CN103206009A - Construction method for preventing temperature deformation and leakage in glass fiber reinforced mortar sewage pipelines - Google Patents

Construction method for preventing temperature deformation and leakage in glass fiber reinforced mortar sewage pipelines Download PDF

Info

Publication number
CN103206009A
CN103206009A CN201310128932XA CN201310128932A CN103206009A CN 103206009 A CN103206009 A CN 103206009A CN 201310128932X A CN201310128932X A CN 201310128932XA CN 201310128932 A CN201310128932 A CN 201310128932A CN 103206009 A CN103206009 A CN 103206009A
Authority
CN
China
Prior art keywords
pipeline
manhole
sewage conduct
sewage
seepage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310128932XA
Other languages
Chinese (zh)
Other versions
CN103206009B (en
Inventor
孙杰
杨增礼
张庆学
孙义波
张永亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jinan Urban Construction Group Co Ltd
Original Assignee
Jinan Urban Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jinan Urban Construction Group Co Ltd filed Critical Jinan Urban Construction Group Co Ltd
Priority to CN201310128932.XA priority Critical patent/CN103206009B/en
Publication of CN103206009A publication Critical patent/CN103206009A/en
Application granted granted Critical
Publication of CN103206009B publication Critical patent/CN103206009B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Sewage (AREA)

Abstract

The invention discloses a construction method for preventing temperature deformation and leakage in glass fiber reinforced mortar sewage pipelines. The method includes: covering a pipeline to prevent temperature deformation, applying AJ302 concrete re-pouring agent to the foundation of an inspection chamber to guarantee tightness of the foundation of the inspection chamber, wrapping pipe joints and the pipeline with resin for leakage prevention, and subjecting the sewage inspection chamber and the sewage pipeline to tightness test by a plugging tight fitting composed of steel plates and an air bag. Practice in multiple projections shows that the method is simple and feasible, water tightness succeeds at a higher rate, urban soil pollution is relieved effectively, finishing after engineering construction is reduced, construction period is shortened, and benefits of enterprises are increased.

Description

The anti-temperature of glass reinforced plastic sand pipe sewage conduct becomes the seepage job practices
Technical field
The present invention relates to a kind of municipal drainage pipeline construction method, specially refer to the anti-temperature of a kind of glass reinforced plastic sand pipe sewage conduct and become the seepage job practices.
Background technology
The chemical building material sewage conduct is used more and more widely in the municipal drainage engineering, but chemical building material pipelines such as glass reinforced plastic sand pipe, HDPE pipe are subjected to influence of temperature change big, produce temperature deformation, tubing interface position, tubing and manhole connecting portion are because temperature deformation easily produces seepage, and it is qualified that the pipeline installation quality is difficult to.
Summary of the invention
For overcoming the deficiencies in the prior art, it is reasonable to the invention provides a kind of construction technology, prevents temperature deformation, reduces cost, the cost-effective job practices of fiberglass sand inclusion municipal drainage pipeline of reduction of erection time.
The objective of the invention is to realize in the following manner:
The anti-temperature of a kind of glass reinforced plastic sand pipe sewage conduct becomes the seepage job practices, it is characterized in that: adopt the covering pipeline to prevent temperature deformation, manhole uses the AJ302 concrete to water agent again to guarantee that manhole is at the seal of basic part at basic part, interface tube, pipeline antiseep adopt resin to assure processing, use steel plate and air bag combination shutoff to hold one's breath and detect harness to sewage manhole and the experiment of soil pipe seal; Its concrete construction technology process is: and preparation of construction → measurement unwrapping wire → channel excavation → based process → pipeline laying → tube chamber backfill → tight test → seepage treatment → chute builds by laying bricks or stones → and mouth of pipe connection → well chamber builds by laying bricks or stones → closed-water test → trench backfill → inspect for acceptance.
Its main technique step is:
1) sewage conduct is carried out the pipeline felt and cover, reduce the distortion of the temperature difference generation that illumination produces vitreous building materials sewage conduct, easy construction, cost are low;
2) manhole uses the AJ302 concrete to water agent again at basic part, checks that namely the borehole wall and basic part, glass reinforced plastic sand pipe junction smear one deck AJ302 concrete and water agent again, with the seal of assurance manhole at basic part;
3) tubing and manhole connecting portion carry out roughening treatment to pipeline earlier, brush interfacial agents, sewage conduct and structure be connected employing " intermediary's method " way, when pipeline is two rubber ring interface, the form that to lay rubber ring that is connected with structure, backfill has early reduced pipeline and because of the pipeline that backfilling compaction causes the leakproofness seepage phenomenon that distortion causes has been installed;
4) with the shutoff of steel plate and the air bag combination harness of holding one's breath sewage manhole and sewage conduct are carried out the seal experiment, improved the effect of closed-water test;
5) test method(s) of holding one's breath is searched the breakthrough of sewage conduct, adopts glass reinforced plastic sand pipe mouth of pipe resin to assure treatment technology, breakthrough is in time handled, thereby stopped the seepage of sewage conduct early, has reduced the environment pollution to soil property.
The invention has the beneficial effects as follows: the present invention waters agent again with admixture AJ302 concrete in the processing mortar of traditional manhole basic part and guarantees that manhole is at the seal of basic part, change traditional spacious groove construction and cover to prevent the pipe temperature distortion for felt, traditional asbestos mortar Processing Interface is improved to resin assures, change traditional closed-water test and be the test of holding one's breath, effectively reduction of erection time.Through facts have proved of a plurality of engineerings, method is simple, feasible, improved the success rate of watertightness, effectively reduce city soil property environment pollution, reduce the finishing process after the engineering construction simultaneously, shortened the construction period, increased the benefit of enterprise, good social benefit and economic benefit are arranged, promotional value is arranged in municipal engineering construction.Job practices of the present invention should be used in the urban road improvement project, and in the city was engineered, construction period height, pipeline closed water requirement height especially, adopted when adopting conventional construction party to be difficult to reach duration and quality requirement.
The specific embodiment
With reference to the specific embodiment method of the present invention is done following detailed explanation.
The specific embodiment
1, sewage conduct carries out the pipeline felt and covers, and reduces the distortion of the temperature difference generation that illumination produces vitreous building materials sewage conduct, and easy construction, cost are low.
2, manhole uses the AJ302 concrete to water agent again at basic part, checks that namely the borehole wall and basic part, glass reinforced plastic sand pipe junction smear one deck AJ302 concrete and water agent again, with the seal of assurance manhole at basic part.
3, tubing and manhole connecting portion carry out roughening treatment to pipeline earlier, brush interfacial agents.Sewage conduct and structure be connected employing " intermediary's method " way, when pipeline is two rubber ring interface, with the form that to lay rubber ring that is connected of structure, backfill early, reduced pipeline and because of the pipeline that backfilling compaction causes the leakproofness seepage phenomenon that distortion causes has been installed.
4, with the shutoff of steel plate and the air bag combination harness of holding one's breath sewage manhole and sewage conduct are carried out the seal experiment, improved the effect of closed-water test.
5, the test method(s) of holding one's breath is searched the breakthrough of sewage conduct, adopts glass reinforced plastic sand pipe mouth of pipe resin to assure treatment technology, breakthrough is in time handled, thereby stopped the seepage of sewage conduct early, has reduced the environment pollution to soil property.
Key technology: the glass reinforced plastic sand pipe sun-proof produces temperature and becomes; Water agent again with the AJ302 concrete and guarantee that manhole is at the seal of basic part; Sewage conduct and structure be connected employing " intermediary's method " way, reduce pipeline and because of the pipeline that backfilling compaction causes the leakproofness seepage phenomenon that distortion causes be installed; The shutoff of steel plate and the air bag combination harness of holding one's breath is carried out the seal experiment to sewage manhole and sewage conduct; Resin is assured the processing seepage.
Technical indicator: pipeline, manhole water percolating capacity reach code requirement.
The scope of application: job practices of the present invention is applicable to the glass reinforced plastic sand pipe sewage conduct construction in the urban road drainage engineering.
The situation of having used and having promoted:
Bin Hu main road, Westbound engineering is the supporting key construction project in rich garden, garden, and comparatively advanced fiberglass sand inclusion tubing is adopted in drainage works, for guaranteeing workmanship, is the similar engineering accumulation advanced experience of constructing in the urban district later on simultaneously, and the spy carries out this technical research.The anti-temperature of glass reinforced plastic sand pipe sewage conduct becomes the research of seepage job practices and originates in Bin Hu main road, Westbound engineering (on November 10,4 days~2008 March in 2008), in Jinan City Beijing West Railway Station section municipal engineering second phase I mark I contract section (on August 10,4 days~2011 October in 2010) and the section municipal engineering core space highway construction BT of Jinan City Beijing West Railway Station project two bid sections (on November 10,4 days~2011 March in 2011), obtain promoting, construction technology of the present invention is reasonable, can reduce cost, the reduction of erection time, originality, novelty and applicability are arranged.This technology compares than other technology, and operating expenses is low and work efficiency is high, has good social benefit and economic benefit.The anti-temperature of glass reinforced plastic sand pipe sewage conduct becomes the seepage job practices and have promotional value in the municipal drainage engineering of urban road transformation.

