CN103192345A - Installation tooling of condenser - Google Patents
Installation tooling of condenser Download PDFInfo
- Publication number
- CN103192345A CN103192345A CN2013101076249A CN201310107624A CN103192345A CN 103192345 A CN103192345 A CN 103192345A CN 2013101076249 A CN2013101076249 A CN 2013101076249A CN 201310107624 A CN201310107624 A CN 201310107624A CN 103192345 A CN103192345 A CN 103192345A
- Authority
- CN
- China
- Prior art keywords
- core body
- condenser
- blocking cap
- platform
- core
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Abstract
The invention discloses an installation tooling of a condenser. The condenser is a parallel flow condenser which comprises a core and two collector tubes located on two sides of the core. The installation tooling of the condenser comprises a core pressing unit and plug cap installation units located on two sides of the core pressing unit. The core pressing unit comprises a platform for positioning and placing the core, a press plate slidably arranged on the platform and extruding the core in the extending direction of the collector tubes and a pressing cylinder used for driving the press plate to move. Each plug cap installation unit comprises a positioning seat used for positioning the collector tubes, a plug cap installation seat arranged on the positioning seat and a pushing portion used for pushing the collector tubes towards the plug cap installation seat. The installation tooling is simple and compact in structure due to the core pressing unit and the plug cap installation units, can fast bundle the core and install plug caps, is low in cost, and is applicable to automobile manufacture enterprises for assembling the parallel flow condenser.
Description
Technical field
The present invention relates to a kind of assembly tooling, relate in particular to a kind of condenser assembly tooling that the automobile condenser is assembled.
Background technology
The condenser of automobile need carry out soldering with the collector tube that is positioned at the core body both sides with the core body at middle part when assembling, when soldering, can adopt special positioning tool that core body and collector tube are positioned, but this class positioning tool cost is higher, design is complicated, be difficult to promote, therefore, usually condenser is carried out manual location, this need stop up core body with various wire harness such as iron wires in core surface, blocking cap with the collector tube two ends is fit into collector tube again, this process often adopts two stations, and operating efficiency is lower.
Summary of the invention
The technical problem to be solved in the present invention provides a kind of condenser assembly tooling, can finish the installation with blocking cap of tying up to core body fast, and simple in structure, cost is low.
For solving the problems of the technologies described above, the technical solution used in the present invention is:
A kind of condenser assembly tooling, described condenser are the parallel flow condenser that comprises core body and be positioned at two collector tubes of core body both sides, the blocking cap installation unit that this condenser assembly tooling comprises the core body compressing unit and is positioned at core body compressing unit both sides; Described core body compressing unit comprise the location place the platform of core body and be slidingly arranged on the platform, along the pressing plate of collector tube prolonging direction extruding core body with drive the clamping cylinder of presser motion; Described blocking cap installation unit comprises the positioning seat that collector tube is positioned, the pushing part that is arranged on the blocking cap mount pad on the positioning seat and collector tube is pushed to the blocking cap mount pad.
As limitation of the invention, be provided with the trapezoidal wire harness guide plate that falls that is positioned at below both between core body compressing unit and the blocking cap installation unit.
As limitation of the invention further, be provided with at the middle part of platform cable-through hole and be communicated with cable-through hole fall trapezoidal wire harness guide plate.
As limitation of the invention, below platform, be provided with gripper shoe, described blocking cap installation unit is installed on the gripper shoe with respect to the platform distance adjustablely.
As limitation of the invention, described pushing part comprises the slide block that is slidingly arranged on the positioning seat and the promotion cylinder that promotes slide block movement, and the contact-making surface of described slide block and collector tube is the planar structure that is parallel to the port of collector tube.
Owing to adopted above-mentioned technical scheme, the present invention compared with prior art, obtained technological progress is: condenser assembly tooling provided by the present invention, by core body compressing unit and blocking cap installation unit are set, it is simple and compact for structure, can finish the installation with blocking cap of tying up to core body fast, cost is lower; The linear steering plate is set makes things convenient for wire harness material such as iron wire to pass, convenient core body is tied up; The blocking cap installation unit can be regulated, and can adapt to the condenser of different model; Adopt promotion cylinder and slide block slowly to promote collector tube stably, collector tube is not caused damage, and compact conformation.
The present invention is applicable at automobile manufacturing enterprise the parallel flow type condenser is assembled.
The present invention is described in further detail below in conjunction with Figure of description and specific embodiment.
Description of drawings
Fig. 1 is the condenser assembly tooling of the embodiment of the invention and the combination figure of condenser;
Fig. 2 is the vertical view of the condenser assembly tooling of present embodiment;
Fig. 3 is the schematic diagram of the blocking cap installation unit of present embodiment.
Among the figure: 1, platform; 2, pressing plate; 3, collector tube; 4, positioning seat; 5, blocking cap mount pad; 6, promote cylinder; 7, slide block; 8, wire harness guide plate; 9, cable-through hole; 10, gripper shoe; 11, chute; 12, core body; 13, collector tube.
The specific embodiment
Embodiment
As shown in Figure 1 to Figure 3, the condenser assembly tooling of present embodiment is used for it being tied up and the blocking cap of packing into two collector tubes 13 that the condenser that assembles comprises core body 12 and is positioned at core body 12 both sides before the condenser soldering.
The assembly tooling of this condenser comprises the core body compressing unit and is positioned at the blocking cap installation unit of core body compressing unit both sides.Wherein, the core body compressing unit is used for core body 12 is compressed, and with convenient core body 12 usefulness iron wires is tied up, and the blocking cap installation unit then is used for blocking cap is installed in collector tube 13.
The core body compressing unit comprise the location place the platform 1 of core body 12 and be slidingly arranged on the platform 1, along the pressing plate 2 of collector tube 13 prolonging directions extruding core body 12 with drive the clamping cylinder 3 that pressing plate 2 moves, clamping cylinder 3 drives pressing plate 2 motions, can produce squeezing effects to core body 12, be that wire harness such as available iron wire is closely tied up core body 12 this moment.
The blocking cap installation unit comprises the positioning seat 4 that collector tube 13 is positioned, the pushing part that is arranged on the blocking cap mount pad 5 on the positioning seat 4 and collector tube 13 is pushed to blocking cap mount pad 5.The pushing part comprises the slide block 7 that is slidingly arranged on the positioning seat 4 and the promotion cylinder 6 that promotes slide block 7 motions, and described slide block 7 is the planar structure that is parallel to the port of collector tube 13 with the contact-making surface of collector tube 13.
In order when tying up wire harness, to lead to wire harness, between core body compressing unit and the blocking cap installation unit and be provided with the trapezoidal wire harness guide plate 8 that falls that is positioned at below both, be provided with at the middle part of platform 1 cable-through hole 9 and be communicated with cable-through hole 9 fall trapezoidal wire harness guide plate 8, have down trapezoidal gathering sill, as shown in fig. 1.Wire harness is concentrated in together behind the trapezoidal cross section by falling when passing these wire harness guide plates 8, conveniently ties up.
Be provided with gripper shoe 10 below platform 1, this platform 1 namely is fixed on the gripper shoe 10, in gripper shoe 10 chute 11 is set, the blocking cap installation unit slides along chute 11 and arranges, and can be locked on the gripper shoe 10, like this, the blocking cap installation unit just can be adjusted it with respect to the distance of platform 1.Thereby the condenser that adapts to different model.
Claims (5)
1. condenser assembly tooling, described condenser is the parallel flow condenser that comprises core body and be positioned at two collector tubes of core body both sides, it is characterized in that: described condenser assembly tooling comprises the core body compressing unit, and the blocking cap installation unit that is positioned at core body compressing unit both sides; Described core body compressing unit comprise the location place the platform of core body and be slidingly arranged on the platform, along the pressing plate of collector tube prolonging direction extruding core body with drive the clamping cylinder of presser motion; Described blocking cap installation unit comprises the positioning seat that collector tube is positioned, the pushing part that is arranged on the blocking cap mount pad on the positioning seat and collector tube is pushed to the blocking cap mount pad.
2.. condenser assembly tooling according to claim 1 is characterized in that: be provided with the trapezoidal wire harness guide plate that falls that is positioned at below both between core body compressing unit and the blocking cap installation unit.
3. condenser assembly tooling according to claim 2 is characterized in that: be provided with at the middle part of platform cable-through hole and be communicated with cable-through hole fall trapezoidal wire harness guide plate.
4. condenser assembly tooling according to claim 3 is characterized in that: be provided with gripper shoe below platform, described blocking cap installation unit is installed on the gripper shoe with respect to the platform distance adjustablely.
5. according to each described condenser assembly tooling in the claim 1 to 4, it is characterized in that: described pushing part comprises the slide block that is slidingly arranged on the positioning seat and the promotion cylinder that promotes slide block movement, and the contact-making surface of described slide block and collector tube is the planar structure that is parallel to the port of collector tube.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310107624.9A CN103192345B (en) | 2013-03-30 | 2013-03-30 | Condenser assembly tooling |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310107624.9A CN103192345B (en) | 2013-03-30 | 2013-03-30 | Condenser assembly tooling |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103192345A true CN103192345A (en) | 2013-07-10 |
CN103192345B CN103192345B (en) | 2015-08-05 |
Family
ID=48715254
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310107624.9A Expired - Fee Related CN103192345B (en) | 2013-03-30 | 2013-03-30 | Condenser assembly tooling |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103192345B (en) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104227255A (en) * | 2014-07-23 | 2014-12-24 | 泰州安吉电子有限公司 | Row welding production line for condenser |
CN104942559A (en) * | 2015-06-17 | 2015-09-30 | 安徽江淮松芝空调有限公司 | Top evaporator assembling machine |
CN105197280A (en) * | 2015-11-10 | 2015-12-30 | 贵州贵航汽车零部件股份有限公司 | Pipe-tape heat radiator core banding clamp |
CN106238856A (en) * | 2016-08-30 | 2016-12-21 | 博耐尔汽车电气系统有限公司 | A kind of manufacture method of heat exchanger soldering bracket |
CN106270908A (en) * | 2016-08-30 | 2017-01-04 | 博耐尔汽车电气系统有限公司 | A kind of heat exchanger soldering bracket |
CN107350623A (en) * | 2017-08-30 | 2017-11-17 | 浙江创新汽车空调有限公司 | Laser welding streamline and its technique for the welding of condenser support body |
CN110793182A (en) * | 2019-11-15 | 2020-02-14 | 河南机电职业学院 | Air conditioner core assembling equipment for automobile production |
CN115582694A (en) * | 2022-11-25 | 2023-01-10 | 中科艾尔(北京)科技有限公司 | Centering welding tool for base block and plugging cap |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1921411A1 (en) * | 2006-11-13 | 2008-05-14 | Frape Behr S.A. | Heat exchanger, in particular condenser for a car air conditioning system |
JP2009162468A (en) * | 2007-12-13 | 2009-07-23 | Tgk Co Ltd | Receiver drier integrated type condenser |
KR101015348B1 (en) * | 2011-01-04 | 2011-02-16 | 주식회사 두원공조 | Brazing jig assembly for heat exchanger and method of manufacturing heat exchanger use of the same |
CN201792305U (en) * | 2010-08-19 | 2011-04-13 | 芜湖精博热传导技术有限公司 | Manual assembly machine for parallel flow condensers |
CN202106191U (en) * | 2011-05-31 | 2012-01-11 | 浙江松信汽车空调有限公司 | Rotary assembling table of a condenser core |
CN202123348U (en) * | 2011-06-21 | 2012-01-25 | 浙江华尔达汽车空调有限公司 | Concurrent flow condenser assembling machine |
CN202240400U (en) * | 2011-06-10 | 2012-05-30 | 上海贝洱热系统有限公司 | Universal core assembly machine |
CN102513816A (en) * | 2011-12-23 | 2012-06-27 | 芜湖博耐尔汽车电气系统有限公司 | Press mounting device for mounting plug cap of air-conditioning condenser |
-
2013
- 2013-03-30 CN CN201310107624.9A patent/CN103192345B/en not_active Expired - Fee Related
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1921411A1 (en) * | 2006-11-13 | 2008-05-14 | Frape Behr S.A. | Heat exchanger, in particular condenser for a car air conditioning system |
JP2009162468A (en) * | 2007-12-13 | 2009-07-23 | Tgk Co Ltd | Receiver drier integrated type condenser |
CN201792305U (en) * | 2010-08-19 | 2011-04-13 | 芜湖精博热传导技术有限公司 | Manual assembly machine for parallel flow condensers |
KR101015348B1 (en) * | 2011-01-04 | 2011-02-16 | 주식회사 두원공조 | Brazing jig assembly for heat exchanger and method of manufacturing heat exchanger use of the same |
CN202106191U (en) * | 2011-05-31 | 2012-01-11 | 浙江松信汽车空调有限公司 | Rotary assembling table of a condenser core |
CN202240400U (en) * | 2011-06-10 | 2012-05-30 | 上海贝洱热系统有限公司 | Universal core assembly machine |
CN202123348U (en) * | 2011-06-21 | 2012-01-25 | 浙江华尔达汽车空调有限公司 | Concurrent flow condenser assembling machine |
CN102513816A (en) * | 2011-12-23 | 2012-06-27 | 芜湖博耐尔汽车电气系统有限公司 | Press mounting device for mounting plug cap of air-conditioning condenser |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104227255A (en) * | 2014-07-23 | 2014-12-24 | 泰州安吉电子有限公司 | Row welding production line for condenser |
CN104227255B (en) * | 2014-07-23 | 2017-09-15 | 江苏海森电气科技有限公司 | Condenser row's weldering production line |
CN104942559A (en) * | 2015-06-17 | 2015-09-30 | 安徽江淮松芝空调有限公司 | Top evaporator assembling machine |
CN105197280A (en) * | 2015-11-10 | 2015-12-30 | 贵州贵航汽车零部件股份有限公司 | Pipe-tape heat radiator core banding clamp |
CN106238856A (en) * | 2016-08-30 | 2016-12-21 | 博耐尔汽车电气系统有限公司 | A kind of manufacture method of heat exchanger soldering bracket |
CN106270908A (en) * | 2016-08-30 | 2017-01-04 | 博耐尔汽车电气系统有限公司 | A kind of heat exchanger soldering bracket |
CN107350623A (en) * | 2017-08-30 | 2017-11-17 | 浙江创新汽车空调有限公司 | Laser welding streamline and its technique for the welding of condenser support body |
CN110793182A (en) * | 2019-11-15 | 2020-02-14 | 河南机电职业学院 | Air conditioner core assembling equipment for automobile production |
CN110793182B (en) * | 2019-11-15 | 2021-03-19 | 河南机电职业学院 | Air conditioner core assembling equipment for automobile production |
CN115582694A (en) * | 2022-11-25 | 2023-01-10 | 中科艾尔(北京)科技有限公司 | Centering welding tool for base block and plugging cap |
Also Published As
Publication number | Publication date |
---|---|
CN103192345B (en) | 2015-08-05 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103192345A (en) | Installation tooling of condenser | |
CN204368932U (en) | A kind of alternately automatic feed mechanism | |
CN203459895U (en) | Automobile air-conditioning valve core assembly machine | |
CN203076520U (en) | Automatic assembling production line with additional plate chains | |
CN207078624U (en) | Tool endless-walk mechanism | |
CN204692192U (en) | A kind of linear type fan automatic assembling machine | |
CN104879326A (en) | Linear automatic fan assembling machine | |
CN204847370U (en) | A loading attachment for producing window decoration lens | |
CN204365802U (en) | Autofeed formula stamping machine | |
CN205058647U (en) | Special elasticity of thermoplasticity combined material production extrusion device | |
CN108766757A (en) | A kind of efficient inductance coil process equipment | |
CN205551946U (en) | Integrated circuit for packing tube pressure of nailer bind and put | |
CN204701858U (en) | A kind of be applied to bag-spring machine be compressed into mould bagging apparatus | |
CN209919813U (en) | Automatic spring assembling device for steering wheel lock base | |
CN209077569U (en) | C-type wire clamp stamping device | |
CN103350162B (en) | Cable wire cutting apparatus | |
CN102328164A (en) | Material clamping method for device with cam | |
CN203377470U (en) | Material-feeding clamping mechanism for connector assembly machine | |
CN207009874U (en) | A kind of circular cold pressing dissipates terminal conveyer | |
CN205465818U (en) | Condenser mount | |
CN207082979U (en) | The spring and connection ball-and-socket assembling device of the electronic support bar of automobile tail gate | |
CN204289406U (en) | A kind of triode pin fully automatic forming machine | |
CN203983699U (en) | Terminal press | |
CN208722728U (en) | A kind of fool proof tooling for inductance coil | |
CN208543764U (en) | Moulding cuts loading and unloading linkage mechanism |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150805 |
|
CF01 | Termination of patent right due to non-payment of annual fee |