一种坝基加固框架结构和坝基加固方法 Download PDFInfo
- Publication number
- CN103195077B CN103195077B CN201310112635.6A CN201310112635A CN103195077B CN 103195077 B CN103195077 B CN 103195077B CN 201310112635 A CN201310112635 A CN 201310112635A CN 103195077 B CN103195077 B CN 103195077B
- Authority
- CN
- China
- Prior art keywords
- pile
- dam foundation
- girth
- exceeds
- dam
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 230000002787 reinforcement Effects 0.000 title claims abstract description 22
- 238000011105 stabilization Methods 0.000 title claims abstract description 13
- 239000004567 concrete Substances 0.000 claims abstract description 20
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 16
- 239000010959 steel Substances 0.000 claims abstract description 16
- 239000007921 spray Substances 0.000 claims abstract description 11
- 230000003014 reinforcing Effects 0.000 claims description 8
- 239000004568 cement Substances 0.000 claims description 5
- 239000011378 shotcrete Substances 0.000 claims description 3
- 230000005311 nuclear magnetism Effects 0.000 claims description 2
- 239000011435 rock Substances 0.000 abstract description 10
- 238000010276 construction Methods 0.000 abstract description 6
- 239000002689 soil Substances 0.000 description 11
- 238000003860 storage Methods 0.000 description 5
- 239000004927 clay Substances 0.000 description 4
- 229910052570 clay Inorganic materials 0.000 description 4
- 238000005056 compaction Methods 0.000 description 4
- 239000004576 sand Substances 0.000 description 4
- 238000005507 spraying Methods 0.000 description 4
- 230000000694 effects Effects 0.000 description 3
- 241000731961 Juncaceae Species 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 239000003864 humus Substances 0.000 description 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances data:image/svg+xml;base64,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 data:image/svg+xml;base64,PD94bWwgdmVyc2lvbj0nMS4wJyBlbmNvZGluZz0naXNvLTg4NTktMSc/Pgo8c3ZnIHZlcnNpb249JzEuMScgYmFzZVByb2ZpbGU9J2Z1bGwnCiAgICAgICAgICAgICAgeG1sbnM9J2h0dHA6Ly93d3cudzMub3JnLzIwMDAvc3ZnJwogICAgICAgICAgICAgICAgICAgICAgeG1sbnM6cmRraXQ9J2h0dHA6Ly93d3cucmRraXQub3JnL3htbCcKICAgICAgICAgICAgICAgICAgICAgIHhtbG5zOnhsaW5rPSdodHRwOi8vd3d3LnczLm9yZy8xOTk5L3hsaW5rJwogICAgICAgICAgICAgICAgICB4bWw6c3BhY2U9J3ByZXNlcnZlJwp3aWR0aD0nODVweCcgaGVpZ2h0PSc4NXB4JyB2aWV3Qm94PScwIDAgODUgODUnPgo8IS0tIEVORCBPRiBIRUFERVIgLS0+CjxyZWN0IHN0eWxlPSdvcGFjaXR5OjEuMDtmaWxsOiNGRkZGRkY7c3Ryb2tlOm5vbmUnIHdpZHRoPSc4NS4wJyBoZWlnaHQ9Jzg1LjAnIHg9JzAuMCcgeT0nMC4wJz4gPC9yZWN0Pgo8dGV4dCB4PScxMy4zJyB5PSc1My42JyBjbGFzcz0nYXRvbS0wJyBzdHlsZT0nZm9udC1zaXplOjIzcHg7Zm9udC1zdHlsZTpub3JtYWw7Zm9udC13ZWlnaHQ6bm9ybWFsO2ZpbGwtb3BhY2l0eToxO3N0cm9rZTpub25lO2ZvbnQtZmFtaWx5OnNhbnMtc2VyaWY7dGV4dC1hbmNob3I6c3RhcnQ7ZmlsbDojRTg0MjM1JyA+SDwvdGV4dD4KPHRleHQgeD0nMjguMicgeT0nNjIuOScgY2xhc3M9J2F0b20tMCcgc3R5bGU9J2ZvbnQtc2l6ZToxNXB4O2ZvbnQtc3R5bGU6bm9ybWFsO2ZvbnQtd2VpZ2h0Om5vcm1hbDtmaWxsLW9wYWNpdHk6MTtzdHJva2U6bm9uZTtmb250LWZhbWlseTpzYW5zLXNlcmlmO3RleHQtYW5jaG9yOnN0YXJ0O2ZpbGw6I0U4NDIzNScgPjI8L3RleHQ+Cjx0ZXh0IHg9JzM1LjAnIHk9JzUzLjYnIGNsYXNzPSdhdG9tLTAnIHN0eWxlPSdmb250LXNpemU6MjNweDtmb250LXN0eWxlOm5vcm1hbDtmb250LXdlaWdodDpub3JtYWw7ZmlsbC1vcGFjaXR5OjE7c3Ryb2tlOm5vbmU7Zm9udC1mYW1pbHk6c2Fucy1zZXJpZjt0ZXh0LWFuY2hvcjpzdGFydDtmaWxsOiNFODQyMzUnID5PPC90ZXh0Pgo8L3N2Zz4K O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 2
- 241000196324 Embryophyta Species 0.000 description 1
- 230000002411 adverse Effects 0.000 description 1
- 238000009412 basement excavation Methods 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000005755 formation reaction Methods 0.000 description 1
- 238000011065 in-situ storage Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000004062 sedimentation Methods 0.000 description 1
- 239000002002 slurry Substances 0.000 description 1
- 238000011144 upstream manufacturing Methods 0.000 description 1
Abstract
Description
Claims (7)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310112635.6A CN103195077B (zh) | 2013-04-02 | 2013-04-02 | 一种坝基加固框架结构和坝基加固方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310112635.6A CN103195077B (zh) | 2013-04-02 | 2013-04-02 | 一种坝基加固框架结构和坝基加固方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103195077A CN103195077A (zh) | 2013-07-10 |
CN103195077B true CN103195077B (zh) | 2015-09-09 |
Family
ID=48717880
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310112635.6A Active CN103195077B (zh) | 2013-04-02 | 2013-04-02 | 一种坝基加固框架结构和坝基加固方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103195077B (zh) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103526721B (zh) * | 2013-10-29 | 2016-01-20 | 中国电建集团成都勘测设计研究院有限公司 | 一种透水桩基丁坝 |
CN112359823B (zh) * | 2020-11-17 | 2022-03-11 | 毛志鹏 | 由钢管桩和水泥土桩构成的组合基桩 |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU401777A1 (ru) * | 1972-02-08 | 1973-10-12 | УСТРОЙСТВО дл БЕРЕГОВОГО КРЕПЛЕНИЯ НАПЛАВНЫХ СООРУЖЕНИЙ | |
CN1259604A (zh) * | 1999-12-10 | 2000-07-12 | 王光明 | 水泥土加强组合桩工法 |
CN201660880U (zh) * | 2009-12-17 | 2010-12-01 | 上海市第二建筑有限公司 | 在内部套打钻孔灌注桩的双轴搅拌桩围护结构 |
CN201770969U (zh) * | 2010-08-06 | 2011-03-23 | 周细龙 | 一种水库堤坝 |
JP2012097433A (ja) * | 2010-10-29 | 2012-05-24 | Sumitomo Denko Steel Wire Kk | コンクリート構造物の補強体、コンクリート構造物の補強構造、およびコンクリート構造物の補強方法 |
CN102720165A (zh) * | 2012-06-25 | 2012-10-10 | 中国水电顾问集团中南勘测设计研究院 | 一种面板堆石坝坝坡 |
CN102733376A (zh) * | 2012-07-02 | 2012-10-17 | 朱建新 | 复合桩及其施工方法 |
CN203129163U (zh) * | 2013-04-02 | 2013-08-14 | 中国水电顾问集团中南勘测设计研究院 | 一种坝基加固框架结构 |
-
2013
- 2013-04-02 CN CN201310112635.6A patent/CN103195077B/zh active Active
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU401777A1 (ru) * | 1972-02-08 | 1973-10-12 | УСТРОЙСТВО дл БЕРЕГОВОГО КРЕПЛЕНИЯ НАПЛАВНЫХ СООРУЖЕНИЙ | |
CN1259604A (zh) * | 1999-12-10 | 2000-07-12 | 王光明 | 水泥土加强组合桩工法 |
CN201660880U (zh) * | 2009-12-17 | 2010-12-01 | 上海市第二建筑有限公司 | 在内部套打钻孔灌注桩的双轴搅拌桩围护结构 |
CN201770969U (zh) * | 2010-08-06 | 2011-03-23 | 周细龙 | 一种水库堤坝 |
JP2012097433A (ja) * | 2010-10-29 | 2012-05-24 | Sumitomo Denko Steel Wire Kk | コンクリート構造物の補強体、コンクリート構造物の補強構造、およびコンクリート構造物の補強方法 |
CN102720165A (zh) * | 2012-06-25 | 2012-10-10 | 中国水电顾问集团中南勘测设计研究院 | 一种面板堆石坝坝坡 |
CN102733376A (zh) * | 2012-07-02 | 2012-10-17 | 朱建新 | 复合桩及其施工方法 |
CN203129163U (zh) * | 2013-04-02 | 2013-08-14 | 中国水电顾问集团中南勘测设计研究院 | 一种坝基加固框架结构 |
Also Published As
Publication number | Publication date |
---|---|
CN103195077A (zh) | 2013-07-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101591904B (zh) | 先预压排水后向排水体注浆形成复合桩基的加固方法 | |
CN203200746U (zh) | 一种高压旋喷中空加固管桩 | |
CN202559376U (zh) | 一种高架桥下临河市政道路结构 | |
CN204059332U (zh) | 一种混凝土预制管桩与堆载预压软土地基处理装置 | |
CN102505704A (zh) | 软弱地质竖井中大型沉井施工方法 | |
CN203924036U (zh) | 一种外包活性材料桩体的预应力管桩 | |
CN103741670A (zh) | 一种消除负摩阻力的地基处理方法 | |
CN103161151B (zh) | 一种高压旋喷中空加固管桩的施工方法及高压旋喷中空加固管桩 | |
CN103334450B (zh) | 一种带排水沟的桩柱预制板挡土墙的施工方法 | |
CN103835292B (zh) | 高频振冲扩底注浆管桩的施工方法 | |
CN106869153B (zh) | 一种井点降水快速处理软地基的方法 | |
CN103195077B (zh) | 一种坝基加固框架结构和坝基加固方法 | |
CN110965416A (zh) | 一种针对山区高填方路基加固的竹材加筋体系及施工方法 | |
CN104480956B (zh) | 一种小直径模袋混凝土桩复合地基 | |
CN104762957B (zh) | 一种螺旋成孔夯扩cfg桩的施工方法 | |
CN207469269U (zh) | 一种水利工程高强土工格室结构类生态护坡 | |
CN107299650B (zh) | 一种远距离沉井排土纠偏方法 | |
CN203129163U (zh) | 一种坝基加固框架结构 | |
CN212656252U (zh) | 一种新型输电线路杆塔基础 | |
CN202559340U (zh) | 一种先排水预压后注浆劲芯水泥搅拌桩 | |
CN102561368B (zh) | 一种预压实加筋土块柔性支护结构 | |
CN204456058U (zh) | 一种降低建筑基础沉降速率的施工结构 | |
CN103410143A (zh) | 一种提高空心桩桩基承载力的施工方法 | |
CN102966109A (zh) | 软土地基带状深基坑封底施工方法 | |
CN204238176U (zh) | 生态石笼网箱挡墙 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
C06 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
C10 | Entry into substantive examination | ||
CB02 | Change of applicant information |
Address after: 410014 Hunan province Changsha Yuhua District, camphor Road No. 16 Applicant after: Co., Ltd of Zhongnan Prospecting Design Inst. China Hydrauelectric Consultant Group Address before: 410014, 9 camphor Road, Yuhua District, Hunan, Changsha Applicant before: Zhongnan Prospecting Design Inst. China Hydrauelectric Consultant Group Address after: 410014 Hunan province Changsha Yuhua District, camphor Road No. 16 Applicant after: Company limited of Central-South survey and design research institute of electricity Jian group of China Address before: 410014 Hunan province Changsha Yuhua District, camphor Road No. 16 Applicant before: Co., Ltd of Zhongnan Prospecting Design Inst. China Hydrauelectric Consultant Group |
|
C53 | Correction of patent for invention or patent application | ||
COR | Change of bibliographic data |
Free format text: CORRECT: APPLICANT; FROM: ZHONGNAN PROSPECTING DESIGN INST. CHINA HYDRAUELECTRIC CONSULTANT GROUP TO: HYDROCHINA ZHONGNAN ENGINEERING CORPORATION Free format text: CORRECT: APPLICANT; FROM: HYDROCHINA ZHONGNAN ENGINEERING CORPORATION TO: CHINA POWER GROUP ZHONGNAN INVESTIGATION DESIGN + RESEARCH INSTITUTE CO., LTD. |
|
GR01 | Patent grant | ||