CN103104287A - 一种条带采空区充填复采方法 - Google Patents
一种条带采空区充填复采方法 Download PDFInfo
- Publication number
- CN103104287A CN103104287A CN201310031921XA CN201310031921A CN103104287A CN 103104287 A CN103104287 A CN 103104287A CN 201310031921X A CN201310031921X A CN 201310031921XA CN 201310031921 A CN201310031921 A CN 201310031921A CN 103104287 A CN103104287 A CN 103104287A
- Authority
- CN
- China
- Prior art keywords
- band
- filling
- strip
- goaf
- empty
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000005065 mining Methods 0.000 title claims abstract description 20
- 238000000034 method Methods 0.000 title claims abstract description 13
- 239000003245 coal Substances 0.000 claims abstract description 30
- 239000000463 material Substances 0.000 claims abstract description 16
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 4
- 239000011435 rock Substances 0.000 claims description 12
- 238000004519 manufacturing process Methods 0.000 claims description 7
- 238000007599 discharging Methods 0.000 claims description 3
- 230000000505 pernicious effect Effects 0.000 claims description 3
- 238000011084 recovery Methods 0.000 abstract description 4
- 238000007711 solidification Methods 0.000 abstract 1
- 230000008023 solidification Effects 0.000 abstract 1
- 239000000945 filler Substances 0.000 description 4
- 239000006210 lotion Substances 0.000 description 3
- 238000010586 diagram Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 230000006378 damage Effects 0.000 description 1
- 239000012467 final product Substances 0.000 description 1
- 238000012856 packing Methods 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Images
Landscapes
- Lining And Supports For Tunnels (AREA)
Abstract
本发明公开了一种条带采空区充填复采方法,包括如下步骤:a打开条带采空区主要巷道的密闭墙,进行通风,排放可能残留的有害气体;b对条带采空区内的巷道进行清理,加固局部出现破碎的顶板,排除积水;c采用膏体充填材料,对条带采空区内的空条带进行充填,形成充填条带一;d待充填条带一凝固后,对条带采空区内的遗留条带煤柱进行回采;e对由回采形成的新空条带采用矸石进行非胶结充填,形成充填条带二。本发明采用膏体充填方式,用充填材料充满条带采空区,再把过去遗留下的条带煤柱资源复采出来,并对回采所形成的新空条带采用矸石进行非胶结充填,在进一步提高煤炭资源回收率的同时,又可以杜绝由条带煤柱失稳造成的矿区地质灾害隐患。
Description
技术领域
本发明涉及一种煤矿条带采空区复采方法,适用于条带开采形成的条带采空区内煤柱的复采,属于煤炭开采方法领域。
背景技术
在建筑物下的薄及中厚煤层中采用条带开采是保证地面建筑物安全、解放建筑物下压煤资源的行之有效的开采方式。几十年来,我国煤矿采用条带开采方式在建筑物下压煤资源开采过程中,形成了大面积的条带采空区,同时,也将大量条带煤柱作为上覆岩层的支撑体遗留井下,造成了煤炭资源的浪费。同时,随着时间延长,这些煤柱发生失稳的可能性越来越大。一旦煤柱发生失稳,将造成矿区地震、地表塌陷、房屋破坏等地质灾害。
因此,很有必要开发研制一种煤矿条带采空区复采方法,采用膏体充填方式,用充填材料充满条带采空区,再把过去遗留的煤柱资源复采出来,提高煤炭资源回收率,同时可以杜绝由煤柱失稳造成的矿区地质灾害隐患。
发明内容
本发明的任务在于提供一种煤矿条带采空区充填复采方法。
其技术解决方案是:
一种条带采空区充填复采方法,包括如下步骤:
a打开条带采空区主要巷道的密闭墙,进行通风,排放可能残留的有害气体;然后进入步骤b,
b对条带采空区内的巷道进行清理,加固局部出现破碎的顶板,排除积水;然后进入步骤c,
c采用膏体充填材料,对条带采空区内的空条带进行充填,形成充填条带一;然后进入步骤d,
d待充填条带一凝固后,对条带采空区内的遗留条带煤柱进行回采;然后进入步骤e,
e对由回采形成的新空条带采用矸石进行非胶结充填,形成充填条带二;充填条带二用于改善位于其两侧的充填条带一的受力状态,提高两侧充填条带一的稳定性,同时对上覆岩层可能发生的局部下沉起到限制作用。
上述步骤c包括确定膏体充填材料的单向强度的步骤:
假设一个条带采空区内有N1个空条带,N2个遗留条带煤柱,在N1个空条带内采用膏体充填材料进行充填,所形成的N1个充填条带一的支撑能力之和应该不小于上覆岩层的重量;单向抗压强度的计算公式为:
式中,σg为充填膏体材料的单向抗压强度,γ为上覆岩层的平均容重,H为煤层埋藏深度,W为一个空条带的宽度。
本发明具有以下有益技术效果:
本发明采用膏体充填方式,用充填材料充满条带采空区,再把过去遗留下的条带煤柱资源复采出来,并对回采所形成的新空条带采用矸石进行非胶结充填,在进一步提高煤炭资源回收率的同时,又可以杜绝由条带煤柱失稳造成的矿区地质灾害隐患。
附图说明
下面结合附图与具体实施方式对本发明作更进一步的说明:
图1示出了本发明中的一个条带采空区,为其平面结构示意图。
图2为图1的立面结构示意图。
图3示出了图1的条带采空区在全部充填膏体填充材料后的情形。
图4示出了图3的条带采空区在回采后的情形。
图5示出了图4的条带采空区在新空条带充填矸石后的情形。
图中,1.边界煤柱,2.空条带(空洞),3.遗留条带煤柱,4.密闭墙,5.上覆岩层,6.充填条带一,7.新空条带,8.充填条带二。
具体实施方式
结合图1至图5,一种条带采空区充填复采方法,包括如下步骤:
步骤一,打开条带采空区主要巷道的密闭墙,进行通风,排放可能残留的有害气体,诸如残留的瓦斯等。
步骤二,在完成步骤一后,紧接着对条带采空区内的巷道进行清理,加固局部出现破碎的顶板,排除积水。上述两步骤重点参看图1。
步骤三,在完成步骤二后,紧接着采用膏体充填材料,对条带采空区内的空条带进行充填,形成充填条带一。该步骤包括确定膏体充填材料的单向强度的步骤:
重点参看图2与图3,假设一个条带采空区内有N1个空条带,N2个遗留条带煤柱。在N1个空条带内采用膏体充填材料进行充填,N1个充填体条带一的支撑能力之和应该不小于上覆岩层的重量(γH)。即:
σg×W×N1=γH/100
因此,充填材料的单向抗压强度为:
式中,σg为充填膏体材料的单向抗压强度,单位为Mpa;γ为上覆岩层的平均容重,单位为t/m3;H为煤层埋藏深度,单位为m;W为各空条带的宽度,单位为m。
步骤四,在完成步骤三后,即待充填条带一凝固后,对条带采空区内的遗留条带煤柱进行回采。重点参看图4。
步骤五,在完成步骤四后,再对由开采遗留条带煤柱所形成的新空条带进行充填。在对新空条带进行充填时,由于不需要其承担上覆岩层的重量,可以采用矸石进行非胶结充填,或采用低强度膏体进行充填,形成充填条带二。充填条带二的作用是改善位于其两侧的充填条带一的受力状态,即由单向应力状态变为三向应力状态,提高两侧充填条带一的稳定性;同时对上覆岩层可能发生的局部下沉起到限制作用。因此,上述低强度膏体的材料强度只要达到1Mpa,即充填材料凝固后能够自立自稳即可。重点参看图4与图5。
上述方式中未述及的有关技术内容采取或借鉴已有技术即可实现。
需要说明的是,在本说明书的教导下本领域的技术人员还可以作出这样或那样的容易变化方式,诸如等同方式,或明显变形方式。上述的变化方式均应在本发明的保护范围之内。
Claims (2)
1.一种条带采空区充填复采方法,其特征在于包括如下步骤:
a打开条带采空区主要巷道的密闭墙,进行通风,排放可能残留的有害气体;然后进入步骤b,
b对条带采空区内的巷道进行清理,加固局部出现破碎的顶板,排除积水;然后进入步骤c,
c采用膏体充填材料,对条带采空区内的空条带进行充填,形成充填条带一;然后进入步骤d,
d待充填条带一凝固后,对条带采空区内的遗留条带煤柱进行回采;然后进入步骤e,
e对由回采形成的新空条带采用矸石进行非胶结充填,形成充填条带二;充填条带二用于改善位于其两侧的充填条带一的受力状态,提高两侧充填条带一的稳定性,同时对上覆岩层可能发生的局部下沉起到限制作用。
2.根据权利要求1所述的一种条带采空区充填复采方法,其特征在于上述步骤c包括确定膏体充填材料的单向强度的步骤:
假设一个条带采空区内有N1个空条带,N2个遗留条带煤柱,在N1个空条带内采用膏体充填材料进行充填,所形成的N1个充填条带一的支撑能力之和应该不小于上覆岩层的重量;单向抗压强度的计算公式为:
式中,σg为充填膏体材料的单向抗压强度,γ为上覆岩层的平均容重,H为煤层埋藏深度,W为一个空条带的宽度。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310031921XA CN103104287A (zh) | 2013-01-28 | 2013-01-28 | 一种条带采空区充填复采方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310031921XA CN103104287A (zh) | 2013-01-28 | 2013-01-28 | 一种条带采空区充填复采方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN103104287A true CN103104287A (zh) | 2013-05-15 |
Family
ID=48312452
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310031921XA Pending CN103104287A (zh) | 2013-01-28 | 2013-01-28 | 一种条带采空区充填复采方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103104287A (zh) |
Cited By (31)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103291303A (zh) * | 2013-06-27 | 2013-09-11 | 山东科技大学 | 一种留设条带煤柱的开采方法 |
CN103321677A (zh) * | 2013-06-04 | 2013-09-25 | 山东科技大学 | 利用条带充填墙体主动控制煤矿关键层运动的方法 |
CN103643992A (zh) * | 2013-12-10 | 2014-03-19 | 中国恩菲工程技术有限公司 | 采矿充填方法 |
CN103742149A (zh) * | 2014-01-22 | 2014-04-23 | 太原理工大学 | 一种综放复采残留底煤的方法 |
CN103821515A (zh) * | 2014-02-20 | 2014-05-28 | 山西晋煤集团技术研究院有限责任公司 | 一种对拉工作面充填采煤工艺 |
CN103993882A (zh) * | 2014-05-26 | 2014-08-20 | 中国矿业大学 | 一种冒落区注浆充填置换条带煤柱的方法 |
CN104088637A (zh) * | 2014-04-04 | 2014-10-08 | 太原理工大学 | 一种煤层群条件下上组浅埋残煤复采方法 |
CN104153800A (zh) * | 2014-08-14 | 2014-11-19 | 中铁第一勘察设计院集团有限公司 | 复杂地质小净距并行隧道对拉锚杆加固体系及其施工方法 |
CN104453995A (zh) * | 2014-11-28 | 2015-03-25 | 冀中能源峰峰集团有限公司 | 采空区矸石膏体条带充填方法 |
CN104564011A (zh) * | 2015-02-11 | 2015-04-29 | 新奥气化采煤有限公司 | 一种地下气化方法 |
CN105114080A (zh) * | 2015-08-11 | 2015-12-02 | 冀中能源峰峰集团有限公司 | 一种保护层及无人化薄煤层开采方法 |
CN105422099A (zh) * | 2015-12-11 | 2016-03-23 | 太原理工大学 | 一种柱旁双侧全部充填复采残采区遗留煤柱的方法 |
CN105545309A (zh) * | 2015-12-11 | 2016-05-04 | 太原理工大学 | 一种柱旁双侧部分充填复采残采区遗留煤柱的方法 |
CN106014412A (zh) * | 2016-06-24 | 2016-10-12 | 太原理工大学 | 一种梯式构造充填复采残采区遗留煤柱群的方法 |
CN106121645A (zh) * | 2016-06-24 | 2016-11-16 | 太原理工大学 | 一种台阶式构造充填复采残采区遗留煤柱群的方法 |
CN106150502A (zh) * | 2016-06-24 | 2016-11-23 | 太原理工大学 | 一种多级梯式构造充填复采残采区遗留煤柱群的方法 |
CN106761750A (zh) * | 2016-12-26 | 2017-05-31 | 高红波 | 急倾斜煤层纵向长壁刨铣建槽式开采方法 |
CN107237634A (zh) * | 2017-06-29 | 2017-10-10 | 中国矿业大学 | 一种资源枯竭矿井区段遗留煤柱分类回收方法 |
CN107780936A (zh) * | 2017-09-29 | 2018-03-09 | 大同煤矿集团有限责任公司 | 一种厚煤层遗煤复采工艺 |
WO2018045633A1 (zh) * | 2016-09-08 | 2018-03-15 | 中国矿业大学 | 一种煤矿固体密实条带充填采煤方法 |
CN108087021A (zh) * | 2017-11-01 | 2018-05-29 | 中国矿业大学 | 一种充填采煤回收遗留煤柱并控制隔水关键层稳定的方法 |
CN108708724A (zh) * | 2018-05-18 | 2018-10-26 | 中国矿业大学(北京) | 一种胶结充填回收旺格维利煤柱采煤方法 |
CN108757023A (zh) * | 2018-07-09 | 2018-11-06 | 中国矿业大学 | 一种利用矸石条带充填开采置换煤柱的方法 |
CN109341651A (zh) * | 2018-10-11 | 2019-02-15 | 广东安元矿业勘察设计有限公司 | 条带式房柱胶结充填采矿法地表沉降量的预测方法 |
CN110486082A (zh) * | 2019-09-09 | 2019-11-22 | 河北充填采矿技术有限公司 | 一种采空区不同材料交替充填的方法 |
WO2020010696A1 (zh) * | 2018-07-09 | 2020-01-16 | 中国矿业大学 | 一种预留巷道胶结充填回收房式煤柱的方法 |
CN112096449A (zh) * | 2020-10-26 | 2020-12-18 | 西安科技大学 | 一种煤矿采空区膏体条带注浆组合充填开采方法 |
WO2021103193A1 (zh) * | 2019-11-29 | 2021-06-03 | 山东科技大学 | 一种采空区经纬状充填方法 |
CN117386367A (zh) * | 2023-10-23 | 2024-01-12 | 中国矿业大学 | 一种遗留条带煤柱多次充填长壁综采方法 |
CN117432410A (zh) * | 2023-10-23 | 2024-01-23 | 中国矿业大学 | 一种条带采空区遗留煤柱充填复采方法 |
CN117449853A (zh) * | 2023-10-23 | 2024-01-26 | 中国矿业大学 | 一种条带采空区全充遗留煤柱局部复采方法 |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101487392A (zh) * | 2008-01-16 | 2009-07-22 | 中国神华能源股份有限公司 | 房柱式采煤方法 |
CN102061938A (zh) * | 2010-12-10 | 2011-05-18 | 天地科技股份有限公司 | 一种采用膏体充填采空区回收煤柱的充填工艺 |
-
2013
- 2013-01-28 CN CN201310031921XA patent/CN103104287A/zh active Pending
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101487392A (zh) * | 2008-01-16 | 2009-07-22 | 中国神华能源股份有限公司 | 房柱式采煤方法 |
CN102061938A (zh) * | 2010-12-10 | 2011-05-18 | 天地科技股份有限公司 | 一种采用膏体充填采空区回收煤柱的充填工艺 |
Non-Patent Citations (2)
Title |
---|
孙希奎等: "高水材料充填置换开采承压水上条带煤柱的理论研究", 《煤炭学报》 * |
李海滨: "级索煤矿村下压煤充填开采模式研究", 《中国优秀硕士学位论文全文数据库工程科技Ⅰ辑》 * |
Cited By (47)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103321677A (zh) * | 2013-06-04 | 2013-09-25 | 山东科技大学 | 利用条带充填墙体主动控制煤矿关键层运动的方法 |
CN103291303A (zh) * | 2013-06-27 | 2013-09-11 | 山东科技大学 | 一种留设条带煤柱的开采方法 |
CN103291303B (zh) * | 2013-06-27 | 2016-02-17 | 山东科技大学 | 一种留设条带煤柱的开采方法 |
CN103643992A (zh) * | 2013-12-10 | 2014-03-19 | 中国恩菲工程技术有限公司 | 采矿充填方法 |
CN103643992B (zh) * | 2013-12-10 | 2016-04-13 | 中国恩菲工程技术有限公司 | 采矿充填方法 |
CN103742149B (zh) * | 2014-01-22 | 2015-10-28 | 太原理工大学 | 一种综放复采残留底煤的方法 |
CN103742149A (zh) * | 2014-01-22 | 2014-04-23 | 太原理工大学 | 一种综放复采残留底煤的方法 |
CN103821515A (zh) * | 2014-02-20 | 2014-05-28 | 山西晋煤集团技术研究院有限责任公司 | 一种对拉工作面充填采煤工艺 |
CN103821515B (zh) * | 2014-02-20 | 2016-05-04 | 山西晋煤集团技术研究院有限责任公司 | 一种对拉工作面充填采煤工艺 |
CN104088637A (zh) * | 2014-04-04 | 2014-10-08 | 太原理工大学 | 一种煤层群条件下上组浅埋残煤复采方法 |
CN103993882A (zh) * | 2014-05-26 | 2014-08-20 | 中国矿业大学 | 一种冒落区注浆充填置换条带煤柱的方法 |
CN104153800A (zh) * | 2014-08-14 | 2014-11-19 | 中铁第一勘察设计院集团有限公司 | 复杂地质小净距并行隧道对拉锚杆加固体系及其施工方法 |
CN104153800B (zh) * | 2014-08-14 | 2016-04-27 | 中铁第一勘察设计院集团有限公司 | 复杂地质小净距并行隧道对拉锚杆加固体系及其施工方法 |
CN104453995A (zh) * | 2014-11-28 | 2015-03-25 | 冀中能源峰峰集团有限公司 | 采空区矸石膏体条带充填方法 |
CN104564011A (zh) * | 2015-02-11 | 2015-04-29 | 新奥气化采煤有限公司 | 一种地下气化方法 |
CN104564011B (zh) * | 2015-02-11 | 2018-08-14 | 新奥科技发展有限公司 | 一种地下气化方法 |
CN105114080A (zh) * | 2015-08-11 | 2015-12-02 | 冀中能源峰峰集团有限公司 | 一种保护层及无人化薄煤层开采方法 |
CN105422099A (zh) * | 2015-12-11 | 2016-03-23 | 太原理工大学 | 一种柱旁双侧全部充填复采残采区遗留煤柱的方法 |
CN105545309A (zh) * | 2015-12-11 | 2016-05-04 | 太原理工大学 | 一种柱旁双侧部分充填复采残采区遗留煤柱的方法 |
CN106121645A (zh) * | 2016-06-24 | 2016-11-16 | 太原理工大学 | 一种台阶式构造充填复采残采区遗留煤柱群的方法 |
CN106150502A (zh) * | 2016-06-24 | 2016-11-23 | 太原理工大学 | 一种多级梯式构造充填复采残采区遗留煤柱群的方法 |
CN106014412A (zh) * | 2016-06-24 | 2016-10-12 | 太原理工大学 | 一种梯式构造充填复采残采区遗留煤柱群的方法 |
CN106150502B (zh) * | 2016-06-24 | 2018-05-04 | 太原理工大学 | 一种多级梯式构造充填复采残采区遗留煤柱群的方法 |
CN106014412B (zh) * | 2016-06-24 | 2018-05-04 | 太原理工大学 | 一种梯式构造充填复采残采区遗留煤柱群的方法 |
WO2018045633A1 (zh) * | 2016-09-08 | 2018-03-15 | 中国矿业大学 | 一种煤矿固体密实条带充填采煤方法 |
CN106761750A (zh) * | 2016-12-26 | 2017-05-31 | 高红波 | 急倾斜煤层纵向长壁刨铣建槽式开采方法 |
CN106761750B (zh) * | 2016-12-26 | 2018-11-13 | 高红波 | 急倾斜煤层纵向长壁刨铣建槽式开采方法 |
CN107237634A (zh) * | 2017-06-29 | 2017-10-10 | 中国矿业大学 | 一种资源枯竭矿井区段遗留煤柱分类回收方法 |
CN107780936A (zh) * | 2017-09-29 | 2018-03-09 | 大同煤矿集团有限责任公司 | 一种厚煤层遗煤复采工艺 |
CN107780936B (zh) * | 2017-09-29 | 2019-06-18 | 大同煤矿集团有限责任公司 | 一种厚煤层遗煤复采工艺 |
CN108087021A (zh) * | 2017-11-01 | 2018-05-29 | 中国矿业大学 | 一种充填采煤回收遗留煤柱并控制隔水关键层稳定的方法 |
CN108708724B (zh) * | 2018-05-18 | 2019-04-23 | 中国矿业大学(北京) | 一种胶结充填回收旺格维利煤柱采煤方法 |
CN108708724A (zh) * | 2018-05-18 | 2018-10-26 | 中国矿业大学(北京) | 一种胶结充填回收旺格维利煤柱采煤方法 |
US11339658B2 (en) | 2018-07-09 | 2022-05-24 | China University Of Mining And Technology | Method for recovering room-type coal pillars by cemented filling of reserved roadways |
WO2020010696A1 (zh) * | 2018-07-09 | 2020-01-16 | 中国矿业大学 | 一种预留巷道胶结充填回收房式煤柱的方法 |
CN108757023A (zh) * | 2018-07-09 | 2018-11-06 | 中国矿业大学 | 一种利用矸石条带充填开采置换煤柱的方法 |
CN109341651B (zh) * | 2018-10-11 | 2020-10-23 | 广东安元矿业勘察设计有限公司 | 条带式房柱胶结充填采矿法地表沉降量的预测方法 |
CN109341651A (zh) * | 2018-10-11 | 2019-02-15 | 广东安元矿业勘察设计有限公司 | 条带式房柱胶结充填采矿法地表沉降量的预测方法 |
CN110486082A (zh) * | 2019-09-09 | 2019-11-22 | 河北充填采矿技术有限公司 | 一种采空区不同材料交替充填的方法 |
WO2021103193A1 (zh) * | 2019-11-29 | 2021-06-03 | 山东科技大学 | 一种采空区经纬状充填方法 |
CN112096449A (zh) * | 2020-10-26 | 2020-12-18 | 西安科技大学 | 一种煤矿采空区膏体条带注浆组合充填开采方法 |
CN117386367A (zh) * | 2023-10-23 | 2024-01-12 | 中国矿业大学 | 一种遗留条带煤柱多次充填长壁综采方法 |
CN117432410A (zh) * | 2023-10-23 | 2024-01-23 | 中国矿业大学 | 一种条带采空区遗留煤柱充填复采方法 |
CN117449853A (zh) * | 2023-10-23 | 2024-01-26 | 中国矿业大学 | 一种条带采空区全充遗留煤柱局部复采方法 |
CN117386367B (zh) * | 2023-10-23 | 2024-05-31 | 中国矿业大学 | 一种遗留条带煤柱多次充填长壁综采方法 |
CN117449853B (zh) * | 2023-10-23 | 2024-06-21 | 中国矿业大学 | 一种条带采空区全充遗留煤柱局部复采方法 |
CN117432410B (zh) * | 2023-10-23 | 2024-06-25 | 中国矿业大学 | 一种条带采空区遗留煤柱充填复采方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103104287A (zh) | 一种条带采空区充填复采方法 | |
Deng et al. | Feasibility analysis of gob-side entry retaining on a working face in a steep coal seam | |
