CN103241668A - 深海海底储罐安装装备及方法 - Google Patents

深海海底储罐安装装备及方法 Download PDF

Info

Publication number
CN103241668A
CN103241668A CN2012100274318A CN201210027431A CN103241668A CN 103241668 A CN103241668 A CN 103241668A CN 2012100274318 A CN2012100274318 A CN 2012100274318A CN 201210027431 A CN201210027431 A CN 201210027431A CN 103241668 A CN103241668 A CN 103241668A
Authority
CN
China
Prior art keywords
storage tank
sea
seabed
deep
oil
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012100274318A
Other languages
English (en)
Inventor
徐松森
张士华
高慧
初新杰
丁善福
王海涛
李森
吴泉佟
于鸿洁
杨宁宁
刘景红
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Petroleum and Chemical Corp
Drilling Technology Research Institute of Sinopec Shengli Petroleum Administration Bureau
Original Assignee
China Petroleum and Chemical Corp
Drilling Technology Research Institute of Sinopec Shengli Petroleum Administration Bureau
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Petroleum and Chemical Corp, Drilling Technology Research Institute of Sinopec Shengli Petroleum Administration Bureau filed Critical China Petroleum and Chemical Corp
Priority to CN2012100274318A priority Critical patent/CN103241668A/zh
Publication of CN103241668A publication Critical patent/CN103241668A/zh
Pending legal-status Critical Current

Links

Images

Abstract

深海海底储罐安装装备及方法属于海洋工程技术领域,解决超过常规浮吊起重与容绳联合能力的海底储罐等大型海底构筑物深海安装难题。深海海底储罐安装装备由提吊架、升沉补偿器、收放绞车、供油船、充填液充排管路组成,海上安装时在储罐内充满油等轻质液体,用升沉补偿器消减船舶振摇等引起的附加惯性力。本发明通过现有装备的合理组合,实现了过去无法在深海安装自重过千吨的大型设施的难题;通过充油,实现了体内外压力的自动平衡,结构设计易于实现;串接升沉补偿装置进行吊装作业,可以降低安装大型水下设施时环境因素对浮吊等设备的影响。

Description

深海海底储罐安装装备及方法
技术领域
本发明属于海洋工程技术领域,涉及海底储罐等大型水下结构物的深海安装技术。
背景技术
受到浮吊起吊能力和容绳量的限制,目前深海海底安装单体的最大重量不超过数百吨,尚无单体自重千吨以上的庞大结构在300m以上海域水下安装先例。海上大型浮吊尽管最大起吊能力达到上万吨,但通常有效升降变化范围与起重臂高度相近,也有作业者为了进行深海安装,对浮吊进行临时改装增大绞车容绳量、减少穿绳滑轮,这同时也大大降低了可安装单体的最大重量。
在重力式平台等安装主要依靠结构自身的浮性,或利用浮筒等协助完成安装,而不是依靠吊车,这不适于深海海底安装。
我单位已经申报过专利--深水水下储油石油生产系统(CN101672176)提出大型水下储罐采用充气式安装,优点是成本低,可提供的浮力大,可以携带更大配重;存在的问题是随着水深变化,罐内空气被大幅压缩,需要不断充气,水深时大量的压缩空气耗能高且供气管路、设备选型困难,只适于在水深较浅时采用。
目前海上浮吊、升沉补偿器、油船、大型绞车等设施属于成熟技术,但未见通过优化组合并用于海底大型设施安装的技术。
发明内容
本发明的目的是在于主要利用现有关键装备的组合,形成深海海底储罐安装装备及方法,解决大型罐体结构物在深海的安装难题。
本发明的技术解决方案:
深海海底储罐安装装备,由提吊架1、升沉补偿器2、收放绞车3、供油船4、充填液充排管路5组成;其中升沉补偿器2上端固定在提吊架1上,下端附设滑轮6;收放绞车3的缆索穿过滑轮6与储罐7相连;充填液充排管路5连接供油船4和储罐7。
各组件的连接次序可调整或简单组合变化。装置还包含压力传感器13、位移传感器14、超声测距传感器15、视频监视器16之一或其任意组合,并通过有线或无线方式传输到工作母船上。收放绞车起升能力1000t以上,安装储罐自重1000-20000t,储罐充填低密度液体后水中重量50-1000t。
深海海底储罐安装方法是:
第一步:供油船4通过充填液充排管路5向储罐7充油,同时排出储罐7内原有气体。
第二步:在充油过程中,储罐7缓慢下沉,待接近被海水淹没时,收放绞车3收缆索,使之承受额定范围内的拉力,持续充油直至储罐内完全充满液体。
第三步:关闭储罐5上与充填液充排管路3相连的阀门,然后断开充填液充排管路3与储罐5的连接。
第四步:收放绞车3放缆索,储罐7下放,直至海底并调整至规定位置。待以后连接海底储罐7和水面接收设施之间的立管安装完成后,储罐内的置换油即可通过立管导出。
步骤次序可调整或合并。
由于深海海底受到的浪流力很小,只要重力略大于浮力,并经过校核计算,即可保障水下储罐安装后保持水下稳定。
发明的有益效果:
(1)通过现有装备的合理组合,实现了过去无法在深海安装自重过千吨的大型设施的难题,特别是解决了水下储罐的安装难题,为以水下储罐为基础的各种海上开发方案的制定扫除了一项障碍。
(2)通过充油,实现了体内外压力的自动平衡,结构设计易于实现。特别在深海安装时,代替充气调整内外平衡,不必在下沉过程中持续调整充气压力平衡浮力等,并可因此省去控制气路,提高安全可靠性。
(3)串接升沉补偿装置进行吊装作业,可以降低安装大型水下设施时环境因素对浮吊等设备的影响。
附图说明
图1为深海海底储罐安装示意图
图2为升沉补偿器随储罐入水的深海海底储罐安装示意图
图3 为一种封闭的深海海底储罐
图4为一种无底的深海海底储罐
1-提吊架、2-升沉补偿器、3-收放绞车、4-供油船 、5-充填液充排管路、6-滑轮、7-储罐、8-注排油阀、9-深水立管接口及阀、10-排气阀、11-通海阀、12-油泵、13-压力传感器、14-位移传感器、15-超声测距传感器、16-视频监视器。
具体实施方式
以下结合说明书附图1、附图2、附图3、附图4说明装备构成、连接关系及安装施工工艺:
附图1中深海海底储罐安装装备由提吊架1、升沉补偿器2、收放绞车3、供油船4、充填液充排管路5组成。升沉补偿器2上端固定在提吊架1上,下端附设滑轮6;收放绞车3的缆索穿过滑轮6与储罐7相连;充填液充排管路5连接供油船4和储罐7。采用该连接方式时升沉补偿器2不随储罐7入水。
附图2中深海海底储罐安装装备由浮吊(含提吊架1、收放绞车3)、升沉补偿器2、供油船4、充填液充排管路5组成。升沉补偿器2上端固定在浮吊吊钩上,下端与储罐7相连;充填液充排管路5连接供油船4和储罐7。采用此连接方式时升沉补偿器2随储罐7入水。
附图3、附图4分别表示了封闭型深海海底储罐、无底的深海海底储罐以及配属阀门、传感器布置情况。
深海海底储罐的安装工艺是:
第一步:提吊装置1、供油船4、储罐7均自航或拖航至安装海域就位。
第二步:按照前述连接关系完成提吊架1、升沉补偿器2、收放绞车3、储罐7之间的连接以及供油船4、充填液充排管路5、储罐7之间连接。
第三步:供油船4通过充填液充排管路5向储罐7充油,同时排出储罐7内原有气体。如果经过计算充满油后罐体浮力会大于总重力,需要先在罐内灌注适量海水。
第四步:在充油过程中,储罐7缓慢下沉,待接近被海水淹没时,收放绞车3收缆索,使之承受额定范围内的拉力,持续充油直至储罐内完全充满液体。此时罐体水中总重量应控制在略大于浮力,还需考虑安装完成后至立管安装之前储罐7在水下的抗滑移等稳定性。
第五步:关闭储罐7上与充填液充排管路5相连的阀门,然后断开充填液充排管路5与储罐7的连接。储罐5上附设的其他阀门除下部所设通海阀外也全部关闭。
第六步:收放绞车3放缆索,储罐7下放,直至海底并调整至规定位置。
第七步:经过以上六步基本完成储罐安装,用ROV协助解脱储罐上的吊索。待以后连接海底储罐7和水面接收设施之间的立管安装完成后,储罐内的置换油可通过立管导出。
上述安装过程中采用压力传感器测量罐内液位,采用位移传感器和压力传感器测量储罐下沉深度,采用超声传感器测量距海底的距离,采用ROV上携带视频监视器观察安装情况并避免与已有海底设施安装位置冲突。
以下实施例除参数不同外均采用上述安装装备和安装工艺。
实施例1:  20000 m3水下储罐安装
储罐主体为钢制,型式为双层壁、双层顶,无底。储罐最大容量20000 m3,含固定配重自重4780t。目标海区水深1500m。储油舱充16800 m3密度为840kg/m3的柴油、其他空间充满海水后,水下重量246t。用目前浮吊和钻井船用升沉补偿器能够实现。此种组合还具备一定调整裕量。
实施例2:  10万方海底储罐安装。储罐形式为封闭式组合储罐,设计罐体储油容量10万方,含固定配重自重为18577t。储油舱充84000 m3密度850kg/m3的柴油,其他空间充满海水。水下重量757t。此种组合也具备一定调整裕量。
实施例3: 4000 m3×N(N为整数)水下罐组安装。水下储罐单元为封闭型储罐,单罐额定容量4000 m3,含固定配重自重1509t,目标区水深300m。储油舱充满密度800kg/m3的煤油,单体水下重量85t。单体完成后水下作业完成各罐的连接。

Claims (6)

1.深海海底储罐安装装备,由提吊架(1)、升沉补偿器(2)、收放绞车(3)、供油船(4)、充填液充排管路(5)组成,其特征是:升沉补偿器(2)上端固定在提吊架(1)上,下端附设滑轮(6);收放绞车(3)的缆索穿过滑轮(6)与储罐(7)相连;充填液充排管路(5)连接供油船(4)和储罐(7)。
2.权利要求1所述的深海海底储罐安装装备,其特征是:各组件的连接次序可调整或简单组合变化。
3.权利要求1所述的深海海底储罐安装装备,其特征是:包含压力传感器(13)、位移传感器(14)、超声测距传感器(15)、视频监视器(16)之一或其任意组合,并通过有线或无线方式传输到工作母船上。
4.深海海底储罐安装方法,其特征是:
第一步:供油船(4)通过充填液充排管路(5)向储罐(7)充油,同时排出储罐(7)内原有气体;
第二步:在充油过程中,储罐(7)缓慢下沉,待接近被海水淹没时,收放绞车(3)收缆索,使之承受额定范围内的拉力,持续充油直至储罐内完全充满液体;
第三步:关闭储罐(5)上与充填液充排管路(3)相连的阀门,然后断开充填液充排管路(3)与储罐(5)的连接;
第四步:收放绞车(3)放缆索,储罐(7)下放,直至海底并调整至规定位置;
待以后连接海底储罐(7)和水面接收设施之间的立管安装完成后,储罐内的置换油即可通过立管导出。
5.权利要求4所述的深海海底储罐安装方法,其特征是:收放绞车起升能力1000t以上,安装储罐自重1000-20000t,储罐充填低密度液体后水中重量50-1000t。
6.权利要求4所述的深海海底储罐安装方法,其特征是:步骤次序可调整或合并。
CN2012100274318A 2012-02-08 2012-02-08 深海海底储罐安装装备及方法 Pending CN103241668A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012100274318A CN103241668A (zh) 2012-02-08 2012-02-08 深海海底储罐安装装备及方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012100274318A CN103241668A (zh) 2012-02-08 2012-02-08 深海海底储罐安装装备及方法

Publications (1)

Publication Number Publication Date
CN103241668A true CN103241668A (zh) 2013-08-14

Family

ID=48921585

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012100274318A Pending CN103241668A (zh) 2012-02-08 2012-02-08 深海海底储罐安装装备及方法

Country Status (1)

Country Link
CN (1) CN103241668A (zh)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104495618A (zh) * 2014-12-01 2015-04-08 中国葛洲坝集团第六工程有限公司 一种利用小型起重设备安装水下超重构件的方法
CN105752861A (zh) * 2014-12-19 2016-07-13 中石化胜利石油工程有限公司钻井工艺研究院 利用浮力块和吊导两用索安装深海水下重型设施的方法
CN105775074A (zh) * 2014-12-19 2016-07-20 中石化胜利石油工程有限公司钻井工艺研究院 渐次自由释放浮力块的深海重型设施安装方法
CN108547278A (zh) * 2018-05-24 2018-09-18 海洋石油工程股份有限公司 基于导管架吊装船舶的海床处理方法
CN109132869A (zh) * 2018-09-21 2019-01-04 中国船舶科学研究中心(中国船舶重工集团公司第七0二研究所) 一种海上人员转移系统及方法
CN110745215A (zh) * 2019-10-09 2020-02-04 中国石油大学(北京) 深海作业装备的下放系统及下放方法
CN117446364A (zh) * 2023-12-18 2024-01-26 泰安市特种设备检验研究院 一种具有改进充排控制机构的高安全性罐车

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5899637A (en) * 1996-12-11 1999-05-04 American Oilfield Divers, Inc. Offshore production and storage facility and method of installing the same
CN1243083A (zh) * 1998-07-28 2000-02-02 J·雷·麦克德莫特股份有限公司 深水放置装置
CN1286665A (zh) * 1997-12-18 2001-03-07 美国油田钻探公司 海洋生产和贮存设备及其安装方法
US20020141829A1 (en) * 2001-03-27 2002-10-03 Choi Michael S. Seabed oil storage and tanker offtake system
CN201292828Y (zh) * 2008-09-09 2009-08-19 中国石化集团胜利石油管理局钻井工艺研究院 深水水下储油石油生产装置
CN202529761U (zh) * 2012-02-08 2012-11-14 中国石油化工股份有限公司 深海海底储罐安装装备

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5899637A (en) * 1996-12-11 1999-05-04 American Oilfield Divers, Inc. Offshore production and storage facility and method of installing the same
CN1286665A (zh) * 1997-12-18 2001-03-07 美国油田钻探公司 海洋生产和贮存设备及其安装方法
CN1243083A (zh) * 1998-07-28 2000-02-02 J·雷·麦克德莫特股份有限公司 深水放置装置
US20020141829A1 (en) * 2001-03-27 2002-10-03 Choi Michael S. Seabed oil storage and tanker offtake system
CN201292828Y (zh) * 2008-09-09 2009-08-19 中国石化集团胜利石油管理局钻井工艺研究院 深水水下储油石油生产装置
CN202529761U (zh) * 2012-02-08 2012-11-14 中国石油化工股份有限公司 深海海底储罐安装装备

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104495618A (zh) * 2014-12-01 2015-04-08 中国葛洲坝集团第六工程有限公司 一种利用小型起重设备安装水下超重构件的方法
CN104495618B (zh) * 2014-12-01 2016-09-21 中国葛洲坝集团第六工程有限公司 一种利用小型起重设备安装水下超重构件的方法
CN105752861A (zh) * 2014-12-19 2016-07-13 中石化胜利石油工程有限公司钻井工艺研究院 利用浮力块和吊导两用索安装深海水下重型设施的方法
CN105775074A (zh) * 2014-12-19 2016-07-20 中石化胜利石油工程有限公司钻井工艺研究院 渐次自由释放浮力块的深海重型设施安装方法
CN105775074B (zh) * 2014-12-19 2017-10-10 中石化胜利石油工程有限公司钻井工艺研究院 渐次自由释放浮力块的深海重型设施安装方法
CN105752861B (zh) * 2014-12-19 2017-12-12 中石化胜利石油工程有限公司钻井工艺研究院 利用浮力块和吊导两用索安装深海水下重型设施的方法
CN108547278A (zh) * 2018-05-24 2018-09-18 海洋石油工程股份有限公司 基于导管架吊装船舶的海床处理方法
CN108547278B (zh) * 2018-05-24 2020-09-18 海洋石油工程股份有限公司 基于导管架吊装船舶的海床处理方法
CN109132869A (zh) * 2018-09-21 2019-01-04 中国船舶科学研究中心(中国船舶重工集团公司第七0二研究所) 一种海上人员转移系统及方法
CN109132869B (zh) * 2018-09-21 2020-04-07 中国船舶科学研究中心(中国船舶重工集团公司第七0二研究所) 一种海上人员转移系统及方法
CN110745215A (zh) * 2019-10-09 2020-02-04 中国石油大学(北京) 深海作业装备的下放系统及下放方法
CN110745215B (zh) * 2019-10-09 2020-11-13 中国石油大学(北京) 深海作业装备的下放系统及下放方法
CN117446364A (zh) * 2023-12-18 2024-01-26 泰安市特种设备检验研究院 一种具有改进充排控制机构的高安全性罐车
CN117446364B (zh) * 2023-12-18 2024-03-15 泰安市特种设备检验研究院 一种具有改进充排控制机构的高安全性罐车

Similar Documents

Publication Publication Date Title
WO2017107936A1 (zh) 利用视频测距的海洋平台起重机升沉补偿控制系统及方法
CN103241668A (zh) 深海海底储罐安装装备及方法
CN101774422B (zh) 一种海上安装施工资源-组合式工程驳
CN102322062B (zh) 一种桶式防波堤基础桶体的搬运及安装工艺
EA020375B1 (ru) Способ опускания груза на дно водоема и установка для его осуществления
CN106677258B (zh) 一种电厂海上取水头沉箱的安装工艺
CN203345167U (zh) 可移动自升式人工岛
CN113341868A (zh) 一种海上沉箱安装施工的远程监控系统
CN110761315B (zh) 一种利用钻探船施工吸力锚的方法
CN103603364B (zh) 深水用吸力式重力基础及其深水安装装置和深水安装方法
CN103883273A (zh) 利用饱和潜水支持船上的双吊机安装立管的方法
CN108408611A (zh) 一种移动式主动升沉补偿器及其工作方法
CN110155262A (zh) 一种具有自安装功能的干树半潜式平台
CN201566808U (zh) 舰用小艇收放装置的液压控制系统
CN102837804A (zh) 深水中吸力锚的安装设备及安装方法
JP6914411B1 (ja) 杭の施工方法
GB2284629A (en) Installing underwater storage tank
CN202529761U (zh) 深海海底储罐安装装备
CN203583509U (zh) 深水用吸力式重力基础及其深水安装装置
CN201292828Y (zh) 深水水下储油石油生产装置
AU2013100492A4 (en) Tank
CN201258730Y (zh) 一种带有动力定位浮筒的深水水下储油石油生产装置
GB2564665A (en) Subsea installation method
CN203174612U (zh) 大型物件水下施工装置
CN112027005B (zh) 一种多功能海洋工程装置的海上安装办法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20130814