CN103174162A - 一种用于输电线路铁塔的复合桩结构 - Google Patents

一种用于输电线路铁塔的复合桩结构 Download PDF

Info

Publication number
CN103174162A
CN103174162A CN2011104337133A CN201110433713A CN103174162A CN 103174162 A CN103174162 A CN 103174162A CN 2011104337133 A CN2011104337133 A CN 2011104337133A CN 201110433713 A CN201110433713 A CN 201110433713A CN 103174162 A CN103174162 A CN 103174162A
Authority
CN
China
Prior art keywords
pile
transmission line
iron tower
composite
securing
Prior art date
Application number
CN2011104337133A
Other languages
English (en)
Inventor
倪镭
房岭锋
许建华
张永隆
陶春凤
顾俊颉
Original Assignee
上海市电力公司
国家电网公司
上海电力设计院有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 上海市电力公司, 国家电网公司, 上海电力设计院有限公司 filed Critical 上海市电力公司
Priority to CN2011104337133A priority Critical patent/CN103174162A/zh
Publication of CN103174162A publication Critical patent/CN103174162A/zh

Links

Abstract

本发明涉及一种用于输电线路铁塔的复合桩结构,包括桩体和桩体紧固件,所述的桩体紧固件设在桩体的两侧。与现有技术相比,本发明具有缩短桩体长度、有效减少水平位移、节约混凝土用量等优点。

Description

一种用于输电线路铁塔的复合粧结构
技术领域
[0001] 本发明涉及一种于输电线路铁塔固定结构,尤其是涉及一种用于输电线路铁塔的复合桩结构。
背景技术
[0002] 铁塔是通过基础将荷载传递到地基中,所以无论是地基还是基础不管哪一部分出现问题或发生破坏,都将对上部的铁塔造成恶劣的影响或重大事故,进而影响电网的安全运行。所以在基础设计时必须通过对工程所在地区地质地貌的分析研究,遵循“安全可靠、方便施工、便于运行、注重环保、节省投资”的原则来选择与工程所在地区地质情况相对应的基础型式。目前上海地区常用的基础型式为:①直柱式基础;②单桩、双桩、四桩钻孔灌注桩基础这两种型式。其中直柱式基础一般用于地质情况较好的地区,而灌注桩基础一般用于河塘、软土等地质不利地区。
[0003] 上海地区的地质土均系第四纪三角洲堆积物和沉淀物,是典型的软土地基,地表下30.0m范围内普遍分布有多个软粘土层,地下水位较高,持力层的地基承载力较低,相对于其他地区的铁塔浅埋基础(直柱式基础)需要占用更大的占地面积且基础开挖更深,造成基础开挖量大,混凝土及钢筋用量也就更大;另外在线路建设中为了减少前期的赔偿费用,有更多的铁塔不得不定位于河塘内或位于面积狭窄地区,其后果是工程中钻孔灌注桩的运用数量呈逐年上升趋势,而钻孔灌注桩基础同样存在混凝土和钢筋用量大、工程造价相对较高的问题。
[0004] 上海地区地势平坦,鱼塘、河沟纵横,地下水的水量充沛,水位常年维持在较高的水平,上海地区又是典型的软土地基,软土具有高含水量、大空隙比、低强度、高压缩性等不良工程特点。近几年由于铁塔设计标准提高,征地、绿化赔偿、铁塔基础维护费用增加等各方面的原因,电网建设的成本越来越高,迫切需要能找一种或几种基础型式,能减少征地面积、降低基础的材料用量,使其在基础占地面积、综合造价等方面更具合理性与经济性。
发明内容
[0005] 本发明的目的就是为了克服上述现有技术存在的缺陷而提供一种缩短桩体长度、有效减少水平位移、节约混凝土用量的用于输电线路铁塔的复合桩结构。
[0006] 本发明的目的可以通过以下技术方案来实现:
[0007] —种用于输电线路铁塔的复合桩结构,其特征在于,包括桩体和桩体紧固件,所述的桩体紧固件设在桩体的两侧。
[0008] 所述的桩体紧固件设有两个,分别对称设在桩体两侧。
[0009] 所述的桩体紧固件通过旋喷注浆形成,其旋喷注浆点与桩体外表面的垂直距离大于注浆半径。
[0010] 所述的旋喷注浆点与桩体外表面的垂直距离为220〜270mm。
[0011] 所述的注衆半径为380〜420mm。[0012] 若所述的桩体为抗压桩体,所述的桩体紧固件的深度为桩体深度加三倍桩体直径。
[0013] 若所述的桩体为抗拔桩,所述的桩体紧固件的深度为桩体深度。
[0014] 与现有技术相比,本发明具有以下优点:
[0015] 1、将本发明作为输电线路铁塔的基础型式,起到减少占地面积,减少基础的混凝土和钢筋用量,降低工程造价,节约工程投资,为工程建设提供技术支持;
[0016] 2、达到缩小桩径,缩短桩体长度,有效减少水平位移,节约混凝土用量。
附图说明
[0017] 图1为本发明的结构截面示意图。
具体实施方式
[0018] 下面结合附图和具体实施例对本发明进行详细说明。
[0019] 实施例
[0020] 如图1所示,一种用于输电线路铁塔的复合桩结构,包括桩体I和桩体紧固件2,所述的桩体紧固件2设在桩体I的两侧。所述的桩体紧固件2设有两个,分别对称设在桩体I两侧。所述的桩体紧固件2通过旋喷注浆形成,其旋喷注浆点21与桩体I外表面的距离大于注浆半径。所述的旋喷注浆点21与桩体外表面的距离为250mm。所述的注浆直径d为 400mm。
[0021] 若所述的桩体I为抗压桩体,所述的桩体紧固件2的深度为桩体深度加三倍桩体直径。若所述的桩体I为抗拔桩,所述的桩体紧固件2的深度为桩体深度。

Claims (7)

1.一种用于输电线路铁塔的复合桩结构,其特征在于,包括桩体和桩体紧固件,所述的桩体紧固件设在桩体的两侧。
2.根据权利要求1所述的一种用于输电线路铁塔的复合桩结构,其特征在于,所述的桩体紧固件设有两个,分别对称设在桩体两侧。
3.根据权利要求1所述的一种用于输电线路铁塔的复合桩结构,其特征在于,所述的桩体紧固件通过旋喷注浆形成,其旋喷注浆点与桩体外表面的垂直距离大于注浆半径。
4.根据权利要求3所述的一种用于输电线路铁塔的复合桩结构,其特征在于,所述的旋喷注浆点与桩体外表面的垂直距离为220〜270mm。
5.根据权利要求3所述的一种用于输电线路铁塔的复合桩结构,其特征在于,所述的注楽.半径为380〜420mm。
6.根据权利要求1所述的一种用于输电线路铁塔的复合桩结构,其特征在于,若所述的桩体为抗压桩体,所述的桩体紧固件的深度为桩体深度加三倍桩体直径。
7.根据权利要求1所述的一种用于输电线路铁塔的复合桩结构,其特征在于,若所述的桩体为抗拔桩,所述的桩体紧固件的深度为桩体深度。
CN2011104337133A 2011-12-21 2011-12-21 一种用于输电线路铁塔的复合桩结构 CN103174162A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011104337133A CN103174162A (zh) 2011-12-21 2011-12-21 一种用于输电线路铁塔的复合桩结构

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011104337133A CN103174162A (zh) 2011-12-21 2011-12-21 一种用于输电线路铁塔的复合桩结构

Publications (1)

Publication Number Publication Date
CN103174162A true CN103174162A (zh) 2013-06-26

Family

ID=48634317

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011104337133A CN103174162A (zh) 2011-12-21 2011-12-21 一种用于输电线路铁塔的复合桩结构

Country Status (1)

Country Link
CN (1) CN103174162A (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104790423A (zh) * 2015-03-12 2015-07-22 中国能源建设集团浙江省电力设计院有限公司 一种大型输电杆塔复合扩顶灌注桩基础

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001303567A (ja) * 2000-04-21 2001-10-31 Nitto Tekko Kk 軟弱地盤にコンクリート基礎を打設する際のマイクロパイル打設工法及び打設装置
CN1710213A (zh) * 2005-07-04 2005-12-21 雷玉华 带高压旋喷桩尖的同步组合桩的施工方法
CN101010465A (zh) * 2004-09-17 2007-08-01 东京电力株式会社 铁塔的基础构造
CN101010464A (zh) * 2004-09-17 2007-08-01 东京电力株式会社 铁塔的基础构造
CN101509261A (zh) * 2009-01-20 2009-08-19 中国科学院武汉岩土力学研究所 一种用于软弱地基上超高压输电线铁塔的桩板基础的方法
CN101718098A (zh) * 2009-11-09 2010-06-02 中国电力科学研究院 一种微型桩联合掏挖复合基础及其施工方法
CN101871217A (zh) * 2009-04-23 2010-10-27 润弘精密工程事业股份有限公司 预铸桩帽结构及其接合结构的接合方法
DE102012201281A1 (de) * 2011-02-08 2012-08-09 Otto Drexler Stahlbeton-Rammpfahlfundament
CN202466610U (zh) * 2011-12-21 2012-10-03 上海市电力公司 用于输电线路铁塔的复合桩结构

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001303567A (ja) * 2000-04-21 2001-10-31 Nitto Tekko Kk 軟弱地盤にコンクリート基礎を打設する際のマイクロパイル打設工法及び打設装置
CN101010465A (zh) * 2004-09-17 2007-08-01 东京电力株式会社 铁塔的基础构造
CN101010464A (zh) * 2004-09-17 2007-08-01 东京电力株式会社 铁塔的基础构造
CN1710213A (zh) * 2005-07-04 2005-12-21 雷玉华 带高压旋喷桩尖的同步组合桩的施工方法
CN101509261A (zh) * 2009-01-20 2009-08-19 中国科学院武汉岩土力学研究所 一种用于软弱地基上超高压输电线铁塔的桩板基础的方法
CN101871217A (zh) * 2009-04-23 2010-10-27 润弘精密工程事业股份有限公司 预铸桩帽结构及其接合结构的接合方法
CN101718098A (zh) * 2009-11-09 2010-06-02 中国电力科学研究院 一种微型桩联合掏挖复合基础及其施工方法
DE102012201281A1 (de) * 2011-02-08 2012-08-09 Otto Drexler Stahlbeton-Rammpfahlfundament
CN202466610U (zh) * 2011-12-21 2012-10-03 上海市电力公司 用于输电线路铁塔的复合桩结构

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
建筑施工手册(第四版)编写组: "《建筑施工手册(第四版)》", 31 January 2003, 中国建筑工业出版社 *
秦庆芝等: "特高压输电线路煤矿采动影响区铁塔基础设计研究", 《电力建设》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104790423A (zh) * 2015-03-12 2015-07-22 中国能源建设集团浙江省电力设计院有限公司 一种大型输电杆塔复合扩顶灌注桩基础

Similar Documents

Publication Publication Date Title
CN201962688U (zh) 地下连续墙码头桩基础结构
CN203515597U (zh) 适用于软弱地层的隧道结构
CN202644547U (zh) 一种边坡生态恢复植被种植保障结构型式
CN103147464B (zh) 一种地下室抗浮板的泄压结构及其施工方法
CN202989937U (zh) 一种格栅式双排桩支护结构
CN103510551A (zh) 一种桥梁深水基础三向静动力加载模型试验平台
CN200985518Y (zh) 门式抗浮结构
CN201962558U (zh) 山区高陡边坡路基构造
CN204662499U (zh) 地下室混凝土外墙、防水、肥槽一体化施工构造
CN103510528B (zh) 用于地下结构抗浮的盲沟排水结构
CN103526721B (zh) 一种透水桩基丁坝
CN201343733Y (zh) 稳定岩质边坡生态防护构造
CN103243678B (zh) 防波堤
CN101634143A (zh) 含软弱粘土地层中的螺旋挤土灌注桩复合地基处理方法
CN203083879U (zh) 土层锚杆应变测试系统
CN2916024Y (zh) 塌陷区抗变形高压电线塔
CN201485847U (zh) 一种新型尾矿坝同步排渗加固装置
CN102425082A (zh) 高速铁路岩溶强烈发育车站道岔区路基加固构造
CN107794942B (zh) 一种下穿河床综合管廊结构的施工方法
CN203569579U (zh) 一种建筑地基
CN103924602B (zh) 深厚软土基坑施工方法
CN108360547B (zh) 一种适用于深水、强震条件下的桥梁复合基础
CN103074903B (zh) 滩涂流沙软弱地基风机基础护筒型混凝土灌注桩
CN203583493U (zh) 组合式格构钢架喷锚基坑支护结构
CN102182163B (zh) 一种组装式泥石流拦砂坝及其施工方法

Legal Events

Date Code Title Description
PB01 Publication
C06 Publication
SE01 Entry into force of request for substantive examination
C10 Entry into substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20130626

RJ01 Rejection of invention patent application after publication