CN103195381B - A kind of cable tunnel construction of working shaft mud system - Google Patents
A kind of cable tunnel construction of working shaft mud system Download PDFInfo
- Publication number
- CN103195381B CN103195381B CN201310108068.7A CN201310108068A CN103195381B CN 103195381 B CN103195381 B CN 103195381B CN 201310108068 A CN201310108068 A CN 201310108068A CN 103195381 B CN103195381 B CN 103195381B
- Authority
- CN
- China
- Prior art keywords
- mud
- construction
- detector
- slurry
- separator
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000010276 construction Methods 0.000 title claims abstract description 43
- 239000002002 slurry Substances 0.000 claims abstract description 55
- 238000011084 recovery Methods 0.000 claims abstract description 13
- 229910000278 bentonite Inorganic materials 0.000 claims description 8
- 239000000440 bentonite Substances 0.000 claims description 8
- SVPXDRXYRYOSEX-UHFFFAOYSA-N bentoquatam Chemical compound O.O=[Si]=O.O=[Al]O[Al]=O SVPXDRXYRYOSEX-UHFFFAOYSA-N 0.000 claims description 8
- 238000001514 detection method Methods 0.000 claims description 6
- DGAQECJNVWCQMB-PUAWFVPOSA-M Ilexoside XXIX Chemical compound C[C@@H]1CC[C@@]2(CC[C@@]3(C(=CC[C@H]4[C@]3(CC[C@@H]5[C@@]4(CC[C@@H](C5(C)C)OS(=O)(=O)[O-])C)C)[C@@H]2[C@]1(C)O)C)C(=O)O[C@H]6[C@@H]([C@H]([C@@H]([C@H](O6)CO)O)O)O.[Na+] DGAQECJNVWCQMB-PUAWFVPOSA-M 0.000 claims description 5
- 239000002131 composite material Substances 0.000 claims description 5
- 229910052708 sodium Inorganic materials 0.000 claims description 5
- 239000011734 sodium Substances 0.000 claims description 5
- 238000002156 mixing Methods 0.000 claims description 3
- 125000004122 cyclic group Chemical group 0.000 abstract description 4
- 229940092782 bentonite Drugs 0.000 description 7
- 229920000642 polymer Polymers 0.000 description 4
- 210000002421 cell wall Anatomy 0.000 description 2
- 239000004567 concrete Substances 0.000 description 2
- ONCZQWJXONKSMM-UHFFFAOYSA-N dialuminum;disodium;oxygen(2-);silicon(4+);hydrate Chemical compound O.[O-2].[O-2].[O-2].[O-2].[O-2].[O-2].[O-2].[O-2].[O-2].[O-2].[O-2].[O-2].[Na+].[Na+].[Al+3].[Al+3].[Si+4].[Si+4].[Si+4].[Si+4] ONCZQWJXONKSMM-UHFFFAOYSA-N 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 239000000203 mixture Substances 0.000 description 2
- 239000002893 slag Substances 0.000 description 2
- 229940080314 sodium bentonite Drugs 0.000 description 2
- 229910000280 sodium bentonite Inorganic materials 0.000 description 2
- 239000002689 soil Substances 0.000 description 2
- 238000010521 absorption reaction Methods 0.000 description 1
- 239000000654 additive Substances 0.000 description 1
- 230000000996 additive effect Effects 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 239000004568 cement Substances 0.000 description 1
- 239000004927 clay Substances 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000005189 flocculation Methods 0.000 description 1
- 230000016615 flocculation Effects 0.000 description 1
- 238000005755 formation reaction Methods 0.000 description 1
- 239000003673 groundwater Substances 0.000 description 1
- 150000002500 ions Chemical class 0.000 description 1
- 238000002955 isolation Methods 0.000 description 1
- 230000009916 joint effect Effects 0.000 description 1
- 239000002245 particle Substances 0.000 description 1
- 238000000746 purification Methods 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 238000009423 ventilation Methods 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Landscapes
- Excavating Of Shafts Or Tunnels (AREA)
Abstract
The present invention relates to a kind of cable tunnel construction of working shaft mud system, including fresh Slurry Storage case, construction slurry groove, first mud detector, mud separator, useless slurry case, second mud detector, reclaim mud reserve tank and stuff box, described construction slurry groove one end is connected with fresh Slurry Storage case and stuff box respectively, the other end and the first mud detector connect, the first described mud detector connects mud separator entrance and useless slurry case respectively, described mud separator outlet is connected with reclaiming mud reserve tank, described recovery mud reserve tank connects the second mud detector and stuff box respectively, the second described mud detector is connected with stuff box. compared with prior art, the present invention has mud construction reliability height, can be effectively improved the advantages such as mud cyclic utilization rate.
