CN103225389B CN201310126720.8A CN201310126720A CN103225389B CN 103225389 B CN103225389 B CN 103225389B CN 201310126720 A CN201310126720 A CN 201310126720A CN 103225389 B CN103225389 B CN 103225389B
Authority
CN
China
Prior art keywords
operation platform
steel frame
main steel
construction
elevator
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310126720.8A
Other languages
Chinese (zh)
Other versions
CN103225389A (en
Inventor
高昌义
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Nuclear Engineering Co Ltd
Original Assignee
SEPCO2 Electric Power Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SEPCO2 Electric Power Construction Co Ltd filed Critical SEPCO2 Electric Power Construction Co Ltd
Priority to CN201310126720.8A priority Critical patent/CN103225389B/en
Publication of CN103225389A publication Critical patent/CN103225389A/en
Application granted granted Critical
Publication of CN103225389B publication Critical patent/CN103225389B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Types And Forms Of Lifts (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The invention discloses a device for a mould hoisting machine of a concrete cylinder wall construction top lifting platform. The device comprises a main steel frame, wherein a hoisting machine is mounted at the top of the main steel frame; an elevator which can ascend to the bottom of the hoisting machine is mounted inside the main steel frame; the periphery of the main steel frame is sleeved with a steel cylinder; the steel cylinder can be mounted on the main steel frame in a detachable manner through a plug-in pin; an elevator exit is arranged on the main steel frame; construction platform layers are distributed outside the main steel frame; a hoisting basket device and a mould hoisting device for hoisting a cylinder wall inner mould plate and a cylinder wall outer mould plate are arranged at the bottoms of the construction platform layers positioned at the top of the steel cylinder; and the hoisting basket device is positioned at the outer part of the mould hoisting device. During the construction process of the concrete cylinder wall, the integrated tower type crane structure is adopted to hoist construction personnel and construction material, so that the assurance of the safety of the construction personnel and the construction material can be facilitated, meanwhile, the utilization is comparatively labor-saving, the construction efficiency is increased to a large extent, and the labor intensity of working personnel is reduced.

Description

Concrete tube wall construction lifting platform hangs mould machine
Technical field
The present invention relates to a kind of building implements, particularly relate to a kind of lifting platform building concrete tube wall use and hang mould machine.
Background technology
The current barrel of concrete tube wall construction as chimney utilizes the slding form operation of many radiation beams, and top adopts radiation beam operation platform, and radiation beam top is provided with hoist engine and sliding formwork lift-up device.The lifting of material and constructor all relies on hoist engine and is connected to the wire rope cage below hoist engine, and in deduction process, hanging basket easily returns and rocks, and is unfavorable for the safety of staff and lifting material, is especially not suitable for use in winter.And the lifting device of jenny, template carriage and the radiation beam that use at present are very heavy, after concrete tube wall construction is completed, when removing above-mentioned mechanical device, owing to being work high above the ground, therefore more dangerous, be unfavorable for the safety farthest ensureing constructor.
Summary of the invention
Technical problem to be solved by this invention is to provide a kind of use safety, and concrete tube wall construction lifting platform simple to operate hangs mould machine.
For solving the problems of the technologies described above, technical scheme of the present invention is: concrete tube wall construction lifting platform hangs mould machine, comprise main steel frame, described main steel frame top is provided with elevator, the elevator that can rise to bottom described elevator is installed in described main steel frame, described main steel frame periphery is set with steel cylinder, described steel cylinder is detachably installed on described main steel frame by grafting pin, described main steel frame is provided with elevator outlet, described main steel frame outside is distributed with operation platform layer, nacelle device and the mould lifting appliance for promoting barrel inner formword and barrel exterior sheathing is provided with bottom the described operation platform layer being positioned at described steel barrel top, and described nacelle device is positioned at the outside of described mould lifting appliance.
As preferred technical scheme, described operation platform layer comprises the first operation platform, the second operation platform and the 3rd operation platform that distribute along described steel cylinder from top to bottom.
As preferred technical scheme, described first operation platform, the second operation platform and the 3rd operation platform comprise the hydraulic telescopic arm be distributed on described steel cylinder outer wall respectively, and the described hydraulic telescopic arm of described second operation platform and the 3rd operation platform is respectively equipped with operational foot board.
As preferred technical scheme, between described hydraulic telescopic arm and described steel cylinder, be connected with bracing piece.
As preferred technical scheme, between described hydraulic telescopic arm and described barrel inner formword, be connected with oblique pull support bar.
As preferred technical scheme, described mould lifting appliance comprises the described operation platform layer bottom surface that be installed on top and to the circuit orbit of downward-extension, described circuit orbit is distributed with the electric block promoting described barrel inner formword and barrel exterior sheathing.
As the improvement to technique scheme, described nacelle device comprises the hanging basket being sleeved on concrete tube wall outside, and described hanging basket is provided with safety net near the side of described concrete tube wall.
Owing to have employed technique scheme, concrete tube wall construction lifting platform hangs mould machine, comprise main steel frame, described main steel frame top is provided with elevator, the elevator that can rise to bottom described elevator is installed in described main steel frame, described main steel frame periphery is set with steel cylinder, described steel cylinder is detachably installed on described main steel frame by grafting pin, described main steel frame is provided with elevator outlet, described main steel frame outside is distributed with operation platform layer, nacelle device and the mould lifting appliance for promoting barrel inner formword and barrel exterior sheathing is provided with bottom the described operation platform layer being positioned at described steel barrel top, and described nacelle device is positioned at the outside of described mould lifting appliance, the invention has the beneficial effects as follows: in the work progress of concrete tube wall, overall tower type crane structure is adopted to carry out lifting construction personnel and construction material, contribute to the safety ensureing constructor and construction material transport, use more laborsaving simultaneously, improve efficiency of construction largely, alleviate the labour intensity of staff.
Accompanying drawing explanation
The following drawings is only intended to schematically illustrate the present invention and explain, not delimit the scope of the invention.Wherein:
Fig. 1 is the structural representation of the embodiment of the present invention;
Fig. 2 is the schematic enlarged-scale view of embodiment of the present invention operation platform layer;
Fig. 3 is the top view of the embodiment of the present invention first operation platform;
Fig. 4 is the top view of the embodiment of the present invention second operation platform;
Fig. 5 is the top view of the embodiment of the present invention the 3rd operation platform;
Fig. 6 is the lift structure schematic diagram of embodiment of the present invention electric block;
Fig. 7 is the mounting structure schematic diagram of embodiment of the present invention barrel inner formword and barrel exterior sheathing;
In figure: 1-main steel frame; 2-elevator; 3-elevator; 4-steel cylinder; 5-elevator exports; 6-first operation platform; 7-second operation platform; 8-the 3rd operation platform; 9-hydraulic telescopic arm; 10-operational foot board; 11-bracing piece; 12-barrel inner formword; 13-barrel exterior sheathing; 14-circuit orbit; 15-electric block; 16-hanging basket; 17-oblique pull support bar.
Detailed description of the invention
Describe in detail with reference to the accompanying drawings according to exemplary embodiment of the present invention.Here it is to be noted that it in the accompanying drawings, by identical Reference numeral imparting mechanism and the substantially identical ingredient of function, and in order to make manual more simple and clear, the redundancy eliminated about substantially the same ingredient describes.
Shown in composition graphs 1 and Fig. 2, concrete tube wall construction lifting platform hangs mould machine, and comprise main steel frame 1, described main steel frame 1 top is provided with elevator 2, described main steel frame 1 and described elevator 2 can use tower crane of the prior art.The elevator 2 that can rise to bottom described elevator 2 is installed in described main steel frame 1, for transporting constructor, elevator 2 Comparision is stablized, and can not produce and rock, use reliable, and the hook of elevator 2 is used for Lifting Convey construction material, the transport of construction material and staff is separated, uses safer.
Described main steel frame 1 periphery is set with steel cylinder 4, described steel cylinder 4 is detachably installed on described main steel frame 1 by grafting pin, described main steel frame 1 is provided with elevator outlet 5, because main steel frame 1 is formed by the connection of multiple steel work section, therefore grafting pin is fixed on the two ends up and down of each steel work section, along with the rising of concrete tube wall construction height, needs steel cylinder 4 to promote, each lifting all needs to utilize grafting pin to be fixed, to ensure the safety used.
As shown in Figures 2 to 5, the outside of main steel frame 1 described in the present embodiment is distributed with operation platform layer, when promoting steel cylinder 4, is hooked on by the hook of elevator 2 on operation platform layer, starts elevator 2 and hook is moved upward.Described operation platform layer comprises the first operation platform 6, second operation platform 7 and the 3rd operation platform 8 that distribute along described steel cylinder 4 from top to bottom, wherein said first operation platform 6, second operation platform 7 and the 3rd operation platform 8 comprise the hydraulic telescopic arm 9 be distributed on described steel cylinder 4 outer wall respectively, the described hydraulic telescopic arm 9 of described second operation platform 7 and the 3rd operation platform 8 is respectively equipped with operational foot board 10, and operational foot board 10 constructability personnel operation uses.Described hydraulic telescopic arm 9 uses high-quality lightweight section material as far as possible, to alleviate the weight of operation platform layer, is connected with bracing piece 11 between described hydraulic telescopic arm 9 and described steel cylinder 4, to ensure the security reliability that hydraulic telescopic arm 9 uses.
As Fig. 2, shown in Fig. 6 and Fig. 7, nacelle device and the mould lifting appliance for promoting barrel inner formword 12 and barrel exterior sheathing 13 is provided with bottom the described operation platform layer being positioned at described steel cylinder 4 top, and described nacelle device is positioned at the outside of described mould lifting appliance, wherein said mould lifting appliance comprises the described operation platform layer bottom surface that be installed on top and to the circuit orbit 14 of downward-extension, described circuit orbit 14 is distributed with the electric block 15 promoting described barrel inner formword 12 and barrel exterior sheathing 13, described barrel inner formword 12 and barrel exterior sheathing 13 are arranged with hanger, hang to facilitate the hook of electric block 15, electric block 15 is utilized to realize the adjustment of the upper-lower position of described barrel inner formword 12 and barrel exterior sheathing 13, use more laborsaving.Described nacelle device comprises the hanging basket 16 being sleeved on concrete tube wall outside, and described hanging basket 16 is provided with safety net or tarpaulin near the side of described concrete tube wall, is convenient to the installation insulation of described barrel exterior sheathing 13, so that install fixing.The inner formword of barrel described in the present embodiment 12 and barrel exterior sheathing 13 adopt reinforcing bar split bolt and nut to be fixed on concrete tube wall, so that undertaken fastening by barrel inner and outer template rapidly.
Oblique pull support bar 17 is connected with between the layer of operation platform described in the present embodiment and described barrel inner formword 12, described barrel inner formword 12 is provided with the connecting axle for connecting oblique pull support bar 17, described hydraulic telescopic arm 9 is provided with the handing-over axle connecting described oblique pull support bar 17, oblique pull support bar 17 is connected between described hydraulic telescopic arm 9 and described jointed shaft, and the setting of oblique pull support bar 17 has the double advantage being convenient to described barrel inner formword 12 and barrel exterior sheathing 13 quick position and raising operation platform layer fastness.
The present invention is in the work progress of concrete tube wall, overall tower type crane structure is adopted to carry out lifting construction personnel and construction material, contribute to the safety ensureing constructor and construction material transport, use more laborsaving simultaneously, improve efficiency of construction largely, alleviate the labour intensity of staff.
More than show and describe general principle of the present invention, principal character and advantage of the present invention.The technician of the industry should understand; the present invention is not restricted to the described embodiments; what describe in above-described embodiment and manual just illustrates principle of the present invention; without departing from the spirit and scope of the present invention; the present invention also has various changes and modifications, and these changes and improvements all fall in the claimed scope of the invention.Application claims protection domain is defined by appending claims and equivalent thereof.

Claims (1)

1. concrete tube wall construction lifting platform hangs mould machine, comprise main steel frame, described main steel frame top is provided with elevator, it is characterized in that: the elevator that can rise to bottom described elevator is installed in described main steel frame, described main steel frame periphery is set with steel cylinder, described steel cylinder is detachably installed on described main steel frame by grafting pin, described main steel frame is provided with elevator outlet, described main steel frame outside is distributed with operation platform layer, nacelle device and the mould lifting appliance for promoting barrel inner formword and barrel exterior sheathing is provided with bottom the described operation platform layer being positioned at described steel barrel top, and described nacelle device is positioned at the outside of described mould lifting appliance,
Described mould lifting appliance comprises the described operation platform layer bottom surface that be installed on top and to the circuit orbit of downward-extension, described circuit orbit is distributed with the electric block promoting described barrel inner formword and barrel exterior sheathing;
Described operation platform layer comprises the first operation platform, the second operation platform and the 3rd operation platform that distribute along described steel cylinder from top to bottom;
Described first operation platform, the second operation platform and the 3rd operation platform comprise the hydraulic telescopic arm be distributed on described steel cylinder outer wall respectively, and the described hydraulic telescopic arm of described second operation platform and the 3rd operation platform is respectively equipped with operational foot board;
Oblique pull support bar is connected with between described hydraulic telescopic arm and described barrel inner formword.
2. concrete tube wall construction lifting platform as claimed in claim 1 hangs mould machine, it is characterized in that: be connected with bracing piece between described hydraulic telescopic arm and described steel cylinder.
3. concrete tube wall construction lifting platform as claimed in claim 1 hangs mould machine, and it is characterized in that: described nacelle device comprises the hanging basket being sleeved on concrete tube wall outside, described hanging basket is provided with safety net near the side of described concrete tube wall.
CN201310126720.8A 2013-04-12 2013-04-12 Device for mould hoisting machine of concrete cylinder wall construction top lifting platform Active CN103225389B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310126720.8A CN103225389B (en) 2013-04-12 2013-04-12 Device for mould hoisting machine of concrete cylinder wall construction top lifting platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310126720.8A CN103225389B (en) 2013-04-12 2013-04-12 Device for mould hoisting machine of concrete cylinder wall construction top lifting platform

Publications (2)

Publication Number Publication Date
CN103225389A CN103225389A (en) 2013-07-31
CN103225389B true CN103225389B (en) 2015-04-01

Family

ID=48836011

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310126720.8A Active CN103225389B (en) 2013-04-12 2013-04-12 Device for mould hoisting machine of concrete cylinder wall construction top lifting platform

Country Status (1)

Country Link
CN (1) CN103225389B (en)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105776092B (en) * 2016-04-21 2017-12-29 江河创建集团股份有限公司 A kind of extended position nacelle device
CN109424504B (en) * 2017-09-01 2020-04-14 赵晓军 Construction method of tower barrel
CN109424503B (en) * 2017-09-01 2020-07-14 赵晓军 Installation method of center tower and construction method of tower barrel
CN109025257A (en) * 2018-08-03 2018-12-18 四川省第六建筑有限公司 A kind of form frame system for building
CN110821150B (en) * 2018-08-08 2022-12-06 李宜君 House slip form forming device and forming method
CN209384639U (en) * 2018-08-08 2019-09-13 李宜君 A mold taking device applied to a house sliding mold forming device
CN114109014A (en) * 2021-12-24 2022-03-01 中建八局南方建设有限公司 A kind of super high and small diameter cylindrical curtain wall annular hanging basket and construction method thereof
CN117588052A (en) * 2023-12-08 2024-02-23 上海风领新能源有限公司 Internal mold support adjustment method, internal mold support device and tower mold

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB988400A (en) * 1962-05-16 1965-04-07 Josef Bossner Improvements in or relating to formwork, particularly for casting towers
CN101225708A (en) * 2007-01-19 2008-07-23 兖州煤业榆林能化有限公司 Method for mounting up-sliding bottom-brick-building derrick-free hydraulic sliding formwork of chimney
CN201224993Y (en) * 2007-11-27 2009-04-22 吴杰 Elevating rack body for chimney and well path inner wall constructions
CN101566005A (en) * 2009-05-21 2009-10-28 山东丰汇设备技术有限公司 Chimney hydraulic mould lifting device
RU2476653C1 (en) * 2011-09-15 2013-02-27 Закрытое Акционерное Общество "Спецжелезобетонстрой" Method of erecting high-rise reinforced concrete structures, for example, industrial chimney-stacks and towers
CN203160664U (en) * 2013-04-12 2013-08-28 山东电力建设第二工程公司 Mould hanging device of lifting platform during concrete cylinder wall construction

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB988400A (en) * 1962-05-16 1965-04-07 Josef Bossner Improvements in or relating to formwork, particularly for casting towers
CN101225708A (en) * 2007-01-19 2008-07-23 兖州煤业榆林能化有限公司 Method for mounting up-sliding bottom-brick-building derrick-free hydraulic sliding formwork of chimney
CN201224993Y (en) * 2007-11-27 2009-04-22 吴杰 Elevating rack body for chimney and well path inner wall constructions
CN101566005A (en) * 2009-05-21 2009-10-28 山东丰汇设备技术有限公司 Chimney hydraulic mould lifting device
RU2476653C1 (en) * 2011-09-15 2013-02-27 Закрытое Акционерное Общество "Спецжелезобетонстрой" Method of erecting high-rise reinforced concrete structures, for example, industrial chimney-stacks and towers
CN203160664U (en) * 2013-04-12 2013-08-28 山东电力建设第二工程公司 Mould hanging device of lifting platform during concrete cylinder wall construction

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
无井架液压提模装置施工钢筋混凝土烟囱;史春城;《建筑机械化》;20120630(第6期);第65-67页 *
电动提升模技术在烟囱施工中的应用;陈荣;《大众科技》;20060331;第30卷(第3期);第77、85页 *

Also Published As

Publication number Publication date
CN103225389A (en) 2013-07-31

Similar Documents

Publication Publication Date Title
CN103225389A (en) Device for mould hoisting machine of concrete cylinder wall construction top lifting platform
CN203160664U (en) Mould hanging device of lifting platform during concrete cylinder wall construction
CN105384035A (en) Guide rail installation arrangement and method for installing guide rails
CN105003082A (en) Glass curtain wall mounting equipment and glass curtain mounting method
CN204454402U (en) Detachable winch hanging apparatus
CN204689430U (en) To Construction of Silo movable hoisting device
CN104577876A (en) Plug-in hanging basket for live working of helicopter
CN104444909A (en) Trolley type cable well lid opener
CN103274315A (en) Installing and hoisting device for side plate and upright of gas chamber
CN213389707U (en) Construction hanging basket with stable supporting device
CN202379620U (en) Lifting and operating platform comprehensive equipment
CN105776092B (en) A kind of extended position nacelle device
CN202729645U (en) Tower crane with elevator
CN201336516Y (en) Device for manually installing pole top switch
CN204530513U (en) The manned maintenance Hanging Basket of suspension cable
CN219031629U (en) Lifting equipment for indoor plate installation
CN203702188U (en) Tunnel engineering lining steel bar installing support
CN205275061U (en) Semi -portal crane
CN103058083B (en) Bolt ball truss elevator
CN203320415U (en) Novel large-scale pier coating operation hanging basket
CN210559078U (en) A small material elevator
CN209353738U (en) A kind of prefabricated board fortune entrucking
CN208716705U (en) It is a kind of to apply to the transfer tool for being mounted on small space oil cooler
CN207347124U (en) A kind of loop wheel machine lever
CN217203661U (en) Bridge outer facade auxiliary engineering construction device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 250100 No. 297 industrial North Road, Licheng District, Shandong, Ji'nan

Patentee after: POWERCHINA NUCLEAR ENGINEERING Co.,Ltd.

Address before: 250100 No. 297 industrial North Road, Licheng District, Shandong, Ji'nan

Patentee before: POWERCHINA NUCLEAR ENGINEERING Co.

Address after: 250100 No. 297 industrial North Road, Licheng District, Shandong, Ji'nan

Patentee after: POWERCHINA NUCLEAR ENGINEERING Co.

Address before: 250100 No. 297 industrial North Road, Licheng District, Shandong, Ji'nan

Patentee before: SHANDONG ELECTRIC POWER CONSTRUCTION NO.2 Co.