CN103306274A - 烧结桩及烧结桩制作方法 - Google Patents

烧结桩及烧结桩制作方法 Download PDF

Info

Publication number
CN103306274A
CN103306274A CN201310277815XA CN201310277815A CN103306274A CN 103306274 A CN103306274 A CN 103306274A CN 201310277815X A CN201310277815X A CN 201310277815XA CN 201310277815 A CN201310277815 A CN 201310277815A CN 103306274 A CN103306274 A CN 103306274A
Authority
CN
China
Prior art keywords
hole
stake
sintering
pile
exhausting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310277815XA
Other languages
English (en)
Other versions
CN103306274B (zh
Inventor
李长风
武立波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
The Ningxia Hui Autonomous Region Electric Power Design Institute Co., Ltd.
Original Assignee
NINGXIA HUI AUTONOMOUS REGION ELECTRIC POWER DESIGN INSTITUTE
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NINGXIA HUI AUTONOMOUS REGION ELECTRIC POWER DESIGN INSTITUTE filed Critical NINGXIA HUI AUTONOMOUS REGION ELECTRIC POWER DESIGN INSTITUTE
Priority to CN201310277815.XA priority Critical patent/CN103306274B/zh
Publication of CN103306274A publication Critical patent/CN103306274A/zh
Application granted granted Critical
Publication of CN103306274B publication Critical patent/CN103306274B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

一种烧结桩,涉及湿陷性黄土地基处理技术领域,包括桩体及在桩体内开设的桩孔、抽风孔和连接孔,桩孔、抽风孔以从桩顶向下方式开设,连接孔设在桩孔的底部连接两个桩孔或桩孔与抽风孔并使烧结桩的桩孔和抽风孔形成一个底部连通的结构,桩体为砖质。本发明还提供一种烧结桩制作方法。本发明低噪音、无污染,不用水、碎石等建筑材料,也不用大型机械,桩孔深度不受限制,可以在场地条件受限的情况下选择使用,同时,选用煤炭作燃烧介质成本低,烧结效率高。

Description

烧结桩及烧结桩制作方法
技术领域:
 本发明涉及湿陷性黄土地基处理技术领域,特别涉及一种烧结桩及烧结桩制作方法。
背景技术:
    由于湿陷性黄土受水浸后承载力降低,影响其上部建筑建筑物的稳定性,需要消除湿陷性。目前,消除黄土湿陷性的成熟技术有很多,但这些方法都有一定的缺陷和局限性,例如:浸水法需要大量的水,在我国西北黄土分布地区,多属干旱缺水的地区,大量用水不仅增加工程造价,也浪费了珍贵的水资源;碎石挤密桩不仅需要大量的水,而且机械噪音大、施工中的废水会短时间影响附近农田;灰土桩要求土层湿度大,固结时间长;强夯处理深度有限,施工噪音大。在受到场地环境、运输条件等的限制情况下,许多方法都不便使用。
发明内容
鉴于此,有必要设计一种烧结桩;还有必要提供一种烧结桩制作方法。
    一种烧结桩,包括桩体及在桩体内开设的桩孔、抽风孔和连接孔,桩孔、抽风孔以从桩顶向下方式开设,连接孔设在桩孔的底部连接两个桩孔或桩孔与抽风孔并使烧结桩的桩孔和抽风孔形成一个底部连通的结构,桩体为砖质。
    优选的,抽风孔选在对承载强度要求低的桩体位置开设。
    优选的,桩孔、抽风孔竖直开设。
    优选的,桩孔、抽风孔孔径为8~20cm,相邻桩孔的中心矩为40~60cm。
    优选的,连接孔开设在相邻两个桩孔或桩孔与抽风孔之间。
    优选的,抽风孔为烧结桩底部连接孔的枢纽,抽风孔应同时与两个或两个以上的桩孔相连。
    一种烧结桩制作方法,包括以下步骤:
Figure 493283DEST_PATH_IMAGE001
选址:在湿陷性黄土场地上的拟建建筑物基础下设置桩孔及抽风孔位置,其中,抽风孔选在对承载强度要求低的桩体位置;
Figure 270133DEST_PATH_IMAGE002
开孔:在桩孔及抽风孔位置开孔,并在桩孔及抽风孔底部开设连接孔使烧结桩的所有桩孔形成一个底部连通的结构;
Figure 400900DEST_PATH_IMAGE003
填充燃烧介质并架设抽风机:在桩孔内填充固状燃烧介质并使燃烧介质之间、燃烧介质与桩孔之间留有缝隙;在抽风孔顶端处架设抽风机,抽风机进气口与抽风孔密封对接;
Figure 867654DEST_PATH_IMAGE004
烧结:点燃桩孔顶部的燃烧介质同时启动抽风机,使桩孔、连接孔和抽风孔内的气体强制排出,从而驱动空气不断流入桩孔使桩孔内燃烧介质自上而下的燃烧,燃烧的高温使桩孔周围烧结成砖质的桩体。
    优选的,可在桩孔内多次填充燃烧介质反复烧结。
优选的,燃烧介质为煤。
本发明低噪音、无污染,不用水、碎石等建筑材料,也不用大型机械,桩孔深度不受限制,可以在场地条件受限的情况下选择使用,同时,选用煤炭作燃烧介质成本低,烧结效率高。
附图说明:
附图1是一幅较佳实施方式的烧结桩的剖视示意图。
附图2是一幅较佳实施方式的烧结桩桩孔布局的俯视示意图。
附图3是另一幅较佳实施方式的烧结桩桩孔布局的俯视示意图。
图中:桩体11、桩孔12、连接孔13、桩顶14、抽风孔121、燃烧介质15、抽风机16。
具体实施方式:
    如图1所示,一种烧结桩,包括桩体11及在桩体11内开设的桩孔12、抽风孔121和连接孔13,桩孔12、抽风孔121以从桩顶14向下方式开设,连接孔13设在桩孔12的底部连接两个桩孔12或桩孔12与抽风孔121并使烧结桩的桩孔12和抽风孔121形成一个底部连通的结构,桩体11为砖质。
    抽风孔121选在对承载强度要求低的桩体11位置开设。桩孔12、抽风孔121竖直开设。桩孔12、抽风孔121孔径为8~20cm,相邻桩孔12的中心矩为40~60cm。连接孔13开设在相邻两个桩孔12或桩孔12与抽风孔121之间。
抽风孔121为烧结桩底部连接孔13的枢纽,抽风孔121应同时与两个或两个以上的桩孔12相连。
图2为一种烧结桩桩孔排部方式。
图3为另一种烧结桩桩孔排部方式。
    一种烧结桩制作方法,包括以下步骤:
Figure 982240DEST_PATH_IMAGE001
选址:在湿陷性黄土场地上的拟建建筑物基础下设置桩孔12及抽风孔121位置,其中,抽风孔121选在对承载强度要求低的桩体14位置;
Figure 497535DEST_PATH_IMAGE002
开孔:在桩孔12及抽风孔121位置开孔,并在桩孔12及抽风孔121底部开设连接孔13使烧结桩的所有桩孔12形成一个底部连通的结构;
Figure 810705DEST_PATH_IMAGE003
填充燃烧介质15并架设抽风机16:在桩孔12内填充固状燃烧介质15并使燃烧介质15之间、燃烧介质15与桩孔12之间留有缝隙;在抽风孔121顶端处架设抽风机16,抽风机16进气口与抽风孔121密封对接;
烧结:点燃桩孔12顶部的燃烧介质15同时启动抽风机16,使桩孔12、连接孔13和抽风孔121内的气体强制排出,从而驱动空气不断流入桩孔12使桩孔12内燃烧介质15自上而下的燃烧,燃烧的高温使桩孔12周围烧结成砖质的桩体。
    在本实施方式中,可在桩孔12内多次填充燃烧介质15反复烧结。燃烧介质15为煤。

Claims (9)

1.一种烧结桩,其特征在于,包括桩体及在桩体内开设的桩孔、抽风孔和连接孔,桩孔、抽风孔以从桩顶向下方式开设,连接孔设在桩孔的底部连接两个桩孔或桩孔与抽风孔并使烧结桩的桩孔和抽风孔形成一个底部连通的结构,桩体为砖质。
2.如权利要求1所述的烧结桩,其特征在于,抽风孔选在对承载强度要求低的桩体位置开设。
3.如权利要求1所述的烧结桩,其特征在于,桩孔、抽风孔竖直开设。
4.如权利要求1所述的烧结桩,其特征在于,桩孔、抽风孔孔径为8~20cm,相邻桩孔的中心矩为40~60cm。
5.如权利要求1所述的烧结桩,其特征在于,连接孔开设在相邻两个桩孔或桩孔与抽风孔之间。
6.如权利要求2所述的烧结桩,其特征在于,抽风孔为烧结桩底部连接孔的枢纽,抽风孔应同时与两个或两个以上的桩孔相连。
7.一种烧结桩制作方法,其特征在于,包括以下步骤:
Figure 41377DEST_PATH_IMAGE001
选址:在湿陷性黄土场地上的拟建建筑物基础下设置桩孔及抽风孔位置,其中,抽风孔选在对承载强度要求低的位桩体置;
Figure 360363DEST_PATH_IMAGE002
开孔:在桩孔及抽风孔位置开孔,并在桩孔及抽风孔底部开设连接孔使烧结桩的所有桩孔形成一个底部连通的结构;
Figure 731301DEST_PATH_IMAGE003
填充燃烧介质并架设抽风机:在桩孔内填充固状燃烧介质并使燃烧介质之间、燃烧介质与桩孔之间留有缝隙;在抽风孔顶端处架设抽风机,抽风机进气口与抽风孔密封对接;
Figure 539857DEST_PATH_IMAGE004
烧结:点燃桩孔顶部的燃烧介质同时启动抽风机,使桩孔、连接孔和抽风孔内的气体强制排出,从而驱动空气不断流入桩孔使桩孔内燃烧介质自上而下的燃烧,燃烧的高温使桩孔周围烧结成砖质的桩体。
8.如权利要求7所述的烧结桩制作方法,其特征在于,可在桩孔内多次填充燃烧介质反复烧结。
9.如权利要求7所述的烧结桩制作方法,其特征在于,燃烧介质为煤。
CN201310277815.XA 2013-07-04 2013-07-04 烧结桩及烧结桩制作方法 Active CN103306274B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310277815.XA CN103306274B (zh) 2013-07-04 2013-07-04 烧结桩及烧结桩制作方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310277815.XA CN103306274B (zh) 2013-07-04 2013-07-04 烧结桩及烧结桩制作方法

Publications (2)

Publication Number Publication Date
CN103306274A true CN103306274A (zh) 2013-09-18
CN103306274B CN103306274B (zh) 2015-09-16

Family

ID=49131961

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310277815.XA Active CN103306274B (zh) 2013-07-04 2013-07-04 烧结桩及烧结桩制作方法

Country Status (1)

Country Link
CN (1) CN103306274B (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103953056A (zh) * 2014-05-12 2014-07-30 湖北全洲扬子江建设工程有限公司 一种高楼层地基的施工方法
CN111042106A (zh) * 2019-12-09 2020-04-21 青海民族大学 湿陷性黄土基坑防滑塌电烧结支护桩

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4067198A (en) * 1975-06-18 1978-01-10 Long Erwin L Method and structural support for increasing load carrying capacity in permafrost
CN1944806A (zh) * 2006-10-31 2007-04-11 张延军 低温地热能转换水泥土湿法搅拌桩
CN101761070A (zh) * 2010-01-13 2010-06-30 浙江大东吴集团建设有限公司 一种砖桩结构
CN201635070U (zh) * 2010-01-13 2010-11-17 浙江大东吴集团建设有限公司 一种砖桩结构
CN102704466A (zh) * 2012-05-16 2012-10-03 苏州市伦琴工业设计有限公司 建筑制桩方法
CN203334272U (zh) * 2013-07-04 2013-12-11 宁夏回族自治区电力设计院 烧结桩

