CN103326304A - 10kV charged drainage wire supporting device - Google Patents

10kV charged drainage wire supporting device Download PDF

Info

Publication number
CN103326304A
CN103326304A CN2013102469705A CN201310246970A CN103326304A CN 103326304 A CN103326304 A CN 103326304A CN 2013102469705 A CN2013102469705 A CN 2013102469705A CN 201310246970 A CN201310246970 A CN 201310246970A CN 103326304 A CN103326304 A CN 103326304A
Authority
CN
China
Prior art keywords
drainage thread
resin material
screw rod
thread bracing
drainage wire
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2013102469705A
Other languages
Chinese (zh)
Other versions
CN103326304B (en
Inventor
杨勇奇
楼汝群
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
YIWU ELECTRIC POWER BUREAU
Jinhua Electric Power Bureau
State Grid Corp of China SGCC
Original Assignee
YIWU ELECTRIC POWER BUREAU
Jinhua Electric Power Bureau
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by YIWU ELECTRIC POWER BUREAU, Jinhua Electric Power Bureau, State Grid Corp of China SGCC filed Critical YIWU ELECTRIC POWER BUREAU
Priority to CN201310246970.5A priority Critical patent/CN103326304B/en
Publication of CN103326304A publication Critical patent/CN103326304A/en
Application granted granted Critical
Publication of CN103326304B publication Critical patent/CN103326304B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Suspension Of Electric Lines Or Cables (AREA)

Abstract

The invention discloses a 10kV charged drainage wire supporting device which comprises a concave block, a moving mechanism, a drainage wire supporting frame made of epoxy resin materials and a drainage wire fixing mechanism. The concave block is provided with an upper elastic piece and a lower elastic piece, the drainage wire supporting frame made of the epoxy resin materials is mounted between the upper elastic piece and the lower elastic piece through the moving mechanism, and the drainage wire supporting frame made of the epoxy resin materials is connected with the drainage wire fixing mechanism through an elastic ring. The problems that the safety distance is not enough in the operating process that a lightning arrester and a falling type fuse are replaced, operating steps are complex, time and labor are consumed, and personal safety is seriously harmed are solved. Working processes are simplified, the working time of replacing is shortened, working efficiency is improved, and a safe working distance is guaranteed.

Description

一种10kV带电引流线支撑装置A 10kV Live Drainage Wire Supporting Device

技术领域 technical field

本发明涉及一种10kV带电引流线支撑装置。  The invention relates to a support device for a 10kV live current wire. the

背景技术 Background technique

随着电力事业的发展,用电可靠率以及优质服务显得越来越重要,带电作业在电力生产中的比重日渐增加,特别是事故抢修和电力设备的更换维护,利用带电作业可以有效地减少不必要的停电时间,提高用电可靠率,保障人民生活用电。然而由于电气设备的自然老化以及不可抗拒外力的影响,日常工作中常常遇见避雷器和跌落式熔断器故障或损坏,因此需要班组进行日常维护,对设备进行更换。而更换避雷器和跌落式熔断器作业流程繁琐,绝缘措施必须设置到位,为保障人身安全需将连接在主导线上的引流线拆除。  With the development of the electric power industry, the reliability of power consumption and high-quality service are becoming more and more important. The proportion of live work in electric power production is increasing day by day, especially in emergency repairs and replacement and maintenance of power equipment. The use of live work can effectively reduce the Necessary power outage time, improve the reliability of power consumption, and ensure the power consumption of people's lives. However, due to the natural aging of electrical equipment and the influence of irresistible external forces, lightning arresters and dropout fuses are often faulty or damaged in daily work, so the team needs to perform daily maintenance and replace the equipment. However, the operation process of replacing lightning arresters and dropout fuses is cumbersome, and insulation measures must be set in place. In order to ensure personal safety, the drain wires connected to the main wires must be removed. the

    在以往的作业过程中,更换避雷器和跌落式熔断器时需将连接在主导线上的引流线拆下,然后再对避雷器和跌落式熔断器进行检查和更换。在操作过程中存在着安全距离不足等危险因素,并且操作步骤繁琐,耗时耗力,大大危害到人身安全,导致更换避雷器和跌落式熔断器困难重重,有以下几个原因:1、操作人员利用绝缘斗臂车在作业点与主导线之间上下来回作业既增加了工作强度又重复操作,容易引起主导线和引流线的损伤。2、因地形条件特殊与工作点本身高度已经到达最大负荷率,加上引流线长度造成斗臂车闭锁引起无法完成工作。3、由于作业空间狭小在提取引流线时可能与相间(或线对地)之间引起二次事故。因此如何有效得解决换避雷器和跌落式熔断器问题,将大大有效提高工作效率。  In the past work process, when replacing the arrester and drop-out fuse, it is necessary to remove the drain wire connected to the main line, and then check and replace the arrester and drop-out fuse. In the process of operation, there are dangerous factors such as insufficient safety distance, and the operation steps are cumbersome, time-consuming and labor-intensive, which greatly endangers personal safety and makes it difficult to replace lightning arresters and drop-out fuses. There are several reasons: 1. Operators Utilizing the insulated arm truck to work up and down between the operating point and the main conductor not only increases the work intensity but also repeats the operation, which may easily cause damage to the main conductor and the drain wire. 2. Due to the special terrain conditions and the height of the working point itself has reached the maximum load rate, plus the length of the drainage line, the bucket arm truck is blocked and cannot complete the work. 3. Due to the narrow working space, secondary accidents may be caused between phase-to-phase (or line-to-ground) when extracting the drainage line. Therefore, how to effectively solve the problem of replacing lightning arresters and dropout fuses will greatly improve work efficiency. the

   the

发明内容 Contents of the invention

本发明的目的在于提供了一种10kV带电引流线支撑装置,解决了目前避雷器和跌落式熔断器时工序复杂,更换效率低和无法满足安全距离等问题,具有简化了工作工序,既缩短了更换的工作时间,又保证了安全工作距离的条件的特点。  The purpose of the present invention is to provide a 10kV electrified drain line support device, which solves the problems of complex procedures, low replacement efficiency and failure to meet the safety distance for current lightning arresters and drop-out fuses. It simplifies the working procedures and shortens the replacement time The working hours, but also to ensure the characteristics of the conditions of the safe working distance. the

为了达到上述目的,本发明的技术方案是:  In order to achieve the above object, technical scheme of the present invention is:

一种10kV带电引流线支撑装置,包括凹形块、活动机构、环氧树脂材料制成的引流线支撑架和引流线固定机构;其中所述的凹形块上安装有上弹性片和下弹性片,所述的上弹性片和下弹性片之间通过活动机构安装有环氧树脂材料制成的引流线支撑架;所述的环氧树脂材料制成的引流线支撑架通过弹性圈与引流线固定机构相连。 A 10kV live drain wire support device, including a concave block, a movable mechanism, a drain wire support frame made of epoxy resin material, and a drain wire fixing mechanism; wherein the concave block is equipped with an upper elastic piece and a lower elastic sheet, and a drainage wire support frame made of epoxy resin material is installed between the upper elastic sheet and the lower elastic sheet through a movable mechanism; the drainage wire support frame made of epoxy resin material passes through the elastic ring and drainage The line fixing mechanism is connected.

所述的活动机构包括扳手,插销、第一螺杆和螺母;所述的扳手上部设有凸块,且扳手的下部呈半椭圆,所述的扳手的下部和第一螺杆的上端开设有通孔;所述的插销依次穿过扳手的下部和第一螺杆的上端的通孔,所述的第一螺杆依次穿过上弹性片、环氧树脂材料制成的引流线支撑架和下弹性片后与螺母固连。  The movable mechanism includes a wrench, a latch, a first screw and a nut; the upper part of the wrench is provided with a bump, and the lower part of the wrench is semi-elliptical, and the lower part of the wrench and the upper end of the first screw are provided with a through hole ; The bolts pass through the bottom of the wrench and the through hole on the upper end of the first screw in turn, and the first screw passes through the upper elastic sheet, the drainage wire support frame made of epoxy resin material and the lower elastic sheet successively Fastened with nuts. the

所述的引流线固定机构包括固定架、第二螺杆、活动块、第三螺杆和辅助杆,所述的固定架下端固定安装有第二螺杆,所述的第二螺杆穿过套装在环氧树脂材料制成的引流线支撑架上的弹性圈与环氧树脂材料制成的引流线支撑架固连;所述的固定架上安装有第三螺杆,所述的第三螺杆一端安装有活动块,且第三螺杆的另一端安装有辅助杆。  The drain wire fixing mechanism includes a fixed frame, a second screw, a movable block, a third screw and an auxiliary rod. The lower end of the fixed frame is fixedly equipped with a second screw, and the second screw passes through the epoxy The elastic ring on the drainage wire support frame made of resin material is fixedly connected with the drainage wire support frame made of epoxy resin material; a third screw is installed on the fixed frame, and a movable screw is installed at one end of the third screw. block, and the other end of the third screw is equipped with an auxiliary rod. the

所述的上弹性片和下弹性片之间安装有2个螺栓。  Two bolts are installed between the upper elastic sheet and the lower elastic sheet. the

所述的环氧树脂材料制成的引流线支撑架为长80cm的环氧树脂材料制成的引流线支撑架。  The drainage wire support frame made of epoxy resin material is a drainage wire support frame made of epoxy resin material with a length of 80 cm. the

本发明的有益效果:本发明提供的一种10kV带电引流线支撑装置,解决了在更换避雷器和跌落式熔断器的操作过程中存在3个重要原因:1、操作人员利用绝缘斗臂车在作业点与主导线之间上下来回作业既增加了工作强度又重复操作,容易引起主导线和引流线的损伤。2、因地形条件特殊与工作点本身高度已经到达最大负荷率,加上引流线长度造成斗臂车闭锁引起无法完成工作。3、由于作业空间狭小在提取引流线时可能与相间(或线对地)之间引起二次事故。具有简化了工作工序,既缩短了更换的工作时间,提高工作效率,又保证了安全工作距离的条件的特点。  Beneficial effect of the present invention: a kind of 10kV electrified drain wire supporting device provided by the present invention solves three important reasons in the operation process of replacing the lightning arrester and the drop-out fuse: 1. The operator utilizes the insulating arm truck to work The up and down operation between the point and the main wire not only increases the work intensity but also repeats the operation, which is easy to cause damage to the main wire and the drainage wire. 2. Due to the special terrain conditions and the height of the working point itself has reached the maximum load rate, plus the length of the drainage line, the bucket arm truck is blocked and cannot complete the work. 3. Due to the narrow working space, secondary accidents may be caused between phase-to-phase (or line-to-ground) when extracting the drainage line. It has the characteristics of simplifying the working procedure, not only shortening the working time for replacement, improving working efficiency, but also ensuring the condition of safe working distance. the

附图说明 Description of drawings

图1是本发明的结构示意图;  Fig. 1 is a structural representation of the present invention;

图2是本发明的活动机构的放大示意图; Fig. 2 is the enlarged schematic diagram of movable mechanism of the present invention;

图3是图2的右视图; Fig. 3 is the right view of Fig. 2;

图4是本发明的引流线固定机构的放大示意图; Fig. 4 is the enlarged schematic view of the drainage wire fixing mechanism of the present invention;

图5是本发明的第二螺杆与环氧树脂材料制成的引流线支撑架固定的放大示意图; Fig. 5 is the enlarged schematic diagram of fixing the second screw rod of the present invention to the drainage wire support frame made of epoxy resin material;

图6是本发明在更换跌落式熔断器时的使用状态的结构示意图; Fig. 6 is a schematic structural view of the present invention in use when replacing a drop-out fuse;

图7是本发明在更换避雷器时的使用状态的结构示意图。 Fig. 7 is a schematic structural view of the present invention in use when replacing the lightning arrester.

   the

具体实施方式 Detailed ways

实施例1  Example 1

如图1-5所示,本实施例的一种10kV带电引流线支撑装置,包括凹形块1、活动机构2、长为80cm的环氧树脂材料制成的引流线支撑架3和引流线固定机构4.其中所述的凹形块1上安装有上弹性片5和下弹性片6,所述的上弹性片5和下弹性片6之间通过活动机构2安装有长为80cm的环氧树脂材料制成的引流线支撑架3,所述的上弹性片5和下弹性片6之间安装有2个螺栓18,用来限制长为80cm的环氧树脂材料制成的引流线支撑架活动范围。所述的长为80cm的环氧树脂材料制成的引流线支撑架3通过弹性圈7与引流线固定机构4相连。 As shown in Figures 1-5, a 10kV live drain wire support device in this embodiment includes a concave block 1, a movable mechanism 2, a drain wire support frame 3 made of epoxy resin material with a length of 80 cm, and a drain wire Fixing mechanism 4. The upper elastic sheet 5 and the lower elastic sheet 6 are installed on the concave block 1, and a ring with a length of 80 cm is installed between the upper elastic sheet 5 and the lower elastic sheet 6 through the movable mechanism 2. The drainage wire support frame 3 made of epoxy resin material, two bolts 18 are installed between the upper elastic sheet 5 and the lower elastic sheet 6, used to limit the drainage wire support made of epoxy resin material with a length of 80cm range of activities. The drainage wire support frame 3 made of epoxy resin material with a length of 80 cm is connected with the drainage wire fixing mechanism 4 through an elastic ring 7 .

所述的活动机构2包括扳手8,插销9、第一螺杆10和螺母11。所述的扳手8上部设有凸块81,所述的凸块81为了方便扳动扳手8,且扳手8的下部呈半椭圆,所述的扳手8的下部和第一螺杆10的上端开设有通孔;所述的插销9依次穿过扳手8的下部和第一螺杆10的上端的通孔,所述的第一螺杆10依次穿过上弹性片5、长为80cm环氧树脂材料制成的引流线支撑架3和下弹性片6后与螺母11固定安装。利用椭圆的2个直径长短不一的特点,当往上扳动扳手8至扳手8与第一螺杆10在同一直线上位置时,使得上弹性片5和下弹性片6都往长为80cm的环氧树脂材料制成的引流线支撑架3紧贴,达到固定长为80cm的环氧树脂材料制成的引流线支撑架3的目的。当往下扳动扳手8过程中,使得上弹性片5和下弹性片6都往长为80cm的环氧树脂材料制成的引流线支撑架3松掉,那么长为80cm的环氧树脂材料制成的引流线支撑架3可以根据工作需要转动相应的角度。  The movable mechanism 2 includes a wrench 8 , a latch 9 , a first screw rod 10 and a nut 11 . The upper part of the wrench 8 is provided with a bump 81, the bump 81 is used to pull the wrench 8 conveniently, and the lower part of the wrench 8 is semi-elliptical, and the lower part of the wrench 8 and the upper end of the first screw rod 10 are provided with Through hole: described latch 9 passes through the bottom of wrench 8 and the through hole of the upper end of first screw rod 10 successively, and described first screw rod 10 passes through upper elastic piece 5 successively, and is long and is made of epoxy resin material of 80cm After the drainage wire support frame 3 and the lower elastic sheet 6 are fixedly installed with the nut 11. Utilizing the characteristics of the two diameters of the ellipse, when the wrench 8 is pulled upward until the wrench 8 and the first screw 10 are on the same straight line, the upper elastic sheet 5 and the lower elastic sheet 6 are both 80cm long. The drainage wire support frame 3 made of epoxy resin material is close to each other, so as to achieve the purpose of fixing the drainage wire support frame 3 made of epoxy resin material with a length of 80 cm. When the wrench 8 is pulled down, the upper elastic sheet 5 and the lower elastic sheet 6 are all loosened to the drainage wire support frame 3 made of epoxy resin material with a length of 80 cm, and then the epoxy resin material with a length of 80 cm is loosened. The manufactured drainage wire support frame 3 can be rotated at a corresponding angle according to the work requirements. the

所述的引流线固定机构4包括固定架13、第二螺杆14、活动块15、第三螺杆16和辅助杆17,所述的固定架13下端固定安装有第二螺杆14,所述的第二螺杆14穿过套装在长为80cm的环氧树脂材料制成的引流线支撑架3上的弹性圈7与长为80cm的环氧树脂材料制成的引流线支撑架3固连;所述的固定架13上安装有第三螺杆16,所述的第三螺杆16一端安装有活动块15,且所述的第三螺杆16的另一端安装有辅助杆17。通过移动弹性圈7可以调整固定架13在长为80cm的环氧树脂材料制成的引流线支撑架3上的位置,确保安全的工作距离,当固定架13调整到所需工作位置时,通过旋转第二螺杆14,使得弹性圈7变形紧贴长为80cm的环氧树脂材料制成的引流线支撑架3管壁,到达固定固定架13的目的。所述的固定架13上安装有第三螺杆16,所述的第三螺杆16内侧端安装有活动块15,且所述的第三螺杆16的外侧端安装有辅助杆17,通过辅助杆17绕第三螺杆16做360度圆周运动,可以使第三螺杆16在固定架13上旋进旋出,使得安装在第三螺杆16上的活动块15在固定架13上在来回移动,可以固定和松开位于活动块15和固定架13之间的上引线23或下引线24。  The drain wire fixing mechanism 4 includes a fixed frame 13, a second screw 14, a movable block 15, a third screw 16 and an auxiliary rod 17, the lower end of the fixed frame 13 is fixedly equipped with a second screw 14, and the second screw 14 is fixedly installed on the lower end of the fixed frame 13. Two screw rods 14 pass through the elastic ring 7 that is sleeved on the drainage wire support frame 3 that is made of epoxy resin material that is 80 cm long and are fixedly connected with the drainage wire support frame 3 that is made of epoxy resin material that is 80 cm long; A third screw rod 16 is installed on the fixed frame 13 , a movable block 15 is installed at one end of the third screw rod 16 , and an auxiliary rod 17 is installed at the other end of the third screw rod 16 . By moving the elastic ring 7, the position of the fixed mount 13 on the drainage wire support frame 3 made of epoxy resin material with a length of 80 cm can be adjusted to ensure a safe working distance. When the fixed mount 13 is adjusted to the desired working position, the Rotate the second screw rod 14 so that the deformation of the elastic ring 7 is close to the pipe wall of the drainage wire support frame 3 made of epoxy resin material with a length of 80 cm, so as to achieve the purpose of fixing the fixed frame 13 . A third screw rod 16 is installed on the fixed mount 13, a movable block 15 is installed at the inner end of the third screw rod 16, and an auxiliary rod 17 is installed at the outer end of the third screw rod 16, through which the auxiliary rod 17 Do 360-degree circular motion around the third screw rod 16, the third screw rod 16 can be screwed in and out on the fixed mount 13, so that the movable block 15 installed on the third screw rod 16 can move back and forth on the fixed mount 13, and can be fixed And loosen the upper lead wire 23 or the lower lead wire 24 between the movable block 15 and the fixed frame 13. the

如图6所示,本实施例在使用过程中,当需要更换跌落式熔断器22时,先把10kV带电引流线支撑装置上的凹形块1通过螺栓20固定安装在电线杆12上的角铁21上且使其得满足与电线杆的距离达到40cm的安全工作距离,通过弹性圈7在长为80cm的环氧树脂材料制成的引流线支撑架3上下移动,来调整引流线固定机构4在长为80cm的环氧树脂材料制成的引流线支撑架3上的位置,使其满足引流线固定机构4与主线上的连接的角铁27的距离达到40cm的安全工作距离,将原先固定在跌落式熔断器22上的上引线23拆装到引流线固定机构4上的活动块15和固定架13之间,通过顺时针旋转辅助杆17使第三螺杆16上的活动块15往固定架13上靠拢,来夹紧位于活动块15和固定架13之间的上引线23。随后即可进行更新的换跌落式熔断器22,更换好后,通过顺时针旋转辅助杆17使第三螺杆16上的活动块15往固定架13上远离,来松开位于活动块15和固定架13之间的上引线23,将上引流线23安装到新的换跌落式熔断器22,最后拆下10kV带电引流线支撑装置,完成工作。  As shown in Figure 6, during use of this embodiment, when the drop-out fuse 22 needs to be replaced, the concave block 1 on the 10kV live current wire support device is fixedly installed on the corner of the utility pole 12 through the bolt 20 first. On the iron 21 and make it meet the safe working distance of 40cm with the distance from the utility pole, the drainage wire support frame 3 made of epoxy resin material with a length of 80cm is moved up and down by the elastic ring 7 to adjust the drainage wire fixing mechanism 4. The position on the drain wire support frame 3 made of epoxy resin material with a length of 80 cm is such that the distance between the drain wire fixing mechanism 4 and the connected angle iron 27 on the main line reaches a safe working distance of 40 cm. The upper lead wire 23 fixed on the drop-out fuse 22 is disassembled between the movable block 15 and the fixed frame 13 on the drain wire fixing mechanism 4, and the movable block 15 on the third screw rod 16 is moved toward by rotating the auxiliary rod 17 clockwise. Close on the fixed frame 13, clamp the upper lead wire 23 between the movable block 15 and the fixed frame 13. Then the drop-out fuse 22 that can be updated can be replaced. After the replacement, the movable block 15 on the third screw rod 16 is moved away from the fixed frame 13 by rotating the auxiliary rod 17 clockwise to loosen the movable block 15 and the fixed frame. The upper lead wire 23 between the frames 13, the upper drain wire 23 is installed to a new drop-out fuse 22, and finally the 10kV live drain wire support device is pulled down to complete the work. the

如图7所示,当需要更换避雷器25时,先把10kV带电引流线支撑装置上的凹形块1通过螺栓20固定安装在电线杆12上的角铁21上,且使其满足与电线杆12的距离达到40cm的安全工作距离,通过弹性圈7在长为80cm的环氧树脂材料制成的引流线支撑架3上下移动,来调整引流线固定机构4在长为80cm的环氧树脂材料制成的引流线支撑架3上的位置,使得满足引流线固定机构4与固定跌落式熔断器22的架子26的距离达到40cm的安全工作距离,安装好之后。将原先固定在避雷器25上的下引线24拆装到引流线固定机构4上的活动块15和固定架13之间,通过旋转辅助杆17使第三螺杆16上的活动块15往固定架13上靠拢,来夹紧位于活动块15和固定架13之间的下引线24,随后即可进行更换避雷器25,更换好后,通过逆时针旋转辅助杆17使第三螺杆16上的活动块15往固定架13上远离,来松开位于活动块15和固定架13之间的下引线24,将下引流线24安装到新的避雷器5,最后拆下引流线支撑装置,完成工作。  As shown in Figure 7, when the lightning arrester 25 needs to be replaced, the concave block 1 on the support device of the 10kV live lead wire is fixed and installed on the angle iron 21 on the utility pole 12 through the bolt 20, and it meets the requirements of the utility pole. The distance of 12 reaches the safe working distance of 40cm, and the drainage wire support frame 3 made of epoxy resin material with a length of 80cm is moved up and down by the elastic ring 7 to adjust the drainage wire fixing mechanism 4 in the epoxy resin material with a length of 80cm. The position on the drain wire support frame 3 made is such that the distance between the drain wire fixing mechanism 4 and the shelf 26 fixing the dropout fuse 22 reaches a safe working distance of 40 cm, after installation. Disassemble the lower lead wire 24 originally fixed on the lightning arrester 25 between the movable block 15 and the fixed frame 13 on the drain wire fixing mechanism 4, and make the movable block 15 on the third screw rod 16 move toward the fixed frame 13 by rotating the auxiliary rod 17 Close up to clamp the lower lead wire 24 between the movable block 15 and the fixed frame 13, and then replace the arrester 25. After replacement, the movable block 15 on the third screw rod 16 can be rotated counterclockwise. Move away from the fixed mount 13 to unclamp the lower lead wire 24 between the movable block 15 and the fixed mount 13, install the lower drain wire 24 to the new lightning arrester 5, and finally remove the drain wire support device to complete the work. the

通过上述实施例,本发明提供的一种10kV带电引流线支撑装置,解决了在更换避雷器和跌落式熔断器的操作过程中存在着安全距离不足,并且操作步骤繁琐,耗时耗力,严重危害到人身安全等因素,具有简化了工作工序,既缩短了更换的工作时间,提高工作效率,又保证了安全工作距离的条件的特点。  Through the above-mentioned embodiments, the present invention provides a 10kV live current wire support device, which solves the problem of insufficient safety distance in the operation process of replacing lightning arresters and drop-out fuses, and the operation steps are cumbersome, time-consuming and labor-intensive, and seriously endanger the To personal safety and other factors, it has the characteristics of simplifying the working process, shortening the working time of replacement, improving work efficiency, and ensuring the conditions of safe working distance. the

Claims (6)

1. the charged drainage thread bracing or strutting arrangement of 10kV is characterized in that: comprise drainage thread bracing frame (3) and drainage thread fixed mechanism (4) that spill piece (1), movable device (2), epoxide resin material are made; Flexure strip (5) and following flexure strip (6) are installed on the wherein said spill piece (1), and described going up between flexure strip (5) and the following flexure strip (6) is equipped with the drainage thread bracing frame (3) that epoxide resin material is made by movable device (2); The drainage thread bracing frame (3) that described epoxide resin material is made links to each other with drainage thread fixed mechanism (4) by elastic ring (7).
2. the charged drainage thread bracing or strutting arrangement of a kind of 10kV according to claim 1 is characterized in that described movable device (2) comprises spanner (8), latch (9), first screw rod (10) and nut (11); Described spanner (8) top is provided with projection (81), and the bottom of spanner (8) is semiellipse, and the upper end of the bottom of described spanner (8) and first screw rod (10) offers through hole; Described latch (9) passes the through hole of the upper end of the bottom of spanner (8) and first screw rod (10) successively, and described first screw rod (10) passes drainage thread bracing frame (3) and the following flexure strip (6) and nut (11) fixed installation that flexure strip (5), epoxide resin material are made successively.
3. the charged drainage thread bracing or strutting arrangement of a kind of 10kV according to claim 1, it is characterized in that described drainage thread fixed mechanism (4) comprises fixed mount (13), second screw rod (14), movable block (15), the 3rd screw rod (16) and auxiliary rod (17), described fixed mount (13) lower end is installed with second screw rod (14), and described second screw rod (14) passes the drainage thread bracing frame (3) that the elastic ring (7) that is sleeved on the drainage thread bracing frame (3) that epoxide resin material makes and epoxide resin material make and is connected; The 3rd screw rod (16) is installed on the described fixed mount (13), and described the 3rd screw rod (16) one ends are equipped with movable block (15), and the other end of the 3rd screw rod (16) is equipped with auxiliary rod (17).
4. the charged drainage thread bracing or strutting arrangement of a kind of 10kV according to claim 1 is characterized in that described going up between flexure strip (5) and the following flexure strip (6) is equipped with 2 bolts (18).
5. the charged drainage thread bracing or strutting arrangement of a kind of 10kV according to claim 1 is characterized in that drainage thread bracing frame (3) length that described epoxide resin material is made is the drainage thread bracing frame (3) that the above epoxide resin material of 40cm is made.
6. the charged drainage thread bracing or strutting arrangement of a kind of 10kV according to claim 1 is characterized in that the long drainage thread bracing frame of making for the epoxide resin material of 80cm (3) of drainage thread bracing frame (3) that described epoxide resin material makes.
CN201310246970.5A 2013-06-20 2013-06-20 10kV charged drainage wire supporting device Active CN103326304B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310246970.5A CN103326304B (en) 2013-06-20 2013-06-20 10kV charged drainage wire supporting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310246970.5A CN103326304B (en) 2013-06-20 2013-06-20 10kV charged drainage wire supporting device

Publications (2)

Publication Number Publication Date
CN103326304A true CN103326304A (en) 2013-09-25
CN103326304B CN103326304B (en) 2014-09-17

Family

ID=49194910

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310246970.5A Active CN103326304B (en) 2013-06-20 2013-06-20 10kV charged drainage wire supporting device

Country Status (1)

Country Link
CN (1) CN103326304B (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104638564A (en) * 2015-01-23 2015-05-20 国网山西省电力公司晋城供电公司 Insulated fixing device for use in live replacement of drop-out fuse
CN104967048A (en) * 2015-06-24 2015-10-07 国网天津市电力公司 Thirty-five kV insulation locking rod fixing device special for live-line work and usage method therefor
CN105514868A (en) * 2016-01-21 2016-04-20 国网上海市电力公司 Insulated fixing support of upper lead of fuse wire
CN112350217A (en) * 2020-11-18 2021-02-09 广西电网有限责任公司贵港供电局 Special support for bypass drainage wire
CN112444649A (en) * 2020-12-10 2021-03-05 广东电网有限责任公司广州供电局 Insulating support
CN112564020A (en) * 2020-11-02 2021-03-26 国网浙江省电力有限公司宁波供电公司 Drainage wire fixing auxiliary device for replacing drop-out fuse or lightning arrester
CN113555815A (en) * 2021-06-15 2021-10-26 广东电网有限责任公司广州供电局 Outdoor high-voltage lead fixing device

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1780079A (en) * 2004-11-25 2006-05-31 高裕彬 Crimp tension clamp
CN201466573U (en) * 2009-07-19 2010-05-12 孙兵 Live working rotating hook rod for high-voltage line tower
JP2012105473A (en) * 2010-11-11 2012-05-31 Tdk Corp Lead wire attaching structure and lead wire attaching member
CN202696052U (en) * 2012-06-29 2013-01-23 武汉里得科技有限公司 Drainage wire fixing device
CN203339640U (en) * 2013-06-20 2013-12-11 国家电网公司 10kV charged drainage wire supporting device

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1780079A (en) * 2004-11-25 2006-05-31 高裕彬 Crimp tension clamp
CN201466573U (en) * 2009-07-19 2010-05-12 孙兵 Live working rotating hook rod for high-voltage line tower
JP2012105473A (en) * 2010-11-11 2012-05-31 Tdk Corp Lead wire attaching structure and lead wire attaching member
CN202696052U (en) * 2012-06-29 2013-01-23 武汉里得科技有限公司 Drainage wire fixing device
CN203339640U (en) * 2013-06-20 2013-12-11 国家电网公司 10kV charged drainage wire supporting device

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104638564A (en) * 2015-01-23 2015-05-20 国网山西省电力公司晋城供电公司 Insulated fixing device for use in live replacement of drop-out fuse
CN104967048A (en) * 2015-06-24 2015-10-07 国网天津市电力公司 Thirty-five kV insulation locking rod fixing device special for live-line work and usage method therefor
CN104967048B (en) * 2015-06-24 2017-03-29 国网天津市电力公司 A kind of special 35kV insulated lock levers fixing device of livewire work and its using method
CN105514868A (en) * 2016-01-21 2016-04-20 国网上海市电力公司 Insulated fixing support of upper lead of fuse wire
CN112564020A (en) * 2020-11-02 2021-03-26 国网浙江省电力有限公司宁波供电公司 Drainage wire fixing auxiliary device for replacing drop-out fuse or lightning arrester
CN112350217A (en) * 2020-11-18 2021-02-09 广西电网有限责任公司贵港供电局 Special support for bypass drainage wire
CN112350217B (en) * 2020-11-18 2022-06-24 广西电网有限责任公司贵港供电局 Special support for bypass drainage wire
CN112444649A (en) * 2020-12-10 2021-03-05 广东电网有限责任公司广州供电局 Insulating support
CN113555815A (en) * 2021-06-15 2021-10-26 广东电网有限责任公司广州供电局 Outdoor high-voltage lead fixing device
CN113555815B (en) * 2021-06-15 2023-01-20 广东电网有限责任公司广州供电局 Outdoor high voltage lead wire fixing device

Also Published As

Publication number Publication date
CN103326304B (en) 2014-09-17

Similar Documents

Publication Publication Date Title
CN103326304B (en) 10kV charged drainage wire supporting device
CN205195145U (en) Support is changed to insulator
CN103066531A (en) Supporting frame for 10 KV line live wire
CN203339640U (en) 10kV charged drainage wire supporting device
CN203481707U (en) Upper pile head drainage wire fixing rod
CN202423590U (en) 750kV high-reliability grounding wire device
CN106129901A (en) A kind of 35kV circuit single pole porcelain pole arm repairing instrument
CN204045535U (en) A kind of alternative having damaged fuse switch
CN107871938B (en) Bypass shunt bridging device for double-circuit and multi-circuit line tension-resistant yoke plate
CN205314654U (en) Reinforcement iron tower of power transmission sequence
CN201629518U (en) Arrester replacing device
CN203406589U (en) Concrete pole grounding lead protection device
CN105977860B (en) A kind of replacement overhead transmission line composite cross-arm insulator device and method
CN103594988B (en) 500kV transformer substation tubular busbar deflection correction method
CN207490125U (en) Double back, multi circuit transmission lines strain insulator yoke plate by-pass shunt bridging device
CN205544113U (en) Cross arm for transmission tower
CN203352055U (en) Electric pole grounding downlead lifting apparatus
CN204144800U (en) The special cross-arm card of a kind of ZML type tower
CN203589426U (en) Lifting device for mounting grounding wire hanging hook
CN204011787U (en) High voltage substation protective device
CN102358593A (en) Iron tower gap propping device and preparation method thereof
CN207234284U (en) Pillar insulator replaces instrument
CN201312079Y (en) Clamping apparatus for live line replacement of suspended insulator in middle of 500KV untypical tangent tower via splicing method
CN207234282U (en) On-load replaces the specific purpose tool of fuse switch
CN104051985A (en) Device and method for replacing charged roller bottle in 10 kV power distribution network

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent of invention or patent application
CB02 Change of applicant information

Address after: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Applicant after: State Grid Corporation of China

Applicant after: YIWU POWER SUPPLY COMPANY OF STATE GRID ZHEJIANG ELECTRIC POWER COMPANY

Applicant after: Jinhua Power Supply Company, State Grid Zhejiang Electric Power Company

Address before: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Applicant before: State Grid Corporation of China

Applicant before: Yiwu Electric Power Bureau

Applicant before: Jinhua Power Industry Bureau

C14 Grant of patent or utility model
GR01 Patent grant