CN103303661B - Device capable of realizing automatic 90-degree steering of packing box during conveying process - Google Patents
Device capable of realizing automatic 90-degree steering of packing box during conveying process Download PDFInfo
- Publication number
- CN103303661B CN103303661B CN201310232712.1A CN201310232712A CN103303661B CN 103303661 B CN103303661 B CN 103303661B CN 201310232712 A CN201310232712 A CN 201310232712A CN 103303661 B CN103303661 B CN 103303661B
- Authority
- CN
- China
- Prior art keywords
- double
- speed
- roller
- rollers
- frame
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000012856 packing Methods 0.000 title claims abstract description 26
- 238000000034 method Methods 0.000 title claims abstract description 13
- 238000004806 packaging method and process Methods 0.000 claims abstract description 18
- 229920006351 engineering plastic Polymers 0.000 claims description 3
- 239000000463 material Substances 0.000 claims description 3
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000005484 gravity Effects 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000002372 labelling Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
Landscapes
- Attitude Control For Articles On Conveyors (AREA)
Abstract
本发明公开了一种能实现包装箱输送过程中自动转向90°的装置。七根倍速辊位于多根输送辊中间,七根倍速辊和多根输送辊平行等间距地安装在机架上,七根倍速辊和多根输送辊两端均安装链轮,通过电动机带动链条驱动七根倍速辊和多根输送辊进行转动;导向装置安装在机架上并位于包装箱前进方向的右侧,导向装置由挡块和一组导向轮构成,挡块前端面与输送线前进方向垂直,一组导向轮平行等间距地安装在挡块的左侧面,导向装置与七根倍速辊组合为包装箱提供导向和旋转平移的功能。本发明结构简单,功能可靠,倍速辊上倍速滚子具有一定的柔性,不易损坏包装箱,可以完成包装箱自动转向90°以实现对包装箱规定面的喷码或贴标及识别等操作。
The invention discloses a device capable of automatically turning 90° during the conveying process of packing boxes. The seven double-speed rollers are located in the middle of the multiple conveyor rollers, and the seven double-speed rollers and the multiple conveyor rollers are installed on the frame in parallel and equidistant. Both ends of the seven double-speed rollers and the multiple conveyor rollers are equipped with sprockets, and the chain is driven by the motor. Drive seven double-speed rollers and multiple conveying rollers to rotate; the guide device is installed on the frame and is located on the right side of the forward direction of the packing box. The guide device is composed of a stopper and a set of guide wheels, and the front end of the stopper moves forward with the conveying line The direction is vertical, and a set of guide wheels are installed on the left side of the block at equal intervals in parallel. The combination of the guide device and seven double-speed rollers provides the functions of guiding, rotating and translating for the packing box. The invention is simple in structure and reliable in function. The double-speed roller on the double-speed roller has certain flexibility and is not easy to damage the packaging box.
Description
技术领域 technical field
本发明涉及生产线上包装箱的输送装置,尤其是涉及一种能实现包装箱输送过程中自动转向90°的装置。 The invention relates to a conveying device for packaging boxes on a production line, in particular to a device capable of automatically turning 90° during the conveying process of packaging boxes.
背景技术 Background technique
在完成产品装箱后,包装箱一侧需要进行喷码或贴标以及识别等操作,以实现对包装箱及产品的管理和信息查询。传统上,这些操作都由人工完成。随着社会发展,自动化程度的提高,为了提升效率,节约时间和空间,在输送线上自动完成这些操作已成为迫切,但包装箱在输送轨道上往往是以一个方向运动的,在轨道两侧的操作设备只能对包装箱的左右两侧进行操作,前后两面则无法处理,因此让包装箱在输送过程中在特定位置上自动转向90°后前进使输送线两侧的操作设备才能对包装箱上规定面进行操作,如进行喷码或贴标及识别等操作,提升自动化程度。 After the product is packed, the side of the box needs to be sprayed or labeled and identified to realize the management and information query of the box and the product. Traditionally, these operations are done manually. With the development of society and the improvement of the degree of automation, in order to improve efficiency and save time and space, it has become urgent to automatically complete these operations on the conveyor line. However, the packaging boxes often move in one direction on the conveyor track. The operating equipment can only operate on the left and right sides of the packaging box, and the front and rear sides cannot be processed. Therefore, the packaging box is automatically turned 90° at a specific position during the conveying process and then moved forward so that the operating equipment on both sides of the conveyor line can handle the packaging. Operate on the specified surface on the box, such as inkjet or labeling and identification, to improve the degree of automation.
发明内容 Contents of the invention
本发明的目的是提供一种能实现包装箱输送过程中自动转向90°的装置,从而来满足特定工序的要求。 The purpose of the present invention is to provide a device that can automatically turn 90° during the conveying process of the packaging box, so as to meet the requirements of the specific process.
本发明采用的技术方案如下: The technical scheme that the present invention adopts is as follows:
本发明包括七根倍速辊、多根输送辊、导向装置和机架;七根倍速辊位于多根输送辊中间,七根倍速辊和多根输送辊平行等间距地安装在机架上,七根倍速辊和多根输送辊两端均安装链轮,通过电动机带动链条驱动七根倍速辊和多根输送辊转动;导向装置安装在机架上并位于包装箱前进方向的右侧,导向装置由挡块和一组导向轮构成,挡块前端面与输送线前进方向垂直,一组导向轮平行等间距地安装在挡块的左侧面。 The present invention comprises seven double-speed rollers, multiple conveying rollers, a guiding device and a frame; the seven double-speed rollers are located among the multiple conveying rollers, and the seven double-speed rollers and the multiple conveying rollers are installed on the frame in parallel and equally spaced, and the seven Both ends of the double-speed roller and multiple conveying rollers are equipped with sprockets, and the motor drives the chain to drive the seven double-speed rollers and multiple conveying rollers to rotate; the guiding device is installed on the frame and is located on the right side of the forward direction of the packing box It is composed of a block and a set of guide wheels. The front end of the block is perpendicular to the forward direction of the conveying line, and a set of guide wheels are installed on the left side of the block in parallel and equidistant.
所述的七根倍速辊均包括转轴和倍速滚子;每个倍速滚子均包括第一主动滚子、第二主动滚子和被动滚子;第一主动滚子、第二主动滚子套在转轴上,转轴上有台肩,第一主动滚子的大端面靠在转轴台肩上,通过平键与转轴固定,第二主动滚子小端面贴在第一主动滚子小端面,通过圆销与转轴固定,被动滚子的小圆柱孔嵌套在第一主动滚子和第二主动滚子的小圆柱轴上形成间隙配合。 The seven double-speed rollers include rotating shafts and double-speed rollers; each double-speed roller includes a first driving roller, a second driving roller and a passive roller; the first driving roller, the second driving roller sleeve On the rotating shaft, there is a shoulder on the rotating shaft. The large end surface of the first driving roller leans against the shoulder of the rotating shaft, and is fixed with the rotating shaft through a flat key. The small end surface of the second driving roller is attached to the small end surface of the first driving roller. The round pin is fixed to the rotating shaft, and the small cylindrical hole of the driven roller is nested on the small cylindrical shaft of the first driving roller and the second driving roller to form a clearance fit.
所述的七根倍速辊上的倍速滚子形成错位安装,即从靠近包装箱的第一根倍速辊上的倍速滚子到远离包装箱的第七根倍速辊上的倍速滚子的排列顺序为:第一根至第六根倍速辊的倍速滚子均位于机架中心线左侧,其中第一根、第三根、第五根倍速辊的倍速滚子远离机架中心线,第二根、第四根、第六根倍速辊的倍速滚子靠近机架中心线,第一根、第二根倍速辊上的倍速滚子中心点与挡块旋转端点共线,第三根倍速辊的倍速滚子的左端面在包装箱接触挡块时包装箱的左端面左侧0至5毫米,第四根倍速辊的倍速滚子和第二根倍速辊的倍速滚子与中心线间距相等,第五根倍速辊的倍速滚子和第三根倍速辊的倍速滚子与中心线间距相等,第五根、第六根倍速辊的倍速辊子中心点与挡块的旋转端点距离相等,第七根倍速辊的倍速滚子位于机架中心线上。 The double-speed rollers on the seven double-speed rollers are installed in a dislocation, that is, the arrangement sequence is from the double-speed roller on the first double-speed roller close to the packing box to the double-speed roller on the seventh double-speed roller far away from the packing box It is: the double-speed rollers of the first to sixth double-speed rollers are all located on the left side of the centerline of the frame, and the double-speed rollers of the first, third and fifth double-speed rollers are far away from the centerline of the frame, and the double-speed rollers of the second The double-speed rollers of the first, fourth and sixth double-speed rollers are close to the center line of the frame, the center points of the first and second double-speed rollers are in line with the end points of the block rotation, and the third double-speed roller The left end surface of the double-speed roller of the first double-speed roller is 0 to 5 mm to the left of the left end surface of the packaging box when the packing box touches the stopper, and the distance between the double-speed roller of the fourth double-speed roller and the double-speed roller of the second double-speed roller is equal to the center line , the distance between the double-speed roller of the fifth double-speed roller and the double-speed roller of the third double-speed roller is equal to the center line, the distance between the center point of the double-speed roller of the fifth and sixth double-speed roller is equal to the rotation end point of the block, and the distance between the double-speed roller of the fifth and sixth double-speed roller is equal. The double-speed rollers of the seven double-speed rollers are located on the center line of the frame.
所述的七根倍速辊的倍速滚子的材料为工程塑料。 The material of the double-speed rollers of the seven double-speed rollers is engineering plastics.
本发明具有的有益的效果是: The beneficial effects that the present invention has are:
本发明结构简单,功能可靠,倍速辊上倍速滚子具有一定的柔性,不易损坏包装箱,可以完成包装箱自动转向90°以实现对包装箱规定面的喷码或贴标及识别等操作。 The invention has simple structure and reliable function. The double-speed roller on the double-speed roller has certain flexibility and is not easy to damage the packaging box.
附图说明 Description of drawings
图1是本发明的整体结构的俯视示意图。 Fig. 1 is a schematic top view of the overall structure of the present invention.
图2是本发明的倍速辊的剖视图。 Fig. 2 is a sectional view of the double-speed roller of the present invention.
图3是本发明的第一主动滚子的剖视图。 Fig. 3 is a sectional view of the first driving roller of the present invention.
图4是本发明的第二主动滚子的剖视图。 Fig. 4 is a sectional view of the second driving roller of the present invention.
图5是本发明的被动滚子的剖视图。 Fig. 5 is a sectional view of a driven roller of the present invention.
图6是本发明的包装箱运动过程的示意图。 Fig. 6 is a schematic diagram of the movement process of the packaging box of the present invention.
图中:1、倍速辊,2、输送辊,3、导向装置,4、机架,5、链轮,6、挡块,7、导向轮,8、转轴,9、第一主动滚子,10、第二主动滚子,11、被动滚子,12、平键,13、圆销,14、包装箱,15、倍速滚子。 In the figure: 1. double-speed roller, 2. conveying roller, 3. guiding device, 4. frame, 5. sprocket, 6. block, 7. guide wheel, 8. rotating shaft, 9. first driving roller, 10, the second active roller, 11, passive roller, 12, flat key, 13, round pin, 14, packing box, 15, double speed roller.
具体实施方式 Detailed ways
下面结合附图和实施例对本发明做进一步说明。 The present invention will be further described below in conjunction with the accompanying drawings and embodiments.
如图1所示,本发明包括七根倍速辊1、多根输送辊2、导向装置3和机架4;七根倍速辊1位于多根输送辊2中间,七根倍速辊1和多根输送辊2平行等间距地安装在机架4上,七根倍速辊1和多根输送辊2两端均安装链轮5,通过电动机(未示出)带动链条(未示出)驱动七根倍速辊1多根和输送辊2转动;导向装置3安装在机架4上并位于包装箱14前进方向的右侧,导向装置3由挡块6和一组导向轮7构成,挡块6前端面与输送线前进方向垂直,一组导向轮7平行等间距地安装在挡块6的左侧面。导向装置3与七根倍速辊1组合为包装箱14提供导向和旋转平移的功能。 As shown in Figure 1, the present invention comprises seven double-speed rollers 1, many conveying rollers 2, guiding device 3 and frame 4; The conveying rollers 2 are installed on the frame 4 in parallel and equally spaced, and the sprockets 5 are installed at both ends of the seven double-speed rollers 1 and the multiple conveying rollers 2, and the chains (not shown) are driven by the motor (not shown) to drive the seven A plurality of double-speed rollers 1 and conveying rollers 2 rotate; the guide device 3 is installed on the frame 4 and is located on the right side of the forward direction of the packing box 14, the guide device 3 is composed of a stopper 6 and a set of guide wheels 7, and the front end of the stopper 6 The surface is perpendicular to the advancing direction of the conveying line, and a group of guide wheels 7 are installed on the left side of the block 6 in parallel and equidistantly. The combination of the guiding device 3 and the seven double-speed rollers 1 provides the function of guiding and rotating and translating for the packaging box 14 .
如图1、图2、图3、图4、图5所示,所述的七根倍速辊1均包括转轴8和倍速滚子15;每个倍速滚子15均包括第一主动滚子9、第二主动滚子10和被动滚子11;第一主动滚子9、第二主动滚子10套在转轴8上,转轴8上有台肩,第一主动滚子9的大端面靠在转轴8台肩上,通过平键12与转轴8固定,第二主动滚子10小端面贴在第一主动滚子9小端面,通过圆销13与转轴8固定,被动滚子11的小圆柱孔嵌套在第一主动滚子9和第二主动滚子10的小圆柱轴上形成间隙配合。 As shown in Figure 1, Figure 2, Figure 3, Figure 4, and Figure 5, the seven double-speed rollers 1 include a rotating shaft 8 and a double-speed roller 15; each double-speed roller 15 includes a first driving roller 9 , the second active roller 10 and the passive roller 11; the first active roller 9 and the second active roller 10 are set on the rotating shaft 8, and there is a shoulder on the rotating shaft 8, and the large end surface of the first active roller 9 leans against On the shoulder of the rotating shaft 8, the flat key 12 is fixed to the rotating shaft 8, the small end surface of the second driving roller 10 is attached to the small end surface of the first driving roller 9, fixed to the rotating shaft 8 through the round pin 13, and the small cylinder of the passive roller 11 The holes are nested on the small cylindrical shafts of the first driving roller 9 and the second driving roller 10 to form a clearance fit.
如图1所示,所述的七根倍速辊1上的倍速滚子15形成错位安装,即从靠近包装箱14的第一根倍速辊上的倍速滚子到远离包装箱14的第七根倍速辊上的倍速滚子的排列顺序为:第一根至第六根倍速辊的倍速滚子均位于机架中心线左侧,其中第一根、第三根、第五根倍速辊的倍速滚子远离机架中心线,第二根、第四根、第六根倍速辊的倍速滚子靠近机架中心线,第一根、第二根倍速辊上的倍速滚子中心点与挡块6旋转端点共线,第三根倍速辊的倍速滚子的左端面在包装箱接触挡块时包装箱的左端面左侧0至5毫米,第四根倍速辊的倍速滚子和第二根倍速辊的倍速滚子与中心线间距相等,第五根倍速辊的倍速滚子和第三根倍速辊的倍速滚子与中心线间距相等,第五根、第六根倍速辊的倍速辊子中心点与挡块6的旋转端点距离相等,第七根倍速辊的倍速滚子位于机架中心线上。 As shown in Figure 1, the double-speed rollers 15 on the seven double-speed rollers 1 form a dislocation installation, that is, from the double-speed roller on the first double-speed roller close to the packaging box 14 to the seventh one away from the packaging box 14 The arrangement order of the double-speed rollers on the double-speed rollers is: the double-speed rollers of the first to sixth double-speed rollers are all located on the left side of the center line of the frame, and the double-speed rollers of the first, third and fifth double-speed rollers The rollers are far away from the centerline of the frame, the double-speed rollers of the second, fourth, and sixth double-speed rollers are close to the centerline of the frame, and the center point of the double-speed rollers on the first and second double-speed rollers and the stopper 6 Rotation endpoints are collinear, the left end face of the double speed roller of the third double speed roller is 0 to 5 mm to the left of the left end face of the packing box when the packing box touches the block, the double speed roller of the fourth double speed roller and the second double speed roller The distance between the double-speed rollers of the double-speed rollers and the center line is equal, the distance between the double-speed rollers of the fifth double-speed roller and the double-speed rollers of the third double-speed rollers is equal to the center line, and the distance between the double-speed rollers of the fifth and sixth double-speed rollers is equal. Point is equal to the rotation end point distance of stopper 6, and the double-speed roller of the seventh double-speed roller is located on the center line of the frame.
所述的七根倍速辊1的倍速滚子15的材料为工程塑料,确保一定的柔性,不易损坏包装箱14。当包装箱14位于倍速滚子15上时,在包装箱14的重力作用下,被动滚子11与第一主动滚子9、第二主动滚子10接触,被动滚子11随着转轴8一起转动,由于倍速滚子15的存在使转动半径增大,使倍速滚子圆周面上的速度增大,从而可以使包装箱14向某一方向快速移动。 The material of the double-speed rollers 15 of the seven double-speed rollers 1 is engineering plastics, which ensures certain flexibility and is not easy to damage the packing box 14 . When the packing case 14 is on the double-speed roller 15, under the action of gravity of the packing case 14, the passive roller 11 is in contact with the first driving roller 9 and the second driving roller 10, and the passive roller 11 is in contact with the rotating shaft 8 Rotation, due to the existence of the double-speed roller 15, the radius of rotation is increased, and the speed on the circumferential surface of the double-speed roller is increased, so that the packing box 14 can be moved quickly in a certain direction.
如图6所示,包装箱14在本发明装置上的具体运动过程为: As shown in Figure 6, the specific movement process of packing box 14 on the device of the present invention is:
包装箱14在输送辊2的作用下运动至倍速辊1时,在第一根、第二根倍速辊的倍速滚子15C的作用下使包装箱14朝向导向装置3输送,包装箱14接触导向装置3上的挡块6的端面接触后,在第三根、第四根、第五根倍速辊的倍速滚子15B的作用力下绕挡块6的端点旋转平移并向前输送,随后在第六根、第七根倍速辊的倍速滚子15A及导向轮7的作用下,包装箱14旋转90°后紧靠导向轮7,继续前进,从而完成输送过程中包装箱90°度旋转。 When the packaging box 14 moves to the double-speed roller 1 under the action of the conveying roller 2, under the action of the double-speed roller 15C of the first and second double-speed rollers, the packaging box 14 is transported towards the guide device 3, and the packaging box 14 touches the guide After the end faces of the stoppers 6 on the device 3 are in contact, they rotate and translate around the end points of the stoppers 6 under the force of the double-speed rollers 15B of the third, fourth and fifth double-speed rollers and transport them forward, and then Under the action of the double-speed roller 15A of the sixth and the seventh double-speed rollers and the guide wheel 7, the packing case 14 rotates 90° and abuts against the guide wheel 7 and moves on, thereby completing the 90° rotation of the packing case in the conveying process.
Claims (3)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201310232712.1A CN103303661B (en) | 2013-06-13 | 2013-06-13 | Device capable of realizing automatic 90-degree steering of packing box during conveying process |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201310232712.1A CN103303661B (en) | 2013-06-13 | 2013-06-13 | Device capable of realizing automatic 90-degree steering of packing box during conveying process |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN103303661A CN103303661A (en) | 2013-09-18 |
| CN103303661B true CN103303661B (en) | 2015-05-20 |
Family
ID=49129452
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201310232712.1A Active CN103303661B (en) | 2013-06-13 | 2013-06-13 | Device capable of realizing automatic 90-degree steering of packing box during conveying process |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN103303661B (en) |
Families Citing this family (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN107499951B (en) * | 2017-09-18 | 2023-06-02 | 湖北科德智能装备有限公司 | Destacking conveying device and automatic destacking system |
| CN108128502A (en) * | 2018-02-07 | 2018-06-08 | 广州盛原成自动化科技有限公司 | Carton automatic code spraying system |
Citations (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| DE2848820A1 (en) * | 1978-11-10 | 1980-05-14 | Enzinger Union Werke Ag | DEVICE FOR TURNING RECTANGULAR PARTS, e.g. BOTTLE BOXES |
| EP0124269A1 (en) * | 1983-03-30 | 1984-11-07 | Rockwool International A/S | Orienting device |
| DE4205310A1 (en) * | 1992-02-21 | 1993-08-26 | Masch Und Apparatebau Latz Gmb | Rolling bar conveyor belt for moving packets - has two parallel rolling tracks whose rollers can be driven simultaneously at the same speed in opposite directions. |
| CN201125085Y (en) * | 2007-11-20 | 2008-10-01 | 天津华一有限责任公司 | 90-degree steering connecting apparatus |
| DE202007018515U1 (en) * | 2006-02-22 | 2008-11-20 | Khm Transportanlagen Gmbh | Device for transporting any parts |
| CN201367250Y (en) * | 2009-02-25 | 2009-12-23 | 昆明昆船物流信息产业有限公司 | Self-selective differential turning and conveying device |
| CN201506603U (en) * | 2009-09-25 | 2010-06-16 | 深圳市中金岭南有色金属股份有限公司韶关冶炼厂 | Speed-changing conveying roller way |
| CN103072808A (en) * | 2013-02-07 | 2013-05-01 | 杨承然 | Automatic quantity-determining, turning and conveying mechanism for paper money bundle |
| CN203359487U (en) * | 2013-06-13 | 2013-12-25 | 浙江大学 | Device capable of achieving 90-degree automatic steering in packing container conveying process |
-
2013
- 2013-06-13 CN CN201310232712.1A patent/CN103303661B/en active Active
Patent Citations (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| DE2848820A1 (en) * | 1978-11-10 | 1980-05-14 | Enzinger Union Werke Ag | DEVICE FOR TURNING RECTANGULAR PARTS, e.g. BOTTLE BOXES |
| EP0124269A1 (en) * | 1983-03-30 | 1984-11-07 | Rockwool International A/S | Orienting device |
| DE4205310A1 (en) * | 1992-02-21 | 1993-08-26 | Masch Und Apparatebau Latz Gmb | Rolling bar conveyor belt for moving packets - has two parallel rolling tracks whose rollers can be driven simultaneously at the same speed in opposite directions. |
| DE202007018515U1 (en) * | 2006-02-22 | 2008-11-20 | Khm Transportanlagen Gmbh | Device for transporting any parts |
| CN201125085Y (en) * | 2007-11-20 | 2008-10-01 | 天津华一有限责任公司 | 90-degree steering connecting apparatus |
| CN201367250Y (en) * | 2009-02-25 | 2009-12-23 | 昆明昆船物流信息产业有限公司 | Self-selective differential turning and conveying device |
| CN201506603U (en) * | 2009-09-25 | 2010-06-16 | 深圳市中金岭南有色金属股份有限公司韶关冶炼厂 | Speed-changing conveying roller way |
| CN103072808A (en) * | 2013-02-07 | 2013-05-01 | 杨承然 | Automatic quantity-determining, turning and conveying mechanism for paper money bundle |
| CN203359487U (en) * | 2013-06-13 | 2013-12-25 | 浙江大学 | Device capable of achieving 90-degree automatic steering in packing container conveying process |
Also Published As
| Publication number | Publication date |
|---|---|
| CN103303661A (en) | 2013-09-18 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN203806621U (en) | Ampoule bottle sending mechanism | |
| CN201914495U (en) | Rotary table of packaging line | |
| CN103517852B (en) | Conveyor for labeling machines | |
| CN203332919U (en) | Horizontal steering conveyor | |
| CN103979133B (en) | A kind of shunting conveying line device of liquid detergent | |
| CN103303661B (en) | Device capable of realizing automatic 90-degree steering of packing box during conveying process | |
| CN105293025A (en) | Component clamping device | |
| CN203359487U (en) | Device capable of achieving 90-degree automatic steering in packing container conveying process | |
| CN203544899U (en) | Conveyor provided with flange | |
| CN105083945A (en) | Automatic turnover front conveying mechanism with mechanical arms | |
| CN203246812U (en) | Turnover device | |
| CN202575210U (en) | Tooth-shaped conveying belt | |
| CN204916953U (en) | Production line transportation area | |
| CN104003165A (en) | Pop-up roller transfer machine | |
| CN204324239U (en) | Mechanism of push bottles ahead | |
| CN203045416U (en) | Plate conveyer used for drilling machine | |
| CN205023308U (en) | Synchronous belt conveyer | |
| CN105236076A (en) | Insulating plate conveying device | |
| CN103896055A (en) | Multistage package moving and carrying conveyor | |
| CN204280579U (en) | A kind of chain high precision transfer structure | |
| KR20140045661A (en) | Drive shaft of conveyor | |
| CN202124467U (en) | Intermittent positioning and filling device for filling machine | |
| CN205045354U (en) | 180 no internal diameter belt of degree machine of turning | |
| CN204713899U (en) | A kind of feedway | |
| CN203211811U (en) | Bottle storage mechanism for automatic bottle settling machine |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| C41 | Transfer of patent application or patent right or utility model | ||
| TR01 | Transfer of patent right |
Effective date of registration: 20160721 Address after: 321300 Zhejiang city of Jinhua province Yongkang City West West Industrial Zone Lantian Road No. 16 Patentee after: SIMTO GROUP Co.,Ltd. Address before: 310027 Hangzhou, Zhejiang Province, Xihu District, Zhejiang Road, No. 38, No. Patentee before: Zhejiang University |
|
| TR01 | Transfer of patent right |
Effective date of registration: 20200721 Address after: 321300 No. 199 Huacheng East Road, Xicheng Street, Yongkang City, Jinhua City, Zhejiang Province Patentee after: ZHEJIANG DEFEILUO INTELLIGENT MACHINERY MANUFACTURING Co.,Ltd. Address before: 321300, Lantian Road, Xicheng Industrial Zone, Xicheng County, Jinhua, Zhejiang, Yongkang 16 Patentee before: SIMTO GROUP Co.,Ltd. |
|
| TR01 | Transfer of patent right | ||
| PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of invention: Device capable of automatically turning 90 deg in the process of packing box conveying Effective date of registration: 20220413 Granted publication date: 20150520 Pledgee: Yongkang branch of the Industrial Commercial Bank of China Ltd. Pledgor: ZHEJIANG DEFEILUO INTELLIGENT MACHINERY MANUFACTURING Co.,Ltd. Registration number: Y2022330000502 |
|
| PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
| PC01 | Cancellation of the registration of the contract for pledge of patent right |
Granted publication date: 20150520 Pledgee: Yongkang branch of the Industrial Commercial Bank of China Ltd. Pledgor: ZHEJIANG DEFEILUO INTELLIGENT MACHINERY MANUFACTURING Co.,Ltd. Registration number: Y2022330000502 |
|
| PC01 | Cancellation of the registration of the contract for pledge of patent right |