CN103323784B - Monitoring system for battery test - Google Patents

Monitoring system for battery test Download PDF

Info

Publication number
CN103323784B
CN103323784B CN201310248014.0A CN201310248014A CN103323784B CN 103323784 B CN103323784 B CN 103323784B CN 201310248014 A CN201310248014 A CN 201310248014A CN 103323784 B CN103323784 B CN 103323784B
Authority
CN
China
Prior art keywords
layer
test
monitoring
battery
execution
Prior art date
Application number
CN201310248014.0A
Other languages
Chinese (zh)
Other versions
CN103323784A (en
Inventor
潘天天
温家鹏
于勤录
冯韬
刘军
吴齐会
Original Assignee
北京优科利尔能源设备有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 北京优科利尔能源设备有限公司 filed Critical 北京优科利尔能源设备有限公司
Priority to CN201310248014.0A priority Critical patent/CN103323784B/en
Publication of CN103323784A publication Critical patent/CN103323784A/en
Application granted granted Critical
Publication of CN103323784B publication Critical patent/CN103323784B/en

Links

Abstract

The invention discloses a monitoring system for a battery test. The functions of relative systems are achieved through the arrangement of an execution system layer, a monitoring system layer and an analysis system layer, meanwhile, the above systems can be extended flexibly, composite control is conducted on different test devices, a plurality of test devices can test a plurality of battery boxes at the same time, and thus the work efficiency of the battery test is improved. Due to the fact that a traditional battery test can only test batteries in a single box, a large quantity of time and manpower are wasted, and the monitoring system for the battery test has the advantages of being flexible in arrangement, simple, practical and capable of saving cost.

