CN103334587A - Fast assembly and disassembly structure and method of wood or bamboo horizontal template - Google Patents

Fast assembly and disassembly structure and method of wood or bamboo horizontal template Download PDF

Info

Publication number
CN103334587A
CN103334587A CN2013102300379A CN201310230037A CN103334587A CN 103334587 A CN103334587 A CN 103334587A CN 2013102300379 A CN2013102300379 A CN 2013102300379A CN 201310230037 A CN201310230037 A CN 201310230037A CN 103334587 A CN103334587 A CN 103334587A
Authority
CN
China
Prior art keywords
template
fill plate
fast
bamboo matter
trapezoidal
Prior art date
Application number
CN2013102300379A
Other languages
Chinese (zh)
Other versions
CN103334587B (en
Inventor
杨益铨
黄跃森
陈伟
Original Assignee
福建省二建建设集团有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 福建省二建建设集团有限公司 filed Critical 福建省二建建设集团有限公司
Priority to CN201310230037.9A priority Critical patent/CN103334587B/en
Publication of CN103334587A publication Critical patent/CN103334587A/en
Application granted granted Critical
Publication of CN103334587B publication Critical patent/CN103334587B/en

Links

Abstract

The invention relates to a fast assembly and disassembly structure and method of a wood or bamboo horizontal template. The fast assembly and disassembly structure is characterized by comprises templates arranged below a to-be-cast floor slab, a regular trapezoidal filler plate for disassembling the template is arranged on each template, and an inverted trapezoidal filler plate is arranged between two adjacent templates. The fast assembly and disassembly structure and method of the wood or bamboo horizontal template not only facilitate the assembling and disassembling of the templates, but also shorten the turnover time of the templates.

Description

Wood bamboo matter horizontal shuttering is installed and removed structure and method thereof fast
Technical field:
The present invention relates to a kind of wooden bamboo matter horizontal shuttering and install and remove structure and method fast.
 
Background technology:
The template installation and removal of existing floor are loaded down with trivial details especially, cause the template dismounting very difficult, not only consuming time because template expands extruding after having built cement material when particularly dismantling, and cause the damage of template easily; In addition, according to national building standard, require after floor is built to dismantle more than 28 days, otherwise cause the distortion of cement floor easily, therefore cause the templates that when the building city high rise building, need be equipped with many cover floors.
?
Summary of the invention:
The object of the present invention is to provide a kind of wooden bamboo matter horizontal shuttering to install and remove structure and method fast, this wood bamboo matter horizontal shuttering mounting or dismounting fast is simple in structure, reasonable in design, be conducive to make things convenient for the loading and unloading of template, the quick mounting and dismounting method of this wood bamboo matter horizontal shuttering, not only be conducive to make things convenient for the loading and unloading of template, improve workmanship, and can reduce the turn around time of template.
The present invention's wood bamboo matter horizontal shuttering is installed and removed structure fast, and it is characterized in that: comprise the template that is located at build floor to be poured below, described template is provided with the trapezoid fill plate in order to the template dismounting, is provided with down trapezoidal fill plate between described template.
Above-mentionedly fall the perpendicular support post that is provided with between trapezoidal fill plate below and the ground, described support post and fall and be provided with Fang Liang between the trapezoidal fill plate.
Above-mentioned support post is provided with the form removal device, and described form removal device comprises the fagging that is fixed on the support post and is threaded in the vertical support bar that is used for the support shuttering crossbeam on the fagging.
Above-mentioned template crossbeam is i beam or Fang Liang.
The veneer that above-mentioned template, trapezoidal fill plate and the trapezoidal fill plate that falls are formed by the multi-layered sheet gummed.
The sheet material that above-mentioned template, trapezoidal fill plate and the trapezoidal fill plate that falls are spliced by row's pin chips or fine bamboo strip.
The present invention's wood bamboo matter horizontal shuttering is installed and removed structure fast by dismantling the trapezoid fill plate that template is provided with earlier, thereby unload removing template extruding force in the horizontal direction, as long as the bonding force that overcomes between template and floor when the dismounting template (is having under the situation that increases release agent, bonding force is very little), so very light is detachable template, time saving and energy saving.
The both ends of above-mentioned template side are provided with the shrinkage pool groove in order to dismounting, and the medium position of described template side also is provided with the shrinkage pool groove.
Above-mentioned template one side is provided with fin, and another side correspondence of described template is provided with the groove for the butt joint fin.
Be arranged with steel bushing in the above-mentioned shrinkage pool groove.
In two groove steel bushings, be equipped with reinforcing bar during above-mentioned adjacent two square template amalgamations.
The quick mounting and dismounting method of the present invention's wood bamboo matter horizontal shuttering, it is characterized in that: when mounted, earlier form removal device and support post are linked into an integrated entity, after vertically setting one by one then, spread template crossbeam and template successively at support bar, simultaneously spread Fang Liang successively in the support post upper end and fall trapezoidal fill plate, regulate the design height of template by the height of threaded adjusting support bar, the trapezoid fill plate, fall and to begin to lay reinforcing bar etc. after the design height of trapezoidal fill plate and template all regulates; Three to a couple of days after floor is built gets final product the turn support bar, one section 5-30cm distance of template crossbeam decline that it is supported, the trapezoid fill plate of then leaving behind, then other template just is easy to pull down, perhaps stretch into the template of leaving behind in the shrinkage pool groove of template by drag hook, trapezoid fill plate, template are dropped on it have only 5-30cm apart from the template crossbeam, and be unlikely to directly to fall on the ground, removed support post, Fang Liang again in 20-30 then days and fell trapezoidal fill plate.
The quick mounting and dismounting method of the present invention's wood bamboo matter horizontal shuttering, three to a couple of days after watering build floor the trapezoid fill plate that the dismounting template is provided with behind the template crossbeam that can descend earlier, thereby unload removing template extruding force in the horizontal direction, as long as the bonding force that overcomes between template and floor when the dismounting template (is having under the situation that increases release agent, bonding force is very little), so very light is detachable template, time saving and energy saving.Thereby make the turnaround time of template foreshorten to 3 to 4 days from original 28 days, reduced the turnaround time of template, also reduced the outfit quantity of template, reduced cost of production.
 
Description of drawings:
Fig. 1 is organigram of the present invention;
Fig. 2 is the organigram that the present invention removes the form removal device;
Fig. 3 a is the organigram of veneer;
Fig. 3 b is Fig. 3 a upward view;
Fig. 4 a is the organigram of the sheet material that is spliced of the thin bamboo batten of a row;
Fig. 4 b is Fig. 4 a upward view.
Fig. 5 is the organigram of the another kind of embodiment of template;
Fig. 6 is the organigram of two template amalgamations.
?
The specific embodiment:
The present invention's wood bamboo matter horizontal shuttering is installed and removed structure fast, comprises the template 2 that is located at build floor to be poured 1 below, and described template is provided with the trapezoid fill plate 4 in order to the template dismounting, is provided with down trapezoidal fill plate 3 between described template.
The template that adopts and trapezoidal fill plate can be the veneers (as shown in Figure 3) that is formed by multi-layered sheet 201 gummeds, also can be the sheet material (as shown in Figure 4) that is spliced by row's pin chips or fine bamboo strip 202.The sheet material that adopts veneer or be spliced by row's fine bamboo strip, pin chips can strengthen the support strength of floor as template.
For better support, above-mentionedly fall the perpendicular support post 5 that is provided with between trapezoidal fill plate 3 belows and the ground, described support post 5 and fall and be provided with a tree, used in making timber for boats beam 11 between the trapezoidal fill plate 3.Level interval between two support posts 5 is less than 2 meters.Support post is steel pipe support.
For the ease of the dismounting of template, above-mentioned support post 5 is provided with form removal device 6, and described form removal device 6 comprises the fagging 7 that is fixed on the support post and is threaded in the vertical support bar 9 that is used for support shuttering crossbeam 8 on the fagging.
In order to design needs, above-mentioned template crossbeam can be i beam or other brace summer.
The present invention's wood bamboo matter horizontal shuttering is installed and removed structure fast by dismantling the trapezoid fill plate that template is provided with earlier, thereby unload removing template extruding force in the horizontal direction, as long as the bonding force that overcomes between template and floor when the dismounting template (is having under the situation that increases release agent, bonding force is very little), so very light is detachable template, time saving and energy saving.
For the ease of the dismounting template, the both ends of above-mentioned template 2 sides are provided with shrinkage pool groove 12 in order to dismounting, and the medium position of described template side also is provided with shrinkage pool groove 12.
Reliable for the positioning stablity of each template, above-mentioned template one side is provided with fin 13, and another side correspondence of described template is provided with the groove 14 for the butt joint fin.
To be not easy to damage shrinkage pool groove and firm for cooperating in order making, to be arranged with steel bushing 15 in the above-mentioned shrinkage pool groove 12.In two groove steel bushings, be equipped with reinforcing bar 16 during above-mentioned adjacent two square template amalgamations.
The quick mounting and dismounting method of the present invention's wood bamboo matter horizontal shuttering, it is characterized in that: when mounted, earlier form removal device and support post are linked into an integrated entity, after vertically setting one by one then, spread template crossbeam and template successively at support bar, simultaneously spread Fang Liang successively in the support post upper end and fall trapezoidal fill plate, regulate the design height of template by the height of threaded adjusting support bar, the trapezoid fill plate, fall and to begin to lay reinforcing bar etc. after the design height of trapezoidal fill plate and template all regulates; Three to a couple of days after floor is built gets final product the turn support bar, one section 5-30cm distance of template crossbeam decline that it is supported, the trapezoid fill plate of then leaving behind, then other template just is easy to pull down, perhaps stretch into the template of leaving behind in the shrinkage pool groove of template by drag hook, trapezoid fill plate, template are dropped on it have only 5-30cm apart from the template crossbeam, and be unlikely to directly to fall on the ground, removed support post, Fang Liang again in 20-30 then days and fell trapezoidal fill plate.
The quick mounting and dismounting method of the present invention's wood bamboo matter horizontal shuttering, three to a couple of days after watering build floor the trapezoid fill plate that the dismounting template is provided with behind the template crossbeam that can descend earlier, thereby unload removing template extruding force in the horizontal direction, as long as the bonding force that overcomes between template and floor when the dismounting template (is having under the situation that increases release agent, bonding force is very little), so very light is detachable template, time saving and energy saving.Thereby make the turnaround time of template foreshorten to 3 to 4 days from original 28 days, reduced the turnaround time of template, also reduced the outfit quantity of template, reduced cost of production.
The above only is preferred embodiment of the present invention, and all equalizations of doing according to the present patent application claim change and modify, and all should belong to covering scope of the present invention.