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4067198A (en) * 1975-06-18 1978-01-10 Long Erwin L Method and structural support for increasing load carrying capacity in permafrost
CN1944806A (zh) * 2006-10-31 2007-04-11 张延军 低温地热能转换水泥土湿法搅拌桩
CN101761070A (zh) * 2010-01-13 2010-06-30 浙江大东吴集团建设有限公司 一种砖桩结构
CN201635070U (zh) * 2010-01-13 2010-11-17 浙江大东吴集团建设有限公司 一种砖桩结构
CN102704466A (zh) * 2012-05-16 2012-10-03 苏州市伦琴工业设计有限公司 建筑制桩方法
CN203334272U (zh) * 2013-07-04 2013-12-11 宁夏回族自治区电力设计院 烧结桩

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103953056A (zh) * 2014-05-12 2014-07-30 湖北全洲扬子江建设工程有限公司 一种高楼层地基的施工方法
CN103953056B (zh) * 2014-05-12 2015-10-28 湖北全洲扬子江建设工程有限公司 一种高楼层地基的施工方法
CN111042106A (zh) * 2019-12-09 2020-04-21 青海民族大学 湿陷性黄土基坑防滑塌电烧结支护桩
CN111042106B (zh) * 2019-12-09 2021-03-02 青海民族大学 湿陷性黄土基坑防滑塌电烧结支护桩

Also Published As

Publication number Publication date
CN103306274B (zh) 2015-09-16

Similar Documents

Publication Publication Date Title
CN103669385A (zh) 利用网状桩基础提高桩群承载力的方法
CN203924083U (zh) 承台基坑开挖井点降水装置
CN201390973Y (zh) 一种自立铁塔的桩板式基础
CN103306274B (zh) 烧结桩及烧结桩制作方法
CN203334272U (zh) 烧结桩
CN104912091B (zh) 一种岩溶水导水装置及导水方法
CN207148103U (zh) 一种用于污染填土地层的气液分离巢式监测井
CN204492705U (zh) 拼装组合式无底钢箱泥浆池
CN104020028A (zh) 动静力学相似模拟试验预制裂隙组合试模
CN209293149U (zh) 一种抗浮建筑底板的泄水结构
CN202369994U (zh) 铰接式护坡砌块及铰接式护坡
CN204059128U (zh) 一种八面八角建筑工程用环保砖块
CN205501935U (zh) 一种生态驳岸砖及驳岸
CN207392141U (zh) 一种河湖污泥资源化处置的生态护岸
CN206477351U (zh) 用于大厚度高湿陷性黄土地基的素土挤密桩
CN104895066B (zh) 超长旋喷劲芯组合桩的施工方法
CN202509453U (zh) 一种矩形护坡砌块
CN203869926U (zh) 动静力学相似模拟试验预制裂隙组合试模
CN102677671A (zh) 一种厚渣石层场地预制桩施工方法
CN207003163U (zh) 混凝土透水性砖体
CN211229151U (zh) 一种混凝土砌筑模块
CN205576679U (zh) 一种蓄水植草砖
CN104131503B (zh) 一种八面八角建筑工程用环保砖块的铺设施工方法
CN212270566U (zh) 一种高强透水砖
CN204589744U (zh) 草坪砖

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: No. 3120, Dalian Road, Jinfeng District, Yinchuan, the Ningxia Hui Autonomous Region

Patentee after: The Ningxia Hui Autonomous Region Electric Power Design Institute Co., Ltd.

Address before: 750001 East Road, the Great Wall, Yinchuan, Yinchuan, the Ningxia Hui Autonomous Region

Patentee before: Ningxia Hui Autonomous Region Electric Power Design Institute