Description

Battery testing monitoring system
Technical field
The present invention relates to battery testing, it is related to a kind of battery testing monitoring system in more detail.
Background technology
Due to electric automobile, popularizing of motorcycle and developing rapidly of battery material technology, People increasingly pay attention to for the performance of electrokinetic cell.Cell production companies need to comply with market Will, the quality standard to the commonly used higher level of battery producing.When cell production companies pair When most of electrokinetic cells are tested, typically with battery case for a unit.Due to tradition Battery detecting technology can only be tested for single case battery, so operation not only expends in a large number Time and manpower, and require the staff being engaged in battery testing to have higher technical merit.
In the prior art, publication number:CN1971301, denomination of invention:A kind of battery detecting System.This patent of invention is a kind of to be related to the battery testing system that detects, including central control board, Detection execution equipment data harvester, detection execution equipment and corresponding data acquisition unit It is connected, central control board is connected with detection execution equipment by data/address bus, and center controls Platform is monitored to detection execution equipment, the related data of battery is preserved and analyzes, and Analysis result is sent to detection execution equipment, detection execution equipment receives, treatment of battery is related Data simultaneously forwards it to central control board, also receive from central control board analysis result simultaneously Output it, data acquisition unit gathers battery related data, and send it to detection execution Equipment;Central control board includes data analysis module, memory module and monitoring modular;Detection is held Row equipment includes data forwarding module and analysis result output module.This patent of invention is not related to grasp Make multiple devices the battery of multiple battery cases is carried out detecting, monitors.
In a word, in the prior art, lack a kind of battery testing monitoring system, can either be flexible Operation multiple stage test equipment, can conveniently implement the test of the battery to multiple battery cases again, have Effect reduces manpower, time cost.
Content of the invention
In view of in this, in order to overcome the deficiencies in the prior art, the present invention provides a kind of battery to survey Examination monitoring system.System setting execution system layer, monitoring system layer and analysis system layer, pass through Each system layer of flexible expansion, is combined to different test equipments controlling, realizes to multiple The test monitoring of battery case, can process the battery of multiple stage test equipment and multiple battery cases simultaneously Test job.
A kind of battery testing monitoring system of the present invention is achieved by the following technical programs: A kind of battery testing monitoring system it is characterised in that:Including execution system layer, monitor key-course With analysis system layer.Described analysis system layer is provided with service managing server and form browses Device.Described supervision key-course is provided with monitoring management server, database server, display control Client processed.Described execution system layer has industrial computer, test equipment master controller, test equipment Power model data collector.Described form browser passes through Ethernet and service management service Device, database server, monitoring management server and display control client connect.Described prison Turn TCP equipment depending on key-course via CAN to interact with execution system layer by CAN network.
Described data acquisition unit can be one or more than one;
Described CAN turns TCP equipment and can be connected with one or the above data acquisition unit Connect;
Described monitoring management server connects one or more than one CAN by Transmission Control Protocol and turns TCP Equipment.
A kind of superior effect of battery testing monitoring system of the present invention is, flexibly arrange, Simple and practical, cost-effective.A kind of battery testing monitoring system of the present invention can carry out net Network is layered, by arranging execution system layer, monitoring system layer and analysis system layer, different system Layer completes the function of corresponding system layer with different latticed forms.Complete the function of corresponding system, And can each system layer of flexible expansion, different test equipments is combined control, simultaneously Process the test job of multiple stage test equipment and the battery of multiple battery cases, improve battery testing Operating efficiency.Battery detecting monitoring system of the present invention can be surveyed in horizontal and vertical analysis simultaneously Test system.
Brief description
Fig. 1 is a kind of structural representation of battery testing monitoring system of the present invention.
Specific embodiment
Describe the specific embodiment of the invention in conjunction with Figure of description 1 in detail.
As shown in figure 1, a kind of battery testing monitoring system of the present invention, its structure includes holding Row system layer, monitoring system layer and analysis system layer, are monitored to multiple stage test equipment and are controlled System.
Described analysis system layer is provided with form browser database server, and described form is clear Device of looking at is connected by Ethernet with database server.Described analysis system layer is mainly with WEB Form forms.User can be realized and interacting that service management services by form browser.Institute State analysis system layer and can carry out data analysis business to described battery testing monitoring system, it is not But it is capable of the test data of each test system unit of longitudinal comparison, simultaneously also being capable of lateral comparison The test data of each test system unit.Described analysis system layer is according to different method of testings Eventually form different test report with analysis method.
Described monitoring system layer is provided with monitoring management server, database server and display control Client processed.Described display and control client database server are by Transmission Control Protocol respectively It is connected with monitoring management server, described monitoring system layer is substantially carried out described battery testing prison The supervision of the whole test process of control system and control.Described display and control client can be hand The terminal devices such as machine, panel computer, notebook computer.
Described execution system layer is provided with industrial computer, test equipment master controller, test equipment work( Rate module data collector, described CAN turn TCP equipment respectively with industrial computer, test equipment master Controller, test equipment power model data collector are connected.Described execution system layer master Battery test apparatus to be referred to and battery sampling equipment.The CAN network letter of described execution system layer Breath turns monitoring system layer described in TCP device forwards by CAN, and each test equipment combines one The node that CAN turns TCP forms a test system unit, can accommodate multiple surveys in whole system Test system unit, and access as needed in monitoring system layer, formed to multiple stage testing equipment Monitoring system.Described test equipment main controller carries out charge and discharge to the battery of one or more battery case Electricity, described test equipment power model measures battery case overall operation parameter, described data acquisition Device measures monomer operational factor, in described execution system layer, described industrial computer, test equipment master The device nodes such as controller, test equipment power model data collector are with the side of bus CAN Formula is communicated.Described CAN turns TCP equipment can be with one or the above data acquisition Device is connected, and described monitoring management server connects one or a CAN by Transmission Control Protocol and turns TCP equipment.
It should be noted that the foregoing is only presently preferred embodiments of the present invention, rather than to this Invent the restriction of described technical scheme, the equivalent that any technical characteristic to the present invention is done Or it is conspicuously improved, still within protection scope of the present invention.

Claims (3)

1. a kind of battery testing monitoring system it is characterised in that:Including execution system layer, monitor key-course and Analysis system layer, described analysis system layer is provided with form browser and service managing server, described supervision control Preparative layer is provided with control management server, database server, display control client, described execution system Layer be provided with CAN turn TCP equipment, industrial computer, test equipment master controller, test equipment power model and Data acquisition unit, described form browser passes through Ethernet with service managing server database server even Connect, described supervision key-course is turned TCP equipment via CAN and interacted with described execution system layer by CAN network; Same supervision key-course and analysis system layer can connect multiple execution system layers.
2. according to claim 1 a kind of battery testing monitoring system it is characterised in that:Described supervision is controlled Preparative layer, execution system layer and analysis system layer can be separate.
3. according to claim 1 a kind of battery testing monitoring system it is characterised in that:Described data is adopted Storage can have one or more than one.
CN201310248014.0A 2013-06-20 2013-06-20 Monitoring system for battery test CN103323784B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310248014.0A CN103323784B (en) 2013-06-20 2013-06-20 Monitoring system for battery test

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310248014.0A CN103323784B (en) 2013-06-20 2013-06-20 Monitoring system for battery test

Publications (2)

Publication Number Publication Date
CN103323784A CN103323784A (en) 2013-09-25
CN103323784B true CN103323784B (en) 2017-02-08

Family

ID=49192648

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310248014.0A CN103323784B (en) 2013-06-20 2013-06-20 Monitoring system for battery test

Country Status (1)

Country Link
CN (1) CN103323784B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106645925A (en) * 2016-09-11 2017-05-10 浙江大学 Electric energy storage device power test system

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1971301A (en) * 2005-11-23 2007-05-30 比亚迪股份有限公司 An examining system for battery
CN102540098A (en) * 2012-01-19 2012-07-04 北京优科利尔能源设备有限公司 Data collecting system of battery pack
CN102608537A (en) * 2012-03-02 2012-07-25 北京优科利尔能源设备有限公司 Feed network type heavy-power battery testing device
CN103094633A (en) * 2013-01-08 2013-05-08 北京优科利尔能源设备有限公司 Detecting and maintaining system applied to electromobile power battery

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2002021662A2 (en) * 2000-09-04 2002-03-14 Invensys Energy Systems (Nz) Limited Battery monitoring network
JP2007522450A (en) * 2004-01-26 2007-08-09 ジョンソン コントロールズ テクノロジー カンパニーJohnson Controls Technology Company System and method for monitoring vehicle battery

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1971301A (en) * 2005-11-23 2007-05-30 比亚迪股份有限公司 An examining system for battery
CN102540098A (en) * 2012-01-19 2012-07-04 北京优科利尔能源设备有限公司 Data collecting system of battery pack
CN102608537A (en) * 2012-03-02 2012-07-25 北京优科利尔能源设备有限公司 Feed network type heavy-power battery testing device
CN103094633A (en) * 2013-01-08 2013-05-08 北京优科利尔能源设备有限公司 Detecting and maintaining system applied to electromobile power battery

Also Published As

Publication number Publication date
CN103323784A (en) 2013-09-25

Similar Documents

Publication Publication Date Title
CN103997298B (en) Monitoring data collecting terminal of photovoltaic power station and monitoring data system
CN103235221B (en) Fault detecting system and fault detecting method for photovoltaic power station remote monitoring
CN202652273U (en) Remote monitoring system based on multiple photovoltaic power stations
CN202196155U (en) Solar cell panel state monitoring system
CN202330487U (en) Intelligent ammeter applied to solar distributed grid-connected system
CN204479970U (en) Based on the machine room rotating ring monitoring system of Internet of Things
CN202634082U (en) On-line monitoring and early warning system for direct-current equipment of substations
CN204190699U (en) A kind of supervisory control system based on Internet of Things solar components
CN202384835U (en) Monitoring system of distributed photovoltaic grid-connected power inverters
CN103203277B (en) Ball mill monitoring system based on smart cloud computing platform and monitoring method
CN203590150U (en) Photovoltaic convergence monitoring device with multifunctional communication mode
CN102608537B (en) Feed network type heavy-power battery testing device
CN106233572A (en) System and method for distributed uninterrupted power source
CN102195785A (en) Local power management unit and power management system employing the same
CN202231491U (en) Power distribution monitoring system
KR101409781B1 (en) Integrated monitoring system for photovoltaics facility
CN203491973U (en) System for measuring generation power of photovoltaic assemblies
CN201742443U (en) Computer network for testing electric transmission and transformation equipment states
CN201965215U (en) Storage battery pack on-line monitoring system
CN106340968B (en) Integrated support system and method for power distribution network management and control
CN105260840B (en) A kind of internet+schedulable load synthesis scheduling system
CN203117365U (en) Online insulation monitoring system suitable for photovoltaic grid-connected power generation system
CN105376534A (en) Integrated electric power information communication monitoring platform based on wireless transmission technology
CN204961272U (en) Centralized control system that pump station is wireless
CN202403924U (en) Bridge health monitoring system based on recommended standard (RS) 485 bus

Legal Events

Date Code Title Description
PB01 Publication
C06 Publication
SE01 Entry into force of request for substantive examination
C10 Entry into substantive examination
GR01 Patent grant
C14 Grant of patent or utility model