CN103103979A - 现浇后张法工字型桩在水泥土中的插入方法 - Google Patents
现浇后张法工字型桩在水泥土中的插入方法 Download PDFInfo
- Publication number
- CN103103979A CN103103979A CN2013100304407A CN201310030440A CN103103979A CN 103103979 A CN103103979 A CN 103103979A CN 2013100304407 A CN2013100304407 A CN 2013100304407A CN 201310030440 A CN201310030440 A CN 201310030440A CN 103103979 A CN103103979 A CN 103103979A
- Authority
- CN
- China
- Prior art keywords
- pile
- soil
- pile body
- cement
- construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
本发明公开了一种现浇后张法工字型桩在水泥土中插入方法,包括:测量放样,根据已知的坐标基点,定位桩体的位置;开沟挖槽,对应桩机的施工位置开沟挖槽,并清理多余土体;设置导向,在桩体的具体位置处设置型钢导向;桩机就位,将桩机架设在具体的施工位置上;搅拌成桩,利用水泥土搅拌成工字型桩体;插入桩体,将工字型桩体插入土体内;移机,工字型桩体施工完成后,移动桩机,进行下一次施工。通过上述方式,本发明不受开挖施工时间限制,可降低成本控制风险;抗弯性能强于型钢,抗变形能力强、变形小、可规模制作等优点,同时又施工工序简单、实用性强、成本低,适用范围更广;避免了型钢拔出时造成周边建筑和环境沉降、开裂的情况。
Description
技术领域
本发明涉及建筑工程中的施工方法,特别是涉及一种现浇后张法工字型桩在水泥土中插入方法。
背景技术
基坑开挖对周围环境的影响取决于地下水位的控制、围护结构变形和止水性状以及基底隆起变形等因素。传统的基坑支护方式在抗变形、止水、环保等环节的结合上,存在着施工难度大、速度慢、造价高等问题。SMW工法亦称劲性水泥土搅拌桩法, SMW工法具有支护抗渗的双重功能,能够很好的解决上述问题,但因型钢租赁和拔出对周围土体的影响导致了其使用广泛性。
发明内容
本发明主要解决的技术问题提供一种现浇后张法工字型桩在水泥土中插入方法,用后张法工字型桩代替型钢,施工工序简单、实用性强、成本低。
为解决上述技术问题,本发明采用的一个技术方案是:提供一种现浇后张法工字型桩在水泥土中插入方法,包括以下步骤:
1)测量放样,根据已知的坐标基点,定位桩体的位置;
2)开沟挖槽,对应桩机的施工位置开沟挖槽,并清理多余土体;
3)设置导向,在桩体的具体位置处设置型钢导向;
4)桩机就位,将桩机架设在具体的施工位置上;
5)搅拌成桩,利用水泥土搅拌成工字型桩体;
6)插入桩体,将工字型桩体插入土体内;
7)移机,工字型桩体施工完成后,移动桩机,进行下一次施工。
在本发明一个较佳实施例中,步骤5)中是利用三轴搅拌机将水泥土搅拌成工字型桩体。
在本发明一个较佳实施例中,步骤5)施工前进行成桩试验,确定搅拌下沉、提升速度、水泥浆液水灰比及成桩工艺。
在本发明一个较佳实施例中,步骤5)搅拌而成的桩体桩位偏差小于等于50mm,桩身垂直度误差小于等于1/200mm,桩径偏差小于等于10mm,桩底标高偏差小于等于50mm。
在本发明一个较佳实施例中,步骤6)中,将工字型桩体插入土体内的过程是利用吊机,首先利用桩体自重沉入,然后通过振动锤将工字型桩体压入土体中。
本发明的有益效果是:本发明现浇后张法工字型桩在水泥土中插入方法使止水与挡土两种功效“强强联合”有机结合在一起;不受开挖施工时间限制,可降低成本控制风险;抗弯性能强于型钢,抗变形能力强、变形小、可规模制作等优点,同时又施工工序简单、实用性强、成本低等特点,适用范围更广;避免了型钢拔出时造成周边建筑和环境沉降、开裂的情况。
附图说明
图1是本发明现浇后张法工字型桩在水泥土中插入方法的流程示意图;
具体实施方式
下面结合附图对本发明的较佳实施例进行详细阐述,以使本发明的优点和特征能更易于被本领域技术人员理解,从而对本发明的保护范围做出更为清楚明确的界定。
请参阅图1,本发明实施例包括:
一种现浇后张法工字型桩在水泥土中插入方法,包括以下步骤:
1)测量放样,根据已知的坐标基点,按设计图纸定出桩体具体位置;
2)开沟挖槽,对应桩机的施工位置开沟挖槽,目的是便于桩机的施工以及残余土体的清理;
3)设置导向,在桩体的具体位置处设置型钢导向,目的是定位插入后张法工字型桩的平面位置,以使后张法工字型桩的底部中心对正桩位中心并用线锤控制器垂直度;
4)桩机就位,将桩机架设在具体的施工位置上,移动前,看清上、下、左、右各方向的情况,发现有障碍物应及时清除,移位结束后检查定位情况并及时纠正,桩机应平稳、平正;同时用线锤对龙门立柱垂直定位观测以确保桩机的垂直度;
5)搅拌成桩,利用三轴搅拌机将水泥土搅拌成工字型桩体,在施工前应通过成桩试验确定搅拌下沉和提升速度、水泥浆液水灰比等工艺参数及成桩工艺;搅拌桩桩位偏差不超过50mm,桩身垂直度误差不超过1/200mm,桩径偏差不大于10mm,桩底标高偏差不超过+50mm;
搅拌过程中的压浆速度应和提升(或下沉)速度相配合,确保额定浆量在桩身长度范围内均匀分布;搅拌机提升时不应在孔内产生负压造成周边土体的过大扰动,搅拌次数或搅拌时间应能保证水泥土搅拌桩的成桩质量;因故搁置超过2h以上的拌制浆液应作废浆处理;搭接施工的相邻桩,施工间歇时间不应超过24h,当超过24h,搭接施工时应放慢搅拌速度;若无法搭接或搭接不良,应采用冷缝处理,以保证围护结构整体的隔水效果。
6)插入桩体,将工字型桩体插入土体内;用50t吊机起吊,在插入过程中首先让其靠自重沉入,然后通过特制振动锤将工字型桩压入土体中。后张法工字型支护桩在现场按设计长度整段制作。预应力筋预留孔道采用预埋金属波纹管;桩体注入的混凝土采用附模式振捣器或小型振动棒振捣,振动棒不得触及波纹管,保证混凝土密实。工字型桩在插入过程中应控制桩顶标高、垂直度、形心转角等;
7)移机,工字型桩体施工完成后,移动桩机,进行下一次施工。
本发明是对SMW工法的技术改良,用截面优化的工字型桩替换H型钢,除具有SMW工法桩特有的支护抗渗功能外,又具有其本身的特点:不受开挖施工时间限制,可降低成本控制风险;抗弯性能好,抗变形能力强,适用范围广;工艺简单、成桩速度快,工期短,适用土层范围广;与型钢相比,避免了型钢拔出时造成周边建筑和环境沉降、开裂情况的发生,施工过程无污染,场地整洁干净、噪音小,而且可以节约社会资源,在提倡建设节约型社会,实现了可持续发展的今天,推广应用该工法更加具有现实意义。
本发明现浇后张法工字型桩在水泥土中插入方法使止水与挡土两种功效“强强联合”有机结合在一起;不受开挖施工时间限制,可降低成本控制风险;抗弯性能强于型钢,抗变形能力强、变形小、可规模制作等优点,同时又施工工序简单、实用性强、成本低等特点,适用范围更广;避免了型钢拔出时造成周边建筑和环境沉降、开裂的情况。
以上所述仅为本发明的实施例,并非因此限制本发明的专利范围,凡是利用本发明说明书及附图内容所作的等效结构或等效流程变换,或直接或间接运用在其他相关的技术领域,均同理包括在本发明的专利保护范围内。
Claims (5)
1.一种现浇后张法工字型桩在水泥土中插入方法,其特征在于,包括以下步骤:
1)测量放样,根据已知的坐标基点,定位桩体的位置;
2)开沟挖槽,对应桩机的施工位置开沟挖槽,并清理多余土体;
3)设置导向,在桩体的具体位置处设置型钢导向;
4)桩机就位,将桩机架设在具体的施工位置上;
5)搅拌成桩,利用水泥土搅拌成工字型桩体;
6)插入桩体,将工字型桩体插入土体内;
7)移机,工字型桩体施工完成后,移动桩机,进行下一次施工。
2.根据权利要求1所述的现浇后张法工字型桩在水泥土中插入方法,其特征在于:步骤5)中是利用三轴搅拌机将水泥土搅拌成工字型桩体。
3.根据权利要求1所述的现浇后张法工字型桩在水泥土中插入方法,其特征在于:步骤5)施工前进行成桩试验,确定搅拌下沉、提升速度、水泥浆液水灰比及成桩工艺。
4.根据权利要求1所述的现浇后张法工字型桩在水泥土中插入方法,其特征在于:步骤5)搅拌而成的桩体桩位偏差小于等于50mm,桩身垂直度误差小于等于1/200mm,桩径偏差小于等于10mm,桩底标高偏差小于等于50mm。
5.根据权利要求1所述的现浇后张法工字型桩在水泥土中插入方法,其特征在于:步骤6)中,将工字型桩体插入土体内的过程是利用吊机,首先利用桩体自重沉入,然后通过振动锤将工字型桩体压入土体中。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310030440.7A CN103103979B (zh) | 2013-01-28 | 2013-01-28 | 现浇后张法工字型桩在水泥土中的插入方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310030440.7A CN103103979B (zh) | 2013-01-28 | 2013-01-28 | 现浇后张法工字型桩在水泥土中的插入方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103103979A true CN103103979A (zh) | 2013-05-15 |
CN103103979B CN103103979B (zh) | 2015-11-18 |
Family
ID=48312153
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310030440.7A Active CN103103979B (zh) | 2013-01-28 | 2013-01-28 | 现浇后张法工字型桩在水泥土中的插入方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103103979B (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103452101A (zh) * | 2013-08-26 | 2013-12-18 | 江苏鼎达建筑新技术有限公司 | 预应力混凝土桩及支护桩墙 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH11293667A (ja) * | 1998-04-08 | 1999-10-26 | Sumitomo Metal Ind Ltd | H形鋼杭およびその施工方法 |
CN101538855A (zh) * | 2009-04-01 | 2009-09-23 | 东南大学 | 使用工形搅拌桩处理三层软弱地基的方法 |
CN201981541U (zh) * | 2010-09-16 | 2011-09-21 | 杭州南联土木工程科技有限公司 | 变直径水泥搅拌桩帷幕植入抗侧向力桩围护墙 |
CN202139604U (zh) * | 2011-03-07 | 2012-02-08 | 温州长城基础工程公司 | 基坑支护用现浇异型钢筋混凝土桩芯水泥土地下连续墙 |
CN202595728U (zh) * | 2012-04-09 | 2012-12-12 | 江苏鼎达建筑新技术有限公司 | 预应力混凝土支护桩墙 |
-
2013
- 2013-01-28 CN CN201310030440.7A patent/CN103103979B/zh active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH11293667A (ja) * | 1998-04-08 | 1999-10-26 | Sumitomo Metal Ind Ltd | H形鋼杭およびその施工方法 |
CN101538855A (zh) * | 2009-04-01 | 2009-09-23 | 东南大学 | 使用工形搅拌桩处理三层软弱地基的方法 |
CN201981541U (zh) * | 2010-09-16 | 2011-09-21 | 杭州南联土木工程科技有限公司 | 变直径水泥搅拌桩帷幕植入抗侧向力桩围护墙 |
CN202139604U (zh) * | 2011-03-07 | 2012-02-08 | 温州长城基础工程公司 | 基坑支护用现浇异型钢筋混凝土桩芯水泥土地下连续墙 |
CN202595728U (zh) * | 2012-04-09 | 2012-12-12 | 江苏鼎达建筑新技术有限公司 | 预应力混凝土支护桩墙 |
Non-Patent Citations (1)
Title |
---|
刘辉光等: "水泥搅拌土植入工形钢筋混凝土桩基围护技术", 《施工技术》, vol. 38, no. 9, 18 September 2009 (2009-09-18) * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103452101A (zh) * | 2013-08-26 | 2013-12-18 | 江苏鼎达建筑新技术有限公司 | 预应力混凝土桩及支护桩墙 |
CN103452101B (zh) * | 2013-08-26 | 2016-08-10 | 江苏鼎达建筑新技术有限公司 | 预应力混凝土桩及支护桩墙 |
Also Published As
Publication number | Publication date |
---|---|
CN103103979B (zh) | 2015-11-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101864773B (zh) | 一种深基坑支护工艺 | |
CN101768961B (zh) | 一种型钢三轴水泥土搅拌桩的施工方法 | |
CN102943466B (zh) | 微型钢管混凝土桩穿透路基层加固软弱地基施工工法 | |
CN111945767B (zh) | 一种海上风电升压站先桩法外套式导管架的施工工艺 | |
CN102635120B (zh) | 圆形深基坑无支撑施工结构和施工方法 | |
CN102797252A (zh) | 地下连续墙的施工方法 | |
CN109610470A (zh) | 一种采用三轴搅拌桩机的基坑支护施工方法 | |
CN102628266A (zh) | 长螺旋钻孔灌注桩的施工方法 | |
CN104947649A (zh) | 顶管施工引起的沉井后背土体变形控制方法 | |
CN106088120B (zh) | 一种围堰下放施工方法 | |
CN105113496A (zh) | 一种水泥土搅拌桩的施工方法 | |
CN111485544A (zh) | 一种嵌岩桩基底下伏溶洞处置检测结构及方法 | |
CN102677630B (zh) | 高含水率淤泥质土体中混凝土防渗墙的建造方法 | |
CN103397634A (zh) | 一种锁扣钢管桩围堰的锚固施工方法 | |
CN110409435A (zh) | 一种新型水泥搅拌桩施工方法 | |
CN212405086U (zh) | 一种嵌岩桩基底下伏溶洞处置检测结构 | |
CN206784421U (zh) | 基坑用塔吊基础的支撑装置 | |
CN212405119U (zh) | 一种灌注桩堵漏固孔结构 | |
CN107299640A (zh) | 一种变截面井筒式地下连续墙基础及其施工方法 | |
CN103103979B (zh) | 现浇后张法工字型桩在水泥土中的插入方法 | |
CN105239573B (zh) | 型钢栈桥的内植管锚岩施工方法 | |
CN104563100A (zh) | 水泥土搅拌桩后植压灌桩支护结构及施工方法 | |
CN110374109A (zh) | 一种工法桩围护在综合管廊基坑的应用方法 | |
CN102605775B (zh) | 一种柔性桩与刚性桩上下同体组合桩及成桩方法 | |
CN206477240U (zh) | 一种用于深水裸岩河床的栈桥桩基 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C56 | Change in the name or address of the patentee | ||
CP01 | Change in the name or title of a patent holder |
Address after: 213000 Jiangsu province Changzhou City Zhonglou District Mushu Road No. ten Patentee after: Jiangsu Dingda Building New Technology Co., Ltd. Patentee after: Changzhou Institute of building science group Limited by Share Ltd Address before: 213000 Jiangsu province Changzhou City Zhonglou District Mushu Road No. ten Patentee before: Jiangsu Dingda Building New Technology Co., Ltd. Patentee before: Changzhou Architectural Research Institute Co., Ltd. |