CN103099298B - Tobacco leaf bulk curing barn smoke waste heat utilization device - Google Patents
Tobacco leaf bulk curing barn smoke waste heat utilization device Download PDFInfo
- Publication number
- CN103099298B CN103099298B CN201310067051.1A CN201310067051A CN103099298B CN 103099298 B CN103099298 B CN 103099298B CN 201310067051 A CN201310067051 A CN 201310067051A CN 103099298 B CN103099298 B CN 103099298B
- Authority
- CN
- China
- Prior art keywords
- chimney
- chamber
- smoke
- room
- heat
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Housing For Livestock And Birds (AREA)
Abstract
本发明公开了一种烟叶密集烤房烟气余热利用装置,包括换热室、回烟室和连接室;烟囱位于换热室的一侧;烟囱内设置有隔烟板;烟囱在隔烟板上方和下方与回烟室之间通过上金属管和下金属管相连接。冷风经过上下金属管时即被加热升温成为热空气;在加热室的侧墙上设置有加热室进风口;通过连接室将换热室的换热室热风出口和烤房的加热室进风口连接起来,以将换热室内的热空气导入加热室。本发明的烟叶密集烤房烟气余热利用装置,具有可利用烤房烟囱排放的烟气的余热加热进入烤房的空气、减少燃料(主要是煤炭)的消耗、减少有害气体排放、实现烟叶烘烤节能减排并降低成本等优点。<!--1-->
The invention discloses a flue gas waste heat utilization device in a dense tobacco barn, which comprises a heat exchange chamber, a smoke return chamber and a connecting chamber; the chimney is located on one side of the heat exchange chamber; The upper and lower parts are connected with the smoke return chamber through an upper metal pipe and a lower metal pipe. When the cold air passes through the upper and lower metal pipes, it is heated and becomes hot air; the side wall of the heating room is provided with an air inlet of the heating room; the hot air outlet of the heat exchange room is connected to the air inlet of the heating room of the barn through the connecting room up to direct the hot air in the heat exchange chamber into the heating chamber. The flue gas waste heat utilization device of the tobacco leaf-intensive barn of the present invention can use the waste heat of the flue gas discharged from the barn chimney to heat the air entering the barn, reduce fuel (mainly coal) consumption, reduce harmful gas emissions, and achieve tobacco leaf drying. Roasting has the advantages of energy saving, emission reduction and cost reduction. <!--1-->
Description
技术领域 technical field
本发明属于节能减排技术领域,具体涉及一种烟叶密集烤房的烟气余热利用装置。The invention belongs to the technical field of energy saving and emission reduction, and in particular relates to a flue gas waste heat utilization device of a tobacco leaf intensive curing barn.
背景技术 Background technique
我国是世界上烤烟种植面积最大的国家。烟叶成熟后需要采装到烤房里面进行烘烤加工,该过程要消耗大量的煤炭。煤炭在烤房的火炉里燃烧,产生高温烟气,高温烟气流经换热器传递热量、加热加热室内的空气,使之成为热空气,热空气被循环风机送到装烟室内加热烟叶、促进烟叶发生极其复杂的变化,最终使烟叶变黄和干燥;在换热器内做功后的烟气最后进入烟囱,被排到烤房外面。实际上,被排出的烟气仍然蕴含大量的热量,其温度通常超过120℃,在一些换热器导热系数下降、换热效率降低的情况下,烟气被排出时的温度可达200℃以上。目前密集烤房上没有采取余热利用措施,高温烟气都排放到大气之中,使得密集烤房的烟气余热均被白白浪费而未能得到利用,降低了烤房总热效率,所以单位干烟叶耗煤量较大,排放的烟气较多,烘烤成本较高。本发明对烤房烟气余热进行利用后,可明显减少煤炭消耗,是烟叶烘烤实现节能、减排、降本、增收的有效途径之一。my country is the country with the largest planting area of flue-cured tobacco in the world. After the tobacco leaves are mature, they need to be collected and loaded into the barn for baking, which consumes a lot of coal. Coal is burned in the furnace of the barn to produce high-temperature flue gas. The high-temperature flue gas flows through the heat exchanger to transfer heat and heat the air in the heating room to become hot air. The hot air is sent to the smoking room by the circulating fan to heat the tobacco leaves. It promotes extremely complex changes in the tobacco leaves, and finally makes the tobacco leaves turn yellow and dry; the flue gas after doing work in the heat exchanger finally enters the chimney and is discharged outside the barn. In fact, the exhausted flue gas still contains a lot of heat, and its temperature usually exceeds 120°C. In the case of some heat exchangers with reduced thermal conductivity and reduced heat transfer efficiency, the temperature of the exhausted flue gas can reach above 200°C . At present, there is no waste heat utilization measure in the intensive curing barn, and the high-temperature flue gas is discharged into the atmosphere, so that the waste heat of the flue gas in the intensive barn is wasted and not utilized, which reduces the total thermal efficiency of the barn, so the unit dry tobacco leaves The coal consumption is larger, the flue gas emission is more, and the baking cost is higher. The invention can obviously reduce the coal consumption after utilizing the waste heat of the flue gas in the curing barn, and is one of the effective ways for tobacco leaf curing to realize energy saving, emission reduction, cost reduction and income increase.
发明内容 Contents of the invention
本发明是为避免上述已有技术中存在的不足之处,提供一种烟叶密集烤房烟气余热利用装置,以利用烤房烟囱排放的烟气的余热、从而可减少燃料的消耗。In order to avoid the disadvantages of the above-mentioned prior art, the present invention provides a waste heat utilization device for flue gas in a dense tobacco barn, which can reduce fuel consumption by utilizing the waste heat of the flue gas discharged from the chimney of the barn.
本发明为解决技术问题采用以下技术方案。The present invention adopts the following technical solutions to solve the technical problems.
烟叶密集烤房烟气余热利用装置,其结构特点是,包括烟囱、换热室、回烟室、连接室和回烟室;所述烤房包括装烟室和加热室;所述加热室与装烟室之间设置有隔热墙;所述加热室和所述装烟室的顶端设置有房顶;所述加热室内设有用于固定风机的风机台板,所述风机台板延伸至加热室之外;所述加热室之内设置有火炉,所述火炉上方设置有换热器;所述风机台板上,在位于所述换热器的正上方的位置固定设有循环风机;所述风机台板位于所述房顶的下方;在所述房顶的上表面上,在所述加热室的上方设置有换热室和烟囱;所述烟囱的出烟口位于所述换热室顶盖的上方;The flue gas waste heat utilization device of dense tobacco leaves barn has the following structural features: a chimney, a heat exchange room, a smoke return room, a connecting room and a smoke return room; the barn includes a tobacco loading room and a heating room; the heating room and A heat insulation wall is arranged between the smoke chambers; a roof is provided on the top of the heating chamber and the smoke chamber; a fan table for fixing the fan is provided in the heating chamber, and the fan table extends to the heating chamber. outside the heating chamber; a stove is arranged inside the heating chamber, and a heat exchanger is arranged above the stove; a circulating fan is fixedly installed on the fan plate at a position directly above the heat exchanger; The fan table is located below the roof; on the upper surface of the roof, a heat exchange chamber and a chimney are arranged above the heating chamber; the smoke outlet of the chimney is located in the heat exchange chamber the top of the roof;
所述烟囱位于所述换热室的一侧,所述换热室的另一侧设置有回烟室,所述烟囱内设置有隔烟板;所述烟囱与所述回烟室之间通过上金属管和下金属管相连接;所述上金属管与所述烟囱的连接口位于所述隔烟板的上方,所述下金属管与所述烟囱的连接口位于所述隔烟板的下方;The chimney is located on one side of the heat exchange chamber, the other side of the heat exchange chamber is provided with a smoke return chamber, and a smoke partition is arranged inside the chimney; The upper metal pipe is connected with the lower metal pipe; the connection port between the upper metal pipe and the chimney is located above the smoke baffle, and the connection port between the lower metal pipe and the chimney is located at the top of the smoke baffle below;
在所述换热室的靠近所述装烟室的一侧的侧墙上设置有换热室冷风进口;在所述换热室的远离所述装烟室一侧的侧墙上设置有换热室热风出口;所述加热室的远离所述装烟室一侧的侧墙上设置有加热室进风口;在所述换热室和所述加热室的远离所述装烟室的一侧的侧墙之外,设置有同时覆盖了所述换热室的换热室热风出口和所述加热室进风口的连接室;所述连接室位于所述风机台板的上表面上。A cold air inlet of the heat exchange chamber is provided on the side wall of the heat exchange chamber near the side of the smoke chamber; The hot air outlet of the hot room; the side wall of the heating room away from the smoke loading room is provided with a heating room air inlet; on the side of the heat exchange room and the heating room away from the smoke loading room In addition to the side wall of the heat exchange chamber, there is a connection chamber covering both the hot air outlet of the heat exchange chamber and the air inlet of the heating chamber; the connection chamber is located on the upper surface of the fan table.
本发明的烟叶密集烤房烟气余热利用装置的结构特点也在于:The structural features of the flue gas waste heat utilization device of the tobacco leaf intensive curing barn of the present invention also lie in:
所述回烟室的外侧开设有回烟室保温门。The outside of the smoke return room is provided with a smoke return room insulation door.
在连接室的远离所述装烟室的一侧的侧墙上设置有连接室窗户。A connection room window is arranged on the side wall of the connection room away from the smoke chamber.
在换热室的换热室冷风进口所在的墙的内壁上,设有覆盖于所述换热室冷风进口之上的塑料薄膜;所述塑料薄膜的上端固定于墙面上,下端自由下垂。On the inner wall of the wall where the cold air inlet of the heat exchange chamber is located, a plastic film covering the cold air inlet of the heat exchange chamber is provided; the upper end of the plastic film is fixed on the wall, and the lower end hangs freely.
所述隔烟板是由耐火材料制成的。The smoke baffle is made of refractory material.
与已有技术相比,本发明有益效果体现在:Compared with the prior art, the beneficial effects of the present invention are reflected in:
本发明的烟叶密集烤房烟气余热利用装置,采用低成本的方法利用烤房烟囱排放的烟气的余热,加热进入烤房的空气,提高其温度,为烟叶烘烤提供辅助能量,从而可减少燃料的消耗,实现烟叶烘烤节能、减排、降本,相应增加烟农的经济收益。The flue gas waste heat utilization device of the tobacco leaf intensive curing barn of the present invention uses the waste heat of the flue gas discharged from the chimney of the barn barn to heat the air entering the barn barn to increase its temperature and provide auxiliary energy for tobacco leaf roasting, thereby enabling Reduce fuel consumption, realize energy saving, emission reduction, and cost reduction in tobacco leaf curing, and correspondingly increase the economic benefits of tobacco farmers.
现有的烤房中,外部冷空气直接进入烤房的加热室。而本发明的烤房中,外部冷空气经过换热室加热后,再经由连接室进入加热室,因而和现有技术相比进入加热室的空气温度较高,可减少加热燃料的消耗。In the existing barn, external cold air directly enters the heating chamber of the barn. However, in the barn of the present invention, the external cold air enters the heating chamber through the connection chamber after being heated by the heat exchange chamber. Therefore, compared with the prior art, the temperature of the air entering the heating chamber is higher, which can reduce the consumption of heating fuel.
本发明的烟叶密集烤房烟气余热利用装置,具有可利用烤房烟囱排放的烟气的余热加热进入烤房的空气、实现烟叶烘烤节能减排并降低成本、节约燃料、环保性能佳等优点。The flue gas waste heat utilization device of the tobacco leaf-intensive curing barn of the present invention can use the waste heat of the flue gas discharged from the barn chimney to heat the air entering the barn, realize energy saving and emission reduction of tobacco leaf baking, reduce costs, save fuel, and have good environmental protection performance, etc. advantage.
附图说明 Description of drawings
图1为本发明的烟叶密集烤房烟气余热利用装置的立体图。Fig. 1 is a perspective view of the flue gas waste heat utilization device of the tobacco leaf intensive curing barn of the present invention.
图2为本发明的烟叶密集烤房烟气余热利用装置的剖视图。Fig. 2 is a cross-sectional view of the flue gas waste heat utilization device of the tobacco leaf intensive curing barn of the present invention.
图中标号为:1装烟室,101房顶,2烟囱 ,3换热室,4换热室顶盖,5换热室冷风进口, 6隔烟板,7回烟室保温门,8回烟室,9上金属烟管,10下金属烟管,11隔热墙,12换热室热风出口,13连接室,14加热室进风口,15连接室窗户,16风机台板,17加热室,18风机,19换热器,20火炉。The labels in the figure are: 1 smoke chamber, 101 roof, 2 chimney, 3 heat exchange chamber, 4 heat exchange chamber top cover, 5 heat exchange chamber cold air inlet, 6 smoke partition, 7 return smoke chamber insulation door, 8 return Smoke chamber, 9 upper metal smoke pipe, 10 lower metal smoke pipe, 11 heat insulation wall, 12 hot air outlet of heat exchange room, 13 connection room, 14 air inlet of heating room, 15 window of connection room, 16 fan platen, 17 heating room , 18 fans, 19 heat exchangers, 20 stoves.
以下通过具体实施方式,并结合附图对本发明作进一步说明。The present invention will be further described below through specific embodiments and in conjunction with the accompanying drawings.
具体实施方式Detailed ways
参见图1~图2,烟叶密集烤房烟气余热利用装置,包括烟囱2、换热室3、回烟室8、连接室13和回烟室8;所述烤房包括装烟室1和加热室17;所述加热室17与装烟室1之间设置有隔热墙11;所述加热室17和所述装烟室1的顶端设置有房顶101;所述加热室17内设有用于固定风机18的风机台板16,所述风机台板16延伸至加热室17之外;所述加热室17之内设置有火炉20,所述火炉20上方设置有换热器19;所述风机台板16上,在位于所述换热器19的正上方的位置固定设有循环风机18;所述风机台板16位于所述房顶101的下方;在所述房顶101的上表面上,在所述加热室17的上方设置有换热室3和烟囱2;所述烟囱2的出烟口位于所述换热室顶盖4的上方;Referring to Figures 1 to 2, the flue gas waste heat utilization device in a tobacco leaf intensive curing room includes a chimney 2, a heat exchange room 3, a smoke return room 8, a connecting room 13 and a smoke return room 8; the barn includes a tobacco loading room 1 and Heating chamber 17; a heat insulating wall 11 is arranged between the heating chamber 17 and the smoke chamber 1; a roof 101 is arranged on the top of the heating chamber 17 and the smoke chamber 1; There is a fan table 16 for fixing the fan 18, and the fan table 16 extends outside the heating chamber 17; a stove 20 is arranged inside the heating chamber 17, and a heat exchanger 19 is arranged above the stove 20; On the fan table 16, a circulating fan 18 is fixed at a position directly above the heat exchanger 19; the fan table 16 is located below the roof 101; on the roof 101 On the surface, a heat exchange chamber 3 and a chimney 2 are arranged above the heating chamber 17; the smoke outlet of the chimney 2 is located above the top cover 4 of the heat exchange chamber;
所述烟囱2位于所述换热室3的一侧,所述换热室3的另一侧设置有回烟室8,所述烟囱2内设置有隔烟板6;所述烟囱2与所述回烟室8之间通过上金属管9和下金属管10相连接;所述上金属管9与所述烟囱2的连接口位于所述隔烟板6的上方,所述下金属管10与所述烟囱2的连接口位于所述隔烟板6的下方;The chimney 2 is located on one side of the heat exchange chamber 3, the other side of the heat exchange chamber 3 is provided with a smoke return chamber 8, and the chimney 2 is provided with a smoke partition 6; the chimney 2 and the The smoke chamber 8 is connected by an upper metal pipe 9 and a lower metal pipe 10; the connection port between the upper metal pipe 9 and the chimney 2 is located above the smoke baffle plate 6, and the lower metal pipe 10 The connection port with the chimney 2 is located below the smoke baffle 6;
在所述换热室3的靠近所述装烟室1的一侧的侧墙上设置有换热室冷风进口5;在所述换热室3的远离所述装烟室1一侧的侧墙上设置有换热室热风出口12;所述加热室17的远离所述装烟室1一侧的侧墙上设置有加热室进风口14;在所述换热室3和所述加热室17的远离所述装烟室1的一侧的侧墙之外,设置有同时覆盖了所述换热室3的换热室热风出口12和所述加热室进风口14的连接室13;所述连接室13位于所述风机台板16的上表面上。A heat exchange chamber cold air inlet 5 is provided on the side wall of the heat exchange chamber 3 near the side of the smoke chamber 1; The heat exchange chamber hot air outlet 12 is arranged on the wall; the heating chamber air inlet 14 is arranged on the side wall of the heating chamber 17 away from the side wall of the smoke chamber 1; between the heat exchange chamber 3 and the heating chamber 17, the side wall away from the side wall of the smoke chamber 1 is provided with a connecting chamber 13 that simultaneously covers the heat exchange chamber hot air outlet 12 of the heat exchange chamber 3 and the heating chamber air inlet 14; The connection chamber 13 is located on the upper surface of the fan platform 16 .
本发明是将密集烤房烟囱2通过下金属管10、回烟室8和上金属管9延长到换热室4里面,利用高温烟气加热换热室内的空气;再将换热室4内被加热的空气引入烤房里面辅助供热,以减少烟叶烘烤用煤量。烤房包括装烟室1和加热室17。The present invention extends the chimney 2 of the dense barn into the heat exchange chamber 4 through the lower metal pipe 10, the smoke return chamber 8 and the upper metal pipe 9, and uses high-temperature flue gas to heat the air in the heat exchange chamber; The heated air is introduced into the barn to assist heating, so as to reduce the amount of coal used for tobacco leaf curing. Barn comprises smoke chamber 1 and heating chamber 17.
在砌密集烤房房顶1上面的烟囱2时,将烟囱2一侧墙下部留一开口,在该开口正对面的房顶1另一边砌一个用于回烟的小空间即回烟室8;将一根较粗的金属管10的一端插在烟囱2开口处下部,插过墙至烟道处即可,另一端插入回烟室8下部,插过墙刚好进入回烟室8即可;用耐火材料隔烟板6沿此下金属管10上面将烟囱2的烟道水平密封;再将另一根上金属管9的一端插在烟囱侧墙开口处上部,另一端插入回烟室8上部,构成烟气回路,烟气依次通过下金属管、回烟室、上金属管后,从烟囱的出烟口排出。上下金属管被烟气加热后散热,将换热室内的冷空气加热后再输送给加热室。如图2中箭头为烟气的流向。When building the chimney 2 on the roof 1 of the dense barn, leave an opening at the lower part of the wall on one side of the chimney 2, and build a small space for returning smoke, that is, a smoke return chamber 8, on the other side of the roof 1 directly opposite the opening. Insert one end of a thicker metal pipe 10 into the lower part of the opening of the chimney 2, insert it through the wall to the flue, and insert the other end into the lower part of the smoke return chamber 8, insert it through the wall just to enter the smoke return chamber 8 The flue of the chimney 2 is horizontally sealed along the lower metal pipe 10 with a refractory material smoke separator 6; another end of the upper metal pipe 9 is inserted into the upper part of the opening of the side wall of the chimney, and the other end is inserted into the smoke return chamber 8 The upper part constitutes the flue gas circuit, and the flue gas passes through the lower metal pipe, the smoke return chamber, and the upper metal pipe in turn, and is discharged from the smoke outlet of the chimney. The upper and lower metal pipes are heated by the flue gas to dissipate heat, and the cold air in the heat exchange chamber is heated and then sent to the heating chamber. As shown in Figure 2, the arrows indicate the flow direction of the flue gas.
加热室火炉内燃料燃烧产生的高温烟气经过换热器换热后,进入烟囱下部;然后向上运动,依次通过下金属管、回烟室、上金属管后从烟囱的出烟口排出。装烟室与加热室之间通过隔热墙下方的进风口和隔热墙上方的回风口相连通,循环风机用于将加热室和装烟室内的热气循环流动起来,从而通过热气输送热量对装烟室内的烟叶进行烘烤。The high-temperature flue gas produced by fuel combustion in the heating chamber enters the lower part of the chimney after being exchanged by the heat exchanger; then moves upward, passes through the lower metal pipe, the smoke return chamber, and the upper metal pipe in turn, and then is discharged from the smoke outlet of the chimney. The smoke chamber and the heating chamber are connected through the air inlet below the heat insulation wall and the return air above the heat insulation wall. Tobacco leaves in the smoking chamber are cured.
将连接金属管的烟囱墙和回烟室墙密封;要在回烟室8朝外的一面墙上面设一扇可自由开关的回烟室保温门7,必要时打开以便清除金属管内的积灰,以确保金属管的换热效率。最后在加热室17顶上方建造换热室4,将烟囱下部、上下金属管和回烟室8包围在里面。在换热室3位于加热室进风口14上方的墙上面设一个换热室热风出口12;再在循环风机台板16上面砌一个连接室13,将换热室3换热室热风出口12和加热室进风口14包围在里面,以确保从换热室3出来的热空只能进入烤房以发挥作用。在连接室13正对加热室进风口14的围墙上设1个可以开关的连接室窗户15,以便对加热室进风口控制门进行检修。Seal the chimney wall connected to the metal pipe and the wall of the smoke return chamber; set a freely openable and openable heat return door 7 of the smoke return room on the wall facing the outside of the smoke return room 8, and open it if necessary to remove the dust accumulated in the metal pipe , to ensure the heat transfer efficiency of the metal tube. Build the heat exchange chamber 4 above the top of the heating chamber 17 at last, and surround the chimney bottom, the upper and lower metal pipes and the smoke return chamber 8 inside. A hot air outlet 12 of the heat exchange chamber is set on the wall above the heat exchange chamber 3 above the air inlet 14 of the heating chamber; The heating chamber air inlet 14 is surrounded inside to ensure that the hot air coming out from the heat exchange chamber 3 can only enter the baking room to play a role. On the enclosure wall facing the heating chamber air inlet 14 in the connecting chamber 13, a connecting chamber window 15 that can be switched is established, so that the heating chamber air inlet control door is overhauled.
因为在烟囱里面设置了隔烟板6,在烟叶烘烤过程中,烟囱2下部里面温度较高的烟气只能进入下金属管10流向回烟室8,然后通过上金属管9回流进入烟囱上部,最后从烟囱上口排出;在此过程中,烟气加热金属管,金属管则加热换热室3内的空气;换热室3内的热空气通过连接室13进入加热室17辅助供热,从而减少燃料的消耗,达到节能减排降本的目的。Because the smoke partition 6 is set inside the chimney, during the tobacco leaf curing process, the flue gas with a higher temperature in the lower part of the chimney 2 can only enter the lower metal pipe 10 and flow to the return chamber 8, and then flow back into the chimney through the upper metal pipe 9 The upper part is finally discharged from the upper mouth of the chimney; during this process, the flue gas heats the metal pipe, and the metal pipe heats the air in the heat exchange chamber 3; the hot air in the heat exchange chamber 3 enters the heating chamber 17 through the connecting chamber 13 for auxiliary supply heat, thereby reducing fuel consumption and achieving the purpose of energy saving, emission reduction and cost reduction.
所述回烟室8的外侧开设有回烟室保温门7。回烟室保温门为密封门,可随时打开以清除回烟室和两个金属管内的积灰,以免堵塞出烟通道,并提高金属管的换热效率。The outside of the smoke return chamber 8 is provided with a smoke return chamber insulation door 7 . The thermal insulation door of the smoke return room is a sealed door, which can be opened at any time to remove the dust accumulated in the smoke return room and the two metal pipes, so as not to block the smoke outlet channel and improve the heat exchange efficiency of the metal pipes.
在连接室13的远离所述装烟室1的一侧的侧墙上设置有连接室窗户15。通过该连接室窗户,可以对加热室进风口进行维修。A connection room window 15 is arranged on the side wall of the connection room 13 away from the smoke chamber 1 . Through the window of the connection room, the air inlet of the heating room can be maintained.
在换热室3的换热室冷风进口5所在的墙的内壁上,设有覆盖于所述换热室冷风进口5之上的塑料薄膜;所述塑料薄膜的上端固定于墙面上,下端自由下垂。On the inner wall of the wall where the cold air inlet 5 of the heat exchange chamber of the heat exchange chamber 3 is located, a plastic film covering the cold air inlet 5 of the heat exchange chamber is provided; the upper end of the plastic film is fixed on the wall, and the lower end Free droop.
在换热室3的靠近所述装烟室1的一侧的墙上面开设两个冷风进风口5,在每个冷风进风口5里面一侧的上方墙壁上面用木条水平固定几层折叠塑料薄膜,薄膜片的四边适当大于冷风进风口5,薄膜上端固定而下端自由下垂盖住进风口,既起阻挡换热室内的热量向外散失的作用,又可以根据烟叶烘烤进程的需要自由开启大小而适量进风。Two cold air inlets 5 are provided on the wall near the side of the smoke chamber 1 in the heat exchange chamber 3, and several layers of folded plastic are horizontally fixed with wooden strips on the upper wall on the side of each cold air inlet 5. Film, the four sides of the film are appropriately larger than the cold air inlet 5, the upper end of the film is fixed and the lower end hangs freely to cover the air inlet, which not only prevents the heat from being lost in the heat exchange chamber, but also can be opened freely according to the needs of the tobacco leaf curing process The size and the right amount of air intake.
所述隔烟板6是由耐火材料制成的。The smoke partition 6 is made of refractory material.
在砌密集烤房房顶1上面的烟囱2时,将烟囱右侧墙下部留一开口,在该开口正对面的房顶另一边砌一个回烟室8。烟囱和回烟室墙厚度为13cm,采用标准砖砌筑,两面均采用水泥沙浆粉刷严密。回烟室内空规格为,长24cm、宽24cm、高56cm。将一根外径18cm、管壁厚4mm的耐候钢管10的一端插在烟囱2开口处下部,高度为距离烤房顶10cm,插过墙至烟道处即可,另一端插入回烟室8下部,距离烤房顶10cm,插过左墙刚好进入回烟室即可。用厚度为8cm的耐火材料隔烟板6沿下金属管10上面将烟囱2的烟道水平密封;再将另一根外径18cm、管壁厚4mm的耐候钢管9的一端插在烟囱2右墙开口处上部,另一端插入回烟室8左墙上部,构成烟气回路;2根金属管上下排列,之间的距离为10cm。将连接金属管的烟囱墙和回烟室墙密封。在回烟室8朝外的右墙上面设1扇可自由开关的回烟室保温门7,门槛高6cm,门高56cm、宽32cm、厚6cm;回烟室保温门7采用耐火保温的岩棉夹心彩钢板制作;回烟室保温门7只在清除金属管内外积灰时才打开,平时关严。在加热室17顶上方建造换热室3,将烟囱下部、两个金属管和回烟室8包围在里面。换热室墙厚度为20cm,采用标准砖砌筑,两面均采用水泥沙浆粉刷严密;顶为钢筋混凝土构件,厚10cm。换热室内空规格为,长180cm、宽220cm、高70cm。在换热室3位于隔热墙11上方的墙上面开设2个冷风进风口5,净空规格均为高40cm、宽50cm,2个相距80cm距,底边距烤房顶20cm;在每个冷风进风口5里面一侧的上方墙壁上面用木条水平固定2~3层折叠塑料薄膜,薄膜片的四边大于冷风进风口510cm,自由下垂盖住进风口5,既起阻挡换热室内的热量向外散失的作用,又可以根据烟叶烘烤进程的需要自由开启大小而适量进风;在换热室3位于加热室进风口14上方的墙上面居中设一个换热室热风出口12,规格为高40cm、宽90cm,下边沿距烤房顶面10cm;再在循环风机台板16上面砌一个连接室13,将换热室3换热室热风出口12和加热室进风口14包围在里面;连接室13墙厚20cm,采用标准砖砌筑,两面均采用水泥沙浆粉刷严密,顶为钢筋混凝土构件,厚10cm;连接室内空规格为,长40cm、宽120cm、高150cm。在连接室13正对加热室进风口14的围墙上设1个可以开关的连接室窗户15,规格为高80cm、宽90cm,安装木门,门板厚4cm。When building the chimney 2 on the roof 1 of the densely packed barn house, an opening is left at the bottom of the right side wall of the chimney, and a return smoke chamber 8 is built on the other side of the roof directly opposite the opening. The thickness of the chimney and smoke return chamber wall is 13cm, and it is built with standard bricks, and both sides are tightly painted with cement mortar. The empty specification of the smoke return room is 24cm in length, 24cm in width and 56cm in height. Insert one end of a weather-resistant steel pipe 10 with an outer diameter of 18 cm and a pipe wall thickness of 4 mm into the lower part of the opening of the chimney 2 at a height of 10 cm from the roof of the barn. The lower part is 10cm away from the roof of the roasting house, and it can be inserted through the left wall just to enter the smoke recovery room. The flue of chimney 2 is horizontally sealed along lower metal pipe 10 with the refractory material smoke barrier 6 with a thickness of 8 cm; then another end of weather-resistant steel pipe 9 with an outer diameter of 18 cm and a pipe wall thickness of 4 mm is inserted into the right side of chimney 2 The upper part of the opening of the wall, and the other end is inserted into the upper part of the left wall of the smoke return chamber 8 to form a flue gas circuit; two metal pipes are arranged up and down, and the distance between them is 10cm. Seal the chimney wall and return chamber wall where the metal pipes are connected. On the outer right wall of the smoke return room 8, there is a smoke return room insulation door 7 that can be opened and closed freely. The threshold is 6 cm high, the door is 56 cm high, 32 cm wide, and 6 cm thick; It is made of cotton sandwich color steel plate; the thermal insulation door 7 of the smoke return room is only opened when the dust accumulation inside and outside the metal pipe is removed, and it is usually closed tightly. Build the heat exchange chamber 3 above the top of the heating chamber 17, and surround the chimney bottom, two metal pipes and the smoke return chamber 8 inside. The thickness of the heat exchange room wall is 20cm, which is built with standard bricks, and both sides are tightly painted with cement mortar; the top is a reinforced concrete member with a thickness of 10cm. The empty specification of the heat exchange chamber is 180cm in length, 220cm in width and 70cm in height. Open 2 cold air inlets 5 on the wall above the thermal insulation wall 11 in the heat exchange chamber 3, the headroom specifications are all high 40cm, wide 50cm, 2 apart from each other by 80cm, and the bottom edge is 20cm from the roof of the grill; 2~3 layers of folded plastic films are horizontally fixed with wooden strips on the top wall of one side of the air inlet 5, and the four sides of the film sheet are larger than the cold air inlet 510cm, freely sagging to cover the air inlet 5, both to block the heat in the heat exchange chamber The effect of external loss can be freely opened according to the needs of the tobacco leaf curing process and an appropriate amount of air can be taken in; a heat exchange chamber hot air outlet 12 is set in the center of the heat exchange chamber 3 on the wall above the heating chamber air inlet 14, and the specification is high. 40cm, 90cm wide, and the lower edge is 10cm away from the top surface of the barn; then build a connection chamber 13 on the top plate of the circulating fan 16, and surround the heat exchange chamber 3 hot air outlet 12 of the heat exchange chamber and the air inlet 14 of the heating chamber; The wall of room 13 is 20cm thick, built with standard bricks, both sides are tightly painted with cement mortar, and the roof is reinforced concrete members, 10cm thick; the specification of the connecting room is 40cm long, 120cm wide, and 150cm high. Establish a connection room window 15 that can be switched on the enclosure wall facing the heating chamber air inlet 14 in the connection room 13, the specification is high 80cm, wide 90cm, wooden door is installed, and the door panel is thick 4cm.
利用本发明的装置的烤房,节能减排降本效果明显。多次试验结果表明,每烤出1kg干烟叶的平均耗煤量和平均耗电量,接装了本型的密集烤房分别为1.531kg(当地原煤,下同)和0.593kWh,而没有集热器的对照密集烤房分别为1.712kg和0.615 kWh。前者比后者节煤0.181kg/kg(干烟),节煤率为10.60%;相应地减少了10.60%的废气排放;节电0.022 kWh /kg(干烟),节电率为3.577%;节约烘烤成本0.158元/kg(干烟)(以当地2012年煤价800元/t、电价0.60元/ kWh计算),节本率为9.088%。Utilizing the barn of the device of the present invention, the effect of energy saving, emission reduction and cost reduction is obvious. The results of multiple tests show that the average coal consumption and average electricity consumption per 1kg of dried tobacco leaves are 1.531kg (local raw coal, the same below) and 0.593kWh respectively for the intensive curing barns installed with this type, while those without centralized The control dense barn of the heater is 1.712kg and 0.615 kWh respectively. Compared with the latter, the former saves 0.181kg/kg of coal (dry smoke), and the coal saving rate is 10.60%; correspondingly, the waste gas emission is reduced by 10.60%; the power saving is 0.022 kWh/kg (dry smoke), and the power saving rate is 3.577%; The cost of baking is saved by 0.158 yuan/kg (dry tobacco) (calculated based on the local coal price of 800 yuan/t and electricity price of 0.60 yuan/kWh in 2012), and the saving rate is 9.088%.
本发明的装置,造价较低,使用寿命长,使用方便。集热室和连接室围结构均使用廉价材料,预期使用寿命达10年以上。本型在烟叶烘烤过程中,密集烤房可自动吸用集热室里面的热空气,不需要烘烤人员操作,不会增加工作量。The device of the invention has low manufacturing cost, long service life and convenient use. Both the heat collection chamber and the surrounding structure of the connecting chamber are made of cheap materials, and the service life is expected to be more than 10 years. During the tobacco leaf curing process of this type, the intensive curing room can automatically absorb the hot air in the heat collecting chamber, and does not need to be operated by baking personnel, and will not increase the workload.
Claims (3)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201310067051.1A CN103099298B (en) | 2013-03-04 | 2013-03-04 | Tobacco leaf bulk curing barn smoke waste heat utilization device |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201310067051.1A CN103099298B (en) | 2013-03-04 | 2013-03-04 | Tobacco leaf bulk curing barn smoke waste heat utilization device |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN103099298A CN103099298A (en) | 2013-05-15 |
| CN103099298B true CN103099298B (en) | 2015-03-25 |
Family
ID=48307754
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201310067051.1A Expired - Fee Related CN103099298B (en) | 2013-03-04 | 2013-03-04 | Tobacco leaf bulk curing barn smoke waste heat utilization device |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN103099298B (en) |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN104720088A (en) * | 2013-12-18 | 2015-06-24 | 贵州中烟工业有限责任公司 | Bulk curing barn with improved radiating device and fan system |
Family Cites Families (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN2784849Y (en) * | 2003-10-11 | 2006-05-31 | 张树堂 | Electric baking room |
| JP5004330B2 (en) * | 2006-11-17 | 2012-08-22 | 三州産業株式会社 | Heat exchanger |
| JP5137525B2 (en) * | 2007-10-22 | 2013-02-06 | 三州産業株式会社 | Energy-saving leaf tobacco dryer |
| CN201911283U (en) * | 2011-01-04 | 2011-08-03 | 红云红河烟草(集团)有限责任公司 | Intelligent control tobacco drying intensive coal-fired curing barn |
| CN102697160B (en) * | 2012-06-07 | 2014-06-04 | 昆明贵勋科技有限公司 | Energy-saving tobacco flue-curing house capable of effectively recycling dehumidification heat energy |
| CN203058264U (en) * | 2013-03-04 | 2013-07-17 | 贵州省烟草公司黔南州公司 | Tobacco leaf bulk curing barn smoke waste heat utilization device |
-
2013
- 2013-03-04 CN CN201310067051.1A patent/CN103099298B/en not_active Expired - Fee Related
Also Published As
| Publication number | Publication date |
|---|---|
| CN103099298A (en) | 2013-05-15 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN203234014U (en) | Airflow alternating type and horizontal type intensive tobacco baking house | |
| CN202853308U (en) | Drying stove utilizing small-sized boiler smoke dust waste heat | |
| CN203550434U (en) | Steam hot wind wood drying device | |
| CN203037009U (en) | Energy-saving curing barn with waste heat recovery device arranged in baking chamber | |
| CN203136999U (en) | Control system for airflow alternating horizontal type bulk flue-cured tobacco barn | |
| CN106562466B (en) | A kind of intensive baking room with waste heat recovery zero emission | |
| CN103040084A (en) | Efficient waste heat recovery energy-saving emission-reduction roasting room | |
| CN203058264U (en) | Tobacco leaf bulk curing barn smoke waste heat utilization device | |
| CN103099298B (en) | Tobacco leaf bulk curing barn smoke waste heat utilization device | |
| CN201299089Y (en) | Intensive flue-cured tobacco room | |
| CN105115155A (en) | Biofuel hot-blast stove | |
| CN213428290U (en) | Small-sized gas type automatic energy-saving tobacco flue-curing house | |
| CN202680445U (en) | Energy-saving tobacco flue-curing house capable of effectively recovering, returning and utilizing moisture exhaust heat | |
| CN204763370U (en) | Dismantled and assembled roast room of air current decline formula foaming siding wall body | |
| CN106401147A (en) | Flue type composite wall of northern rural residence | |
| CN106901395B (en) | A kind of solid heat storage electricity coaster for baking tobacco | |
| CN204047990U (en) | Bulk curing barn High Temperature Moist Air waste-heat recovery device | |
| CN205002373U (en) | Biomass fuel hot blast stove | |
| CN217722660U (en) | Descending type coal-fired tobacco flue-curing house heating chamber waste heat recycling device | |
| CN215571673U (en) | Energy-saving environment-friendly drying room | |
| CN200973346Y (en) | Tobacco leaf compression type bake room combined device used solar to reduce coal consumption | |
| CN205351967U (en) | Well cold cycle drying equipment | |
| CN205607115U (en) | Rotatory drying -machine of heat exchange | |
| CN103134182A (en) | Waste gas recovering all-steel air-cooled type energy-saving hot blast furnace | |
| CN201878744U (en) | Highly-efficient low-emission hot air tobacco curing furnace |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150325 Termination date: 20170304 |