- Publication number
- CN103173230B CN103173230B CN201310107186.6A CN201310107186A CN103173230B CN 103173230 B CN103173230 B CN 103173230B CN 201310107186 A CN201310107186 A CN 201310107186A CN 103173230 B CN103173230 B CN 103173230B
- Authority
- CN
- China
- Prior art keywords
- slide rail
- brick
- suspension rod
- checker brick
- hook
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The invention provides a transporting and constructing method and a transporting and constructing device for coke-oven checker bricks. The transporting and constructing device comprises a slide rail section, wherein the slide rail is arranged in a slide rail supporting base; the slide rail supporting base is connected on a fixed rod by a hanging shaft; an adjusting rod is arranged at one end of the fixed rod; a lead screw is arranged at one end of the adjusting rod; an adjusting nut is arranged for adjusting the extending length of the adjusting rod; a first hanging rod is connected at the tail end of the slide rail; a second hanging rod is hung on the tail end of the first hanging rod; and a checker brick hanging tool bag is arranged on the bottom of the second hanging rod. The invention further discloses a method for transporting the cove-oven checker bricks by adopting the device. According to the transporting and constructing method and the transporting and constructing device for coke-oven checker bricks disclosed by the invention, the slide rail is arranged at a chute port, and the hanging tool is used to replace the conventional manual transportation for transporting the check bricks, so that the labor intensity can be greatly relieved and the working efficiency can be improved.
Description
Technical field
The invention belongs to metallurgical equipment maintenance technique field, be specifically related to a kind of transport, building method and device of coke oven checker brick.
Background technology
Between coke oven regenerator main wall and regenerator list wall, have checker brick, when coke oven high-temperature flue gas is flowed through checker brick surface, transfer heat to checker brick, now the temperature of brick raises gradually.In the time changing air or Gas Flow into and cross this checker brick surface, the heat being accumulated in brick is passed to air or coal gas, thereby reaches the object of preheating.
Fill 6 meter of 60 hole coke oven as example taking top, more than 240 of regenerator, the checker brick quantity of each regenerator is 1560, piles up by the mode of a dead lift completely, and carrying personnel are according to brachium, everyone does not carry 34 not etc., carry the roundtrip of the needs 520 times of 3, carry the roundtrip of the needs 390 times of 4, labour intensity is very large, in the urgent need to a kind of novel method, master worker is freed from heavy manual work.
Summary of the invention
Technical problem to be solved by this invention is the deficiency for above-mentioned existence, provide one to utilize chute mouth that slide rail is installed, use suspender to transport checker brick and replace a dead lift in the past, can greatly reduce labor intensity, transport, building method and the device of the coke oven checker brick of increasing work efficiency.
The technical solution adopted for the present invention to solve the technical problems is:
The transport of coke oven checker brick, build device by laying bricks or stones, it is characterized in that: include one section of slide rail, slide rail is arranged in slide rail bearing, slide rail bearing is connected on fixed link by suspended axle, one end of fixed link is provided with governor lever, governor lever one end is screw mandrel, and setting nut is installed, the development length of capable of regulating governor lever; Described slide rail end is connected with the first suspension rod, and the first suspension rod end is hung with the second suspension rod, and in the second suspension rod bottom, checker brick suspender bag is installed.
In such scheme, described fixed link is C type, and fixed link two ends are vertical perk upwards, can be inserted in the chute mouth on regenerator list wall.
In such scheme, the first described suspension rod upper end is provided with slide rail wheel, and bottom is provided with horizontal hanger bar, and slide rail wheel can drive the first suspension rod to slide on slide rail.
In such scheme, the second described suspension rod upper end is provided with hook, coordinates suspension by hook with the hanger bar on the first suspension rod, and the second suspension rod lower end is also provided with horizontal hanger bar.
In such scheme, described checker brick suspender comprises brick hook, gib head, anti-down railing and axle, and brick hook bottom is provided with coupler body, and top is provided with axle center annulus, and brick hook axle center annulus one side is provided with anti-down railing; Gib head is inverted V-shape, and the termination of gib head is also provided with axle center annulus, and the axle center annulus of brick hook adopts axle to be connected with the axle center annulus of gib head.
Transport, the building method of coke oven checker brick comprise following steps:
The first step, is first inserted into the two ends of fixed link in the chute mouth on regenerator list wall, the screw mandrel on governor lever is extended, and the governor lever the other end is inserted in the chute mouth on regenerator main wall, tightens setting nut.
Adopt the same manner that multiple fixed links and governor lever are installed.
Second step, is inserted into slide rail in slide rail bearing, then the slide rail wheel of the first suspension rod is suspended in slide rail, hangs up the second suspension rod in the hanger bar of the first suspension rod.
According to the transport of checker brick, build the quantity that highly increases and decreases the second suspension rod by laying bricks or stones.
The 3rd step, catches on the good checker brick of code on construction scaffolding platform by the brick hook of checker brick suspender, mentions brick hook, and gib head is hung on the second suspension rod, and now, gib head is stressed, and anti-down railing is close to checker brick naturally.
The 4th step, holds up checker brick suspender steady and carries out, to regenerator inside, mentioning brick hook, and gib head is taken off from the second suspension rod, and now, gib head does not stress, and anti-down railing is opened, then checker brick are completed further and built by laying bricks or stones.
Repeat the 3rd step and the 4th step, complete gradually regenerator lattice brick transport, build by laying bricks or stones.
Adopt the beneficial effect after technique scheme to be:
1. apparatus of the present invention are simple in structure, flexible operation.
2. utilize chute mouth that slide rail is installed, use suspender to transport checker brick and replace a dead lift in the past, greatly alleviated labour intensity, improved working efficiency.
Brief description of the drawings
Fig. 1 is the exemplary construction schematic diagram of the embodiment of the present invention;
Fig. 2 is the slide rail seat structure schematic diagram of the embodiment of the present invention;
Fig. 3 is the first hanging rod structure schematic diagram of the embodiment of the present invention;
Fig. 4 is the second hanging rod structure schematic diagram of the embodiment of the present invention;
Fig. 5 is the brick hook structure schematic diagram of the embodiment of the present invention;
Fig. 6 is checker brick structure schematic diagram;
Fig. 7 is that checker brick are filled position stereographic map;
Fig. 8 is that checker brick are filled position vertical planning drawing;
Fig. 9 is fixed link, the governor lever installation position schematic diagram of the embodiment of the present invention.
In figure: 1. fixed link; 2. governor lever; 3. setting nut; 4. suspended axle; 5. slide rail bearing; 6. slide rail; 7. the first suspension rod; 8. the second suspension rod; 9. brick hook; 10. gib head; 11. anti-down railings; 12. axles; 13. checker brick; 14. regenerator main walls; 15. regenerator list walls; 16. regenerator fire grates; 17. checker brick are filled position; 18. chute mouths; 19. construction scaffolding platforms.
Embodiment
Below in conjunction with embodiment, the present invention is further illustrated:
The transport of embodiment of the present invention coke oven checker brick, build device by laying bricks or stones, as shown in Figures 1 to 5, mainly formed by fixed link 1, governor lever 2, setting nut 3, suspended axle 4, slide rail bearing 5, slide rail 6, the first suspension rod 7, the second suspension rod 8 and checker brick suspender, wherein one end of fixed link 1 connects governor lever 2, the bar portion of governor lever 2 is provided with screw thread, and setting nut 3 is arranged on governor lever 2; Fixed link 1 bottom is provided with suspended axle 4 and slide rail bearing 5; The first suspension rod 7 upper ends are provided with slide rail wheel, and bottom is provided with hanger bar; The second suspension rod 8 upper ends are provided with hook, and bottom is provided with hanger bar; Checker brick suspender comprises brick hook 9, gib head 10, anti-down railing 11 and axle 12, and brick hook 9 bottoms are provided with coupler body, and top is provided with axle center annulus, and brick hook 9 axle center annulus one sides are provided with anti-down railing 11; Gib head 10 is inverted V-shape, and the termination of gib head 10 is provided with axle center annulus, and the axle center annulus of brick hook 9 adopts axle 12 to be connected with the axle center annulus of gib head 10.
Above-mentioned fixed link 1 is C type, and two ends are vertical perk upwards, and the spacing at the two ends of C type equals the spacing of two chute mouths, the middle part weld horizontal pipe of C type, two ends and the level pipe of C type are 45° angle, so that the two ends of C type while filling in chute mouth, conforms to the gradient of chute mouth brick; The two ends of C type is provided with rubber peel, prevents and chute mouth brick direct friction.
The bar portion of governor lever 2 is provided with screw thread, is inserted in the level pipe of fixed link 1, and setting nut 3 is housed on screw thread, so that rotation when setting nut 3, increases or shorten the length of screw thread in level pipe; Termination and the bar portion of governor lever 2 the other ends are 45° angle, so that termination while filling in chute mouth, conforms to the gradient of chute mouth brick; There is rubber peel its termination, prevents and chute mouth brick direct friction.
The level pipe of suspended axle 4 one end and fixed link 1 is connected, and the other end is provided with screw thread and nut, so that suspended axle tangles slide rail bearing 5.
The second suspension rod 8 according to the transport of checker brick, build the quantity that highly increases and decreases the second suspension rod by laying bricks or stones.
The technical parameter of above-mentioned parts and material also can change according to practical situation.
The transport of coke oven checker brick provided by the invention, building method are to utilize chute mouth 18 that slide rail 6 is installed, and make slide rail suspender catch on checker brick and complete round transport in regenerator, build by laying bricks or stones, and referring to Fig. 1 to Fig. 9, the step of the method comprises:
The first step, as Fig. 9, is first inserted into the two ends of fixed link 1 in the chute mouth 18 on regenerator list wall 15, the screw mandrel on governor lever 2 is extended, and the other end is inserted in the chute mouth 18 on regenerator main wall 14, tightens setting nut 3.
Adopt the same manner that multiple fixed links 1 and governor lever 2 are installed.
Second step, is inserted into slide rail 6 in slide rail bearing 5, then the slide rail wheel of the first suspension rod 7 is suspended in slide rail 6, hangs up the second suspension rod 8 in the hanger bar of the first suspension rod 7.
According to the transport of checker brick, build the quantity that highly increases and decreases the second suspension rod 8 by laying bricks or stones.
The 3rd step, catches on the good checker brick 13 of code on construction scaffolding platform 19 by the brick hook 9 of checker brick suspender, mentions brick hook 9, and gib head 10 is hung on the second suspension rod 8, and now, gib head 10 is stressed, and anti-down railing is close to checker brick 13 naturally.
The 4th step, holds up checker brick suspender steady and carries out, to regenerator inside, mentioning brick hook 9, and gib head 10 is taken off from the second suspension rod 8, and now, gib head 10 does not stress, and anti-down railing is opened, then checker brick 13 are completed further and built by laying bricks or stones.
Repeat the 3rd step and the 4th step, complete gradually regenerator lattice brick transport, build by laying bricks or stones.
As Fig. 8, regenerator lattice brick is placed on regenerator fire grate 16, and 60 every layer, totally 26 layers, the masonry way of checker brick is dry code, and piling up requirement is to ensure that checker brick hole is penetrating up and down.Can on construction scaffolding platform 19, pile up as required checker brick 13, that piles up manyly both can reduce operator and entered the number of times of regenerator, also can on checker brick suspender, increase the traction rope made of hemp, back and forth transported checker brick, and operator directly build by laying bricks or stones after receiving checker brick.
Protection scope of the present invention is not limited to the above embodiments, and obviously, those skilled in the art can carry out various changes and distortion and not depart from the scope of the present invention and spirit the present invention.If these changes and distortion belong in the scope of the claims in the present invention and equivalent technologies thereof, the intent of the present invention also comprises these changes and is out of shape interior.
Claims (5)
1. the transport of coke oven checker brick, build device by laying bricks or stones, it is characterized in that: include one section of slide rail, slide rail is arranged in slide rail bearing, slide rail bearing is connected on fixed link by suspended axle, one end of fixed link is provided with governor lever, governor lever one end is screw mandrel, and setting nut is installed, the development length of capable of regulating governor lever; Described fixed link is C type, and fixed link two ends are vertical perk upwards, can be inserted in the chute mouth on regenerator list wall; Described slide rail end is connected with the first suspension rod, and the first suspension rod end is hung with the second suspension rod, and in the second suspension rod bottom, checker brick suspender bag is installed.
2. the transport of coke oven checker brick as claimed in claim 1, build device by laying bricks or stones, it is characterized in that: the first described suspension rod upper end is provided with slide rail wheel, and bottom is provided with horizontal hanger bar, slide rail wheel can drive the first suspension rod to slide on slide rail.
3. the transport of coke oven checker brick as claimed in claim 1, build device by laying bricks or stones, it is characterized in that: the second described suspension rod upper end is provided with hook, coordinate suspension by hook with the hanger bar on the first suspension rod, the second suspension rod lower end is also provided with horizontal hanger bar.
4. the transport of coke oven checker brick as claimed in claim 1, build device by laying bricks or stones, it is characterized in that: described checker brick suspender comprises brick hook, gib head, anti-down railing and axle, brick hook bottom is provided with coupler body, and top is provided with axle center annulus, and brick hook axle center annulus one side is provided with anti-down railing; Gib head is inverted V-shape, and the termination of gib head is also provided with axle center annulus, and the axle center annulus of brick hook adopts axle to be connected with the axle center annulus of gib head.
5. the transport of coke oven checker brick, building method, is characterized in that, comprises following steps:
The first step, is first inserted into the two ends of fixed link in the chute mouth on regenerator list wall, the screw mandrel on governor lever is extended, and the governor lever the other end is inserted in the chute mouth on regenerator main wall, tightens setting nut;
Adopt the same manner that multiple fixed links and governor lever are installed;
Second step, is inserted into slide rail in slide rail bearing, then the slide rail wheel of the first suspension rod is suspended in slide rail, hangs up the second suspension rod in the hanger bar of the first suspension rod;
According to the transport of checker brick, build the quantity that highly increases and decreases the second suspension rod by laying bricks or stones;
The 3rd step, catches on the good checker brick of code on construction scaffolding platform by the brick hook of checker brick suspender, mentions brick hook, and gib head is hung on the second suspension rod, and now, gib head is stressed, and anti-down railing is close to checker brick naturally;
The 4th step, holds up checker brick suspender steady and carries out, to regenerator inside, mentioning brick hook, and gib head is taken off from the second suspension rod, and now, gib head does not stress, and anti-down railing is opened, then checker brick are completed further and built by laying bricks or stones;
Repeat the 3rd step and the 4th step, complete gradually regenerator lattice brick transport, build by laying bricks or stones.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310107186.6A CN103173230B (en) | 2013-03-29 | 2013-03-29 | Transporting and constructing method and device for coke-oven checker bricks |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310107186.6A CN103173230B (en) | 2013-03-29 | 2013-03-29 | Transporting and constructing method and device for coke-oven checker bricks |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103173230A CN103173230A (en) | 2013-06-26 |
CN103173230B true CN103173230B (en) | 2014-11-12 |
Family
ID=48633434
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310107186.6A Active CN103173230B (en) | 2013-03-29 | 2013-03-29 | Transporting and constructing method and device for coke-oven checker bricks |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103173230B (en) |
Families Citing this family (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104694141B (en) * | 2015-02-13 | 2017-05-03 | 山东钢铁股份有限公司 | Protection plate fixing device and method during replacement of coke oven column |
CN106032469A (en) * | 2015-03-11 | 2016-10-19 | 五冶集团上海有限公司 | Coke oven regenerative chamber checker brick on-line replacing method |
CN105419821A (en) * | 2015-12-02 | 2016-03-23 | 中冶焦耐工程技术有限公司 | Thermal-state non-stop production replacement method of lattice bricks in regenerative chamber of coke oven |
JP7004979B2 (en) * | 2018-04-04 | 2022-01-21 | 日本製鉄株式会社 | How to build a heat storage chamber and a jig for hanging bricks in a heat storage chamber |
CN108611105B (en) * | 2018-04-13 | 2024-01-30 | 中冶焦耐(大连)工程技术有限公司 | Down-adjusting coke oven adjusting brick adding and taking tool and application method thereof |
CN110144231B (en) * | 2019-04-30 | 2021-01-19 | 中国一冶集团有限公司 | Coke oven checker brick mounting device and construction method thereof |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2001019969A (en) * | 1999-07-05 | 2001-01-23 | Kawasaki Steel Corp | Battery for mounting brick onto coke oven |
JP2006036934A (en) * | 2004-07-27 | 2006-02-09 | Jfe Steel Kk | Method for construction of temporary shed for coke oven and coke oven |
CN201272765Y (en) * | 2008-07-31 | 2009-07-15 | 中冶成工上海五冶建设有限公司 | Coke oven water seal tank replacing sling |
CN201861795U (en) * | 2010-09-06 | 2011-06-15 | 贵州省动物疫病预防控制中心 | Portable suspension hog holder |
CN203256222U (en) * | 2013-03-29 | 2013-10-30 | 中国一冶集团有限公司 | Transportation and construction device for coke oven checker bricks |
-
2013
- 2013-03-29 CN CN201310107186.6A patent/CN103173230B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2001019969A (en) * | 1999-07-05 | 2001-01-23 | Kawasaki Steel Corp | Battery for mounting brick onto coke oven |
JP2006036934A (en) * | 2004-07-27 | 2006-02-09 | Jfe Steel Kk | Method for construction of temporary shed for coke oven and coke oven |
CN201272765Y (en) * | 2008-07-31 | 2009-07-15 | 中冶成工上海五冶建设有限公司 | Coke oven water seal tank replacing sling |
CN201861795U (en) * | 2010-09-06 | 2011-06-15 | 贵州省动物疫病预防控制中心 | Portable suspension hog holder |
CN203256222U (en) * | 2013-03-29 | 2013-10-30 | 中国一冶集团有限公司 | Transportation and construction device for coke oven checker bricks |
Also Published As
Publication number | Publication date |
---|---|
CN103173230A (en) | 2013-06-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103173230B (en) | Transporting and constructing method and device for coke-oven checker bricks | |
CN101338562B (en) | Concrete conveying process for high steep and big drop height landform | |
CN205955236U (en) | Container formula of taking pulley platform of unloading of encorbelmenting | |
CN103738834A (en) | Adjustable three-point lifting method | |
CN205348733U (en) | Furred ceiling operation platform | |
CN102060232B (en) | Transportation method for refractory brick for stove construction | |
CN203256222U (en) | Transportation and construction device for coke oven checker bricks | |
CN203284084U (en) | Suspension type transporter at cave top | |
CN107842246A (en) | A kind of chimney steel beam hydraulic lifting high-altitude integral slipping hanging apparatus and method | |
CN103556626B (en) | Hanging structure for hoisting large-diameter hole drilling filling pile steel bar cage | |
CN204827251U (en) | Novel suit derrick upright | |
CN104016260A (en) | Compartment funnel slipping mounting method and slipping mounting mechanism | |
CN102071812B (en) | Method for vertically transporting building materials | |
CN104131124B (en) | Blast furnace cooling stave laid on end edge brick construction method | |
CN203625889U (en) | Hanging cage structure for large-diameter hole drilling cast pile reinforcement cage hanging | |
CN207633847U (en) | A kind of chimney steel beam hydraulic promotion high-altitude integral slipping hanging apparatus | |
CN207312995U (en) | One kind self-control bridge-collision-avoidance wall form hanging device | |
CN207228566U (en) | A kind of suspended construction garbage channel | |
CN204959511U (en) | Buried sleeve formula sleeper hoist device | |
CN102001583A (en) | Semi-automatic brick hanging fixture | |
CN203625891U (en) | Hanging structure for large-diameter hole drilling cast pile reinforcement cage hanging | |
CN104328920B (en) | Construction material carrying method | |
CN103884640B (en) | A kind of prestress pipe friction resistance test device and installation method thereof | |
CN206256382U (en) | It is a kind of to suspend purlin car in midair for the triangle that Wavelike steel webplate is installed | |
CN105133446B (en) | Embedded sleeve type sleeper hoisting device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |