CN103084775B - The supervisor of welding pipeline and the method for arm and welding frock - Google Patents

The supervisor of welding pipeline and the method for arm and welding frock Download PDF

Info

Publication number
CN103084775B
CN103084775B CN201310013143.1A CN201310013143A CN103084775B CN 103084775 B CN103084775 B CN 103084775B CN 201310013143 A CN201310013143 A CN 201310013143A CN 103084775 B CN103084775 B CN 103084775B
Authority
CN
China
Prior art keywords
welding
supervisor
arm
pipeline
jack
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310013143.1A
Other languages
Chinese (zh)
Other versions
CN103084775A (en
Inventor
贺平
丁凌
乔斌杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Nuclear Industry 23 Construction Co Ltd
Original Assignee
China Nuclear Industry 23 Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Nuclear Industry 23 Construction Co Ltd filed Critical China Nuclear Industry 23 Construction Co Ltd
Priority to CN201310013143.1A priority Critical patent/CN103084775B/en
Publication of CN103084775A publication Critical patent/CN103084775A/en
Application granted granted Critical
Publication of CN103084775B publication Critical patent/CN103084775B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The present invention relates to prefabricated pipeline field during Nuclear Power Station.During for solving to use prior art that the connecting portion of pipeline supervisor and arm is welded, the problem that welding effect is poor, workload is big, calibration result is poor.The present invention proposes a kind of supervisor and the method for arm of welding pipeline, the main frame tube of the pipeline formed by tack welding is located on bracing frame and fixes, arm is positioned at above supervisor and is positioned at same perpendicular with supervisor, welding frock is installed on pipeline, two band steel snare hangs on supervisor, it is interior to place jack that gripper shoe is located in band steel circle, and jack is positioned at the underface of supervisor and the connecting portion of arm, and backplate is positioned on jack;Regulating the height deformation quantity with reduction pipeline of jack after welding, welding position cools down, and removes frock.This welding method, strong adaptability, workload is little, working strength is low, the shortest, even weld, and calibration result is good.

Description

The supervisor of welding pipeline and the method for arm and welding frock
Technical field
The present invention relates to prefabricated pipeline field during Nuclear Power Station, particularly relate to the supervisor in pipeline The method being grouping welding with arm, and the work used when supervisor and arm being grouping welding Dress.
Background technology
At present, when using welding method by the supervisor of pipeline together with branch pipe welding, it is common that first Select smooth welding procedure place, in order to supervisor and arm are placed on smooth welding procedure place Weld.Before welding, first pass through tack welding will supervisor with branch pipe welding together with, and supervisor with Arm is positioned at approximately the same plane, and the pipeline linked together by tack welding lies on smooth place; Then, a correction pipe identical with supervisor's specification is placed in the side deviating from arm supervisor, and correction is managed It is fixed together with supervisor.When welding, welding personnel is first to court at the connecting portion of supervisor and arm Welding to the part of upside, after this part has been welded, upset pipeline and correction pipe, by connecting portion Originally towards the partial switching of downside to towards upside on position, and part unwelded on connecting portion is carried out Welding, after this part has been welded, is placed in pipeline construction site and naturally cools down.This welding side The connecting portion of supervisor and arm is divided at least two weldering section to weld by method, causes the company of supervisor and arm The weld seam connecing position is uneven, and welding effect is poor;In welding process, repeatedly overturning pipeline, workload is big, Working strength is high, constructs loaded down with trivial details;When welding position is cooled down, only rely on and be responsible for setting back-to-back Correction pipe the deformation of pipeline is corrected, calibration result is poor, and pipe deforming seriously, and then causes pipeline Cannot use.
For solving to use existing welding method that the supervisor of pipeline and the connecting portion of arm are welded Time, weld seam is uneven, welding effect is poor, and workload is big, it is loaded down with trivial details to construct, and calibration result is poor, pipe deforming Serious problem, those skilled in the art is badly in need of developing a kind of new welding method.
Summary of the invention
For solving to use existing welding method that the supervisor of pipeline and the connecting portion of arm are welded Time, weld seam is uneven, welding effect is poor, and workload is big, it is loaded down with trivial details to construct, and calibration result is poor, pipe deforming Serious problem, the present invention proposes a kind of supervisor and the method for arm of welding pipeline, this welding Method comprises the steps:
The first step, uses tack welding to be responsible for together with branch pipe welding;
Second step, the main frame tube that tack welding in first step connects the pipeline formed is located on bracing frame and solid Fixed, described arm is positioned at the top of described supervisor and is positioned at same perpendicular with described supervisor, in institute Stating and be provided with welding frock on pipeline, this welding frock includes gripper shoe, backplate and two Band steel circle, said two band steel snare hangs on described supervisor and lays respectively at the both sides of described arm, described It is interior to place jack that gripper shoe is located in described band steel circle, and described jack is positioned at described supervisor with described The underface of the connecting portion of arm, described backplate is positioned on the top bracket of described jack and abuts in institute State on supervisor;
3rd step, welds the connecting portion of described supervisor and described arm, and root after welding Deformation quantity according to described pipeline regulates the height of described jack, and position to be welded cools down, removes described group pair Tool for welding, welding completes.
When using this welding method that the supervisor of pipeline and the connecting portion of arm are welded, due to It is by pipeline construction on bracing frame, thus low to the flatness requirement of welding construction site;In welding process, It is not required to be upset pipeline and interrupts welding, it is possible to the supervisor of the completeest twin conduit and the connecting portion of arm Welding, workload is little, working strength is low, welds single pipeline the shortest, and even weld, welding effect are good; After welding, regulate the height of jack immediately according to the deformation quantity of pipeline, the deformation quantity of pipeline can be reduced, Avoid pipeline cannot use because welding deformation quantity is excessive, eliminate the generation of construction accident.
Preferably, in the first step of the method, tack welding weldering section at least three sections, and described supervisor It is uniformly distributed with the connecting portion of described arm.As such, it is possible to make supervisor and the firm connection of arm, it is to avoid In welding process, arm is responsible for run-off the straight relatively.
Spacing preferably, in the second step of the method, between said two band steel circle and described arm Equal, the centre of described backplate is positioned at the underface of the connecting portion of described supervisor and described arm.This Sample, can make supervisor at the both sides stress equalization of connecting portion, and then avoid supervisor in cooling procedure because being subject to Power is unbalanced and deforms.
Use the supervisor of welding pipeline and the method for arm that the present invention proposes to the supervisor of pipeline and arm Connecting portion when welding, can weld in irregular construction site, welding construction site is wanted Asking low, all can use in pipe prefabrication and installation process, applicability and generalization are stronger;In welding process In, pipeline need not be overturn, can a welding fabrication, reduce workload, reduce working strength, And it is the shortest to weld single pipeline, even weld, welding effect is good;In welding process and after welding All use welding frock that pipe deforming is corrected, the deformation quantity of pipeline can be reduced, improve welding Quality, it is to avoid the generation of construction accident.After tack welding completes, in supervisor and the company of arm of pipeline Connect position and be evenly distributed with at least three sections of tack welding weldering sections, supervisor and the firm connection of arm can be made.In installation group During to tool for welding, making the spacing between two band steel circles and arm equal, the centre of backplate is positioned at The underface of the connecting portion of supervisor and arm, so that supervisor is at the both sides stress equalization of connecting portion, and then Supervisor is avoided to deform upon because of discontinuity equalization in cooling procedure.
The present invention also proposes a kind of welding frock, and this frock includes gripper shoe, backplate and two band steels Circle, in use, said two band steel snare hangs on the supervisor of described pipeline, and lays respectively at described The both sides of the arm that supervisor is linked together by tack welding;Described support grillage is located in said two band steel To place jack in circle, and described jack is positioned at the underface of connecting portion of described supervisor and arm; Described backplate is positioned on the top bracket of described jack, and abuts on described supervisor.
This welding frock, simple in construction, easy to make and low cost, it is simple to dismounting, user Just.When using this welding frock that the supervisor of pipeline and arm are grouping welding, can be in welding After regulate the height of jack to reduce the deformation quantity of pipeline after welding according to the deformation quantity of pipeline immediately, Avoid pipeline cannot use because deformation quantity is excessive.
Preferably, in use, the spacing between said two band steel circle and described arm is equal, described in protect The centre of plate is positioned at the underface of the connecting portion of described supervisor and described arm.As such, it is possible to make main Pipe is at connecting portion both sides stress balance, and then avoids in supervisor's cooling procedure after having welded because of stress Uneven and deform.
Preferably, described backplate is the arc matched with described supervisor.So, the supervisor to pipeline When being grouping welding with arm, the intrados of backplate is attached on the outer wall of supervisor, can reduce the shape of supervisor Variable, and then reduce the deformation quantity of pipeline.
Preferably, described gripper shoe is made up of channel-section steel, and the notch in the most described gripper shoe is downward. The support strength of such gripper shoe is relatively big, and gripper shoe can be avoided to deform upon because stress is excessive.
The welding frock that the present invention proposes, simple in construction, easy to make and low cost, easy accessibility, It is easy to use.Use arc backplate, the deformation quantity of pipeline can be reduced;The support of the gripper shoe that channel-section steel is made Intensity is big, is not susceptible to deformation.
Accompanying drawing explanation
Figure is to use the supervisor of welding pipeline of the present invention and the method for the arm supervisor to pipeline and the connection of arm Schematic perspective view when position is welded.
Detailed description of the invention
The present invention uses welding method to weld the supervisor of pipeline and the connecting portion of arm.
Before welding, first the supervisor of pipeline and the connecting portion of arm are carried out tack welding welding, will be main Pipe is together with branch pipe welding.When carrying out tack welding welding, at least to carry out three sections of tack welding welding, Connecting portion forms at least three tack welding section, so that arm is fixed with the relative position of supervisor.Preferably, Tack welding section is uniformly distributed the supervisor of pipeline and the connecting portion of arm, the tack welding section stress of connecting portion Uniformly, it is to avoid arm is relative to supervisor's run-off the straight.
After tack welding has welded, as it can be seen, tack welding to be connected supervisor 11 frame of the pipeline 1 formed It is located on bracing frame 2 and fixes, making supervisor 11 and arm 12 be positioned at same perpendicular, and arm 12 tops being positioned at supervisor 11.Welding frock 3 is arranged on pipeline 1, this welding frock 3 include gripper shoe 31, backplate 32 and two band steel circles 33, and wherein, two band steel circle 33 sets hang over supervisor On 11 and lay respectively at the both sides of arm 12, the two ends of gripper shoe 31 are inserted in band steel circle 33 to be located in two In individual band steel circle 33, gripper shoe 31 is made to be positioned at below supervisor 11 and 11 parallel, for placement thousand with supervisor Jin top 4, and make jack 4 be positioned at the underface of the connecting portion being responsible for 11 and arm 12;Backplate 32 On the top bracket 41 of jack 4, and abut in the downside of supervisor 11.Gripper shoe can be by channel-section steel system Become, and the notch in gripper shoe is downward in use.Backplate 32 can be the arc matched with supervisor, It can also be rectangular slab.Preferably, the spacing between two band steel circles 33 and arm 12 is equal, backplate 32 Centre be positioned at the supervisor 11 of pipeline and the underface of the connecting portion of arm 12.
In welding with after frock installation, the supervisor of pipeline and the connecting portion of arm are welded, And after welding, the deformation quantity according to pipeline regulates the height of jack immediately, i.e. regulation backplate is to pipe The size of the power that road applies, to reduce the deformation quantity of pipeline.Treat that the weld seam of connecting portion on pipeline is the coldest But after, removing welding frock, welding completes.The height of jack is regulated at the deformation quantity according to pipeline When spending, the deflection of pipeline is the biggest, and the height of jack is the highest.

Claims (5)

1. the supervisor of a welding pipeline and the method for arm, it is characterised in that comprise the steps:
The first step, uses tack welding to be responsible for together with branch pipe welding;
Second step, is located at the main frame tube that tack welding in first step connects the pipeline formed on bracing frame and fixes, Described arm is positioned at the top of described supervisor and is positioned at same perpendicular with described supervisor, at described pipe Being provided with welding frock on road, this welding frock includes gripper shoe, backplate and two band steels Circle, said two band steel snare hangs on described supervisor and lays respectively at the both sides of described arm, said two Spacing between band steel circle with described arm is equal, and it is interior to place thousand that described gripper shoe is located in described band steel circle Jin pushes up, and described jack is positioned at the underface of described supervisor and the connecting portion of described arm, described backplate Being positioned on the top bracket of described jack and abut on described supervisor, the centre of described backplate is positioned at The underface of the connecting portion of described supervisor and described arm;
3rd step, welds and once completes welding to the connecting portion of described supervisor and described arm, and in weldering After connecing, deformation quantity according to described pipeline regulates the height of described jack, and position to be welded cools down, and tears open Except described welding frock, welding completes.
The supervisor of welding pipeline the most according to claim 1 and the method for arm, it is characterised in that In the first step of the method, tack welding weldering section at least three sections, and in described supervisor and the company of described arm Connect position to be uniformly distributed.
3. a welding frock, it is characterised in that this frock includes gripper shoe, backplate and two band steel circles, In use, said two band steel snare hangs on the supervisor of pipeline to be welded, and lays respectively at described The both sides of the arm that supervisor is linked together by tack welding;Described gripper shoe is located in said two band steel circle In to place jack, and described jack is positioned at the underface of connecting portion of described supervisor and arm;Institute State backplate to be positioned on the top bracket of described jack, and abut on described supervisor;In use, described Spacing between two band steel circles and described arm is equal, the centre of described backplate be positioned at described supervisor and The underface of the connecting portion of described arm.
Welding frock the most according to claim 3, it is characterised in that described backplate is and described master The arc that pipe matches.
5. according to the welding frock described in claim 3 or 4, it is characterised in that described gripper shoe is by groove Steel is made, and the notch in the most described gripper shoe is downward.
CN201310013143.1A 2013-01-15 2013-01-15 The supervisor of welding pipeline and the method for arm and welding frock Active CN103084775B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310013143.1A CN103084775B (en) 2013-01-15 2013-01-15 The supervisor of welding pipeline and the method for arm and welding frock

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310013143.1A CN103084775B (en) 2013-01-15 2013-01-15 The supervisor of welding pipeline and the method for arm and welding frock

Publications (2)

Publication Number Publication Date
CN103084775A CN103084775A (en) 2013-05-08
CN103084775B true CN103084775B (en) 2016-08-31

Family

ID=48198173

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310013143.1A Active CN103084775B (en) 2013-01-15 2013-01-15 The supervisor of welding pipeline and the method for arm and welding frock

Country Status (1)

Country Link
CN (1) CN103084775B (en)

Families Citing this family (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103600197B (en) * 2013-11-14 2015-05-13 中国核工业华兴建设有限公司 Butting sleeve adjusting tool and using method thereof
CN104084725B (en) * 2014-07-02 2018-03-09 中广核工程有限公司 A kind of device and method for preventing pipeline of nuclear power plant welding deformation
CN104526199B (en) * 2014-12-18 2016-08-24 国家电网公司 Steel tubular beam assembly welding auxiliary stand
CN105773009A (en) * 2016-05-23 2016-07-20 安徽昌永得机械有限公司 Crane big arm welding deformation planeness correction tool
CN106112345A (en) * 2016-07-28 2016-11-16 洛宁超越农业有限公司 A kind of steel I-beam docking adjusting apparatus of Fructus Mali pumilae job shop
CN106271316A (en) * 2016-08-31 2017-01-04 苏州浩锐石英科技有限公司 Quartz boat automatic sheet-feeding welding fixture
CN106425218B (en) * 2016-10-21 2018-06-26 成都国光电气股份有限公司 A kind of electronics gun housing and exhaust pipe welding fixture
CN106392454B (en) * 2016-10-31 2018-10-23 中国一冶集团有限公司 A kind of welder of open holes on double surfaces pipe reinforced pipe
CN106736183A (en) * 2017-01-18 2017-05-31 成都国光电气股份有限公司 A kind of electronics gun housing and blast pipe weld jig
CN107378393B (en) * 2017-07-10 2019-11-22 广船国际有限公司 A kind of processing method and processing unit (plant) with branch pipe pipe
CN107486642B (en) * 2017-08-09 2020-11-13 胜利油田华滨实业有限公司石油机械滨州分公司 Manifold reversible deformation welding process
CN109530988A (en) * 2018-12-27 2019-03-29 渤海造船厂集团有限公司 A kind of method that stainless steel manifold configuration prevents welding deformation
CN109648240B (en) * 2019-01-24 2021-01-29 奥克斯空调股份有限公司 Welding device
KR102116630B1 (en) * 2019-02-26 2020-05-28 성기천 Pipe manufacturing apparatus for system air conditioners and methods of pipe manufacturing using them
CN110303231A (en) * 2019-04-02 2019-10-08 西安石油大学 A kind of continuous pipe flash butt welding method can be used for produced on-site
CN110424516B (en) * 2019-07-16 2020-11-24 嵊州市越通非开挖建设有限公司 Branch pipe integral adjustment construction method for drainage system
CN110238592A (en) * 2019-07-16 2019-09-17 通号轨道车辆有限公司 Railway vehicle car roof covering welding tooling and welding procedure
CN112108832B (en) * 2019-12-17 2022-04-01 天津市津能管业有限公司 Safe expanded expansion sleeve auxiliary mechanism
CN114378467A (en) * 2021-12-13 2022-04-22 海洋石油工程(青岛)有限公司 Welding scheme of two welding openings of branch pipe connecting branch pipe of branch pipe table

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1524907A (en) * 1923-07-19 1925-02-03 Ohio Brass Co Arc-welding device
US4338712A (en) * 1980-09-02 1982-07-13 Dearman Timothy Charles Welding fixture for use in joining two tubular members
US4750662A (en) * 1987-02-10 1988-06-14 Larry And Associates Pipe welding alignment tool
CN2516287Y (en) * 2002-01-15 2002-10-16 张新如 Hydraulic steel-tube straightener
US6871771B2 (en) * 2002-04-26 2005-03-29 Douglas G. Tonjes Automated header brazing machine
CN102009294A (en) * 2010-08-31 2011-04-13 龙海燕 Predeforming device for welding

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6021199A (en) * 1983-07-14 1985-02-02 Mitsubishi Electric Corp Rotating, holding and pressing device for work

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1524907A (en) * 1923-07-19 1925-02-03 Ohio Brass Co Arc-welding device
US4338712A (en) * 1980-09-02 1982-07-13 Dearman Timothy Charles Welding fixture for use in joining two tubular members
US4750662A (en) * 1987-02-10 1988-06-14 Larry And Associates Pipe welding alignment tool
CN2516287Y (en) * 2002-01-15 2002-10-16 张新如 Hydraulic steel-tube straightener
US6871771B2 (en) * 2002-04-26 2005-03-29 Douglas G. Tonjes Automated header brazing machine
CN102009294A (en) * 2010-08-31 2011-04-13 龙海燕 Predeforming device for welding

Also Published As

Publication number Publication date
CN103084775A (en) 2013-05-08

Similar Documents

Publication Publication Date Title
CN103084775B (en) The supervisor of welding pipeline and the method for arm and welding frock
CN204183172U (en) A kind of hood type round steel pipe docking adjustment fixture
EP2844425A1 (en) Apparatus and method for connecting air cooled condenser heat exchanger coils to steam distribution manifold
CN107825037B (en) Multi-functional removable hole system fixed-position welding device
CN106378578B (en) A kind of pipe fitting spot welding fixture (SWFX)
CN105935843A (en) Welding method for structural part
CN107414391A (en) Three-dimensional column workpiece welding procedure is equipped
CN104328921B (en) The convenient assemble method of piping bar and device
CN206263522U (en) A kind of pipe fitting spot welding fixture (SWFX)
CN102886399A (en) Method for fire tube bending of steel tube arch bridge
CN103357983B (en) A kind of hydroecium jig
CN206153820U (en) High safe welding jig
CN205271242U (en) Vapour cold separation ware dress welds template structure and vapour cold separation ware device
CN208903780U (en) A kind of structure guaranteeing double fuel tank feed-through collar position precisions
KR20130001927U (en) Jig for welding ring flange
CN206677365U (en) Argon bottle fixing device
CN102366868B (en) Assembly welding tooling for inner tube support plate of cryostat
CN206493074U (en) A kind of robot welding tooling
CN202053039U (en) Welding clamp for truss girder
CN206912592U (en) A kind of side shifter entirety solid point welding platform for fork truck
CN108788618A (en) The assembly tooling of cylinder segmentation and assembly method
CN103738466B (en) 400 tons of lifting pipe laying vessel stinger method for makings
CN205200914U (en) Fixing device is used in welder's training and examination
CN205200910U (en) Transmission system dc -to -ac converter welding position frock for bearing box is pull in track traffic
CN217071278U (en) Working steel pipe adjusting and positioning device used in heat insulation pipeline

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant