CN103276803A - 一种空心异形柱多高层装配式钢结构体系 - Google Patents
一种空心异形柱多高层装配式钢结构体系 Download PDFInfo
- Publication number
- CN103276803A CN103276803A CN201310228253XA CN201310228253A CN103276803A CN 103276803 A CN103276803 A CN 103276803A CN 201310228253X A CN201310228253X A CN 201310228253XA CN 201310228253 A CN201310228253 A CN 201310228253A CN 103276803 A CN103276803 A CN 103276803A
- Authority
- CN
- China
- Prior art keywords
- plate
- steel truss
- section steel
- girder
- single channel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 481
- 239000010959 steel Substances 0.000 title claims abstract description 481
- 230000001788 irregular Effects 0.000 title abstract 2
- 238000010276 construction Methods 0.000 claims abstract description 17
- 238000003466 welding Methods 0.000 claims description 28
- 238000004873 anchoring Methods 0.000 claims description 9
- 238000000034 method Methods 0.000 claims description 8
- 230000002146 bilateral Effects 0.000 claims description 7
- YIVWQNVQRXFZJB-UHFFFAOYSA-N o-Succinylbenzoic acid Natural products OC(=O)CCC(=O)C1=CC=CC=C1C(O)=O YIVWQNVQRXFZJB-UHFFFAOYSA-N 0.000 claims description 4
- 239000002131 composite material Substances 0.000 claims description 2
- 239000000203 mixture Substances 0.000 claims description 2
- 239000011150 reinforced concrete Substances 0.000 claims description 2
- 230000015572 biosynthetic process Effects 0.000 claims 2
- 238000005755 formation reaction Methods 0.000 claims 2
- 238000007789 sealing Methods 0.000 abstract 1
- 238000010586 diagram Methods 0.000 description 8
- 238000010923 batch production Methods 0.000 description 3
- 210000001015 Abdomen Anatomy 0.000 description 2
- 230000000875 corresponding Effects 0.000 description 2
- 238000005265 energy consumption Methods 0.000 description 2
- 238000004519 manufacturing process Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 1
- 238000004134 energy conservation Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000001737 promoting Effects 0.000 description 1
- 238000010008 shearing Methods 0.000 description 1
- 230000031068 symbiosis, encompassing mutualism through parasitism Effects 0.000 description 1
- 230000001131 transforming Effects 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Images
Abstract
Description
Claims (7)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310228253.XA CN103276803B (zh) | 2013-06-08 | 2013-06-08 | 一种空心异形柱多高层装配式钢结构体系 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310228253.XA CN103276803B (zh) | 2013-06-08 | 2013-06-08 | 一种空心异形柱多高层装配式钢结构体系 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103276803A true CN103276803A (zh) | 2013-09-04 |
CN103276803B CN103276803B (zh) | 2015-10-28 |
Family
ID=49059409
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310228253.XA Active CN103276803B (zh) | 2013-06-08 | 2013-06-08 | 一种空心异形柱多高层装配式钢结构体系 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103276803B (zh) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103669574A (zh) * | 2013-12-16 | 2014-03-26 | 张跃 | 建筑框架系统及其组装方法 |
CN105604187A (zh) * | 2016-01-27 | 2016-05-25 | 北京工业大学 | 一种装配式钢结构梁柱节点连接装置 |
CN109372187A (zh) * | 2018-12-03 | 2019-02-22 | 北京工业大学 | 含装配式钢管混凝土组合异形柱及耗能钢板墙的框架体系 |
CN113882506A (zh) * | 2021-10-22 | 2022-01-04 | 河南大学 | 一种采用全螺栓连接的装配式桁架梁钢束筒结构体系 |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH09256461A (ja) * | 1996-03-19 | 1997-09-30 | Daiwa House Ind Co Ltd | 柱頭部の柱梁無溶接接合構造 |
CN200949286Y (zh) * | 2006-09-27 | 2007-09-19 | 雅致集成房屋股份有限公司 | 活动房的楼面主梁 |
CN101581115A (zh) * | 2009-06-08 | 2009-11-18 | 清华大学 | 一种混合式钢-混凝土组合框架体系 |
CN101818521A (zh) * | 2010-04-20 | 2010-09-01 | 东南大学 | 一种钢节点预制装配钢筋混凝土框架结构 |
CN101984206A (zh) * | 2010-12-24 | 2011-03-09 | 郑勤民 | 拼装式房屋 |
CN102979178A (zh) * | 2012-11-26 | 2013-03-20 | 北京工业大学 | 一种工业化多高层装配式钢结构框架-偏心支撑体系 |
CN102979176A (zh) * | 2012-11-26 | 2013-03-20 | 北京工业大学 | 一种工业化多高层装配式钢结构体系 |
CN102979168A (zh) * | 2012-11-26 | 2013-03-20 | 北京工业大学 | 一种工业化多高层装配式钢结构框架-中心支撑体系 |
JP2013079508A (ja) * | 2011-10-03 | 2013-05-02 | Nippon Steel & Sumitomo Metal | ラーメン骨組の柱梁接合部 |
-
2013
- 2013-06-08 CN CN201310228253.XA patent/CN103276803B/zh active Active
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH09256461A (ja) * | 1996-03-19 | 1997-09-30 | Daiwa House Ind Co Ltd | 柱頭部の柱梁無溶接接合構造 |
CN200949286Y (zh) * | 2006-09-27 | 2007-09-19 | 雅致集成房屋股份有限公司 | 活动房的楼面主梁 |
CN101581115A (zh) * | 2009-06-08 | 2009-11-18 | 清华大学 | 一种混合式钢-混凝土组合框架体系 |
CN101818521A (zh) * | 2010-04-20 | 2010-09-01 | 东南大学 | 一种钢节点预制装配钢筋混凝土框架结构 |
CN101984206A (zh) * | 2010-12-24 | 2011-03-09 | 郑勤民 | 拼装式房屋 |
JP2013079508A (ja) * | 2011-10-03 | 2013-05-02 | Nippon Steel & Sumitomo Metal | ラーメン骨組の柱梁接合部 |
CN102979178A (zh) * | 2012-11-26 | 2013-03-20 | 北京工业大学 | 一种工业化多高层装配式钢结构框架-偏心支撑体系 |
CN102979176A (zh) * | 2012-11-26 | 2013-03-20 | 北京工业大学 | 一种工业化多高层装配式钢结构体系 |
CN102979168A (zh) * | 2012-11-26 | 2013-03-20 | 北京工业大学 | 一种工业化多高层装配式钢结构框架-中心支撑体系 |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103669574A (zh) * | 2013-12-16 | 2014-03-26 | 张跃 | 建筑框架系统及其组装方法 |
WO2015090094A1 (zh) * | 2013-12-16 | 2015-06-25 | 张跃 | 建筑框架系统及其组装方法 |
CN105604187A (zh) * | 2016-01-27 | 2016-05-25 | 北京工业大学 | 一种装配式钢结构梁柱节点连接装置 |
CN105604187B (zh) * | 2016-01-27 | 2018-01-19 | 北京工业大学 | 一种装配式钢结构梁柱节点连接装置 |
CN109372187A (zh) * | 2018-12-03 | 2019-02-22 | 北京工业大学 | 含装配式钢管混凝土组合异形柱及耗能钢板墙的框架体系 |
CN113882506A (zh) * | 2021-10-22 | 2022-01-04 | 河南大学 | 一种采用全螺栓连接的装配式桁架梁钢束筒结构体系 |
CN113882506B (zh) * | 2021-10-22 | 2022-09-30 | 河南大学 | 一种采用全螺栓连接的装配式桁架梁钢束筒结构体系 |
Also Published As
Publication number | Publication date |
---|---|
CN103276803B (zh) | 2015-10-28 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102979176B (zh) | 一种工业化多高层装配式钢结构体系 | |
CN102979178B (zh) | 一种工业化多高层装配式钢结构框架-偏心支撑体系 | |
CN102995743B (zh) | 一种多高层装配式钢结构体系 | |
CN102979175B (zh) | 一种工业化多高层装配式钢结构框架-预应力偏心支撑体系 | |
CN102979168B (zh) | 一种工业化多高层装配式钢结构框架-中心支撑体系 | |
CN102979169B (zh) | 一种多高层装配式钢结构中心支撑体系 | |
CN102979164A (zh) | 一种多高层装配式钢结构偏心支撑体系 | |
CN102995744A (zh) | 一种工业化多高层装配式钢结构框架-预应力中心支撑体系 | |
CN103410218A (zh) | 一种装配式多高层预应力钢异形柱框架-斜支撑体系 | |
CN102979167A (zh) | 一种多高层装配式钢结构预应力中心支撑体系 | |
CN103334491A (zh) | 一种多高层装配式钢结构异型柱框架支撑体系 | |
CN103276832A (zh) | 一种空心异形柱多高层装配式钢框架-钢板剪力墙体系 | |
CN103206010A (zh) | 一种装配式钢结构预应力偏心支撑框架体系 | |
CN103334488A (zh) | 一种装配式钢结构异型柱框架支撑体系 | |
CN102979170A (zh) | 一种多高层装配式钢结构预应力偏心支撑体系 | |
CN103276833A (zh) | 一种工业化装配式异形柱框架-钢板剪力墙钢结构体系 | |
CN103276793A (zh) | 一种空心异形柱多高层装配式钢框架-中心支撑体系 | |
CN103290925B (zh) | 一种工业化装配式柱贯通式钢结构框架偏心支撑体系 | |
CN103206015A (zh) | 一种装配式钢结构偏心支撑框架体系 | |
CN103276809A (zh) | 一种装配式多高层钢异形柱框架-钢板剪力墙结构体系 | |
CN103276803B (zh) | 一种空心异形柱多高层装配式钢结构体系 | |
CN103276839B (zh) | 一种空心异形柱多高层装配式钢框架-偏心支撑体系 | |
CN103290921B (zh) | 一种工业化装配式柱贯通式钢结构框架体系 | |
CN103276802A (zh) | 一种工业化装配式多高层钢异形柱框架结构体系 | |
CN103290922B (zh) | 一种工业化装配式柱贯通梁实腹式钢结构框架体系 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20191219 Address after: 100000 Beijing Haidian District Huayuan Road No. 2 peony building 4 floor 1424 room Patentee after: Beijing Zhonglian Technology Service Co., Ltd. Address before: 100124 Chaoyang District, Beijing Ping Park, No. 100 Patentee before: Beijing University of Technology Effective date of registration: 20191219 Address after: 313000 1-C, building 1, No. 656, Qixing Road, high tech Zone, Wuxing District, Huzhou City, Zhejiang Province Patentee after: Huzhou xinbeilian Network Technology Co., Ltd Address before: 100000 Beijing Haidian District Huayuan Road No. 2 peony building 4 floor 1424 room Patentee before: Beijing Zhonglian Technology Service Co., Ltd. |
|
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20201126 Address after: 12-14 / F, No. 90, Zhongshan West Road, Zhenjiang City, Jiangsu Province, 212000 Patentee after: ZHENJIANG ELECTRIC POWER DESIGN INSTITUTE Co.,Ltd. Address before: 313000 1-C, building 1, No. 656, Qixing Road, high tech Zone, Wuxing District, Huzhou City, Zhejiang Province Patentee before: Huzhou xinbeilian Network Technology Co.,Ltd. |
|
TR01 | Transfer of patent right |