Claims (10)

1. a wooden bamboo matter horizontal shuttering is installed and removed structure fast, it is characterized in that: comprise the template that is located at build floor to be poured below, described template is provided with the trapezoid fill plate in order to the template dismounting, is provided with down trapezoidal fill plate between described template.
2. wooden bamboo matter horizontal shuttering according to claim 1 is installed and removed structure fast, it is characterized in that: describedly fall the perpendicular support post that is provided with between trapezoidal fill plate below and the ground, described support post and fall and be provided with Fang Liang between the trapezoidal fill plate.
3. wooden bamboo matter horizontal shuttering according to claim 2 is installed and removed structure fast, it is characterized in that: described support post is provided with the form removal device, and described form removal device comprises the fagging that is fixed on the support post and is threaded in the vertical support bar that is used for the support shuttering crossbeam on the fagging.
4. wooden bamboo matter horizontal shuttering according to claim 3 is installed and removed structure fast, and it is characterized in that: described template crossbeam is i beam or Fang Liang.
5. wooden bamboo matter horizontal shuttering according to claim 4 is installed and removed structure fast, it is characterized in that: the sheet material that veneer or described template, the trapezoidal fill plate that described template, trapezoidal fill plate and the trapezoidal fill plate that falls are formed by multi-layered sheet gummed and the trapezoidal fill plate that falls are spliced by row's pin chips or fine bamboo strip.
6. wooden bamboo matter horizontal shuttering according to claim 1 is installed and removed structure fast, and it is characterized in that: the both ends of described template side are provided with the shrinkage pool groove in order to dismounting, and the medium position of described template side also is provided with the shrinkage pool groove.
7. wooden bamboo matter horizontal shuttering according to claim 6 is installed and removed structure fast, it is characterized in that: described template one side is provided with fin, and another side correspondence of described template is provided with the groove for the butt joint fin.
8. wooden bamboo matter horizontal shuttering according to claim 7 is installed and removed structure fast, it is characterized in that: be arranged with steel bushing in the described shrinkage pool groove.
9. wooden bamboo matter horizontal shuttering according to claim 8 is installed and removed structure fast, it is characterized in that: be equipped with reinforcing bar during described adjacent two square template amalgamations in two groove steel bushings.
10. quick mounting and dismounting method of wooden bamboo matter horizontal shuttering, it is characterized in that: when mounted, earlier form removal device and support post are linked into an integrated entity, after vertically setting one by one then, spread template crossbeam and template successively at support bar, simultaneously spread Fang Liang successively in the support post upper end and fall trapezoidal fill plate, regulate the design height of template by the height of threaded adjusting support bar, the trapezoid fill plate, fall and to begin to lay reinforcing bar etc. after the design height of trapezoidal fill plate and template all regulates; Three to a couple of days after floor is built gets final product the turn support bar, one section 5-30cm distance of template crossbeam decline that it is supported, the trapezoid fill plate of then leaving behind, then other template just is easy to pull down, perhaps stretch into the template of leaving behind in the shrinkage pool groove of template by drag hook, trapezoid fill plate, template are dropped on it have only 5-30cm apart from the template crossbeam, and be unlikely to directly to fall on the ground, removed support post, Fang Liang again in 20-30 then days and fell trapezoidal fill plate.
CN201310230037.9A 2013-06-09 2013-06-09 Wood bamboo matter horizontal shuttering Quick assembling-disassembling structure and method thereof CN103334587B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310230037.9A CN103334587B (en) 2013-06-09 2013-06-09 Wood bamboo matter horizontal shuttering Quick assembling-disassembling structure and method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310230037.9A CN103334587B (en) 2013-06-09 2013-06-09 Wood bamboo matter horizontal shuttering Quick assembling-disassembling structure and method thereof

Publications (2)

Publication Number Publication Date
CN103334587A true CN103334587A (en) 2013-10-02
CN103334587B CN103334587B (en) 2015-11-18

Family

ID=49242789

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310230037.9A CN103334587B (en) 2013-06-09 2013-06-09 Wood bamboo matter horizontal shuttering Quick assembling-disassembling structure and method thereof

Country Status (1)

Country Link
CN (1) CN103334587B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109208898A (en) * 2018-10-09 2019-01-15 东莞市皓奇企业管理服务有限公司 The application method of building combined template
CN109208896A (en) * 2018-10-09 2019-01-15 东莞市皓奇企业管理服务有限公司 Build the application method of removable template
CN109208894A (en) * 2018-10-09 2019-01-15 东莞市皓奇企业管理服务有限公司 Build the application method of removable floor template
CN109208895A (en) * 2018-10-09 2019-01-15 东莞市皓奇企业管理服务有限公司 Combined building shuttering
CN109610816A (en) * 2018-12-12 2019-04-12 广东志特新材料科技有限公司 A kind of aluminium alloy Quick-action type template system and its construction method
WO2019222896A1 (en) * 2018-05-21 2019-11-28 增城市碧桂园物业发展有限公司 Floor panel and construction method thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2220505Y (en) * 1995-03-16 1996-02-21 单军前 Combined steel shuttering
CN2232954Y (en) * 1995-07-11 1996-08-14 唐国成 Building slab quick dismounting pillar
CN2366484Y (en) * 1998-05-26 2000-03-01 黄汉屏 Adjustable type supporting apparatus structure able to be early dismantlement
KR20050029967A (en) * 2003-09-24 2005-03-29 고려개발 주식회사 Support frame assembly for supporting concrete slab form and form setting method using the same
CN203361652U (en) * 2013-06-09 2013-12-25 福建省二建建设集团有限公司 Rapid assembly and disassembly structure of horizontal wood-bamboo formworks

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2220505Y (en) * 1995-03-16 1996-02-21 单军前 Combined steel shuttering
CN2232954Y (en) * 1995-07-11 1996-08-14 唐国成 Building slab quick dismounting pillar
CN2366484Y (en) * 1998-05-26 2000-03-01 黄汉屏 Adjustable type supporting apparatus structure able to be early dismantlement
KR20050029967A (en) * 2003-09-24 2005-03-29 고려개발 주식회사 Support frame assembly for supporting concrete slab form and form setting method using the same
CN203361652U (en) * 2013-06-09 2013-12-25 福建省二建建设集团有限公司 Rapid assembly and disassembly structure of horizontal wood-bamboo formworks

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2019222896A1 (en) * 2018-05-21 2019-11-28 增城市碧桂园物业发展有限公司 Floor panel and construction method thereof
CN109208898A (en) * 2018-10-09 2019-01-15 东莞市皓奇企业管理服务有限公司 The application method of building combined template
CN109208896A (en) * 2018-10-09 2019-01-15 东莞市皓奇企业管理服务有限公司 Build the application method of removable template
CN109208894A (en) * 2018-10-09 2019-01-15 东莞市皓奇企业管理服务有限公司 Build the application method of removable floor template
CN109208895A (en) * 2018-10-09 2019-01-15 东莞市皓奇企业管理服务有限公司 Combined building shuttering
CN109208894B (en) * 2018-10-09 2021-03-09 中国矿业大学工程咨询研究院(江苏)有限公司 Use method of detachable floor formwork of building
CN109208898B (en) * 2018-10-09 2021-03-12 中匠华湄模板制造有限公司 Use method of building combined template
CN109610816A (en) * 2018-12-12 2019-04-12 广东志特新材料科技有限公司 A kind of aluminium alloy Quick-action type template system and its construction method

Also Published As

Publication number Publication date
CN103334587B (en) 2015-11-18

Similar Documents

Publication Publication Date Title
CN103107219A (en) Photovoltaic board system, photovoltaic board fixing device and method for mounting photovoltaic board system
CN102587647A (en) Early-removal formwork system for concreting of constructions comprising beams, plates and columns
CN102900024B (en) Using method for overturning die plate for large-scale concrete structure and
CN104099871A (en) Arching structure of high large-span bridge bailey beams and construction method thereof
CN103306208A (en) Formwork creeping method for novel 1.6 parabola-shaped four-column type hollow variable section high pier
CN102936962A (en) Construction method of slanting cantilever steel structure supported by temporary steel frame
CN106013279B (en) Blower foundation experiment loading unit and method
CN104652236A (en) Combined type channel steel support template rod system and construction method thereof
WO2015158225A1 (en) Easily released pre-cast concrete square pile mould
CN105952154B (en) A kind of concrete-pouring template stent
CN105133833B (en) Stair template and the stair construction method using the stair template
CN103352563B (en) The board-like bar frame gang form of self-supporting and construction method thereof
CN103669655B (en) Deformation joint both walls body concrete pouring construction process
CN203514794U (en) Adjustable supporting leg for large steel molding plate
CN203684658U (en) Early-dismantled template system of dropping prevention plate
CN205907674U (en) Wall template reinforcement bearing structure is led on circulated servicetype ground even wall
CN202100002U (en) Stair formalization die
CN102080384B (en) Construction method for mounting lifter on top plate of underground parking garage
CN103306463B (en) Metal liner concrete air channel construction method
CN104294984A (en) Thin-wall square box anti-floating structure and construction method thereof
CN102277920A (en) Hollow reinforced concrete floor and construction method
CN103882990A (en) Rapid mechanical connecting device for building component and manufacturing method thereof
CN103556826A (en) Construction method of post-cast strip area and floor area supporting systems on two sides of post-cast strip area
CN104453224A (en) Formwork support structure of basement exterior wall and construction method of formwork support structure
CN105696747A (en) Construction method for aerial large-span reinforced concrete beam

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant