CN103334435A - 多桩抱桩器 - Google Patents
多桩抱桩器 Download PDFInfo
- Publication number
- CN103334435A CN103334435A CN2013102610996A CN201310261099A CN103334435A CN 103334435 A CN103334435 A CN 103334435A CN 2013102610996 A CN2013102610996 A CN 2013102610996A CN 201310261099 A CN201310261099 A CN 201310261099A CN 103334435 A CN103334435 A CN 103334435A
- Authority
- CN
- China
- Prior art keywords
- pile
- pile holding
- devices according
- holding devices
- arm
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
Abstract
Description
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201310261099.6A CN103334435B (zh) | 2013-06-26 | 2013-06-26 | 多桩抱桩器 |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201310261099.6A CN103334435B (zh) | 2013-06-26 | 2013-06-26 | 多桩抱桩器 |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN103334435A true CN103334435A (zh) | 2013-10-02 |
| CN103334435B CN103334435B (zh) | 2015-05-20 |
Family
ID=49242634
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201310261099.6A Active CN103334435B (zh) | 2013-06-26 | 2013-06-26 | 多桩抱桩器 |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN103334435B (zh) |
Cited By (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN104563119A (zh) * | 2015-01-19 | 2015-04-29 | 天津港航工程有限公司 | 旋转式水上打桩导架 |
| CN106836209A (zh) * | 2017-03-31 | 2017-06-13 | 中交天和机械设备制造有限公司 | 深层搅拌船的抱桩系统 |
| CN109024560A (zh) * | 2018-07-27 | 2018-12-18 | 南京同力建设集团股份有限公司 | 一种水上钢管桩施工定位装置 |
| CN109024599A (zh) * | 2017-06-12 | 2018-12-18 | 财团法人船舶暨海洋产业研发中心 | 旋臂式样架 |
| CN109024600A (zh) * | 2017-06-12 | 2018-12-18 | 财团法人船舶暨海洋产业研发中心 | 旋臂式样架的运作方法 |
Citations (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| GB2168406A (en) * | 1984-11-09 | 1986-06-18 | Earl & Wright Ltd | Removable layback pile guide |
| JP2006322202A (ja) * | 2005-05-18 | 2006-11-30 | Hitachi Constr Mach Co Ltd | 杭打機 |
| KR100733263B1 (ko) * | 2006-04-29 | 2007-06-28 | 삼보지질 주식회사 | 해상 또는 수상에서 강관의 항타 및 현장타설말뚝의 시공을위한 가이드프레임 장치 |
| KR100773227B1 (ko) * | 2006-05-19 | 2007-11-05 | 삼보지질 주식회사 | 해상 또는 수상에서 강관의 항타 및 현장타설말뚝의 시공을위한 강관 클램핑 장치 |
| JP2011140754A (ja) * | 2010-01-05 | 2011-07-21 | Toa Harbor Works Co Ltd | パイルホルダー台船および杭の打設方法 |
| CN202194142U (zh) * | 2011-08-29 | 2012-04-18 | 上海振华重工集团(南通)有限公司 | 抱桩器 |
| CN202989923U (zh) * | 2012-10-19 | 2013-06-12 | 江苏龙源振华海洋工程有限公司 | 一种适用于海上风机多桩基础施工的多桩抱桩器 |
| CN203361155U (zh) * | 2013-06-26 | 2013-12-25 | 上海振华重工(集团)股份有限公司 | 多桩抱桩器 |
-
2013
- 2013-06-26 CN CN201310261099.6A patent/CN103334435B/zh active Active
Patent Citations (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| GB2168406A (en) * | 1984-11-09 | 1986-06-18 | Earl & Wright Ltd | Removable layback pile guide |
| JP2006322202A (ja) * | 2005-05-18 | 2006-11-30 | Hitachi Constr Mach Co Ltd | 杭打機 |
| KR100733263B1 (ko) * | 2006-04-29 | 2007-06-28 | 삼보지질 주식회사 | 해상 또는 수상에서 강관의 항타 및 현장타설말뚝의 시공을위한 가이드프레임 장치 |
| KR100773227B1 (ko) * | 2006-05-19 | 2007-11-05 | 삼보지질 주식회사 | 해상 또는 수상에서 강관의 항타 및 현장타설말뚝의 시공을위한 강관 클램핑 장치 |
| JP2011140754A (ja) * | 2010-01-05 | 2011-07-21 | Toa Harbor Works Co Ltd | パイルホルダー台船および杭の打設方法 |
| CN202194142U (zh) * | 2011-08-29 | 2012-04-18 | 上海振华重工集团(南通)有限公司 | 抱桩器 |
| CN202989923U (zh) * | 2012-10-19 | 2013-06-12 | 江苏龙源振华海洋工程有限公司 | 一种适用于海上风机多桩基础施工的多桩抱桩器 |
| CN203361155U (zh) * | 2013-06-26 | 2013-12-25 | 上海振华重工(集团)股份有限公司 | 多桩抱桩器 |
Cited By (10)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN104563119A (zh) * | 2015-01-19 | 2015-04-29 | 天津港航工程有限公司 | 旋转式水上打桩导架 |
| CN106836209A (zh) * | 2017-03-31 | 2017-06-13 | 中交天和机械设备制造有限公司 | 深层搅拌船的抱桩系统 |
| CN109024599A (zh) * | 2017-06-12 | 2018-12-18 | 财团法人船舶暨海洋产业研发中心 | 旋臂式样架 |
| CN109024600A (zh) * | 2017-06-12 | 2018-12-18 | 财团法人船舶暨海洋产业研发中心 | 旋臂式样架的运作方法 |
| GB2563464A (en) * | 2017-06-12 | 2018-12-19 | Ship And Ocean Ind R & D Center | Pile guide frame coupled with rotatable arm |
| GB2563465A (en) * | 2017-06-12 | 2018-12-19 | Ship And Ocean Ind R & D Center | Operating method of pile guide frame coupled with rotatable arm |
| GB2563464B (en) * | 2017-06-12 | 2019-07-17 | Ship And Ocean Ind R & D Center | Pile guide frame coupled with rotatable arm |
| GB2563465B (en) * | 2017-06-12 | 2019-07-17 | Ship And Ocean Ind R & D Center | Operating method of pile guide frame coupled with rotatable arm |
| CN109024600B (zh) * | 2017-06-12 | 2020-10-13 | 财团法人船舶暨海洋产业研发中心 | 旋臂式样架的运作方法 |
| CN109024560A (zh) * | 2018-07-27 | 2018-12-18 | 南京同力建设集团股份有限公司 | 一种水上钢管桩施工定位装置 |
Also Published As
| Publication number | Publication date |
|---|---|
| CN103334435B (zh) | 2015-05-20 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN103334435B (zh) | 多桩抱桩器 | |
| CN105464117B (zh) | 旋转式水上打桩导架及水上群桩基础打桩工艺 | |
| CN102556284B (zh) | 吸力贯入式弧形板锚及其安装工具和施工方法 | |
| CN205857223U (zh) | 一种螺旋直桩型海上风机承台式基础结构 | |
| CN209568440U (zh) | 一种翻桩导向器 | |
| CN102079365A (zh) | 一种打桩船 | |
| SE535860C2 (sv) | Förfarande för att framställa ett torn till ett vindkraftverk | |
| CN109469089A (zh) | 一种自带稳桩套管的内插式海上风电导管架基础及施工方法 | |
| CN104805814A (zh) | 自升式平台桩腿的安装方法 | |
| CN101402393B (zh) | 风力发电机安装专用作业平台 | |
| CN105350560A (zh) | 一种海上测风雷达基础结构及其安装方法 | |
| CN103215956B (zh) | 一种多桩抱桩器及浅海风电场多桩导管架基础施工方法 | |
| CN105804111B (zh) | 一种不等长腿海上风电导管架基础及其施工方法 | |
| CN203361155U (zh) | 多桩抱桩器 | |
| CN209538210U (zh) | 一种自带稳桩套管的内插式海上风电导管架基础 | |
| CN103726505B (zh) | 海上风电场风机基础 | |
| CN106930291A (zh) | 一种海上多桩限位架及其施工方法 | |
| CN204510221U (zh) | 旋转式水上打桩导架 | |
| CN209503282U (zh) | 一种用于焊接风电基础塔筒的旋转式工作平台 | |
| CN107119687A (zh) | 一种可大幅度旋转的潮间带沉桩限位架及其施工方法 | |
| CN110397072A (zh) | 一种带有螺旋贯入装置的厚壁混凝土筒型基础及其施工方法 | |
| CN110439024A (zh) | 一种用于海上风机的螺旋桩复合筒型基础及其施工方法 | |
| CN201810022U (zh) | 内悬浮内拉线双摇臂360°旋转抱杆 | |
| CN205046567U (zh) | 海上风机基础结构 | |
| CN210827544U (zh) | 一种利用辅助桩改进筒型基础承载性能的复合基础 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| EE01 | Entry into force of recordation of patent licensing contract | ||
| EE01 | Entry into force of recordation of patent licensing contract |
Application publication date: 20131002 Assignee: Shanghai Zhenhua Heavy Industry Group (Nantong) Transmission Machinery Co.,Ltd. Assignor: Shanghai Zhenhua Heavy Industries (Group) Co., Ltd. Contract record no.: 2019310000035 Denomination of invention: Multi-pile pile gripper and multi-pile guide pipe frame foundation construction method for shallow wind power farm Granted publication date: 20150520 License type: Exclusive License Record date: 20190417 |