Description
Technical field
The present invention relates to mud system technical field, especially relate to a kind of cable tunnel construction of working shaft mud system.
Background technology
Along with improving constantly of national economy high speed development and whole people's living standard, the loading of Shanghai Power Network rises year by year, traditional comb lays and is difficult to meet the needs of power tie line between Central Substations, and selection difficulty that the underground space of urban congestion also makes comb path is increasing, it is necessary to adopt power cable tunnel to lay. Construction of working shaft is the important component part of power cable tunnel engineering construction. In the underground engineering construction of whole piece cable tunnel, encounter an a lot of difficult problem, as: due to the restriction of existing construction equipment, technique, make tunnel cross-section can not adopt most economical rectangular cross section; Need main line that well, different section require and branch line intersection to need well and ventilation shaft, equipment raise etc. to be required for excavating shaft in the circuit turning point in whole piece tunnel, at city's these wells centrally disposed that land used is nervous, difficulty is far longer than circuit constructing tunnel. The deficiencies such as mud during current construction of working shaft exists that cyclic utilization rate is not high, difficult quality guarantee after mud circulation.
Summary of the invention
Defect that the purpose of the present invention is contemplated to overcome above-mentioned prior art to exist and the cable tunnel construction of working shaft mud system that a kind of mud construction reliability is high, can be effectively improved mud cyclic utilization rate is provided.
The purpose of the present invention can be achieved through the following technical solutions:
A kind of cable tunnel construction of working shaft mud system, including fresh Slurry Storage case, construction slurry groove, first mud detector, mud separator, useless slurry case, second mud detector, reclaim mud reserve tank and stuff box, described construction slurry groove one end is sequentially connected with fresh Slurry Storage case and stuff box, the construction slurry groove other end and the first mud detector connect, the first described mud detector connects mud separator entrance and useless slurry case respectively, described mud separator outlet is connected with reclaiming mud reserve tank, described recovery mud reserve tank connects the second mud detector and stuff box respectively, the second described mud detector is connected with stuff box,
Construction slurry groove obtains fresh mud from fresh Slurry Storage case and constructs, the index of the mud that the first mud detector detection is discharged from construction slurry groove, judge whether mud meets recovery index, if, then it is transported to mud separator be easily separated, if not, then it is transported to useless slurry case, mud separator is by isolated recovery slurry transportation to recovery mud reserve tank, the index reclaiming mud in mud reserve tank is reclaimed in second mud detector detection, mud fraction controlling instruction is sent to stuff box according to testing result, the index that stuff box reclaims mud according to this control instruction adjustment forms regenerated mud, and carry regenerated mud to construction slurry groove.
Described construction slurry trench bottom is provided with multiple slotted eye.
Described mud separator includes the vibrosieve and the swirler that are connected.
Being provided with the first valve between the first described mud detector and mud separator, be provided with the second valve between the first mud detector and useless slurry case, the first mud detector controls being turned on and off of the first valve and the second valve according to testing result.
Described fresh Slurry Storage case is connected to the mud mixing blender for configuring fresh mud.
Described fresh mud is composite sodium-based bentonite mud.
Compared with prior art, the present invention is by detecting mud index, it is ensured that the quality of circulating mud every time, in time mud index is adjusted, has the advantage that mud construction reliability is high, can be effectively improved mud cyclic utilization rate.
Accompanying drawing explanation
Fig. 1 is the structural representation of the present invention.
Detailed description of the invention
Below in conjunction with the drawings and specific embodiments, the present invention is described in detail. The present embodiment is carried out premised on technical solution of the present invention, gives detailed embodiment and concrete operating process, but protection scope of the present invention is not limited to following embodiment.
As shown in Figure 1, a kind of cable tunnel construction of working shaft mud system, including fresh Slurry Storage case 1, construction slurry groove 2, first mud detector 3, mud separator 4, useless slurry case 5, second mud detector 6, reclaim mud reserve tank 7 and stuff box 8, described construction slurry groove 2 one end is sequentially connected with fresh Slurry Storage case 1 and stuff box 8, the other end and the first mud detector 3 connect, the first described mud detector 3 connects mud separator 4 entrance and useless slurry case 5 respectively, described mud separator 4 outlet is connected with reclaiming mud reserve tank 7, described recovery mud reserve tank 7 connects the second mud detector 6 and stuff box 8 respectively, the second described mud detector 6 is connected with stuff box 8. it is provided with multiple slotted eye bottom described construction slurry groove 2. described mud separator 4 includes the vibrosieve and the swirler that are connected. being provided with the first valve 9 between the first described mud detector 3 and mud separator 4, be provided with the second valve 10 between the first mud detector 3 and useless slurry case 5, the first mud detector 3 controls being turned on and off of the first valve 9 and the second valve 10 according to testing result.
The operation principle of above-mentioned cable tunnel construction of working shaft mud system is: construction slurry groove 2 obtains fresh mud from fresh Slurry Storage case 1 and constructs, the index of the mud that the first mud detector detection is discharged in construction slurry groove slotted eye, judge whether mud meets recovery index, if, then control the first valve 9 to open, slurry transportation is easily separated to mud separator 4, if not, then control the second valve 10 to open, by slurry transportation to useless slurry case 5, mud separator 4 is by isolated recovery slurry transportation to recovery mud reserve tank 7, and export soil slag waste material.Circulating mud is after isolation of purified, although removing many native slags being mixed into therebetween, but do not recover its original retaining wall performance, because mud is in use, will with foundation soil, groundwater contacts, and forming mud skin in flute wall surfaces, this will consume the bentonite composition in mud, and is weakened retaining wall performance by the pollution of cement composition in concrete and harmful ion. So needing the index reclaiming mud that the second mud detector 6 detection is reclaimed in mud reserve tank 7, mud fraction controlling instruction is sent to stuff box 8 according to testing result, the index that stuff box 8 reclaims mud according to this control instruction adjustment forms regenerated mud, make purification mud substantially recover original retaining wall performance, and carry regenerated mud to construction slurry groove 2.
Described fresh Slurry Storage case 1 is connected to the mud mixing blender for configuring fresh mud. Described fresh mud is composite sodium-based bentonite mud. Composite sodium-based bentonite mud is made up of sodium bentonite and heavy polymer, additive. Its retaining wall mechanism is: polymer molecule in the absorption cementation of flute wall surfaces, is polymer and mud skin that bentonite clay particle the collectively forms cementation to cell wall. Owing to have employed sodium bentonite, the expansion multiple after its aquation is more than 10 times of calcium-base bentonite, and bentonitic platelet structure is fully opened. Bridge joint effect between bentonitic platelet and high molecular polymer, can be formed and Bao Youren, fine and close mud skin at cell wall hole wall. Greatly reducing the leak-off of mud, make the fluid loss of mud reduce, thus reducing the disturbance to surrounding formations water content, making the stratum of hole wall periphery maintain the original state as far as possible, caving-preventing characteristic strengthens. Composite sodium-based bentonite mud also has relatively low solid concentration, has the advantages such as certain SELECTIVE FLOCCULATION, low close low shear force.
Claims (5)
1. a cable tunnel construction of working shaft mud system, it is characterized in that, including fresh Slurry Storage case, construction slurry groove, first mud detector, mud separator, useless slurry case, second mud detector, reclaim mud reserve tank and stuff box, described construction slurry groove one end is sequentially connected with fresh Slurry Storage case and stuff box, the construction slurry groove other end and the first mud detector connect, the first described mud detector connects mud separator entrance and useless slurry case respectively, described mud separator outlet is connected with reclaiming mud reserve tank, described recovery mud reserve tank connects the second mud detector and stuff box respectively, the second described mud detector is connected with stuff box, it is provided with the first valve between the first described mud detector and mud separator, it is provided with the second valve between the first mud detector and useless slurry case, first mud detector controls being turned on and off of the first valve and the second valve according to testing result,
Construction slurry groove obtains fresh mud from fresh Slurry Storage case and constructs, the index of the mud that the first mud detector detection is discharged from construction slurry groove, judge whether mud meets recovery index, if, then it is transported to mud separator be easily separated, if not, then it is transported to useless slurry case, mud separator is by isolated recovery slurry transportation to recovery mud reserve tank, the index reclaiming mud in mud reserve tank is reclaimed in second mud detector detection, mud fraction controlling instruction is sent to stuff box according to testing result, the index that stuff box reclaims mud according to this control instruction adjustment forms regenerated mud, and carry regenerated mud to construction slurry groove.
2. a kind of cable tunnel according to claim 1 construction of working shaft mud system, it is characterised in that described construction slurry trench bottom is provided with multiple slotted eye.
3. a kind of cable tunnel according to claim 1 construction of working shaft mud system, it is characterised in that described mud separator includes the vibrosieve and the swirler that are connected.
4. a kind of cable tunnel according to claim 1 construction of working shaft mud system, it is characterised in that described fresh Slurry Storage case is connected to the mud mixing blender for configuring fresh mud.
5. a kind of cable tunnel according to claim 1 construction of working shaft mud system, it is characterised in that described fresh mud is composite sodium-based bentonite mud.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310108068.7A CN103195381B (en) | 2013-03-29 | 2013-03-29 | A kind of cable tunnel construction of working shaft mud system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310108068.7A CN103195381B (en) | 2013-03-29 | 2013-03-29 | A kind of cable tunnel construction of working shaft mud system |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103195381A CN103195381A (en) | 2013-07-10 |
CN103195381B true CN103195381B (en) | 2016-06-08 |
Family
ID=48718180
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310108068.7A Active CN103195381B (en) | 2013-03-29 | 2013-03-29 | A kind of cable tunnel construction of working shaft mud system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103195381B (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103850660A (en) * | 2014-03-13 | 2014-06-11 | 中石化胜利建设工程有限公司 | Mud circulating method and circulating system for cast-in-place pile construction |
CN107460867B (en) * | 2017-08-29 | 2020-06-02 | 上海市基础工程集团有限公司 | Rapid adjusting method for circulating slurry performance |
CN114561933A (en) * | 2022-03-14 | 2022-05-31 | 中基发展建设工程有限责任公司 | Underground continuous wall mud cyclic utilization system |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2483502Y (en) * | 2001-06-01 | 2002-03-27 | 宜昌黑旋风工程机械有限公司 | Mud purification apparatus |
CN101565945A (en) * | 2009-05-19 | 2009-10-28 | 上海隧道工程股份有限公司 | Application method of composite sodium-based bentonite on construction of underground continuous wall |
CN203175441U (en) * | 2013-03-29 | 2013-09-04 | 国家电网公司 | Mud system used for cable tunnel working well construction |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP3659782B2 (en) * | 1997-11-21 | 2005-06-15 | 戸田建設株式会社 | Slurry property measuring system and method, and muddy water treatment system and method using the same |
-
2013
- 2013-03-29 CN CN201310108068.7A patent/CN103195381B/en active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2483502Y (en) * | 2001-06-01 | 2002-03-27 | 宜昌黑旋风工程机械有限公司 | Mud purification apparatus |
CN101565945A (en) * | 2009-05-19 | 2009-10-28 | 上海隧道工程股份有限公司 | Application method of composite sodium-based bentonite on construction of underground continuous wall |
CN203175441U (en) * | 2013-03-29 | 2013-09-04 | 国家电网公司 | Mud system used for cable tunnel working well construction |
Also Published As
Publication number | Publication date |
---|---|
CN103195381A (en) | 2013-07-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102493397B (en) | In-situ landfill and island creation method for recycling polluted bed-mud dehydrated by geotextile tubes | |
CN103195381B (en) | A kind of cable tunnel construction of working shaft mud system | |
CN107131001A (en) | A kind of and water delivery and the Railway Tunnel of communication function | |
CN105155541B (en) | A kind of dual slurry closure construction method of catch pit | |
CN104961270A (en) | Agent vacuum pre-compression method for treating engineering waste slurry | |
CN103951320A (en) | Mix proportion design method of seawater slurry with stable wall retaining property | |
CN108590527A (en) | A kind of method of high-pressure gas pipeline no-dig technique Pipeline Crossing by Horizontal Directional Drilling construction | |
CN101565945A (en) | Application method of composite sodium-based bentonite on construction of underground continuous wall | |
CN203296026U (en) | Air exhausting device for locked and plugged diversion tunnel | |
CN105065040B (en) | A kind of prefabricated underground space tunneling construction method of top plate | |
CN106761775A (en) | A kind of construction method of water-stop curtain | |
CN203175441U (en) | Mud system used for cable tunnel working well construction | |
CN104594370A (en) | High-pressure combined flushing grouting method and structure in karst region | |
CN207499898U (en) | Double-deck fire-fighting life-saving tunnel | |
CN206385425U (en) | A kind of ecological permeable road surface | |
Dong et al. | Analysis of the catastrophe mechanism and treatment countermeasures of a sudden water inrush disaster in a long and deeply buried tunnel in the karst area | |
CN102559243A (en) | Flexible dehydration device and method for recovered liquid of tertiary oil recovery | |
CN202787001U (en) | Underground passage construction treatment structure for urban road | |
CN107514150A (en) | A kind of construction technology of utilization space displacement method reconstruction Durable Water Repellant | |
CN203835412U (en) | Underwater-roadway leakage processing structure | |
CN106223351A (en) | Self priming pump reduces local groundwater level construction method | |
CN206903689U (en) | A kind of and water delivery and the Railway Tunnel of communication function | |
CN207620234U (en) | A kind of reversed beam planted roof drainage system | |
CN206487492U (en) | A kind of shield machine single fluid grouting pipe rapid translating two-liquid grouting device | |
CN204703920U (en) | A kind of solidifying of the working face system based on fiberglass pipe bolt grouting |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |