, so that the wire is always in a tight state during the winding process, making the winding more firm and tight.
本发明绝缘板的两端固定设置有把手,使用时,工作人员双手同时作用于两个把手,将绝缘板横放在双股拉线上,并通过顺时针或者逆时针环绕双股拉线旋转缠绕,省时省力。且绝缘板上开有不同宽度的卡槽,适用于多种不同规格的铁丝的缠绕。Both ends of the insulation board of the present invention are fixedly provided with handles. When in use, the staff act on the two handles with both hands at the same time, place the insulation board horizontally on the double-strand stay wire, and rotate and wind around the double-strand stay wire clockwise or counterclockwise. save time and energy. In addition, there are slots of different widths on the insulating plate, which are suitable for winding iron wires of various specifications.
本发明的绝缘板的背面固定设置有直径大于铁丝直径的金属杆,使用本发明时,金属杆与双股拉线直接接触,避免了整个绝缘板的板面与双股拉线的接触,减少了铁丝缠绕过程中,绝缘板与双股拉线间的摩擦力,省时省力。The back of the insulating board of the present invention is fixedly provided with a metal rod with a diameter greater than that of the iron wire. When using the present invention, the metal rod is in direct contact with the double-strand stay wire, which avoids the contact between the entire insulating board surface and the double-strand stay wire, and reduces the iron wire. During the winding process, the friction between the insulating plate and the double-strand wire saves time and effort.
本发明的绝缘板的正面的端部铰接有伸缩尺,在绝缘板开始环绕双股拉线缠绕时,伸缩尺沿着绝缘板的长度方向放置,伸缩尺可以随时测量已经被铁丝缠绕的双股拉线之间的距离,由于弯曲的双股拉线自上而下间距慢慢变小,通过伸缩尺观察缠绕铁丝的双股拉线之间的距离的变化,确定铁丝缠绕的松紧程度,防止出现铁丝缠绕松紧不一致的现象,确保了铁丝缠绕的整齐美观。当发现缠绕铁丝的双股拉线之间的距离不再发生变化时,旋转伸缩尺,使得伸缩尺的方向与双股拉线平行,并随时测量被铁丝缠绕的双股拉线的缠绕长度,根据行业规定确定双股拉线的铁丝缠绕长度,不会出现由于不确定铁丝的缠绕程度,而过度缠绕,造成铁丝的浪费。The end of the front of the insulation board of the present invention is hinged with a telescopic ruler. When the insulation board begins to wrap around the double-strand guy wire, the telescopic ruler is placed along the length direction of the insulation board, and the telescopic ruler can measure the double-strand guy wire wound by the iron wire at any time. The distance between the curved double-strand wires gradually decreases from top to bottom. Use the telescopic ruler to observe the change in the distance between the double-strand wires wrapped around the iron wire to determine the degree of tightness of the wire winding and prevent the occurrence of iron wire winding tightness. The phenomenon of inconsistency ensures that the wire winding is neat and beautiful. When it is found that the distance between the double-ply guy wires wrapped with iron wires no longer changes, rotate the telescopic ruler so that the direction of the telescopic ruler is parallel to the double-ply guy wires, and measure the winding length of the double-ply guy wires wrapped by iron wire at any time, according to industry regulations Determine the wire winding length of the double-ply guy wire, and there will be no waste of wire due to over-winding due to uncertain wire winding degree.
本发明的绝缘板的正面设置有带导向槽的支撑架,铁丝穿过导向槽输入到过线线槽中,由于支撑架的存在,铁丝在输入到过线槽中时存在一支撑平缓过渡过程,不会存在铁丝形成死弯硬弯的现象,避免了铁丝镀锌层的损伤。另外,铁丝始终处于导线槽之间,保证了铁丝在过线槽位置的稳定,从而使得铁丝的缠绕稳定且紧凑。The front of the insulation board of the present invention is provided with a support frame with a guide groove, and the iron wire passes through the guide groove and is input into the wire passing groove. Due to the existence of the support frame, there is a smooth transition process when the iron wire is input into the wire passing groove , there will be no dead bend and hard bend of the iron wire, and the damage of the galvanized layer of the iron wire will be avoided. In addition, the iron wire is always between the wire grooves, which ensures the stability of the wire passing through the wire grooves, so that the winding of the iron wire is stable and compact.
本发明的过线槽以及支撑架的导线槽的边缘均为光滑弧状,因此铁丝输入时,不会破坏铁丝的镀锌层,延长了铁丝的使用寿命。The edges of the wire passing groove and the wire groove of the support frame of the present invention are smooth and arc-shaped, so when the iron wire is input, the galvanized layer of the iron wire will not be damaged, and the service life of the iron wire is prolonged.
附图说明Description of drawings
图1是本发明实施例一的主视图;Fig. 1 is the front view of Embodiment 1 of the present invention;
图2是本发明实施例一的俯视图;Fig. 2 is a top view of Embodiment 1 of the present invention;
图3是本发明实施例一的左视图;Fig. 3 is the left side view of Embodiment 1 of the present invention;
图4是本发明实施例二的俯视图。Fig. 4 is a top view of Embodiment 2 of the present invention.
其中,1、把手,2、挂丝杆,3、绝缘板,4、第一过线槽,5、第二过线槽,6、伸缩尺,7、支撑架,8、金属杆,9、绕线轮,10、滑轮。Among them, 1. handle, 2. hanging screw, 3. insulation board, 4. first wire slot, 5. second wire slot, 6. telescopic ruler, 7. support frame, 8. metal rod, 9. Winding wheel, 10, pulley.
具体实施方式Detailed ways
下面结合附图对本发明做进一步详细说明:Below in conjunction with accompanying drawing, the present invention is described in further detail:
实施例一Embodiment one
打拉线工具,结构示意如图1、图2和图3所示,包括长条形的绝缘板3,绝缘板3的两端分别固定设置有一把手1;绝缘板3的侧面的一端设置有挂丝杆2,挂丝杆用于缠绕挂放捆绑拉线的铁丝,绝缘板3的侧面另一端或中部开设有两个不同宽度的过线槽,过线槽用于卡住铁丝,过线槽的宽度与铁丝的直径相对应,即过线槽的宽度略大于所用铁丝的直径;过线槽分为第一过线槽4和第二过线槽5,第一过线槽4的宽度小于第二过线槽5的宽度,第一过线槽位于第二过线槽的内侧,第一过线槽用于缠绕较细的铁丝,第二过线槽用于缠绕较粗的铁丝。Pulling wire tool, schematic structure as shown in Fig. 1, Fig. 2 and Fig. 3, comprises elongated insulating plate 3, and the two ends of insulating plate 3 are respectively fixedly provided with a handle 1; One end of the side of insulating plate 3 is provided with hanging The screw rod 2 and the hanging screw rod are used to wind and hang the iron wire for binding the guy wires. The other end or the middle part of the side of the insulating plate 3 is provided with two wire slots of different widths. The wire slots are used to block the iron wires. The width corresponds to the diameter of the iron wire, that is, the width of the wire slot is slightly larger than the diameter of the iron wire used; the wire slot is divided into the first wire slot 4 and the second wire slot 5, and the width of the first wire slot 4 is smaller than that of the second wire slot. Two pass the width of wire groove 5, and the first wire groove is positioned at the inboard of the second wire groove, and the first wire groove is used for winding thinner iron wire, and the second wire groove is used for winding thicker iron wire.
绝缘板3的正面固定设置有用于支撑铁丝的支撑架7,支撑架7位于过线槽和挂丝杆2之间,支撑架7包括支撑杆、导向槽,支撑杆垂直于绝缘板的正面,导向槽位于支撑杆的上端,导向槽用于为铁丝导向,避免铁丝在输入过程中晃动过大,而使得铁丝缠绕不紧凑。The front of insulating board 3 is fixedly provided with the bracing frame 7 that is used to support iron wire, and bracing frame 7 is positioned between wire groove and hanging wire rod 2, and bracing frame 7 comprises bracing bar, guide groove, and bracing bar is perpendicular to the front of insulating board, The guide groove is located at the upper end of the support rod, and the guide groove is used for guiding the iron wire, so as to prevent the iron wire from shaking too much during the input process, so that the iron wire is not wound tightly.
绝缘板3的正面还通过销轴铰接有一精确度较高的伸缩尺6,伸缩尺6的最小计量单位为毫米,伸缩尺6沿绝缘板3的长度方向横放时,伸缩尺6用于测量被铁丝缠绕的双股拉线之间的距离;旋转伸缩尺6,保持与双股拉线平行测量双股拉线的缠绕长度,当缠绕长度较长时,拉伸伸缩尺增加伸缩尺的长度。在本实施例中,伸缩尺6沿绝缘板3长度方向设置在过线槽的下部,且销轴位于第二过线槽5的外侧的的绝缘板3的正面的端部。The front of the insulating board 3 is also hinged with a high-precision telescopic ruler 6 by pin shafts. The minimum measurement unit of the telescopic ruler 6 is millimeters. The distance between the double-strand backguy wires wound by iron wire; Rotate the telescopic ruler 6 to keep parallel with the double-strand backguy to measure the winding length of the double-strand backguy. When the winding length is longer, stretch the telescopic ruler to increase the length of the telescopic ruler. In this embodiment, the telescopic ruler 6 is arranged at the lower part of the wire passage trough along the length direction of the insulation board 3 , and the pin shaft is located at the front end of the insulation board 3 outside the second wire passage 5 .
绝缘板3的背面固定设置一根金属杆8,金属杆8的直径大于铁丝的直径,且金属杆沿着绝缘板3的长度方向设置。由于存在宽度不同的卡线槽,其适用的铁丝的规格也不相同,在本实施方式中所用金属杆8的直径大于较大规格铁丝的直径,且金属杆8位于卡线槽的下部。A metal rod 8 is fixedly arranged on the back side of the insulating board 3 , the diameter of the metal rod 8 is larger than that of the iron wire, and the metal rod is arranged along the length direction of the insulating board 3 . Due to the presence of different widths of the wire clamping slots, the specifications of the applicable iron wires are also different. In this embodiment, the diameter of the metal rod 8 used is larger than that of the larger size iron wires, and the metal rod 8 is located at the bottom of the wire clamping slots.
第一过线槽4、第二过线槽5、支撑架7上的导向槽的边缘均打磨为光滑弧状,使得铁丝输入时,不会破坏铁丝的镀锌层,延长铁丝的使用寿命。The edges of the guide grooves on the first wire trough 4, the second wire trough 5, and the support frame 7 are all polished to a smooth arc shape, so that when the iron wire is input, the galvanized layer of the iron wire can not be damaged, and the service life of the iron wire is extended.
本发明使用时,首先将捆绑拉线的铁丝套于挂丝杆2上,并使铁丝绕过支撑架7上的导线槽,使支撑架7支撑住铁丝,再将铁丝穿过过线槽的槽口,拉伸铁丝,使一段铁丝插在两股拉线之间,并将此段铁丝绕拉线弯曲缠绕一圈后,顺在对折后的两股拉线之间,然后使本发明的绝缘板3垂直横放于双股拉线上,且绝缘板上的金属杆8与双股拉线直接接触,两手握住把手1使打拉线工具环形绕着双股拉线旋转,当通过绝缘板上的伸缩尺6发现双股拉线间的距离没有发生变化时,旋转伸缩尺6,保持伸缩尺与缠绕铁丝的双股拉线平行,并继续缠绕双股拉线,随时通过伸缩尺观察缠绕铁丝的双股拉线的长度,当达到行业规定长度或双股拉线缠绕的长度确保拉线缠绕紧固时,即停止铁丝缠绕,并将铁丝掐断打结。When the present invention is in use, first put the iron wire for binding the wire on the hanging wire rod 2, and make the iron wire go around the wire groove on the support frame 7, make the support frame 7 support the iron wire, and then pass the iron wire through the groove of the wire groove mouth, stretch the iron wire so that a section of iron wire is inserted between the two backguy wires, and after the section of iron wire is bent and wound around the backguy wire for a circle, it is placed between the two backguy wires folded in half, and then the insulation board 3 of the present invention is vertical Put it horizontally on the double-strand guy wire, and the metal rod 8 on the insulating plate is in direct contact with the double-strand guy wire. Hold the handle 1 with both hands to make the pulling wire tool rotate around the double-strand guy wire in a ring. When the distance between the two-ply guy wires does not change, rotate the telescopic ruler 6 to keep the telescopic ruler parallel to the double-ply guy wires wrapped around the iron wire, and continue to wind the double-ply guy wires, and observe the length of the double-ply guy wires wrapped around the iron wire through the telescopic ruler at any time. When the length specified by the industry or the length of double-strand cable winding is ensured to ensure that the cable is tightly wound, the winding of the iron wire will be stopped, and the iron wire will be cut off and knotted.
实施例二Embodiment two
打拉线工具,另一种结构示意如图4所示,与实施例一的区别在于:支撑架7上的导线槽被一滑轮10取代,滑轮10通过销轴设置在支撑杆的上端;挂丝杆2被一绕线轮9取代,绕线轮9通过销轴铰接在绝缘板3的侧面的一端,销轴垂直于绝缘板3的侧面连接。在打拉线工具使用前,将捆绑拉线的铁丝缠绕于绕线轮9上,铁丝在使用过程中通过绕线轮的转动稳定的输出,在输出过程中不会出现铁丝左右上下晃动的现象,使得铁丝在双股拉线上缠绕的更加稳定紧凑,且降低了由于铁丝的晃动对工作人员造成伤害的可能性。Pull wire tool, another kind of structural representation is as shown in Figure 4, and the difference with embodiment one is: the wire groove on the support frame 7 is replaced by a pulley 10, and pulley 10 is arranged on the upper end of support rod by pin; The rod 2 is replaced by a winding wheel 9, the winding wheel 9 is hinged at one end of the side of the insulating plate 3 through a pin shaft, and the pin shaft is connected perpendicular to the side of the insulating plate 3. Before the pulling wire tool is used, the iron wire of the bundled wire is wound on the winding wheel 9, and the iron wire is output stably through the rotation of the winding wheel during use, and the phenomenon that the iron wire does not shake up and down during the output process makes the The iron wire is wound more stably and compactly on the double-strand stay wire, and the possibility of injury to workers due to the shaking of the iron wire is reduced.
Claims (2)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201310238260.8A CN103352599B (en) | 2013-06-17 | 2013-06-17 | Beat stay wire tool box |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201310238260.8A CN103352599B (en) | 2013-06-17 | 2013-06-17 | Beat stay wire tool box |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN103352599A CN103352599A (en) | 2013-10-16 |
| CN103352599B true CN103352599B (en) | 2015-10-28 |
Family
ID=49309007
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201310238260.8A Active CN103352599B (en) | 2013-06-17 | 2013-06-17 | Beat stay wire tool box |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN103352599B (en) |
Families Citing this family (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN103696610B (en) * | 2013-12-03 | 2016-04-27 | 国家电网公司 | A kind of stay wire making tool |
| CN103831784A (en) * | 2014-03-17 | 2014-06-04 | 国家电网公司 | Tool for manufacturing tower stay wire |
| CN105598898A (en) * | 2016-01-22 | 2016-05-25 | 国网山东滨州市滨城区供电公司 | Stay wire tail wire manufacturing tool and use method thereof |
Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US3613745A (en) * | 1969-04-18 | 1971-10-19 | Gottlieb H Treiber | Wire winding tool |
| CN201933828U (en) * | 2010-12-15 | 2011-08-17 | 周连社 | Stay wire making tool |
| CN202140503U (en) * | 2011-06-20 | 2012-02-08 | 唐智海 | Pull wire bundler |
| CN202414894U (en) * | 2011-12-09 | 2012-09-05 | 清丰县供电局 | Aluminum armor tape winder |
| CN202550368U (en) * | 2012-03-09 | 2012-11-21 | 灵寿县供电局 | pull line tool |
-
2013
- 2013-06-17 CN CN201310238260.8A patent/CN103352599B/en active Active
Patent Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US3613745A (en) * | 1969-04-18 | 1971-10-19 | Gottlieb H Treiber | Wire winding tool |
| CN201933828U (en) * | 2010-12-15 | 2011-08-17 | 周连社 | Stay wire making tool |
| CN202140503U (en) * | 2011-06-20 | 2012-02-08 | 唐智海 | Pull wire bundler |
| CN202414894U (en) * | 2011-12-09 | 2012-09-05 | 清丰县供电局 | Aluminum armor tape winder |
| CN202550368U (en) * | 2012-03-09 | 2012-11-21 | 灵寿县供电局 | pull line tool |
Also Published As
| Publication number | Publication date |
|---|---|
| CN103352599A (en) | 2013-10-16 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN205381807U (en) | Unload manual coiling machine of pocket of line fast | |
| CN203582181U (en) | Coil line outgoing device | |
| CN202670932U (en) | Grounding wire winding device | |
| CN103352599B (en) | Beat stay wire tool box | |
| CN108557570A (en) | A kind of Semiautomatic portable grounding wire winding device | |
| CN104022477B (en) | Binding device for overhead lead and stay wire | |
| CN209291695U (en) | A quick cable winding device | |
| CN206820364U (en) | Distribution line Special line laying tool | |
| CN203983909U (en) | Strapping device for aerial condutor and bracing wire | |
| CN209455823U (en) | A kind of combined type pay off rack for electric wire | |
| CN203251019U (en) | A line strain clamp winding device | |
| CN208119477U (en) | Grounding wire pole bundled device | |
| CN204057515U (en) | Electrical lead circuit harmless closing quotation device | |
| CN205855649U (en) | Bracing wire filament winder | |
| CN213034507U (en) | Novel electrician is special wire grip of steel wire steel cable for threading | |
| CN203497857U (en) | Ground wire winding device | |
| CN203617621U (en) | Wire crossover-laying device | |
| CN202967741U (en) | Grounding frame | |
| CN208135627U (en) | A kind of Semiautomatic portable grounding wire winding device | |
| CN208423680U (en) | A kind of route gantry convenient for unwrapping wire | |
| CN206640102U (en) | A kind of cable core collating unit | |
| CN105598898A (en) | Stay wire tail wire manufacturing tool and use method thereof | |
| CN205791197U (en) | A kind of aluminium armor tape wind | |
| CN205791247U (en) | A kind of high-voltage line paying-off implement | |
| CN105967005A (en) | Stay wire winder |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant |