CN103305943A CN2013100711598A CN201310071159A CN103305943A CN 103305943 A CN103305943 A CN 103305943A CN 2013100711598 A CN2013100711598 A CN 2013100711598A CN 201310071159 A CN201310071159 A CN 201310071159A CN 103305943 A CN103305943 A CN 103305943A
Authority
CN
China
Prior art keywords
yarn
godet roller
speed
spinning
batching
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2013100711598A
Other languages
Chinese (zh)
Inventor
桥本欣三
北山太
堀哲也
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TMT Machinery Inc
Original Assignee
TMT Machinery Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TMT Machinery Inc filed Critical TMT Machinery Inc
Publication of CN103305943A publication Critical patent/CN103305943A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H51/00Forwarding filamentary material
    • B65H51/02Rotary devices, e.g. with helical forwarding surfaces
    • B65H51/04Rollers, pulleys, capstans, or intermeshing rotary elements
    • B65H51/06Rollers, pulleys, capstans, or intermeshing rotary elements arranged to operate singly
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H51/00Forwarding filamentary material
    • B65H51/32Supporting or driving arrangements for forwarding devices
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H57/00Guides for filamentary materials; Supports therefor
    • B65H57/003Arrangements for threading or unthreading the guide
    • DTEXTILES; PAPER
    • D01NATURAL OR MAN-MADE THREADS OR FIBRES; SPINNING
    • D01DMECHANICAL METHODS OR APPARATUS IN THE MANUFACTURE OF ARTIFICIAL FILAMENTS, THREADS, FIBRES, BRISTLES OR RIBBONS
    • D01D13/00Complete machines for producing artificial threads
    • D01D13/02Elements of machines in combination
    • DTEXTILES; PAPER
    • D01NATURAL OR MAN-MADE THREADS OR FIBRES; SPINNING
    • D01DMECHANICAL METHODS OR APPARATUS IN THE MANUFACTURE OF ARTIFICIAL FILAMENTS, THREADS, FIBRES, BRISTLES OR RIBBONS
    • D01D7/00Collecting the newly-spun products
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H2701/00Handled material; Storage means
    • B65H2701/30Handled filamentary material
    • B65H2701/31Textiles threads or artificial strands of filaments
    • B65H2701/313Synthetic polymer threads
    • B65H2701/3132Synthetic polymer threads extruded from spinnerets

Abstract

A take-up apparatus is provided such that an air nozzle is not provided in a yam path leading from a melt spinning machine to a godet roller, but filaments are not wound around the godet roller. A take-up apparatus (100) includes a melt spinning machine (10) configured to spin filaments (F), a godet roller group (20) configured to feed yarns (Y) made by combining the filaments (F), and a take-up winder (30) configured to wind the yarns (Y) fed from the godet roller group (20) around bobbins (B). While a yam threading operation is performed on godet rollers (21) and (22), a circumferential speed of the godet rollers (21) and (22) forming the godet roller group (20) is set to a threading speed (Vs) lower than a circumferential speed in a winding period (Pw) and is increased to a winding speed (Vw) after the threading on the godet rollers (21) and (22) is completed and before winding of the yarns (Y) through a threading on the bobbins (B) is started. A circumferential speed of the bobbins (B) is increased to the winding speed (Vw) before the winding of the yarns (Y) through the threading on the bobbins (B) is started.

Description

Spinning coiling equipment
Technical field
The present invention relates to the technology of spinning coiling equipment.
Background technology
In the past, the known long filament that pair spinning arranged was tied up and was consisted of yarn and make the spinning coiling equipment (for example with reference to patent documentation 1) of package by this yarn of reeling.
In such spinning coiling equipment, need to carry out yarn-setting work as the prior preparation that the beginning package is made.When illustrating in greater detail, in such spinning coiling equipment, as the prior preparation that the beginning package is made, operating personnel need to operate suction gun and with the yarn-setting work of yarn lodge in godet roller, guiding piece.
Yet, with the yarn lodge in the situation with the godet roller of High Rotation Speed, as shown in Figure 5, exist the long filament F that consists of yarns Y to be wound up into the worry of godet roller G.Therefore, in spinning coiling equipment in the past, there is the spinning coiling equipment (for example with reference to patent documentation 2) that possesses air nozzle in the yarn path from the device for spinning to the godet roller.This is because by towards yarn winding-up air, make oil and the yarn given fused, and the cause that long filament is twined each other.Like this, in spinning coiling equipment in the past, prevented the situation of winding filament to godet roller.
But, possess the spinning coiling equipment of air nozzle in the yarn path from the device for spinning to the godet roller, produce and cause constructing complicated for air pipe arrangement etc. is set and then cost increases such problem.In addition, owing to needing all the time to the yarn winding-up air towards the godet roller guiding, so also produce the such problem of operating cost increase.
And then, in order to improve the workability of yarn lodge when godet roller, the bobbin, proposed to make godet roller, bobbin with low speed rotation, in the method (for example with reference to patent documentation 3, patent documentation 4) that the yarn lodge is made godet roller, bobbin speedup speed when batching running after bobbin.But, such method exist because of need to speedup when batching running till the speed during the discarded yarn that is wound up into bobbin cause the such problem of sleave increase.Especially in the subsequent processing of pre-oriented yarn (POY PARTIALLYORIENTED YARN), generally link continuously by the outermost yarn with the yarn of the innermost layer of package and other packages and process, and do not allow at the internal layer of the package unusual yarn of reeling.Therefore, as patent documentation 4, need to use Yarn reeling device with automatic yarn handoff functionality to switch at speedup laggard row yarn of speed when batching running, the package that begins normal yarn from innermost layer is batched, and to speedup till batch when running speed during for the whole discarded yarns that are wound to bobbin of each package.
[patent documentation 1] TOHKEMY 2011-144019 communique
[patent documentation 2] TOHKEMY 2010-116648 communique
[patent documentation 3] Japanese Patent Publication 63-5485 communique
[patent documentation 4] Japanese Patent Publication 47-35929 communique
Summary of the invention
The object of the present invention is to provide a kind of spinning coiling equipment (specifically, for producing the spinning coiling equipment of pre-oriented yarn (POY)) that the structure that do not possess air nozzle on the yarn path from the device for spinning to the godet roller and long filament can not be wound up into godet roller that has.
Then, the scheme that is used for this problem of solution is described.
That is, the first invention is a kind of spinning coiling equipment, possesses:
Device for spinning, spinning goes out long filament;
The godet roller group is sent described long filament is tied up the yarn that forms; And
Yarn reeling device, the described Yarn reeling that will send from described godet roller group be to bobbin,
Consist of the peripheral speed of the godet roller of described godet roller group, towards this godet roller extension yarn the time, be made as speed when being lower than the yarn-setting work that batches the peripheral speed between on-stream period, from after the extension yarn of this godet roller is finished till begin batching of yarn by the extension yarn towards described bobbin before speedup speed when batching running
And the peripheral speed of described bobbin was accelerated to speed when batching running before till begin batching of yarn by the extension yarn towards this bobbin.
The second invention is, in the related spinning coiling equipment of the first invention,
Described godet roller group comprises: the first godet roller of hanging at first yarn; And the second godet roller of after described the first godet roller, hanging yarn,
Described the second godet roller, position when turning round is being batched from moving to before till begin batching of yarn by the extension yarn towards described bobbin in position when being positioned at the yarn-setting work that approaches described the first godet roller when this second godet roller is hung yarn after the extension yarn of this second godet roller is finished.
The 3rd invention is, in the related spinning coiling equipment of the second invention,
The action of the peripheral speed of described the first godet roller and described the second godet roller and this second godet roller position movement position when batching running during from yarn-setting work is speed speedup speed when batching running during in linkage from yarn-setting work.
The 4th the invention be, in the related spinning coiling equipment of arbitrary invention of first to the 3rd,
Speed is made as below the 2300m/min during described yarn-setting work.
The 5th the invention be, in the related spinning coiling equipment of arbitrary invention of first to fourth,
Speed is made as more than 50% of speed when batching running during described yarn-setting work.
The invention effect
As effect of the present invention, play effect shown below.
According to the first invention, the peripheral speed of godet roller, when this godet roller is hung yarn, be made as speed when being lower than the yarn-setting work that batches the peripheral speed between on-stream period, from towards the extension yarn of this godet roller is finished after till begin batching of yarn by the extension yarn towards bobbin before speedup to batching speed when turning round.In addition, the peripheral speed of bobbin accelerated to speed when batching running before till begin batching of yarn by the extension yarn towards this bobbin.Thus, this spinning coiling equipment, thereby with the yarn lodge during in godet roller the less traction of yarn and godet roller can reduce the generation of static, therefore can prevent from consisting of the winding filament of yarn to godet roller.And then, can eliminate the sleave that is wound to bobbin.
According to the second invention, the second godet roller is the position when the yarn-setting work that is positioned at when this second godet roller is hung yarn near the first godet roller, is batching position when turning round from moving to before till begin batching of yarn by the extension yarn towards bobbin towards the extension yarn of this second godet roller is finished after.Thus, this spinning coiling equipment, the first godet roller and the second godet roller are positioned at and approach the position that arranges towards the extension yarn of the second godet roller the time, so operating personnel easily carry out yarn-setting work.
According to the 3rd invention, the action of the peripheral speed of the first godet roller and the second godet roller and this second godet roller position movement position when batching running during from yarn-setting work during in linkage from yarn-setting work the speed speedup to batching speed when turning round.Thus, this spinning coiling equipment, the operation of position and make each godet roller speedup to the operation that is operating as of batching speed when turning round when the second godet roller being moved to batch running, so the order of operation that operating personnel carry out becomes simple.
According to the 4th invention, speed is made as below the 2300m/min during yarn-setting work.Thus, this spinning coiling equipment, thereby with the yarn lodge during in godet roller the less traction of yarn and godet roller can reduce the generation of static, therefore can prevent from consisting of the winding filament of yarn to godet roller.
According to the 5th invention, speed is made as more than 50% of speed when batching running during yarn-setting work.Thus, this spinning coiling equipment can in rapid speedup speed when batching running after the extension yarn of godet roller is finished, therefore can reduce by suction gun sucking and discarded yarn.
Description of drawings
Fig. 1 is the integrally-built figure that spinning coiling equipment 100 is shown.
Fig. 2 is the figure that the yarn-setting work of spinning coiling equipment 100 is shown.
Fig. 3 illustrates the figure that the second godet roller 22 moves to the state of position W when batching running.
Fig. 4 is the figure of fact that the peripheral speed of fact of peripheral speed of the first godet roller 21 and the second godet roller 22 and bobbin B is shown.
Fig. 5 illustrates in the prior art the reeled figure of state of long filament F at godet roller G.
Description of symbols
10 device for spinning
20 godet roller groups
21 first godet rollers (godet roller)
22 second godet rollers (godet roller)
30 Yarn reeling devices
31 coil holders
40 lowering or hoisting gears
41 main parts
42 first module sections
43 second unit sections
100 spinning coiling equipment
The B bobbin
The F long filament
The Y yarn
The P package
The SG suction gun
Position during the S yarn-setting work
Position when W batches running
During the Rs yarn-setting work
Pw batches between on-stream period
Speed during the Vs yarn-setting work
Speed when Vw batches running
The specific embodiment
At first, the related spinning coiling equipment 100 of one embodiment of the present invention is described.
Fig. 1 is the integrally-built figure that spinning coiling equipment 100 is shown.Generally speaking, spinning coiling equipment is classified into and makes the equipment make the fullly drawn yarn (FDY) (FDY FULLY DRAWNYARN) that yarns Y stretches fully and make the equipment that makes the pre-oriented yarn (POY PARTIALLYORIENTED YARN) that yarns Y partly stretches.The related spinning coiling equipment 100 of present embodiment is suitable for making the equipment of pre-oriented yarn (POY).
Spinning coiling equipment 100 will be tied up by the long filament F of spinning and consist of yarns Y, and make package P by batching this yarns Y.Spinning coiling equipment 100 mainly is made of device for spinning 10, godet roller group 20, Yarn reeling device 30 and lowering or hoisting gear 40.
Device for spinning 10 can spinning go out plurality of threads F.Utilize extruder (not shown) that the synthetic fiber material (raw material of long filament F) of putting into device for spinning 10 is melted and force feed, carry out spinning from a plurality of mouths that spin that are arranged at spinneret (not shown).Guided by the below towards this device for spinning 10 from the long filament F of device for spinning 10 spinning.
To tie up with the radical of every regulation from the plurality of threads F of device for spinning 10 spinning and consist of threads Y.Then, will tie up the yarns Y that forms to long filament F guides towards godet roller group 20 via feeding means 51.At length describe, will tie up the yarns Y that forms utilizing after feeding means 51 gives oil, towards the first godet roller 21 guiding that consist of godet roller group 20 to long filament F.
Godet roller group 20 can be sent long filament F is tied up the yarns Y that forms.Describe particularly, consist of the first godet roller 21 of godet roller group 20 and the second godet roller 22 at lodge be rotated under the state of yarns Y, can send this yarns Y thus.
The first godet roller 21 is to draw long filament F and will tie up the rotary part that the yarns Y that forms is sent towards the direction of regulation to this long filament F from device for spinning 10.The first godet roller 21 forms the general cylindrical shape shape, the yarns Y that lodge comes via feeding means 51 guiding.The first godet roller 21 at lodge be rotated under the state of yarns Y, this yarns Y can be sent towards the second godet roller 22 thus.
The second godet roller 22 is rotary parts that the yarns Y that will be sent by the first godet roller 21 is sent towards the direction of regulation.The second godet roller 22 forms the general cylindrical shape shape, the yarns Y that lodge is sent from the first godet roller 21.The second godet roller 22 at lodge be rotated under the state of yarns Y, this yarns Y can be sent towards Yarn reeling device 30 thus.
Yarn reeling device 30 can be wound to the yarns Y of sending from godet roller group 20 bobbin B.Coil holder 31 at Yarn reeling device 30 is equipped with a plurality of bobbin B(with reference to Fig. 2).Bobbin B rotates with this coil holder 31 integratedly by coil holder 31 rotations.Like this, Yarn reeling device 30 can batch threads Y simultaneously, and makes package P at each bobbin B.
Position W moved (with reference to Fig. 3) when running was batched by S court in position when lowering or hoisting gear 40 can make the second godet roller 22 from yarn-setting work.Lowering or hoisting gear 40 comprises: Yi Bian the main part 41 that track is being installed; The first module section 42 of the first godet roller 21 grades is installed; And the second unit section 43 that second godet roller 22 etc. is installed.Lowering or hoisting gear 40 is by the rail moving of second unit section 43 along main part 41, and position W moved when running was batched by S court in position in the time of can making the second godet roller 22 from yarn-setting work.
During yarn-setting work position S be the scope of operation (front) side that is positioned at Yarn reeling device 30 directly over and near the position (with reference to Fig. 2, Fig. 3) of the first godet roller 21.Therefore, because the second godet roller 22 position S when being positioned at yarn-setting work, so that the yarn-setting work that operating personnel carry out becomes is easy.
Batching when running position W is position S and be positioned at eminence and the position (with reference to Fig. 1, Fig. 3) of the angle of bend θ of the yarns Y at fulcrum guiding piece 52 places of traversing below upper limit angle of bend (for example 15 degree) when comparing yarn-setting work.Therefore, in the situation that the second godet roller 22 is positioned at position W when batching running, the friction of traverse fulcrum guiding piece 52 and yarns Y is reduced, thereby the quality that prevents this yarns Y worsen.
Then, the prior preparation of the making of beginning package P is elaborated.
Fig. 2 is the figure that the yarn-setting work of spinning coiling equipment 100 is shown.Fig. 3 illustrates the figure that the second godet roller 22 moves to the state of position W when batching running.In addition, the arrow among the figure represents the throughput direction of long filament F and yarns Y and the moving direction of the second godet roller 22.In addition, Fig. 4 is the figure of fact that the peripheral speed of fact of peripheral speed of the first godet roller 21 and the second godet roller 22 and bobbin B is shown.Solid line among the figure represents fact of the peripheral speed of the first godet roller 21 and the second godet roller 22, and the dotted line among the figure represents fact of the peripheral speed of bobbin B.
As mentioned above, in spinning coiling equipment 100, need to carry out yarn-setting work as the prior preparation of the making that begins package P.Illustrate in greater detail, in spinning coiling equipment 100, as the prior preparation of the making of beginning package P, operating personnel need to operate suction gun SG and with the yarn-setting work of yarns Y lodge in each godet roller 21,22, the fulcrum guiding piece 52 that traverses etc.In addition, suction gun SG is can be for the yarn holding device of operating personnel's free operant.Suction gun SG can attract, keep by air amount yarns Y.
At first, operating personnel operate suction gun SG and with the yarns Y lodge in the first godet roller 21.At this moment, it is tangent with respect to the direction of rotation of the first godet roller 21 that yarns Y is become the throughput direction of this yarns Y by lodge.
Then, operating personnel operate suction gun SG and with the yarns Y lodge in the second godet roller 22.At this moment, it is tangent with respect to the direction of rotation of the second godet roller 22 that yarns Y is become the throughput direction of this yarns Y by lodge.In addition, at this constantly, position S when the second godet roller 22 is positioned at yarn-setting work.
In addition, as shown in Figure 4, towards the extension yarn of the first godet roller 21 and the second godet roller 22 time (Rs during each godet roller 21,22 the yarn-setting work), speed Vs(was with reference to solid line among the figure when each godet roller 21,22 peripheral speed were restricted to yarn-setting work).Therefore, when operating personnel with the yarns Y lodge in each godet roller 21,22 the time, the long filament F that consists of this yarns Y can not be wound up into the first godet roller 21, the second godet roller 22.This is to consider speed Vs when being restricted to yarn-setting work by each godet roller 21,22 peripheral speed, thereby the situation that the yarns Y that is drawn into suction gun SG and each godet roller 21,22 less traction reduce the generation of static is impacted.
Then, operating personnel need to operate suction gun SG and not shown separator and with the yarns Y lodge in bobbin B.Herein, operating personnel position S when the yarns Y lodge was made the second godet roller 22 from yarn-setting work before bobbin B moves to position W when batching running.In this spinning coiling equipment 100, operating personnel press indicator cock (not shown), and position W moved when running was batched by S court in position when the second godet roller 22 was from yarn-setting work thus.
Like this, position S when the second godet roller 22 is positioned near the yarn-setting work of the first godet roller 21 towards the extension yarn of this second godet roller 22 time is moving to position W when batching running before till begin batching of yarns Y by the extension yarn towards bobbin B after the extension yarn of this second godet roller 22 is finished.Thus, for this spinning coiling equipment 100 because the first godet roller 21 and the second godet roller 22 are positioned at and approach the position that arranges towards the extension yarn of the second godet roller 22 time, thus operating personnel carry out become easy towards each godet roller 21,22 yarn-setting work.
In addition, as shown in Figure 4, the first godet roller 21 that (batches Pw between on-stream period) during the production of package P and the peripheral speed of the second godet roller 22 are made as batches when running speed Vw(with reference to solid line among the figure).Therefore, in this spinning coiling equipment 100, make in linkage the peripheral speed speedup of the first godet roller 21 and the second godet roller 22 with the movement of the second godet roller 22.
Position S moved to the action speed Vs speedup speed Vw when batching running during in linkage from yarn-setting work that batches when running position W when like this, the peripheral speed of the first godet roller 21 and the second godet roller 22 and this second godet roller 22 were from yarn-setting work.Thus, for this spinning coiling equipment 100, because the operation of position W and make each godet roller 21,22 speedups to the operation that is operating as of batching speed Vw when turning round when the second godet roller 22 being moved to batch running, so that the order of operation that operating personnel carry out becomes is simple.
As described above, the peripheral speed of the first godet roller 21 and the second godet roller 22 is made as speed Vs when being lower than the yarn-setting work that batches the peripheral speed of Pw between on-stream period towards each godet roller 21,22 extension yarn the time, from after each godet roller 21,22 extension yarn are finished till begin batching of yarns Y by the extension yarn towards bobbin B before speedup speed Vw when batching running.Thus, this spinning coiling equipment 100, with the yarns Y lodge in each godet roller 21,22 o'clock, thereby yarns Y and each godet roller 21,22 less traction reduce the generation of static, therefore can prevent that the long filament F that consists of yarns Y is wound up into the first godet roller 21, the second godet roller 22.
In addition, as shown in Figure 4, the peripheral speed of the bobbin B that (batches Pw between on-stream period) during the making of package P also is made as batches when running speed Vw(with reference to dotted line among the figure).Therefore, in this spinning coiling equipment 100, make the peripheral speed speedup of coil holder 31.
In this spinning coiling equipment 100, with towards the operation of each godet roller 21,22 yarn-setting work, speedup speed Vw when batching running simultaneously or before and after above-mentioned operation, operating personnel press indicator cock (not shown), the coil holder 31 of Yarn reeling device 30 begins rotation thus, and the peripheral speed speedup that makes bobbin B is speed Vw when batching running.
Then, after the speed Vw, carry out beginning thus batching of yarns Y towards the extension yarn of this bobbin B when batching running in the peripheral speed speedup of bobbin B.The yarns Y that therefore, can will have immediately a desirable characteristic after just beginning to batch is wound to bobbin B.That is, can eliminate the sleave that is wound to bobbin B.
In addition, in the above description for simplicity and represented each godet roller 21,22 peripheral speed and the peripheral speed of bobbin B with identical label (Vw).But for the peripheral speed of bobbin B, preferably the peripheral speed than the second godet roller 22 is slightly low for the stress that relaxes yarns Y.In addition, for the peripheral speed of bobbin B, the tension stability of the yarns Y during for yarn-setting work, also can be under the yarns Y of the internal layer that is wound to package P can not the degree of abnormal when batching running speed Vw slightly high.
Then, other characteristic points of this spinning coiling equipment 100 described.
In this spinning coiling equipment 100, speed Vs is made as more than 50% and below 2300m/min of speed when batching running during yarn-setting work.This is to be low speed and limited velocity interval with respect to batching when running speed of production of being made as from about 2500m/min to the pre-oriented yarn (POY PARTIALLY ORIENTEDYARN) of 3500m/min of speed Vw.Below to yarn-setting work the time speed Vs be made as speed when batching running more than 50% and the advantage below 2300m/min describe.
This spinning coiling equipment 100, more than 50% of speed when speed Vs is made as and batches running by with the yarn-setting work of the first godet roller 21 and the second godet roller 22 time can shorten the time that reaches speed Vw when batching running from the beginning speedup.On the other hand, when speed Vs deficiency is batched running when each godet roller 21,22 yarn-setting work in 50% of speed the situation, with each godet roller 21,22 speedups speed Vw spended time when batching running, therefore have the worry that is absorbed in the following state of affairs: even towards the extension yarn of traverse fulcrum guiding piece 52, Yarn reeling device 30 with the extension yarn of guiding piece (not shown), finish towards the extension yarn of bobbin B, each godet roller 21,22 peripheral speed also not yet reach batches speed Vw when turning round.In this case, the making that begins package P by the extension yarn towards bobbin B has to wait for that each godet roller 21,22 speedup finish, this period yarns Y attracted by suction gun SG, therefore produce the problem that the discarded amount of yarns Y increases.But this spinning coiling equipment 100 can make each godet roller 21,22 the rapid speedup of peripheral speed speed Vw when batching running after each godet roller 21,22 extension yarn are finished, therefore can reduce by suction gun SG sucking and discarded yarns Y.
In addition, this spinning coiling equipment 100, speed Vs is made as below the 2300m/min by with the yarn-setting work of the first godet roller 21 and the second godet roller 22 time, can reduce the yarns Y that sucked by suction gun SG and each godet roller 21,22 friction, thereby prevents the generation of static.This be in the situation that during yarn-setting work speed Vs than the fast effect that can't obtain of 2300m/min.Thereby, this spinning coiling equipment 100, with the yarns Y lodge in each godet roller 21,22 o'clock, thereby yarns Y and each godet roller 21,22 less traction can reduce the generation of static, therefore can prevent that the long filament F that consists of yarns Y is wound up into the first godet roller 21, the second godet roller 22.

Claims (5)

1. spinning coiling equipment possesses:
Device for spinning, spinning goes out long filament;
The godet roller group is sent described long filament is tied up the yarn that forms; And
Yarn reeling device, the described Yarn reeling that will send from described godet roller group be to bobbin,
This spinning coiling equipment is characterised in that,
Consist of the peripheral speed of the godet roller of described godet roller group, towards this godet roller extension yarn the time, be made as speed when being lower than the yarn-setting work that batches the peripheral speed between on-stream period, from after the extension yarn of this godet roller is finished till begin batching of yarn by the extension yarn towards described bobbin before speedup speed when batching running
And the peripheral speed of described bobbin was made as speed when batching running before till begin batching of yarn by the extension yarn towards this bobbin.
2. spinning coiling equipment as claimed in claim 1 is characterized in that,
Described godet roller group comprises: the first godet roller of hanging at first yarn; And the second godet roller of after described the first godet roller, hanging yarn,
Described the second godet roller, position when turning round is being batched from moving to before till begin batching of yarn by the extension yarn towards described bobbin in position when being positioned at the yarn-setting work that approaches described the first godet roller when this second godet roller is hung yarn after the extension yarn of this second godet roller is finished.
3. spinning coiling equipment as claimed in claim 2 is characterized in that,
The action of the peripheral speed of described the first godet roller and described the second godet roller and this second godet roller position movement position when batching running during from yarn-setting work is speed speedup speed when batching running during in linkage from yarn-setting work.
4. such as each described spinning coiling equipment in the claims 1 to 3, it is characterized in that,
Speed is made as below the 2300m/min during described yarn-setting work.
5. such as each described spinning coiling equipment in the claim 1 to 4, it is characterized in that,
Speed is made as more than 50% of speed when batching running during described yarn-setting work.
CN2013100711598A 2012-03-07 2013-03-06 Take-up apparatus Pending CN103305943A (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2012-050934 2012-03-07
JP2012050934A JP2013184781A (en) 2012-03-07 2012-03-07 Yarn take-up apparatus

Publications (1)

Publication Number Publication Date
CN103305943A true CN103305943A (en) 2013-09-18

Family

ID=47790048

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013100711598A Pending CN103305943A (en) 2012-03-07 2013-03-06 Take-up apparatus

Country Status (4)

Country Link
EP (1) EP2636624A3 (en)
JP (1) JP2013184781A (en)
CN (1) CN103305943A (en)
IN (1) IN2013DE00579A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104562246A (en) * 2013-10-16 2015-04-29 日本Tmt机械株式会社 A spinning coiler
CN109137108A (en) * 2018-08-29 2019-01-04 江苏鑫博高分子材料有限公司 Shell silk device and its stripping silk method
TWI658180B (en) * 2015-10-30 2019-05-01 日商Tmt機械股份有限公司 Automatic yarn threading device
CN113753681A (en) * 2016-10-20 2021-12-07 日本Tmt机械株式会社 Yarn hanging mechanical arm

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS61199577U (en) * 1985-06-04 1986-12-13
JPS63159512A (en) * 1986-12-17 1988-07-02 Teijin Ltd Winding of high-speed yarn
DE10309966A1 (en) * 2002-03-27 2003-10-09 Barmag Barmer Maschf Melt spinning assembly control reduces the speed of the spinning pump drive and filament treatment stages during splicing and joining, to allow for bobbin changes and filament break repairs with minimum wastage
JP2011144019A (en) * 2010-01-15 2011-07-28 Tmt Machinery Inc Yarn winder equipment
CN102190211A (en) * 2010-03-18 2011-09-21 日本Tmt机械株式会社 Spinning-winding apparatus and spinning-in method therein
EP2407408A2 (en) * 2010-07-13 2012-01-18 TMT Machinery, Inc. Filament yarn winding apparatus

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS4735929B1 (en) * 1969-08-12 1972-09-09
JPS5947413A (en) 1982-09-10 1984-03-17 Toray Ind Inc Spinning
JPH0781203B2 (en) * 1985-10-25 1995-08-30 東レ株式会社 Yarn hooking start method for high-speed synthetic fiber winder
JP5368061B2 (en) 2008-11-13 2013-12-18 Tmtマシナリー株式会社 Spinning and winding equipment

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS61199577U (en) * 1985-06-04 1986-12-13
JPS63159512A (en) * 1986-12-17 1988-07-02 Teijin Ltd Winding of high-speed yarn
DE10309966A1 (en) * 2002-03-27 2003-10-09 Barmag Barmer Maschf Melt spinning assembly control reduces the speed of the spinning pump drive and filament treatment stages during splicing and joining, to allow for bobbin changes and filament break repairs with minimum wastage
JP2011144019A (en) * 2010-01-15 2011-07-28 Tmt Machinery Inc Yarn winder equipment
CN102190211A (en) * 2010-03-18 2011-09-21 日本Tmt机械株式会社 Spinning-winding apparatus and spinning-in method therein
EP2407408A2 (en) * 2010-07-13 2012-01-18 TMT Machinery, Inc. Filament yarn winding apparatus

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104562246A (en) * 2013-10-16 2015-04-29 日本Tmt机械株式会社 A spinning coiler
CN104562246B (en) * 2013-10-16 2018-06-08 日本Tmt机械株式会社 Take-up winding
TWI658180B (en) * 2015-10-30 2019-05-01 日商Tmt機械股份有限公司 Automatic yarn threading device
CN113753681A (en) * 2016-10-20 2021-12-07 日本Tmt机械株式会社 Yarn hanging mechanical arm
CN113753681B (en) * 2016-10-20 2023-03-14 日本Tmt机械株式会社 Yarn hanging mechanical arm
CN109137108A (en) * 2018-08-29 2019-01-04 江苏鑫博高分子材料有限公司 Shell silk device and its stripping silk method

Also Published As

Publication number Publication date
EP2636624A3 (en) 2014-09-24
JP2013184781A (en) 2013-09-19
IN2013DE00579A (en) 2015-06-26
EP2636624A2 (en) 2013-09-11

Similar Documents

Publication Publication Date Title
CN101377026B (en) Yarn winding machine and false twisting processor
CN104711689B (en) Filament yarn winding apparatus
CN101792076B (en) Yarn processing method and spinning machine
CN103648941B (en) Bobbin winder
JP2013067935A (en) Spinning machine and method for interrupting yarn production on spinning machine
JP5642441B2 (en) Threading method for spinning winder, spinning winder, and suction gun
EP2186765B1 (en) Take-up winding facility
CN102190211B (en) Spinning-winding apparatus and spinning-in method therein
CN103305943A (en) Take-up apparatus
CN102249120B (en) Method for manufacturing spinning cops
JP2016194188A (en) Method for operating composite system comprising at least one ring spinning machine and at least one winding machine, and composite system
US10907278B2 (en) Method for automatically piecing a thread at a workstation of a textile machine, and textile machine
CN107829173A (en) Ring spinner and the Yarn spinning method using ring spinner
CN111406032B (en) Method for monitoring a winding device and winding device
CN102126644A (en) Spinning winding equipment
CN103510209A (en) Fiber machine
JP2018083681A (en) Revolving type winding method of synthetic fiber yarn
CN105648586B (en) For at the work station of free-end spinning machine on cross-wound bobbin tube winding yarn method and apparatus for carrying out the method
JP3842891B2 (en) Oiling device
EP2184386B1 (en) Device for melt-spinning and winding up synthetic filament yarns
CN102583107A (en) Method for manufacturing dyeing bobbin
JP2019214476A (en) Method and device of affecting winding condition of ring spinning cop
CN106029540A (en) Yarn winding device, textile machine, and package forming method
US759721A (en) Machine for winding yarn or thread.
JPH0428616B2 (en)

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20130918