AU2015345830B2 (en) | Coal mining method with digging, mining and filling parallel operations under control of cover rock cracks and surface subsidence | |
Huang et al. | Cavability control by hydraulic fracturing for top coal caving in hard thick coal seams | |
Yuan | Theory and practice of integrated coal production and gas extraction | |
Peila et al. | Earth pressure balance tunnelling in rock masses: Laboratory feasibility study of the conditioning process | |
Guo et al. | Mining-induced strata stress changes, fractures and gas flow dynamics in multi-seam longwall mining | |
Jin et al. | Evaluation of the remote lower protective seam mining for coal mine gas control: a typical case study from the Zhuxianzhuang Coal Mine, Huaibei Coalfield, China | |
CN103696771B (zh) | 一种跳采式旺格维利采场支巷充填采煤方法 | |
Zhang et al. | Overburden fracture evolution laws and water-controlling technologies in mining very thick coal seam under water-rich roof | |
CN103742148B (zh) | 一种急倾斜煤层柔掩支护下行矸石充填的采煤法 | |
Islam et al. | Numerical simulation of stress distributions and displacements around an entry roadway with igneous intrusion and potential sources of seam gas emission of the Barapukuria coal mine, NW Bangladesh | |
Liu et al. | Environmentally sustainable mining: a case study of intermittent cut-and-fill mining under sand aquifers | |
Wang et al. | Overlying strata movement rules and safety mining technology for the shallow depth seam proximity beneath a room mining goaf | |
Feng et al. | Stress environment of entry driven along gob-side through numerical simulation incorporating the angle of break | |
CN104330107A (zh) | 一种固体充填采煤工作面充填质量评价方法 | |
CN104632223B (zh) | 采矿环境再造移动式泵送充填人工矿柱留矿采矿法 | |
Dudek et al. | FEM for prediction of surface deformations induced by flooding of steeply inclined mining seams | |
CN104088640B (zh) | 一种深部矿体采充空间隔离的采矿法 | |
Ma et al. | Environmentally sustainable mining: a case study on surface subsidence control of grouting into overburden | |
Xu et al. | Mining-induced movement properties and fissure time-space evolution law in overlying strata | |
CN104790953A (zh) | 边角煤短壁连采巷道布置与煤柱留设方法 | |
CN103321677A (zh) | 利用条带充填墙体主动控制煤矿关键层运动的方法 | |
CN104100271A (zh) | 预掘导硐充填人造帮二次复用巷旁支护成巷方法 | |
CN103557001B (zh) | 一种低段高无底柱留矿嗣后充填采矿法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C12 | Rejection of a patent application after its publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20130515 |