CN103276906A - Steel bar connection method and matched fastener thereof - Google Patents
Steel bar connection method and matched fastener thereof Download PDFInfo
- Publication number
- CN103276906A CN103276906A CN2013102230501A CN201310223050A CN103276906A CN 103276906 A CN103276906 A CN 103276906A CN 2013102230501 A CN2013102230501 A CN 2013102230501A CN 201310223050 A CN201310223050 A CN 201310223050A CN 103276906 A CN103276906 A CN 103276906A
- Authority
- CN
- China
- Prior art keywords
- tenon
- steel bars
- steel bar
- fastener
- steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 52
- 239000010959 steel Substances 0.000 title claims abstract description 52
- 238000000034 method Methods 0.000 title claims abstract description 22
- 238000002360 preparation method Methods 0.000 claims description 2
- 230000003014 reinforcing effect Effects 0.000 claims 8
- 210000001503 joint Anatomy 0.000 claims 1
- 238000010276 construction Methods 0.000 abstract description 4
- 238000009430 construction management Methods 0.000 abstract description 2
- 238000004519 manufacturing process Methods 0.000 abstract description 2
- 238000010586 diagram Methods 0.000 description 3
- 238000005096 rolling process Methods 0.000 description 3
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000009435 building construction Methods 0.000 description 1
- 238000002788 crimping Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000001125 extrusion Methods 0.000 description 1
- 238000003908 quality control method Methods 0.000 description 1
Images
Landscapes
- Joining Of Building Structures In Genera (AREA)
Abstract
本发明涉及一种钢筋连接方法,主要包括以下工艺步骤:调直钢筋;在钢筋端部切割出榫头;钢筋榫接,用配套扣件套装在钢筋榫接处并拧紧螺栓。本发明还提供一种与上述方法相配套使用的扣件,由两个对称的钢制半圆筒状的本体构成。两个本体的一边通过铰链连接在一起,另一边均设有凸缘。本发明操作简单,加工工序少,降低工人劳动强度,提高生产效率,节省造价。同时,与本发明的方法配套使用的扣件结构简单,使用方便,可提高装卸速度和连接可靠性,提升施工质量,方便施工管理。
The invention relates to a method for connecting steel bars, which mainly includes the following process steps: straightening the steel bars; cutting a tenon at the end of the steel bars; tenon jointing of the steel bars, and fitting matching fasteners on the tenon joints of the steel bars and tightening bolts. The present invention also provides a fastener used in conjunction with the above method, which is composed of two symmetrical steel semi-cylindrical bodies. One side of the two bodies is connected together by a hinge, and the other side is provided with a flange. The invention has simple operation, fewer processing procedures, reduces labor intensity of workers, improves production efficiency and saves cost. At the same time, the fastener used in conjunction with the method of the present invention has a simple structure and is easy to use, which can improve loading and unloading speed and connection reliability, improve construction quality, and facilitate construction management.
Description
技术领域 technical field
本发明涉及一种建筑施工方法,尤其是一种钢筋连接方法。本发明还涉及一种建筑构件,尤其是一种钢筋连接扣件。 The invention relates to a building construction method, in particular to a steel bar connection method. The invention also relates to a building component, especially a fastener for connecting steel bars.
背景技术 Background technique
目前,常用的大直径钢筋机械连接方式主要有以下三种: At present, there are mainly three types of mechanical connection methods for large-diameter steel bars:
1. 钢筋套筒挤压连接:是将需要连接的带肋钢筋插入特制套筒内,利用液压驱动的挤压机进行侧向加压数道,使钢套筒产生塑性变形,套筒塑性变形后即与带肋钢筋紧密咬合达到连接的效果,压接力要能保护套筒与钢筋紧密咬合,因此对套筒和钢筋的吻合度、套筒的质量要求较高。使用此法时,加工设备笨重,工人劳动强度大,连接速度慢,且套筒较大,成本高; 1. Steel sleeve extrusion connection: Insert the ribbed steel bar to be connected into a special sleeve, and use a hydraulically driven extruder to press several times laterally to cause plastic deformation of the steel sleeve and plastic deformation of the sleeve After that, it will be tightly occluded with the ribbed steel bar to achieve the effect of connection. The crimping force must be able to protect the tight bite between the sleeve and the steel bar. Therefore, the matching degree of the sleeve and the steel bar and the quality of the sleeve are high. When using this method, the processing equipment is cumbersome, the labor intensity of the workers is high, the connection speed is slow, and the sleeve is large and the cost is high;
2. 钢筋锥螺纹套筒连接:是利用螺纹的机械咬合力传递拉力或压力,用锥形螺纹套筒将两根钢筋端头对接在一起。使用该法时,接头的质量不够稳定,且螺距单一,对太粗或太细的钢筋,其连接强度都不理想。而且,钢筋与套筒连接时必须施加一定的拧紧力矩才能保证连接质量。若工人一时疏忽没有拧紧,或钢筋弯曲或有马蹄形切口,都容易产生丝扣不全,给连接质量留下隐患; 2. Rebar tapered thread sleeve connection: it uses the mechanical occlusal force of the thread to transmit tension or pressure, and uses a tapered threaded sleeve to butt the ends of two steel bars together. When using this method, the quality of the joint is not stable enough, and the pitch is single, and the connection strength is not ideal for steel bars that are too thick or too thin. Moreover, a certain tightening torque must be applied when the steel bar is connected with the sleeve to ensure the quality of the connection. If the worker neglects to tighten it for a while, or the steel bar is bent or has a horseshoe-shaped cut, it is easy to produce incomplete threads, leaving hidden dangers to the quality of the connection;
3. 钢筋直螺纹套筒连接:将钢筋待连接的端头用滚扎加工工艺滚扎成规整的直螺纹,再用相配套的直螺纹套筒将两钢筋相对拧紧,实现连接。镦粗直螺纹连接不仅工序繁锁,镦粗后的钢筋头部金相组织发生变化,不经回火处理,会产生应力集中,延性降低,不利于改善接头受力。而且,钢筋本身轧制螺纹时公差较大,丝头加工质量控制难度大,滚丝轮受力条件恶劣、工作寿命低。 3. Steel bar straight thread sleeve connection: The end of the steel bar to be connected is rolled into a regular straight thread with a rolling process, and then the two steel bars are relatively tightened with a matching straight thread sleeve to realize the connection. The upsetting straight thread connection is not only a complicated process, but also the metallographic structure of the head of the steel bar after upsetting will change. If it is not tempered, it will produce stress concentration and reduce ductility, which is not conducive to improving the stress of the joint. Moreover, when the steel bar itself is rolling threads, the tolerance is relatively large, the processing quality control of the thread head is difficult, the stress condition of the thread rolling wheel is harsh, and the working life is low.
综上所述,以上三种连接技术都是用套筒连接,对不同直径的钢筋要求 In summary, the above three connection technologies are all connected by sleeves, and the requirements for steel bars of different diameters
有不同直径的套筒与其配套使用,对套筒要求的规格较多。在操作时,都须首先把连接套的一端安装在基本钢筋的端头上用管钳板手将其拧紧到位,然后异向对中夹紧连接套,将待接钢筋通过异向夹钳中孔对中,拧入连接套内并拧紧到位,施工相对较困难,质量不易保证。 There are sleeves of different diameters used in conjunction with it, and there are many specifications required for the sleeve. When operating, first install one end of the connecting sleeve on the end of the basic steel bar and tighten it in place with a pipe wrench, then clamp the connecting sleeve in different directions, and pass the steel bar to be connected through the different direction clamps. The hole is centered, screwed into the connecting sleeve and tightened in place. The construction is relatively difficult and the quality is not easy to guarantee.
发明内容 Contents of the invention
本发明的目的是提供一种能够克服上述现有技术缺陷的技术方案。 The purpose of the present invention is to provide a technical solution capable of overcoming the above-mentioned defects of the prior art.
本发明的技术方案是:一种钢筋连接方法,主要包括以下工艺步骤: The technical solution of the present invention is: a steel bar connection method, mainly comprising the following process steps:
调直钢筋; Straightening steel bars;
在钢筋端部切割出榫头; Cut tenon at the end of the bar;
把待连接钢筋通过榫头对接,用配套的扣件套装在榫接处,并拧紧穿过扣件通孔的螺栓。 Butt the steel bars to be connected through the tenon, set the matching fasteners on the tenon joints, and tighten the bolts passing through the through holes of the fasteners.
所述钢筋端部的榫头的制备方法是:在钢筋端部先沿轴向将钢筋从中间剖开,长度为100mm,然后将剖开的一半钢筋去除,形成榫头。 The preparation method of the tenon at the end of the steel bar is as follows: at the end of the steel bar, cut the steel bar from the middle along the axial direction, with a length of 100mm, and then remove half of the cut steel bar to form the tenon.
本发明还提供了一种与上述钢筋连接方法配套使用、操作简单且连接可靠的扣件。该扣件由两个对称的钢制半圆筒状的本体构成。两个本体的一边通过铰链连接在一起,另一边均设有凸缘。 The present invention also provides a fastener that is used in conjunction with the above steel bar connection method and is simple to operate and reliable in connection. The fastener consists of two symmetrical steel semi-cylindrical bodies. One side of the two bodies is connected together by a hinge, and the other side is provided with a flange.
所述两个本体的凸缘大小和形状均相同,其上设有若干通孔,通孔内可设置螺栓。 The size and shape of the flanges of the two bodies are the same, and a number of through holes are arranged on them, and bolts can be arranged in the through holes.
本发明的有益效果:本发明钢筋连接方法操作简单,加工工序少,降低工人劳动强度,提高生产效率。与本发明的方法配套使用的扣件结构简单,使用方便,可提高装卸速度和连接可靠性,提升施工质量,方便施工管理。 Beneficial effects of the present invention: the steel bar connection method of the present invention is simple in operation, less in processing steps, reduces labor intensity of workers, and improves production efficiency. The fastener used in conjunction with the method of the present invention has a simple structure and is convenient to use, which can improve loading and unloading speed and connection reliability, improve construction quality, and facilitate construction management.
附图说明 Description of drawings
图1是钢筋榫头示意图。 Figure 1 is a schematic diagram of a tenon of a steel bar.
图2是扣件的示意图。 Figure 2 is a schematic diagram of the fastener.
图3是钢筋连接的示意图。 Figure 3 is a schematic diagram of a steel bar connection.
具体实施方式 Detailed ways
下面结合附图和实施例对本发明作进一步的说明。 The present invention will be further described below in conjunction with the accompanying drawings and embodiments.
本发明主要包括以下工艺步骤: The present invention mainly comprises following processing steps:
一、 调直钢筋; 1. Straighten the steel bar;
二、 钢筋端部切割出榫头:如图1所示,在钢筋1的端部先沿钢筋轴向从中间剖开,长度为100mm,然后将剖开的一半去除,形成榫头2;
2. Cut the tenon at the end of the steel bar: as shown in Figure 1, first cut the end of the steel bar 1 from the middle along the axial direction of the steel bar, with a length of 100mm, and then remove half of the cut to form the
三、 将两根钢筋的榫头对接,用配套的扣件套装在钢筋的对接处,并拧紧扣件上的螺栓。 3. Butt the tenons of the two steel bars, use the matching fasteners to fit the butt joints of the steel bars, and tighten the bolts on the fasteners.
本发明还提供了一种可与上述方法配套使用的扣件。如图2所示,该扣件由两个对称的钢制半圆筒状的本体3构成。两个本体的一边通过铰链4连接在一起,另一边均设有凸缘5。凸缘的大小和形状均相同,其上设有若干通孔6,通孔内可设置螺栓。使用时,如图3所示,将扣件套装在待连接钢筋7的榫接处,拧紧螺栓即可,使施工操作更为简便。同时,由于榫头连接,钢筋相互咬合,增加了钢筋的连接性能,特别是竖向钢筋连接时,接头相互坐落和咬合,经扣件拧紧后,连接质量稳定可靠。
The present invention also provides a fastener that can be used in conjunction with the above method. As shown in FIG. 2 , the fastener is composed of two symmetrical steel semi-cylindrical bodies 3 . One side of the two bodies is connected together by a hinge 4 , and flanges 5 are provided on the other side. The flanges have the same size and shape, and are provided with some through holes 6, and bolts can be arranged in the through holes. When in use, as shown in Figure 3, the fasteners are set on the mortise joints of the
本发明未涉及部分均与现有技术相同或可采用现有技术加以实现。 The parts not involved in the present invention are the same as the prior art or can be realized by adopting the prior art.
Claims (4)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2013102230501A CN103276906A (en) | 2013-06-06 | 2013-06-06 | Steel bar connection method and matched fastener thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2013102230501A CN103276906A (en) | 2013-06-06 | 2013-06-06 | Steel bar connection method and matched fastener thereof |
Publications (1)
Publication Number | Publication Date |
---|---|
CN103276906A true CN103276906A (en) | 2013-09-04 |
Family
ID=49059512
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2013102230501A Pending CN103276906A (en) | 2013-06-06 | 2013-06-06 | Steel bar connection method and matched fastener thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103276906A (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105952161A (en) * | 2016-06-28 | 2016-09-21 | 中交公局第二工程有限公司 | Dismountable reinforcement cage mechanical connection guiding device |
CN107724589A (en) * | 2017-09-29 | 2018-02-23 | 浙江未来加电子商务有限公司 | I-shaped suspension rod |
CN112227607A (en) * | 2020-09-19 | 2021-01-15 | 何艳 | Connecting method of reinforcing steel bar for building |
CN113137009A (en) * | 2021-04-28 | 2021-07-20 | 龙岩市景棋混凝土有限公司 | Steel bar anchoring connection structure and connection method for prefabricated concrete member |
CN114673307A (en) * | 2022-03-29 | 2022-06-28 | 中国矿业大学 | A method of using high-strength fiber fabric and structural adhesive to paste, wind and connect steel bars |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2661812Y (en) * | 2003-12-24 | 2004-12-08 | 马冬 | Reinforcing steel connector |
CN1788129A (en) * | 2003-09-09 | 2006-06-14 | 周德圣 | Joint equipment for steel reinforcing |
CN201195914Y (en) * | 2008-03-26 | 2009-02-18 | 北京建筑机械化研究院 | Split type coupling sleeve |
WO2010051594A1 (en) * | 2008-11-06 | 2010-05-14 | Monkey Steel Limited | Reinforcing |
CN201546375U (en) * | 2009-11-20 | 2010-08-11 | 中煤第三建设(集团)有限责任公司 | Steel bar connector |
-
2013
- 2013-06-06 CN CN2013102230501A patent/CN103276906A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1788129A (en) * | 2003-09-09 | 2006-06-14 | 周德圣 | Joint equipment for steel reinforcing |
CN2661812Y (en) * | 2003-12-24 | 2004-12-08 | 马冬 | Reinforcing steel connector |
CN201195914Y (en) * | 2008-03-26 | 2009-02-18 | 北京建筑机械化研究院 | Split type coupling sleeve |
WO2010051594A1 (en) * | 2008-11-06 | 2010-05-14 | Monkey Steel Limited | Reinforcing |
CN201546375U (en) * | 2009-11-20 | 2010-08-11 | 中煤第三建设(集团)有限责任公司 | Steel bar connector |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105952161A (en) * | 2016-06-28 | 2016-09-21 | 中交公局第二工程有限公司 | Dismountable reinforcement cage mechanical connection guiding device |
CN107724589A (en) * | 2017-09-29 | 2018-02-23 | 浙江未来加电子商务有限公司 | I-shaped suspension rod |
CN112227607A (en) * | 2020-09-19 | 2021-01-15 | 何艳 | Connecting method of reinforcing steel bar for building |
CN113137009A (en) * | 2021-04-28 | 2021-07-20 | 龙岩市景棋混凝土有限公司 | Steel bar anchoring connection structure and connection method for prefabricated concrete member |
CN114673307A (en) * | 2022-03-29 | 2022-06-28 | 中国矿业大学 | A method of using high-strength fiber fabric and structural adhesive to paste, wind and connect steel bars |
CN114673307B (en) * | 2022-03-29 | 2023-08-22 | 中国矿业大学 | Method for pasting winding connection reinforcing steel bar by using high-strength fiber fabric and structure adhesive |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201534305U (en) | Pipe aligning fixture | |
CN103276906A (en) | Steel bar connection method and matched fastener thereof | |
CN205276695U (en) | Reinforcing bar quick -connect machanism | |
CN203484846U (en) | Center-adjustable connecting clamp | |
CN204510627U (en) | A kind of reinforced bar straight thread sleeve connection assembly for rapid construction | |
CN101618509B (en) | A kind of steel thread processing equipment and method | |
CN210013387U (en) | A tensile and compressive steel bar connector | |
CN204195165U (en) | A kind of pipeline quick-assembling positioning tool alignment device | |
CN203343689U (en) | Special clamp and welding system applied to pipeline assembly welding | |
CN110042987A (en) | A kind of Anti-pull-press reinforcing bar connector and application method | |
CN101649668A (en) | Large diameter steel bar connecting sleeve | |
CN203944672U (en) | A kind of on-the-spot continuous-tube hydraulic straightening machine of using | |
CN201560534U (en) | Large-diameter reinforcing steel bar connecting sleeve | |
CN202047527U (en) | Rebar rounding rolling straight thread connector | |
CN211714371U (en) | Mechanical connecting device for reinforcing steel bars | |
CN202591304U (en) | Shape righting aligning machine | |
CN209457273U (en) | Reinforced bar hoop connector | |
CN2612751Y (en) | Radial fastening mechanically coupled adaptor with rib reinforcing steel bar | |
CN212866822U (en) | Tool type wall connecting piece | |
CN209482145U (en) | Rapid Reshaping Device for Suspension Bridge Main Cable Strand Entering Saddle | |
CN202689349U (en) | Reinforced rib straight thread attachment joint | |
CN113478436A (en) | Large-diameter large-pitch thread tightening device and manufacturing method thereof | |
JP3150380U (en) | Temporary bolt for regeneration | |
CN202441049U (en) | External pull connecting device of scaffold | |
CN2780885Y (en) | Rolling straight thread sleeve with rib |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C12 | Rejection of a patent application after its publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20130904 |