Claims (2)

1. the anti-temperature of glass reinforced plastic sand pipe sewage conduct becomes the seepage job practices, it is characterized in that: adopt the covering pipeline to prevent temperature deformation, manhole uses the AJ302 concrete to water agent again to guarantee that manhole is at the seal of basic part at basic part, interface tube, pipeline antiseep adopt resin to assure processing, use steel plate and air bag combination shutoff to hold one's breath and detect harness to sewage manhole and the experiment of soil pipe seal; Its concrete construction technology process is: and preparation of construction → measurement unwrapping wire → channel excavation → based process → pipeline laying → tube chamber backfill → tight test → seepage treatment → chute builds by laying bricks or stones → and mouth of pipe connection → well chamber builds by laying bricks or stones → closed-water test → trench backfill → inspect for acceptance.
2. the anti-temperature of glass reinforced plastic sand pipe sewage conduct according to claim 1 becomes the seepage job practices, it is characterized in that its main technique step is:
1) sewage conduct is carried out the pipeline felt and cover, reduce the distortion of the temperature difference generation that illumination produces vitreous building materials sewage conduct, easy construction, cost are low;
2) manhole uses the AJ302 concrete to water agent again at basic part, checks that namely the borehole wall and basic part, glass reinforced plastic sand pipe junction smear one deck AJ302 concrete and water agent again, with the seal of assurance manhole at basic part;
3) tubing and manhole connecting portion carry out roughening treatment to pipeline earlier, brush interfacial agents, sewage conduct and structure be connected employing " intermediary's method " way, when pipeline is two rubber ring interface, the form that to lay rubber ring that is connected with structure, backfill has early reduced pipeline and because of the pipeline that backfilling compaction causes the leakproofness seepage phenomenon that distortion causes has been installed;
4) with the shutoff of steel plate and the air bag combination harness of holding one's breath sewage manhole and sewage conduct are carried out the seal experiment, improved the effect of closed-water test;
5) test method(s) of holding one's breath is searched the breakthrough of sewage conduct, adopts glass reinforced plastic sand pipe mouth of pipe resin to assure treatment technology, breakthrough is in time handled, thereby stopped the seepage of sewage conduct early, has reduced the environment pollution to soil property.
CN201310128932.XA 2013-04-15 2013-04-15 Construction method for preventing temperature deformation and leakage in glass fiber reinforced mortar sewage pipelines Active CN103206009B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310128932.XA CN103206009B (en) 2013-04-15 2013-04-15 Construction method for preventing temperature deformation and leakage in glass fiber reinforced mortar sewage pipelines

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310128932.XA CN103206009B (en) 2013-04-15 2013-04-15 Construction method for preventing temperature deformation and leakage in glass fiber reinforced mortar sewage pipelines

Publications (2)

Publication Number Publication Date
CN103206009A true CN103206009A (en) 2013-07-17
CN103206009B CN103206009B (en) 2014-12-24

Family

ID=48753401

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310128932.XA Active CN103206009B (en) 2013-04-15 2013-04-15 Construction method for preventing temperature deformation and leakage in glass fiber reinforced mortar sewage pipelines

Country Status (1)

Country Link
CN (1) CN103206009B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104153453A (en) * 2014-06-30 2014-11-19 惠州市卓凡环保科技有限公司 Installation technology of glass fiber reinforced plastic inspection well
CN110107742A (en) * 2019-05-28 2019-08-09 国家能源投资集团有限责任公司 The processing method and FRP sand tube structure of FRP sand tube

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20120026937A (en) * 2010-09-10 2012-03-20 (주)지엠지 Deformation and leakage measuring device for underground pipeline
CN102384337A (en) * 2011-06-20 2012-03-21 永升建设集团有限公司 Rapid plugging method for fiberglass pipeline with water and pressure
CN202329946U (en) * 2011-07-29 2012-07-11 济南城建集团有限公司 Air bag and steel plate combined plugging and sealing detection kit for sewage inspection well and pipeline
CN102606846A (en) * 2011-12-21 2012-07-25 浙江东发环保工程有限公司 Sealing method for gap between glass steel tube and carbon steel sleeve

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20120026937A (en) * 2010-09-10 2012-03-20 (주)지엠지 Deformation and leakage measuring device for underground pipeline
CN102384337A (en) * 2011-06-20 2012-03-21 永升建设集团有限公司 Rapid plugging method for fiberglass pipeline with water and pressure
CN202329946U (en) * 2011-07-29 2012-07-11 济南城建集团有限公司 Air bag and steel plate combined plugging and sealing detection kit for sewage inspection well and pipeline
CN102606846A (en) * 2011-12-21 2012-07-25 浙江东发环保工程有限公司 Sealing method for gap between glass steel tube and carbon steel sleeve

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
安红莉: "关于埋地塑料排水管道施工闭水实验渗漏问题的实证研究", 《价值工程》, no. 32, 31 December 2012 (2012-12-31) *
王俊凯等: "谈小区排水工程施工工序", 《民营科技》, no. 2, 31 December 2012 (2012-12-31) *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104153453A (en) * 2014-06-30 2014-11-19 惠州市卓凡环保科技有限公司 Installation technology of glass fiber reinforced plastic inspection well
CN110107742A (en) * 2019-05-28 2019-08-09 国家能源投资集团有限责任公司 The processing method and FRP sand tube structure of FRP sand tube
CN110107742B (en) * 2019-05-28 2021-07-20 国家能源投资集团有限责任公司 Treatment method of glass fiber reinforced plastic sand inclusion pipe and glass fiber reinforced plastic sand inclusion pipe structure

Also Published As

Publication number Publication date
CN103206009B (en) 2014-12-24

Similar Documents

Publication Publication Date Title
CN102486247B (en) Water supply and drainage pipeline repair technique adopting size film lining method
CN108825269B (en) Mechanical method connecting channel T-shaped junction self-adaptive waterproof structure
CN204343312U (en) Plugging device of precipitation well in foundation pit
CN103206009B (en) Construction method for preventing temperature deformation and leakage in glass fiber reinforced mortar sewage pipelines
CN104197129B (en) A kind of novel reinforced concrete drainage pipe and its manufacture method
CN113235652A (en) Leakage plugging method for deformation joint of comprehensive pipe gallery
CN211312769U (en) Connecting member of plastic pipe and concrete prefabricated inspection well
CN110552378A (en) Underground space roof subsides post-cast strip and seals structure in advance
CN203948784U (en) Jacking pipe joints joint waterproofing structure
CN204827469U (en) A tunnel for transmission fluid
CN110953416A (en) Pipe joint sealing method for socket type reinforced concrete drain pipe
CN202148539U (en) Composite waterproof structure using underground engineering waterproof leaking stoppage treatment and construction method
CN206539353U (en) A kind of tunnel-liner infiltration punishment is reserved to check aperture apparatus
CN112431989B (en) Method for quickly repairing leakage of pipe orifice of PE (polyethylene) solid-wall drain pipe
CN111335445B (en) Construction method of concrete catch basin by using steel pipe as inner mold
CN108086447A (en) Concrete drain pipeline interface ring-type grouting construction method
CN106592635A (en) Integrated inspection shaft and installation method thereof
CN106499038A (en) A kind of inspection shaft inner bag
CN203498985U (en) Local repair structure for steel lining of exhaust pipeline
CN105908778A (en) Comprehensive pipe rack for corrugated spiral pipe structure
CN205678279U (en) A kind of pond overflowing water experiment pool wall sealing hole device
CN205062993U (en) Sewage inspection shaft capable of preventing road surface from collapsing
WO2015192407A1 (en) Construction engineering well body structure
CN220335938U (en) Quick closing device and closing structure for basement bottom plate reserved dewatering well
CN218152838U (en) Adopt asbestos wool cement to fill structure of pipeline interface

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant