CN103266773A CN2013101838717A CN201310183871A CN103266773A CN 103266773 A CN103266773 A CN 103266773A CN 2013101838717 A CN2013101838717 A CN 2013101838717A CN 201310183871 A CN201310183871 A CN 201310183871A CN 103266773 A CN103266773 A CN 103266773A
Authority
CN
China
Prior art keywords
base steel
gang
templates
feed pipe
constructional column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2013101838717A
Other languages
Chinese (zh)
Inventor
尹万云
余华春
刘祖国
何夕平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC17 Group Co Ltd
Original Assignee
China MCC17 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC17 Group Co Ltd filed Critical China MCC17 Group Co Ltd
Priority to CN2013101838717A priority Critical patent/CN103266773A/en
Publication of CN103266773A publication Critical patent/CN103266773A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The invention discloses a novel concrete pouring device for constructional columns. The concrete pouring device comprises base steel templates, a feeding pipe, a check valve, combined templates and a pressure relief pipe and is characterized in that the base steel templates are located at the very bottom, the combined templates are arranged on the upper portions of the base steel templates, the base steel templates on the front and rear sides and the combined templates on the front and rear sides are connected and tensioned through split bolts, the feeding pipe and the check valve are installed on a front-side steel template of the base steel templates, and the pressure relief pipe is installed on the front-side combined template of the last combined template. After the device is assembled, a pump pipe is connected with the feeding pipe through a flange plate, so that concrete can be pumped and jacked, the concrete of the constructional columns is compact by the aid of the pumping pressure and the flowability of the concrete and is not required to be vibrated, and the constructional columns are formed in one step. The concrete pouring device has the advantages that the construction efficiency is greatly improved, the work period is greatly shortened, meanwhile, the compactness of the concrete of the constructional columns is guaranteed, the templates are saved, and the templates can be reused.

Description

A kind of novel constructional column concreting device
Technical field
The present invention relates to the concrete construction technology field, relate in particular to a kind of novel constructional column concreting device.
Background technology
Generally adopt lightweight masonries such as concrete block, concrete hollow block, gangue hollow brick as infilled wall in frame construction, the frame-shear wall structure.Though infilled wall is nonload bearing element in frame construction, owing to reasons such as stability deficiency, material contractions, usually can cause wall crazing, diminish the impression in house and normally use, body of wall also can take place under the geological process to collapse.Show according to relevant seimic disaster census data: seismic process middle frame structure infilled wall destroys comparatively serious, and the crack namely appears in general 7 degree, and the above infilled wall major part of 9 degree is collapsed.Therefore, China's " seismic design provision in building code " requires to make clearly regulation to the structure about overlength masonry infilled wall: for strengthening shock resistance and the stability of infilled wall, framework masonry infilled wall length is during greater than 5m or wall is long when surpassing high 2 times of wall, and reinforced concrete structural column should be set in the middle of body of wall.
As infilled wall part of the whole---constructional column, traditional job practices is to stay a hole from side, constructional column template top, and concrete hole is thus irritated down.This technical construction post construction quality can not get effective control, mainly shows: the concrete vibrating leakiness, and the concrete actual strength is on the low side; The structure capital is connected leakiness with beam (plate); The concrete appearance Forming Quality is poor, defectives such as appearance often is loose, crackle, honeycomb, spillage, dew muscle.Have a strong impact on the performance of constructional column performance, weakened constructional column and guaranteed infilled wall resistance to overturning and the effect that prevents the infilled wall wall crazing, stayed hidden danger of quality to building, reduced the safety and reliability of building.Simultaneously, the loss of traditional handicraft template is big, and the construction effect is low, the construction cost height.Reasonably build device so how to design, high-quality to guarantee, efficient, low cost has just become technical research problem highly significant in the constructional column construction.
Summary of the invention
Purpose of the present invention is exactly the above-mentioned shortcoming that exists at prior art, and a kind of novel constructional column concreting device is provided, and improves efficiency of construction, reduces cost, and guarantees the concrete appearance Forming Quality.
The object of the present invention is achieved like this: a kind of novel constructional column concreting device, comprise base steel form, feed pipe, flap valve, gang form, relief tube, it is characterized in that: the base steel form is at bottommost, gang form is on base steel form top, front and back two wing base steel forms are connected tension with both sides, front and back gang form with split bolt, on the front side steel form of base steel form feed pipe, flap valve are installed, on the front side gang form of last piece gang form relief tube are installed.
Described base steel form is made of steel plate by the constructional column size, and feed pipe and preceding wing base steel form are welded as a whole.The flap valve handle sliding rail that 170mm * 12mm is arranged on the preceding wing base steel form, preceding wing base steel form is connected tension with four split bolts and cushion block with back wing base steel form.The switch of charging aperture that moves up and down to control feed pipe by handle.Described base steel form is of a size of 600mm * 450mm.Described split bolt is with plastic bushing outward.
Described feed pipe end is made of 100mm long straight tube and 37 bend pipes of spending radians, and straight tube and bend pipe are steel pipe.Described feed pipe length overall 370mm, external diameter 80mm, wall thickness 4mm.
Described flap valve is made with the steel plate of long 360mm, thick 5mm, and the steel plate front end is the semicircle of radius 60mm, and the rear end is the rectangle of 300mm * 120mm, and it is the circular-arc of 5mm that the steel plate edge is polished into radius, wing base steel form inboard before being close to.
Described gang form is made with wooden form and iron sheet, and wooden form is surrounded by the thick iron sheet of 3mm outward and embeds in the iron sheet groove, and the iron sheet face is connected tension with the front side gang form with the rear side gang form with four split bolts and cushion block with two angle steel are stupefied in opposite directions.Described wooden form, iron sheet, the stupefied height of angle steel * wide 600mm * 444mm, 600mm * 450mm, the 600mm * 50mm of being respectively, the wooden form of last piece gang form, iron sheet and the stupefied height of last root angle steel are decided on actual conditions.
After the present invention's assembling is finished, pump line is linked to each other by flange with feed pipe, get final product the pumping, jacking concrete, make the constructional column concrete compaction by pumping pressure and concrete flowability, need not to vibrate, one-shot forming, treat that concrete lift-up finishes, pull down flap valve, unclamp flange, move to another constructional column, continue construction.
Compared with prior art, advantage of the present invention is: improved efficiency of construction greatly, shortened the duration, guaranteed the concrete density of constructional column simultaneously, saved template, template is reusable.
Description of drawings
Fig. 1: front elevation drawing of the present invention.
Fig. 2: 1-1 sectional drawing of the present invention.
Fig. 3: 2-2 internal view of the present invention.
Fig. 4: rear elevation of the present invention.
Fig. 5: relief tube mounting vertical plane figure.。
Fig. 6: relief tube is installed the 3-3 sectional drawing.
Among the figure: 1, stupefied 4, the feed pipe 5 of base steel form 2, gang form 3, angle steel, flap valve 6, handle 7, sliding rail 8, cushion block 9, plastic bushing 10, split bolt 11, relief tube.
The specific embodiment
For further describing the present invention, below in conjunction with embodiment and accompanying drawing the present invention is further described.
As shown in the figure, a kind of novel constructional column concreting device, comprise base steel form 1, feed pipe 4, flap valve 5, gang form 2, relief tube 11, it is characterized in that: base steel form 1 is at bottommost, gang form 2 is on base steel form 1 top, front and back two wing base steel forms 1 are connected tension with both sides, front and back gang form 2 usefulness split bolts 10, feed pipe 4, flap valve 5 are installed on the front side steel form of base steel form 1, on the front side gang form of last piece gang form 2 relief tube 11 are installed.
Described base steel form 1 is made of steel plate by the constructional column size, and feed pipe 4 is welded as a whole with preceding wing base steel form 1.Flap valve 5 handles 6 sliding rails 7 that 170mm * 12mm is arranged on the preceding wing base steel form 1, preceding four split bolts 10 of wing base steel form 1 usefulness and cushion block 8 are connected tension with back wing base steel form 1.The switch of charging aperture that moves up and down to control feed pipe 4 by handle 6.Described base steel form 1 is of a size of 600mm * 450mm.The described split bolt 10 outer plastic bushings 9 that are with.
Described feed pipe 4 ends are made of 100mm long straight tube and 37 bend pipes of spending radians, and straight tube and bend pipe are steel pipe.Described feed pipe 4 length overall 370mm, external diameter 80mm, wall thickness 4mm.
The steel plate of the long 360mm of described flap valve 5 usefulness, thick 5mm is made, and the steel plate front end is the semicircle of radius 60mm, and the rear end is the rectangle of 300mm * 120mm, and it is the circular-arc of 5mm that the steel plate edge is polished into radius, wing base steel form 1 inboard before being close to.
Described gang form 2 usefulness wooden forms and iron sheet are made, and wooden form is surrounded by the thick iron sheet of 3mm outward and embeds in the iron sheet groove, and the iron sheet face is connected tension with front side gang form 2 with rear side gang form 2 with four split bolts 10 and cushion block 8 with two angle steel stupefied 3 in opposite directions.Described wooden form, iron sheet, stupefied 3 height of angle steel * wide 600mm * 444mm, 600mm * 450mm, the 600mm * 50mm of being respectively, the wooden form of last piece gang form 2, iron sheet and last root angle steel stupefied 3 are highly decided on actual conditions.
It is of the present invention that to install and use step as follows:
1, wooden form is embedded in the iron sheet groove, be made into gang form 2;
2, make base steel form 1, and welding feed pipe 4;
3, gang form 2 is installed, and the gang form 2 that will have a relief tube 11 is installed in the top, puts on the split bolt 10 that is with plastic bushing 9 simultaneously, and tighten, by split bolt 10 front and back gang form 2 is connected;
4, with flange pump line and feed pipe 4 are connected, open flap valve 5, begin the pumping, jacking concrete, constructing to constructional column finishes, and closes flap valve 5;
5, take flange apart, pump line moves to next root constructional column construction;
When 6, treating the constructional column collapsible die, stripping, template moves to down migrates in root constructional column week.

Claims (5)

1. novel constructional column concreting device, comprise base steel form (1), feed pipe (4), flap valve (5), gang form (2), relief tube (11), it is characterized in that: base steel form (1) is at bottommost, gang form (2) is on base steel form (1) top, front and back two wing base steel forms (1) are connected tension with both sides, front and back gang forms (2) with split bolt (10), feed pipe (4) is installed on the front side steel form of base steel form (1), flap valve (5) is equipped with relief tube (11) on the front side gang form of last piece gang form (2);
Described base steel form (1) is made of steel plate by the constructional column size, and feed pipe (4) is welded as a whole with preceding wing base steel form (1); Flap valve (5) handle (6) sliding rail (7) that 170mm * 12mm is arranged on the preceding wing base steel form (1), preceding wing base steel form (1) is connected tension with four split bolts (10) and cushion block (8) with back wing base steel form (1); The switch of charging aperture that moves up and down to control feed pipe (4) by handle (6);
Described feed pipe (4) end is made of 100mm long straight tube and 37 bend pipes of spending radians, and straight tube and bend pipe are steel pipe;
Described flap valve (5) is made with the steel plate of long 360mm, thick 5mm, and the steel plate front end is the semicircle of radius 60mm, and the rear end is the rectangle of 300mm * 120mm, and it is the circular-arc of 5mm that the steel plate edge is polished into radius, wing base steel form (1) inboard before being close to;
Described gang form (2) is made with wooden form and iron sheet, wooden form is surrounded by the thick iron sheet of 3mm outward and embeds in the iron sheet groove, the iron sheet face is connected tension with front side gang form (2) with rear side gang form (2) with four split bolts (10) and cushion block (8) with two angle steel stupefied (3) in opposite directions.
2. a kind of novel constructional column concreting device according to claim 1, it is characterized in that: described base steel form (1) is of a size of 600mm * 450mm.
3. a kind of novel constructional column concreting device according to claim 1 is characterized in that: the outer plastic bushing (9) that is with of described split bolt (10).
4. a kind of novel constructional column concreting device according to claim 1 is characterized in that: described feed pipe (4) length overall 370mm, external diameter 80mm, wall thickness 4mm.
5. a kind of novel constructional column concreting device according to claim 1, it is characterized in that: described wooden form, iron sheet, angle steel stupefied (3) height * wide 600mm of being respectively * 444mm, 600mm * 450mm, 600mm * 50mm, the wooden form of last piece gang form (2), iron sheet and last root angle steel stupefied (3) are highly decided on actual conditions.
CN2013101838717A 2013-05-17 2013-05-17 Novel concrete pouring device for constructional columns Pending CN103266773A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013101838717A CN103266773A (en) 2013-05-17 2013-05-17 Novel concrete pouring device for constructional columns

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013101838717A CN103266773A (en) 2013-05-17 2013-05-17 Novel concrete pouring device for constructional columns

Publications (1)

Publication Number Publication Date
CN103266773A true CN103266773A (en) 2013-08-28

Family

ID=49010427

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013101838717A Pending CN103266773A (en) 2013-05-17 2013-05-17 Novel concrete pouring device for constructional columns

Country Status (1)

Country Link
CN (1) CN103266773A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104372954A (en) * 2014-11-27 2015-02-25 烟台驰龙建筑节能科技有限公司 Pouring device and construction method of grouted wall
CN104831923A (en) * 2015-05-26 2015-08-12 温州东瓯建设集团有限公司 Constructional column steel molding plate
CN109750832A (en) * 2019-01-24 2019-05-14 中建八局第三建设有限公司 A kind of construction method of constructional column concrete self-compaction
CN111472550A (en) * 2020-05-29 2020-07-31 中国建筑第七工程局有限公司 Constructional column concrete pumping device
CN111749467A (en) * 2020-06-29 2020-10-09 中冶天工集团有限公司 Jacking device for steel pipe concrete and construction method thereof
CN111827676A (en) * 2020-06-29 2020-10-27 中冶天工集团有限公司 Steel column internal flow stopping device for jacking concrete filled steel tube and using method thereof
CN113482355A (en) * 2021-08-13 2021-10-08 中冶天工集团有限公司 Pouring device and construction method for sliding formwork constructional column

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN87103180A (en) * 1987-05-04 1988-11-23 首都钢铁公司 Job technique of jack inverted perfusion steel pipe concrete
JPH04336166A (en) * 1991-05-10 1992-11-24 Taisei Corp Concrete press-fit pipe closure device
CN101435265A (en) * 2008-11-21 2009-05-20 中国建筑第八工程局有限公司 Binghaw material conveying pipe apparatus and method for pumping, jacking and placing by the same
CN202187549U (en) * 2011-07-15 2012-04-11 中国十七冶集团有限公司 Constructional column pumping lifting-up concrete pouring device
CN203247852U (en) * 2013-05-17 2013-10-23 中国十七冶集团有限公司 New type concrete pouring apparatus for constructional column

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN87103180A (en) * 1987-05-04 1988-11-23 首都钢铁公司 Job technique of jack inverted perfusion steel pipe concrete
JPH04336166A (en) * 1991-05-10 1992-11-24 Taisei Corp Concrete press-fit pipe closure device
CN101435265A (en) * 2008-11-21 2009-05-20 中国建筑第八工程局有限公司 Binghaw material conveying pipe apparatus and method for pumping, jacking and placing by the same
CN202187549U (en) * 2011-07-15 2012-04-11 中国十七冶集团有限公司 Constructional column pumping lifting-up concrete pouring device
CN203247852U (en) * 2013-05-17 2013-10-23 中国十七冶集团有限公司 New type concrete pouring apparatus for constructional column

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104372954A (en) * 2014-11-27 2015-02-25 烟台驰龙建筑节能科技有限公司 Pouring device and construction method of grouted wall
CN104831923A (en) * 2015-05-26 2015-08-12 温州东瓯建设集团有限公司 Constructional column steel molding plate
CN109750832A (en) * 2019-01-24 2019-05-14 中建八局第三建设有限公司 A kind of construction method of constructional column concrete self-compaction
CN111472550A (en) * 2020-05-29 2020-07-31 中国建筑第七工程局有限公司 Constructional column concrete pumping device
CN111749467A (en) * 2020-06-29 2020-10-09 中冶天工集团有限公司 Jacking device for steel pipe concrete and construction method thereof
CN111827676A (en) * 2020-06-29 2020-10-27 中冶天工集团有限公司 Steel column internal flow stopping device for jacking concrete filled steel tube and using method thereof
CN113482355A (en) * 2021-08-13 2021-10-08 中冶天工集团有限公司 Pouring device and construction method for sliding formwork constructional column

Similar Documents

Publication Publication Date Title
CN103266773A (en) Novel concrete pouring device for constructional columns
CN103883034B (en) A kind of fabricated shear wall of belt edge confining part and wall-beam syndeton
CN202248876U (en) Shear wall door/window opening formwork composite device
CN202767522U (en) Shear wall reinforcing system in deformation joint
CN204703498U (en) Wall of High-building deformation joint template construction structure
CN107989180B (en) Eccentric supporting frame
CN105401655B (en) Self-control energy consumption unbonded prestressed concrete frame
CN204920210U (en) Dysmorphism spar template reinforced structure
CN201686972U (en) Variable arc steel moulding plate for arch crown of dam gallery
CN205975960U (en) Novel assembled roof beam post nodal connection device
CN204081485U (en) Beam bottom mother plate bracing frame
CN210190102U (en) Prefabricated wallboard hydraulic pressure template
CN105735526B (en) Mountable double-deck steel plate with ductility energy consumption connector waves wall
CN204626961U (en) A kind of steel form trussed construction of swallow-tail form large-sized concrete pier stud
CN106567538A (en) Positioning mold for bathroom concrete flanges
CN205822459U (en) A kind of assembled post girder construction of building in the style of the ancients
CN109098439B (en) An adjustable prefabricated space node pouring template
CN203247852U (en) New type concrete pouring apparatus for constructional column
CN209179483U (en) An adjustable prefabricated space node pouring formwork
CN204357000U (en) A kind of precast and assembled reinforced concrete spinous process of the seventh cervical vertebra frame
CN207597584U (en) Accentric support frame
CN207643373U (en) A kind of prefabricated anchor block adjustable composite steel form
CN206752675U (en) A kind of concrete frame node
CN103195079B (en) Installing type template, installing type template group and complete installing type plate device
CN207160418U (en) A kind of reinforced column constructing device of free removal template

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20130828