CN103264977A CN2013101329257A CN201310132925A CN103264977A CN 103264977 A CN103264977 A CN 103264977A CN 2013101329257 A CN2013101329257 A CN 2013101329257A CN 201310132925 A CN201310132925 A CN 201310132925A CN 103264977 A CN103264977 A CN 103264977A
Authority
CN
China
Prior art keywords
screw rod
bow member
gooseneck
hoisting structure
steel crossbeam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2013101329257A
Other languages
English (en)
Inventor
虞功平
徐建华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongtian Construction Group Co Ltd
Original Assignee
Zhongtian Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhongtian Construction Group Co Ltd filed Critical Zhongtian Construction Group Co Ltd
Priority to CN2013101329257A priority Critical patent/CN103264977A/zh
Publication of CN103264977A publication Critical patent/CN103264977A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Jib Cranes (AREA)

Abstract

本发明公开了一种大跨度预应力双拱架吊装结构,包括设于两根并排的承重柱间的操作平台,所述操作平台上设有下钢横梁,在下钢横梁上方设有上钢横梁,所述下钢横梁与上钢横梁之间设有千斤顶,拱架端部位于两根承重柱之间操作平台下方,所述拱架端部与上钢横梁之间由螺杆连接,所述螺杆顶端穿出上钢横梁并由螺帽紧固,所述螺杆底端穿出拱架端部并由螺帽紧固。本发明利用螺杆作为提升工具,利用千斤顶作为动力源提升螺杆,由螺杆牵引拱架至设计标高,保证在拱架吊装过程中施工人员安全健康,保证结构不发生因吊装工艺造成结构质量破坏,同时缩短了吊装时间。

Description

大跨度预应力双拱架吊装结构
技术领域
本发明涉及大跨度预应力双拱架吊装结构。
背景技术
大跨度双拱架吊装重量重,吊装高度高,施工难度大。
发明内容
本发明所要解决的技术问题就是提供一种大跨度预应力双拱架吊装结构,保证在拱架吊装过程中施工人员安全健康,保证结构不发生因吊装工艺造成结构质量破坏,同时缩短吊装时间。
为解决上述技术问题,本发明采用如下技术方案:大跨度预应力双拱架吊装结构,包括设于两根并排的承重柱间的操作平台,其特征在于:所述操作平台上设有下钢横梁,在下钢横梁上方设有上钢横梁,所述下钢横梁与上钢横梁之间设有千斤顶,拱架端部位于两根承重柱之间操作平台下方,所述拱架端部与上钢横梁之间由螺杆连接,所述螺杆顶端穿出上钢横梁并由螺帽紧固,所述螺杆底端穿出拱架端部并由螺帽紧固。
优选的,所述螺杆设有四根并呈矩形分布。
优选的,所述螺杆为精扎螺纹钢,所述螺杆的直径为40mm。
优选的,所述承重柱上设有休息孔。
优选的,所述拱架端部设有供螺杆穿过的提升预留孔,所述提升预留孔内预埋有钢管作套管,钢管套管与拱架内钢筋焊接固定。
本发明利用螺杆作为提升工具,利用千斤顶作为动力源提升螺杆,由螺杆牵引拱架至设计标高,保证在拱架吊装过程中施工人员安全健康,保证结构不发生因吊装工艺造成结构质量破坏,同时缩短了吊装时间。
附图说明
下面结合附图和具体实施方式对本发明作进一步描述:
图1为大跨度预应力双拱架吊装结构示意图。
具体实施方式
下面结合图1具体说明大跨度预应力双拱架吊装结构,两根并排的承重柱1间设有操作平台10,所述操作平台10上设有下钢横梁20,在下钢横梁上方设有上钢横梁21,所述下钢横梁20与上钢横梁21之间设有千斤顶22,拱架端部3位于两根承重柱1之间操作平台10下方,所述拱架端部与上钢横梁之间由螺杆2连接,所述螺杆顶端穿出上钢横梁并由螺帽紧固,所述螺杆底端穿出拱架端部并由螺帽紧固。
所述螺杆设有四根并呈矩形分布。所述螺杆为精扎螺纹钢,所述螺杆的直径为40mm。所述承重柱上设有休息孔。所述拱架端部设有供螺杆穿过的提升预留孔,所述提升预留孔内预埋有钢管作套管,钢管套管与拱架内钢筋焊接固定。

Claims (5)

1.大跨度预应力双拱架吊装结构,包括设于两根并排的承重柱(1)间的操作平台(10),其特征在于:所述操作平台(10)上设有下钢横梁(20),在下钢横梁上方设有上钢横梁(21),所述下钢横梁与上钢横梁之间设有千斤顶(22),拱架端部(3)位于两根承重柱之间操作平台下方,所述拱架端部与上钢横梁之间由螺杆(2)连接,所述螺杆顶端穿出上钢横梁并由螺帽紧固,所述螺杆底端穿出拱架端部并由螺帽紧固。
2.根据权利要求1所述的大跨度预应力双拱架吊装结构,其特征在于:所述螺杆设有四根并呈矩形分布。
3.根据权利要求2所述的大跨度预应力双拱架吊装结构,其特征在于:所述螺杆为精扎螺纹钢,所述螺杆的直径为40mm。
4.根据权利要求1所述的大跨度预应力双拱架吊装结构,其特征在于:所述承重柱上设有休息孔。
5.根据权利要求1所述的大跨度预应力双拱架吊装结构,其特征在于:所述拱架端部设有供螺杆穿过的提升预留孔,所述提升预留孔内预埋有钢管作套管,钢管套管与拱架内钢筋焊接固定。
CN2013101329257A 2013-04-16 2013-04-16 大跨度预应力双拱架吊装结构 Pending CN103264977A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013101329257A CN103264977A (zh) 2013-04-16 2013-04-16 大跨度预应力双拱架吊装结构

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013101329257A CN103264977A (zh) 2013-04-16 2013-04-16 大跨度预应力双拱架吊装结构

Publications (1)

Publication Number Publication Date
CN103264977A true CN103264977A (zh) 2013-08-28

Family

ID=49008657

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013101329257A Pending CN103264977A (zh) 2013-04-16 2013-04-16 大跨度预应力双拱架吊装结构

Country Status (1)

Country Link
CN (1) CN103264977A (zh)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2560249A1 (fr) * 1984-02-27 1985-08-30 Produits Refractaires Procede de montage rapide d'elements constitutifs d'une construction et dispositif mis en oeuvre dans ce procede
JPH07259191A (ja) * 1994-03-22 1995-10-09 Taisei Corp 構造物の全天候施工方法
JPH10196122A (ja) * 1997-01-07 1998-07-28 Taisei Corp アーチ支保工組立システム及び組立方法
CN101898739A (zh) * 2010-08-16 2010-12-01 天津二十冶建设有限公司 一种基于精轧螺纹钢的吊具及吊装方法
CN102777043A (zh) * 2012-08-03 2012-11-14 浙江精工钢结构有限公司 一种拱形结构“零变形”状态提升施工方法
CN202744261U (zh) * 2012-04-19 2013-02-20 东南大学 精轧螺纹钢筋立柱组装式连续提升千斤顶
CN202766206U (zh) * 2012-09-28 2013-03-06 山东省建设高压容器有限公司 一种烟囱钢内筒液压提升装置
CN203159149U (zh) * 2013-04-16 2013-08-28 中天建设集团有限公司 大跨度预应力双拱架吊装结构

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2560249A1 (fr) * 1984-02-27 1985-08-30 Produits Refractaires Procede de montage rapide d'elements constitutifs d'une construction et dispositif mis en oeuvre dans ce procede
JPH07259191A (ja) * 1994-03-22 1995-10-09 Taisei Corp 構造物の全天候施工方法
JPH10196122A (ja) * 1997-01-07 1998-07-28 Taisei Corp アーチ支保工組立システム及び組立方法
CN101898739A (zh) * 2010-08-16 2010-12-01 天津二十冶建设有限公司 一种基于精轧螺纹钢的吊具及吊装方法
CN202744261U (zh) * 2012-04-19 2013-02-20 东南大学 精轧螺纹钢筋立柱组装式连续提升千斤顶
CN102777043A (zh) * 2012-08-03 2012-11-14 浙江精工钢结构有限公司 一种拱形结构“零变形”状态提升施工方法
CN202766206U (zh) * 2012-09-28 2013-03-06 山东省建设高压容器有限公司 一种烟囱钢内筒液压提升装置
CN203159149U (zh) * 2013-04-16 2013-08-28 中天建设集团有限公司 大跨度预应力双拱架吊装结构

Similar Documents

Publication Publication Date Title
CN103669224A (zh) 斜置拱塔双索面预应力混凝土斜拉桥中拱塔施工方法及钢管支架
CN103911957A (zh) 一种预应力连续箱梁悬臂施工挂篮
CN202047376U (zh) 挂篮前移走行轨道装置
CN203973750U (zh) 整体预制t梁张拉防护棚
CN105781210A (zh) 一种锥形塔架及其工具节辅助穿心式整体提升施工方法
CN103266777A (zh) 大跨度预应力双拱架吊装工艺
CN203486756U (zh) 一种适合工字钢的吊具
CN103264977A (zh) 大跨度预应力双拱架吊装结构
CN205775791U (zh) 一种升降式便桥
CN203559314U (zh) 浓密机轨道固定装置
CN203321544U (zh) 一种液压支架
CN204823738U (zh) 一种双梁电葫芦式起重机主梁矫正装置
CN204850482U (zh) 一种千斤顶反张拉预压工具
CN204325941U (zh) 一种桥梁爬架翻模与挂篮一体装置
CN204023414U (zh) 一种新型大型少支点支架整体落架装置
CN203699601U (zh) 施工升降机吊笼的安全就位引导装置
CN202338106U (zh) 悬挑卸料平台墙体吊环
CN202194073U (zh) 大体积长悬臂盖梁施工装置
CN104562938B (zh) 一种桥梁爬架翻模与挂篮一体装置
CN203159149U (zh) 大跨度预应力双拱架吊装结构
CN102677882A (zh) 一种减小支撑架高宽比提高支撑架承载力方法
CN203684111U (zh) 自顶升缆索吊塔顶门架
CN202100011U (zh) 一种先张法预应力u形梁用穿心牵引式台座
CN204125977U (zh) 管桩桩头便捷连接装置
CN203257069U (zh) 大跨度钢桁架高空散拼简易操作平台

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20130828