CN103245882A - Integrated power failure indication and condition monitoring device - Google Patents

Integrated power failure indication and condition monitoring device Download PDF

Info

Publication number
CN103245882A
CN103245882A CN2013101509599A CN201310150959A CN103245882A CN 103245882 A CN103245882 A CN 103245882A CN 2013101509599 A CN2013101509599 A CN 2013101509599A CN 201310150959 A CN201310150959 A CN 201310150959A CN 103245882 A CN103245882 A CN 103245882A
Authority
CN
China
Prior art keywords
copper bar
power failure
indicator
equipment
integrated power
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2013101509599A
Other languages
Chinese (zh)
Other versions
CN103245882B (en
Inventor
刘畅
都志军
刘荣浩
沈宾
刘丽瑶
唐策
严崇松
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Tianjin Electric Power Corp
Original Assignee
State Grid Corp of China SGCC
Tianjin Electric Power Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Tianjin Electric Power Corp filed Critical State Grid Corp of China SGCC
Priority to CN201310150959.9A priority Critical patent/CN103245882B/en
Publication of CN103245882A publication Critical patent/CN103245882A/en
Application granted granted Critical
Publication of CN103245882B publication Critical patent/CN103245882B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Testing Of Short-Circuits, Discontinuities, Leakage, Or Incorrect Line Connections (AREA)

Abstract

The invention relates to an integrated power failure indication and condition monitoring device. The device comprises a copper bar, temperature sensors, a current transformer, a Rogowski coil, a potential indicator, a DTU (Data Terminal Unit) and a control panel and is characterized in that the copper bar is a cylindrical copper bar coated with an insulation sheath; the upper end of the copper bar is connected with that of a switch cabinet, the lower end of the copper bar is connected with a cable, and the upper end and the lower end of the copper bar are tightened through big screws and nuts respectively; the two temperature sensors are mounted at the upper end and the lower end of the copper bar respectively; the Rogowski coil and the voltage sensor are mounted in the middle of the copper bar; the potential indicator is also mounted on the copper bar; and the whole device is sleeved with an insulating housing. The device integrates secondary monitoring equipment and primary equipment into one module, so that only electrical connection of the primary equipment with a simple structure is needed while on-site mounting of the complex secondary equipment is not needed, thereby saving a great amount of power failure reformation time; and meanwhile, inconvenience caused by battery replacement of the failure indicator is solved, and the failure indicator is connected with an in-station direct current supply, which ensures that the failure indicator can run normally for a long time.

Description

Integrated power failure indication and state monitoring apparatus
Technical field
The invention belongs to power distribution automation technical field, relate to the real-time monitoring of the identification of electrical equipment fault high reliability and power equipment hidden danger, especially a kind of integrated power failure indication and state monitoring apparatus.
Background technology
Fault detector is used very extensive as a kind of important tool of searching trouble spot on the power circuit in power industry.Fault detector provides great convenience by detecting outlet, branch and the section at distribution line failure electric current indication fault place to trouble-shooting.Though developed country's power distribution automation level is very high, the main mode of searching distribution line failure still relies on fault detector.But there is following defective in the existing fault indicator: 1, the working power problem of fault detector, the working power of traditional fault detector has dual mode, first kind is to use lithium battery that power supply is provided, battery electric quantity can use 3-4 usually, surpass that battery can take place not work tenure of use or situation such as fault misdescription, bring influence to the operation of intelligent power distribution net, and controller switching equipment quantity is ten hundreds of, very huge, changing battery is again the thing of a time and effort consuming.Second kind is the current draw working power of utilizing a circuit of electrical network, and this kind working power needs electric current on the circuit can not be less than its minimum working current, but just can not use on the less circuit of some little circuit branches and load.2, the malfunction of fault detector and tripping problem, the indicator accuracy present for short trouble can not reach 100%, misoperation sometimes, reason mainly contains: when a equipment normally moves, because cyclization, solution on the circuit are also operated and the switching of the big load equipment of electricity consumption side, produce dash current sometimes, cause the fault detector misoperation suddenly; B motor feedback is sent electric problem, and motor stall at once when namely being short-circuited transfers generator to by motor and send electricity to the loop that short dot constitutes, or discharging and recharging of capacitor and produce send electric current, and electric current moment amplitude is very big, decays to zero subsequently.Because the outlet breaker tripping operation of previous transformer station, indicator is experienced electric current, voltage again and all reduced to zero, and is similar with fault current, causes the fault detector indication of non-fault branch circuit or load-side wrong.This is indeterminable problem still at present; The traditional fault detector of c can only the detection line fault, does not possess status monitoring function.
Development along with intelligent grid, the status monitoring of power distribution network more and more comes into one's own, when accident takes place, do not become distribution future development trend with regard to the discovering device potential safety hazard, but the existing fault indicator can only detect the generation of fault by excess current etc., can not discovering device hidden danger., equipment such as fault detector, current transformer, electrification display, cable end temperature measurement module construction, install loaded down with trivial details.And traditional power distribution automation transformation for remote measurement amounts such as the electric current on the detection line, voltage, temperature, need be installed numerous mutual inductors, sensor etc. at cable.In addition, to the power distribution network transformation, the power off time of permission is very limited in the completed region of the city, need the Fast Installation automation equipment, therefore install, connect a large amount of mutual inductors, sensor device at cable, not only step is very loaded down with trivial details, make mistakes easily, also take on-the-spot power off time in a large number.So existing power distribution automation renovation technique is not enough to some extent.
Summary of the invention
The objective of the invention is to overcome the weak point of original technology, provide a kind of integrated power failure indication and state monitoring apparatus, the electric current when this device breaks down according to cable on the cable and the Changing Pattern of voltage, failure judgement position; The concept of bonding state monitoring simultaneously, some potential safety hazards that exist in the time of can the checkout equipment operation.
The technical scheme that technical solution problem of the present invention adopts is:
A kind of integrated power failure indication and state monitoring apparatus comprise copper bar, temperature sensor, current transformer, Luo-coil, band point indicator and DTU, and it is characterized in that: described this copper bar is a cylindrical copper bar, and its outer rim is coated with insulation sheath; The copper bar of the last termination switch cubicle of this copper bar, following terminated cable are also used the king bolt nut screwing clamping respectively, the upper/lower terminal of copper bar is installed two temperature sensors respectively, there are a Luo-coil and a voltage sensor in the middle part, one potential indicator also is installed on this copper bar, and whole device is set with an insulation crust outward.
And, the temperature sensor that described copper bar is installed and each coil, its wiring is received on the inner terminal row and is drawn, outside dress aviation plug.
Advantage of the present invention and good effect are:
1, this device only needs secondary monitoring equipment and the integrated module of primary equipment when mounted primary equipment simple in structure is electrically connected, and does not need to reproduce a secondary device that complexity is installed, and saves a large amount of power failure transformation times; Solved fault detector simultaneously and need change the inconvenience of battery, connected direct supply in the station, can guarantee namely that fault detector runs well for a long time.
2, the fault decision logic of this device is changed to some extent, can mask two kinds of false faults, and huge effect has been played in the true(-)running of power distribution automation.
3, this device has increased status monitoring function, solve traditional fault detector and can only gather cable short circuit or earth fault, can not monitor cable splice and connect the hidden danger that does not closely cause, can not monitor near the generation whether shelf depreciation is arranged the cable splice, can make equipment when breaking down, the accident that prevents is in possible trouble.
4, this device solves power distribution automation station loaded down with trivial details difficult problem of erecting equipment when transforming, solve measure, inconvenience that monitoring device is installed, save the power failure transformation time, bring huge social, economic benefit.
Description of drawings
Fig. 1 is parts connection diagram of the present invention.
Embodiment:
For further understanding content of the present invention, characteristics and effect, exemplify following examples now, and conjunction with figs. is described in detail as follows.Need to prove that present embodiment is descriptive, is not determinate, can not limit protection scope of the present invention thus.
A kind of integrated power failure indication and state monitoring apparatus, comprise copper bar 10, temperature sensor 2(8), current transformer 12, Luo-coil 11, band point indicator 9 and DTU, display panel 6, this copper bar is a cylindrical copper bar, and its outer rim is coated with insulation sheath; The upper end 1 of this copper bar connects the copper bar of switch cubicle, lower end 7 connects cable, and use king bolt nut (the present embodiment accompanying drawing does not illustrate) to tighten respectively, the upper/lower terminal of copper bar is installed two temperature sensors respectively, there are a Luo-coil and a voltage sensor in the middle part, one potential indicator also is installed on this copper bar, and whole device is set with an insulation crust 3 outward.
The temperature sensor that copper bar is installed and each coil, its wiring are received on the inner terminal row 5 and are drawn, and outside dress aviation plug is pegged graft when being convenient to on-the-spot the installation.
This device fault judge the logical method take the compound judgement of electric current making alive, step is:
1, uses MSP430F149 single-chip microcomputer 4, operating voltage 2.7---3.6V.Earlier potential indicator voltage is inserted single-chip microcomputer first via A/D input interface, the monitoring input value is less than the 5%(busbar decompression of busbar rated voltage), open as fault detect.
2, the current value with current transformer is converted into magnitude of voltage, input single-chip microcomputer the second road A/D input interface, and when detecting unlatching, every 4ms gathers once, gathers altogether 100 times.Per 10 samplings are used least square method as one group, calculate a slope value K.
3, adjacent two K values are compared, rate of change then is considered as current break greater than X, is true fault; Rate of change then is considered as the electric current gradual change less than X, send electric fault for motor is counter.
4, with single-chip microcomputer one road I/O interface as output, connect the fault detector display panel, when detecting true fault, I/O exports high level, control panel is reported to the police.
5, two temperature sensors are inserted two-way A/D interface, by single-chip microcomputer output digital value, show temperature of cable junction by the digital display screen on the panel.
The principle of work of this device is:
Employing external direct current power supply power supply is installed electric current and potential indicator at device, installs two temperature measurement modules additional, and the temperature of measuring switch cabinet busbar and two contact points of cable splice is monitored the hidden danger of loose contact in real time; Install Luo-coil additional at device, draw two wiring, send DTU to, judge whether to exist shelf depreciation by the DTU algorithm.

Claims (2)

1. an integrated power failure is indicated and state monitoring apparatus, comprise copper bar, temperature sensor, current transformer, Luo-coil, band point indicator and DTU, it is characterized in that: described this copper bar is a cylindrical copper bar, and its outer rim is coated with insulation sheath; The copper bar of the last termination switch cubicle of this copper bar, following terminated cable are also used the king bolt nut screwing clamping respectively, the upper/lower terminal of copper bar is installed two temperature sensors respectively, there are a Luo-coil and a voltage sensor in the middle part, one potential indicator also is installed on this copper bar, and whole device is set with an insulation crust outward.
2. integrated power failure according to claim 1 is indicated and state monitoring apparatus, it is characterized in that: the temperature sensor that described copper bar is installed and each coil, its wiring are received on the inner terminal row and are drawn, outside dress aviation plug.
CN201310150959.9A 2013-04-27 2013-04-27 The power failure instruction of integration and state monitoring apparatus Active CN103245882B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310150959.9A CN103245882B (en) 2013-04-27 2013-04-27 The power failure instruction of integration and state monitoring apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310150959.9A CN103245882B (en) 2013-04-27 2013-04-27 The power failure instruction of integration and state monitoring apparatus

Publications (2)

Publication Number Publication Date
CN103245882A true CN103245882A (en) 2013-08-14
CN103245882B CN103245882B (en) 2015-11-11

Family

ID=48925525

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310150959.9A Active CN103245882B (en) 2013-04-27 2013-04-27 The power failure instruction of integration and state monitoring apparatus

Country Status (1)

Country Link
CN (1) CN103245882B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103900636A (en) * 2014-03-18 2014-07-02 扬州科宇电力有限公司 Online insulation and temperature monitoring system used for 12kV solid insulated switch cabinet
CN104714070A (en) * 2013-12-13 2015-06-17 广东四会互感器厂有限公司 Current sensor adopting differential coil structure
CN110286265A (en) * 2019-07-24 2019-09-27 四川电器集团股份有限公司 Contact arm measure annular device for vacuum circuit breaker
CN110658422A (en) * 2018-06-29 2020-01-07 Abb瑞士股份有限公司 Fail-safe retrofit kit for partial discharge monitoring system and pre-installed Voltage Indication System (VIS)

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08304506A (en) * 1995-05-10 1996-11-22 Kyosan Electric Mfg Co Ltd Device for detecting broken core of navigation light
CN201174529Y (en) * 2007-09-04 2008-12-31 赵国生 Contact box having Rogowski coil
CN201229389Y (en) * 2008-07-24 2009-04-29 福建省泉州电业局 Cable sheath insulation on-line monitoring device
CN101794986A (en) * 2010-03-12 2010-08-04 镇江大全赛雪龙牵引电气有限公司 Line test device and test method of direct-current traction power supply switch cabinet
CN102053193A (en) * 2009-10-27 2011-05-11 广东四会互感器厂有限公司 Current sensor adopting differential coil structure
CN201876517U (en) * 2010-11-26 2011-06-22 山东电力集团公司淄博供电公司 Atmosphere over-voltage intrusion wave monitoring system
CN202190003U (en) * 2011-09-15 2012-04-11 山东电力工程咨询院有限公司 Intelligent component cabinet of intelligent substation
CN102435813A (en) * 2011-09-28 2012-05-02 许继电气股份有限公司 Current acquisition method for low-voltage side of electric furnace transformer and relay protection device
CN202276194U (en) * 2011-10-14 2012-06-13 安徽一天电气技术有限公司 Online medium voltage switch cabinet monitoring device
CN102510007A (en) * 2011-11-10 2012-06-20 杭州恒信电气有限公司 Intelligent medium voltage switch cabinet
CN102638097A (en) * 2012-03-26 2012-08-15 天津市三源电力设备制造有限公司 Remote concentrated measurement and control system for distribution network
CN102879712A (en) * 2012-10-22 2013-01-16 重庆市电力公司长寿供电局 System and method for positioning power distribution network terminal failures

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08304506A (en) * 1995-05-10 1996-11-22 Kyosan Electric Mfg Co Ltd Device for detecting broken core of navigation light
CN201174529Y (en) * 2007-09-04 2008-12-31 赵国生 Contact box having Rogowski coil
CN201229389Y (en) * 2008-07-24 2009-04-29 福建省泉州电业局 Cable sheath insulation on-line monitoring device
CN102053193A (en) * 2009-10-27 2011-05-11 广东四会互感器厂有限公司 Current sensor adopting differential coil structure
CN101794986A (en) * 2010-03-12 2010-08-04 镇江大全赛雪龙牵引电气有限公司 Line test device and test method of direct-current traction power supply switch cabinet
CN201876517U (en) * 2010-11-26 2011-06-22 山东电力集团公司淄博供电公司 Atmosphere over-voltage intrusion wave monitoring system
CN202190003U (en) * 2011-09-15 2012-04-11 山东电力工程咨询院有限公司 Intelligent component cabinet of intelligent substation
CN102435813A (en) * 2011-09-28 2012-05-02 许继电气股份有限公司 Current acquisition method for low-voltage side of electric furnace transformer and relay protection device
CN202276194U (en) * 2011-10-14 2012-06-13 安徽一天电气技术有限公司 Online medium voltage switch cabinet monitoring device
CN102510007A (en) * 2011-11-10 2012-06-20 杭州恒信电气有限公司 Intelligent medium voltage switch cabinet
CN102638097A (en) * 2012-03-26 2012-08-15 天津市三源电力设备制造有限公司 Remote concentrated measurement and control system for distribution network
CN102879712A (en) * 2012-10-22 2013-01-16 重庆市电力公司长寿供电局 System and method for positioning power distribution network terminal failures

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104714070A (en) * 2013-12-13 2015-06-17 广东四会互感器厂有限公司 Current sensor adopting differential coil structure
CN103900636A (en) * 2014-03-18 2014-07-02 扬州科宇电力有限公司 Online insulation and temperature monitoring system used for 12kV solid insulated switch cabinet
CN110658422A (en) * 2018-06-29 2020-01-07 Abb瑞士股份有限公司 Fail-safe retrofit kit for partial discharge monitoring system and pre-installed Voltage Indication System (VIS)
CN110658422B (en) * 2018-06-29 2024-05-28 Abb瑞士股份有限公司 Failsafe retrofit kit for partial discharge monitoring systems and pre-installed Voltage Indication Systems (VIS)
CN110286265A (en) * 2019-07-24 2019-09-27 四川电器集团股份有限公司 Contact arm measure annular device for vacuum circuit breaker
CN110286265B (en) * 2019-07-24 2024-05-10 河北杰能电气设备有限公司 Contact arm measuring ring device for vacuum circuit breaker

Also Published As

Publication number Publication date
CN103245882B (en) 2015-11-11

Similar Documents

Publication Publication Date Title
CN105449865A (en) Intelligent (feeder terminal unit) FTU used for fault positioning and isolating for distribution network
CN202126470U (en) Power cable insulation online monitoring device
CN106168638B (en) Method for realizing online monitoring of high-voltage parallel capacitor by using relay protection device
CN103457192A (en) Intelligent medium voltage switch cabinet
CN103245882A (en) Integrated power failure indication and condition monitoring device
CN209446711U (en) High-tension cable is cross interconnected and insulated on-line monitoring system
CN103675606A (en) Bridge type direct-current fault monitoring alarm
CN103616616A (en) Fault detection method for large-scale grounding grid
CN203037795U (en) Small current grounding line selection system based on CAN network
CN113189481B (en) Electric power instrument with circuit breaker service life monitoring function and monitoring method
CN212008850U (en) Intelligent primary and secondary fused on-column circuit breaker
CN102981105B (en) Based on the Little Current Ground Connection System of CAN network
CN203519062U (en) Switch cabinet partial discharge intelligent on-line monitoring system
CN207074818U (en) A kind of intelligent GIS and Intelligent component cabinet
CN103245885B (en) Power failure instruction and the status monitoring logic judging method of integration
CN202794326U (en) Online monitoring device for grounding current of transformer core
CN209894890U (en) Grounding current on-line monitoring device for grounding iron core of transformer based on PLC
CN202003180U (en) Low-voltage power distribution intelligent controller
CN112671095A (en) Intelligent power distribution terminal and function modularization method, type selection method and expansion method thereof
CN203630273U (en) Bridge-type direct-current fault monitoring alarm
CN110460046B (en) Intelligent power distribution management system and method applied to ships
CN205622313U (en) Two power automatic transfer switch controllers
CN211530850U (en) Intelligent power distribution terminal and system
CN208092163U (en) A kind of EKL5-D-Q novel cables type accident indicator
CN202903864U (en) Electric leakage current detection device of single-phase AC power supply circuit

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant