CN103117524A - 一种输电线路高空压接装置 - Google Patents
一种输电线路高空压接装置 Download PDFInfo
- Publication number
- CN103117524A CN103117524A CN 201310038124 CN201310038124A CN103117524A CN 103117524 A CN103117524 A CN 103117524A CN 201310038124 CN201310038124 CN 201310038124 CN 201310038124 A CN201310038124 A CN 201310038124A CN 103117524 A CN103117524 A CN 103117524A
- Authority
- CN
- China
- Prior art keywords
- pressing plate
- semicircular
- semi
- pressure plate
- power transmission
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Suspension Of Electric Lines Or Cables (AREA)
Abstract
一种输电线路高空压接装置,涉及一种输电线路连接装置,在上半圆压板(5)和下半圆压板(7)的半圆内面上均匀分布有复数个凸起块(6),上半圆压板(5)和下半圆压板(7)分别扣在输电线路断股部位的上下面上,两块下夹块(10)的半圆孔B(8)处于下半圆压板(7)的下部两端,两块上夹块(3)的半圆孔A(4)处于上半圆压板(5)的上部两端,四根锁紧螺丝(1)分别穿过两块上夹块(3)两侧的光孔(2)后连接两块下夹块(10)半圆孔B(8)两侧的螺孔(9);本发明利用上半圆压板和下半圆压板内面上设置的凸起块,可以较好的压接断股的输电线路,较短的时间内便可完成修复工作,确保了输电质量不会降低。
Description
【技术领域】
本发明涉及一种输电线路连接装置,尤其是涉及一种输电线路高空压接装置。
【背景技术】
目前,输电线路的结构通常为多股铝线中间包裹一根钢丝,使用中受到拉扯或线路老化经常会出现断股现象,若局部断股过多时,需要停电对输电线路进行更换,这样不仅作业时间过长,而且还会影响客户使用,也会给电力部门带来较大的经济损失。
【发明内容】
为了克服背景技术中的不足,本发明公开一种输电线路高空压接装置,利用上半圆压板和下半圆压板内面上设置的凸起块,可以较好的压接断股的输电线路,较短的时间内便可完成修复工作,确保了输电质量不会降低。
为实现上述发明目的,本发明采用如下技术方案:
一种输电线路高空压接装置,包括上半圆压板、下半圆压板、上夹块、下夹块和锁紧螺丝,在上半圆压板和下半圆压板的半圆内面上均匀分布有复数个凸起块,上半圆压板和下半圆压板分别扣在输电线路断股部位的上下面上,两块下夹块的半圆孔B处于下半圆压板的下部两端,两块上夹块的半圆孔A处于上半圆压板的上部两端,四根锁紧螺丝分别穿过两块上夹块两侧的光孔后连接两块下夹块半圆孔B两侧的螺孔。
所述的输电线路高空压接装置,在上半圆压板和下半圆压板半圆内面上分别设置的凸起块为圆锥形结构。
由于采用如上所述的技术方案,本发明具有如下有益效果:
本发明所述的输电线路高空压接装置,通过上半圆压板和下半圆压板内面上设置的凸起块,可以较好的压接断股的输电线路,避免了更换输电线路引起的长时间断电现象的发生,较短的时间内便可完成修复工作,使得断股部位通过铜质上半圆压板和下半圆压板导电,确保了输电质量不会降低。
【附图说明】
图1是本发明的结构示意图;
图中:1、锁紧螺丝;2、光孔;3、上夹块;4、半圆孔A;5、上半圆压板;6、凸起块;7、下半圆压板;8、半圆孔B;9、螺孔;10、下夹块。
【具体实施方式】
通过下面的实施例可以更详细的解释本发明,公开本发明的目的旨在保护本发明范围内的一切变化和改进,本发明并不局限于下面的实施例;
结合附图1中所述的输电线路高空压接装置,包括上半圆压板5、下半圆压板7、上夹块3、下夹块10和锁紧螺丝1,在上半圆压板5和下半圆压板7的半圆内面上均匀分布有复数个圆锥形凸起块6,上半圆压板5和下半圆压板7分别扣在输电线路断股部位的上下面上,两块下夹块10的半圆孔B8处于下半圆压板7的下部两端,两块上夹块3的半圆孔A4处于上半圆压板5的上部两端,四根锁紧螺丝1分别穿过两块上夹块3两侧的光孔2后连接两块下夹块10半圆孔B8两侧的螺孔9。
实施本发明所述的输电线路高空压接装置,使用时通知停电,在输电线路的出现断股部位线缠绕复位,然后利用上半圆压板5、下半圆压板7包裹断股部位,将一个上夹块3和一个下夹块10卡在上半圆压板5、下半圆压板7合并后的一端,然后利用两根锁紧螺丝1穿过上夹块3的两个光孔2后连接下夹块10的螺孔9,后在上半圆压板5、下半圆压板7合并后的另一端利用另两根锁紧螺丝1穿过另一上夹块3的两个光孔2后连接另一下夹块10的螺孔9,由于上半圆压板5、下半圆压板7的半圆内面上均匀分布有复数个圆锥形凸起块6,可将断股牢牢地固定在输电线路上,使得修复的输电线路寿命得到有效延长。
本发明未详述部分为现有技术。
Claims (2)
1.一种输电线路高空压接装置,包括上半圆压板(5)、下半圆压板(7)、上夹块(3)、下夹块(10)和锁紧螺丝(1),其特征是:在上半圆压板(5)和下半圆压板(7)的半圆内面上均匀分布有复数个凸起块(6),上半圆压板(5)和下半圆压板(7)分别扣在输电线路断股部位的上下面上,两块下夹块(10)的半圆孔B(8)处于下半圆压板(7)的下部两端,两块上夹块(3)的半圆孔A(4)处于上半圆压板(5)的上部两端,四根锁紧螺丝(1)分别穿过两块上夹块(3)两侧的光孔(2)后连接两块下夹块(10)半圆孔B(8)两侧的螺孔(9)。
2.根据权利要求1所述的输电线路高空压接装置,其特征是:在上半圆压板(5)和下半圆压板(7)半圆内面上分别设置的凸起块(6)为圆锥形结构。
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN 201310038124 CN103117524A (zh) | 2013-01-31 | 2013-01-31 | 一种输电线路高空压接装置 |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN 201310038124 CN103117524A (zh) | 2013-01-31 | 2013-01-31 | 一种输电线路高空压接装置 |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN103117524A true CN103117524A (zh) | 2013-05-22 |
Family
ID=48415830
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN 201310038124 Pending CN103117524A (zh) | 2013-01-31 | 2013-01-31 | 一种输电线路高空压接装置 |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN103117524A (zh) |
Cited By (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN103390804A (zh) * | 2013-07-24 | 2013-11-13 | 江苏科耐特高压电缆附件有限公司 | 一种电缆导电线芯压块 |
| CN103532041A (zh) * | 2013-09-12 | 2014-01-22 | 国家电网公司 | 一种适应输电线路断股的高空压接装置 |
| CN103606762A (zh) * | 2013-11-25 | 2014-02-26 | 国家电网公司 | 一种导体连接线夹及其安装方法 |
| CN105305348A (zh) * | 2015-10-29 | 2016-02-03 | 广州番禺电缆集团有限公司 | 合页式导线接续器 |
| CN105305127A (zh) * | 2015-10-29 | 2016-02-03 | 广州番禺电缆集团有限公司 | 一种电线转接装置单体及由其构成的集成式电线转接装置 |
| CN105305194B (zh) * | 2015-10-29 | 2018-08-24 | 广州番禺电缆集团有限公司 | 一种电线转接装置 |
-
2013
- 2013-01-31 CN CN 201310038124 patent/CN103117524A/zh active Pending
Cited By (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN103390804A (zh) * | 2013-07-24 | 2013-11-13 | 江苏科耐特高压电缆附件有限公司 | 一种电缆导电线芯压块 |
| CN103532041A (zh) * | 2013-09-12 | 2014-01-22 | 国家电网公司 | 一种适应输电线路断股的高空压接装置 |
| CN103606762A (zh) * | 2013-11-25 | 2014-02-26 | 国家电网公司 | 一种导体连接线夹及其安装方法 |
| CN105305348A (zh) * | 2015-10-29 | 2016-02-03 | 广州番禺电缆集团有限公司 | 合页式导线接续器 |
| CN105305127A (zh) * | 2015-10-29 | 2016-02-03 | 广州番禺电缆集团有限公司 | 一种电线转接装置单体及由其构成的集成式电线转接装置 |
| CN105305348B (zh) * | 2015-10-29 | 2018-03-30 | 广州番禺电缆集团有限公司 | 合页式导线接续器 |
| CN105305127B (zh) * | 2015-10-29 | 2018-06-08 | 广州番禺电缆集团有限公司 | 一种电线转接装置单体及由其构成的集成式电线转接装置 |
| CN105305194B (zh) * | 2015-10-29 | 2018-08-24 | 广州番禺电缆集团有限公司 | 一种电线转接装置 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN104852163B (zh) | 一种组装式线缆连接器 | |
| CN103117524A (zh) | 一种输电线路高空压接装置 | |
| CN103647232A (zh) | 一种集束电缆卡线装置 | |
| CN204577638U (zh) | 一种多线孔回折线夹 | |
| CN201829626U (zh) | 导线连接线夹 | |
| CN203166122U (zh) | C型接续线夹 | |
| CN103532041A (zh) | 一种适应输电线路断股的高空压接装置 | |
| CN103001022B (zh) | 接地线线夹 | |
| CN202405721U (zh) | 一种耐张线夹 | |
| CN203553453U (zh) | 线缆压接头 | |
| CN204067766U (zh) | 快接型接地装置 | |
| CN203883381U (zh) | 电线塔线路检修电线拉紧装置 | |
| CN203150740U (zh) | 接地线线夹 | |
| CN204011794U (zh) | 新型电缆接线端子 | |
| CN204651499U (zh) | 低压接户线线缆连接组件 | |
| CN205159995U (zh) | 一种防脱式楔形耐张线夹 | |
| CN204706651U (zh) | 一种组装式线缆连接器 | |
| CN204167513U (zh) | 配电变压器连接线夹 | |
| CN202423957U (zh) | 一种绝缘夹板 | |
| CN202217552U (zh) | 低压复合耐张绝缘子 | |
| CN204696638U (zh) | 压接于主供电线路上的t型分流压接管 | |
| CN207165779U (zh) | 一种10kv配备临时接线结构 | |
| CN205069902U (zh) | 一种导线快速连接装置 | |
| CN103618256B (zh) | 碳纤维导线专用的耐压线夹 | |
| CN205264412U (zh) | 一种线缆压紧装置 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
| WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20130522 |