CN103061458A - Connecting method of metal roof plate and gutter and waterproof eave water baffle plate - Google Patents

Connecting method of metal roof plate and gutter and waterproof eave water baffle plate Download PDF

Info

Publication number
CN103061458A
CN103061458A CN2012105876408A CN201210587640A CN103061458A CN 103061458 A CN103061458 A CN 103061458A CN 2012105876408 A CN2012105876408 A CN 2012105876408A CN 201210587640 A CN201210587640 A CN 201210587640A CN 103061458 A CN103061458 A CN 103061458A
Authority
CN
China
Prior art keywords
plate
metal roof
gutter
roof panel
top horizontal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012105876408A
Other languages
Chinese (zh)
Other versions
CN103061458B (en
Inventor
王越
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dongfangcheng Construction Group Co ltd
Original Assignee
BEIJING OHC STEELWORK ENGINEERING CO LTD
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BEIJING OHC STEELWORK ENGINEERING CO LTD filed Critical BEIJING OHC STEELWORK ENGINEERING CO LTD
Priority to CN201210587640.8A priority Critical patent/CN103061458B/en
Publication of CN103061458A publication Critical patent/CN103061458A/en
Application granted granted Critical
Publication of CN103061458B publication Critical patent/CN103061458B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Roof Covering Using Slabs Or Stiff Sheets (AREA)

Abstract

本发明公开了一种金属屋面板与天沟的连接方法以及防水檐口挡水板,其中,防水檐口挡水板包括:顶部横板;多个顶部封堵结构,设置在所述顶部横板的上表面,形成与金属屋面板的形状相匹配的波峰波谷结构;左侧竖板,连接所述顶部横板的左端;所述左侧竖板的左侧面与天沟侧板上的第一胶泥层相配合形成所述挡水板与所述天沟之间的第一密封结构;所述多个顶部封堵结构的上表面以及所述顶部横板的露出的上表面上涂覆第二胶泥层,所述金属屋面板支撑在所述第二胶泥层上,形成所述挡水板与所述金属屋面板之间的第二密封结构。本发明能够充分满足金属屋面的防水防潮性,解决了由天沟向金属屋面板内侧渗水的技术问题。

The invention discloses a method for connecting a metal roof panel to a gutter and a waterproof cornice water retaining plate, wherein the waterproof cornice water retaining plate comprises: a top horizontal plate; a plurality of top sealing structures arranged on the top horizontal plate The upper surface forms a crest and trough structure that matches the shape of the metal roof panel; the left vertical plate connects the left end of the top horizontal plate; the left side of the left vertical plate connects with the first The cement layer cooperates to form a first sealing structure between the water retaining plate and the gutter; the upper surfaces of the plurality of top sealing structures and the exposed upper surface of the top horizontal plate are coated with a second A cement layer, the metal roof panel is supported on the second cement layer to form a second sealing structure between the water retaining plate and the metal roof panel. The invention can fully satisfy the waterproof and moisture-proof performance of the metal roof, and solves the technical problem of water seepage from the gutter to the inner side of the metal roof panel.

Description

一种金属屋面板与天沟的连接方法以及防水檐口挡水板A connection method between metal roof panel and gutter and waterproof eaves retaining board

技术领域technical field

本发明涉及建筑预制件领域,特别是涉及一种金属屋面板与天沟的连接方法以及防水檐口挡水板。The invention relates to the field of building prefabricated parts, in particular to a method for connecting a metal roof panel and a gutter and a waterproof cornice water retaining plate.

背景技术Background technique

金属屋面是指采用金属板材作为屋盖材料,将结构层和防水层合二为一的屋盖形式,是一种新型组合屋面。其产品在大型公共建筑到厂房、库房、住宅等均有使用。Metal roof refers to the roof form that uses metal sheet as the roof material and combines the structural layer and waterproof layer into one. It is a new type of composite roof. Its products are used in large public buildings to factories, warehouses, and residences.

金属屋面所采用的金属板材称为金属屋面板,金属屋面板的种类很多,有锌板、镀铝锌板、铝合金板、铝镁合金板、钛合金板、铜板、不锈钢板等。厚度一般为0.4~1.5mm,板的表面一般进行涂装处理。The metal sheets used in metal roofs are called metal roof panels. There are many types of metal roof panels, including zinc sheets, galvanized sheets, aluminum alloy sheets, aluminum-magnesium alloy sheets, titanium alloy sheets, copper sheets, and stainless steel sheets. The thickness is generally 0.4 ~ 1.5mm, and the surface of the board is generally painted.

图1为金属屋面板与天沟的配合示意图,如图1所示,金属屋面板100安装后一般具有一个倾斜角度,以便雨水下流,在金属屋面板100的底脚处设置天沟200,以便集流雨水。Figure 1 is a schematic diagram of the cooperation between the metal roof panel and the gutter. As shown in Figure 1, the metal roof panel 100 generally has an inclination angle after installation, so that the rainwater flows down, and the gutter 200 is set at the foot of the metal roof panel 100, so that Collect rainwater.

图2为金属屋面板的结构图,如图2所示,金属屋面板的结构一般为重复出现的多个凹凸结构单元,每个凹凸结构单元都具有波峰101和波谷102。FIG. 2 is a structural diagram of a metal roof panel. As shown in FIG. 2 , the structure of a metal roof panel is generally a plurality of repeated concave-convex structural units, and each concave-convex structural unit has a peak 101 and a trough 102 .

在实际使用中,虽然金属屋面板100具有倾斜角度,并且设置了集流雨水的天沟200,但是雨水还是有可能进入金属屋面板的内侧,这是因为:In actual use, although the metal roof panel 100 has an inclination angle and a gutter 200 for collecting rainwater is provided, rainwater may still enter the inner side of the metal roof panel because:

1,在雨水过大的情况下,雨水可能会溢出天沟,在金属屋面板与天沟搭接的缝隙处灌入金属屋面板的内侧;1. In the case of excessive rainwater, the rainwater may overflow the gutter, and pour into the inner side of the metal roof panel at the gap between the metal roof panel and the gutter;

2,液体具有一定的浸润性,虽然金属屋面板具有倾斜角度,仍然会有一小部分雨水浸入金属屋面板的边缘处,从而影响金属屋面板内侧的湿度。2. The liquid has a certain wettability. Although the metal roof panel has an inclination angle, a small part of rainwater will still soak into the edge of the metal roof panel, thus affecting the humidity inside the metal roof panel.

为了解决以上问题,现有技术在金属屋面板与天沟之间采用了檐口挡水板,图7为现有挡水板的安装示意图,如图7所示,现有挡水板的结构并不能很好的适应金属屋面板的波峰波谷形状,并且在与天沟和金属屋面板的配合处仍留有间隙,仍然没有充分满足金属屋面的防水防潮性。In order to solve the above problems, the existing technology uses cornice water retaining boards between the metal roof panels and the gutter. Figure 7 is a schematic diagram of the installation of the existing water retaining boards. As shown in Figure 7, the structure of the existing water retaining boards It cannot be well adapted to the peak and valley shape of the metal roof panel, and there is still a gap at the joint with the gutter and the metal roof panel, which still does not fully satisfy the waterproof and moisture-proof properties of the metal roof.

因此,现有的金属屋面板的结构,还不能够充分满足金属屋面的防水防潮性,有待进一步的改进。Therefore, the structure of the existing metal roof panel cannot fully satisfy the waterproof and moisture-proof properties of the metal roof, and needs further improvement.

发明内容Contents of the invention

本发明实施例的目的是提供一种金属屋面板与天沟的连接方法以及防水檐口挡水板,能够充分满足金属屋面的防水防潮性,解决了由天沟向金属屋面板内侧渗水的技术问题。The purpose of the embodiments of the present invention is to provide a method for connecting metal roof panels and gutters and a waterproof cornice water retaining plate, which can fully satisfy the waterproof and moisture-proof properties of metal roofs, and solve the technical problem of water seepage from the gutter to the inside of the metal roof panels .

为了实现上述目的,本发明提供了一种防水檐口挡水板,用于金属屋面板与天沟的密封连接,包括:In order to achieve the above object, the present invention provides a waterproof eaves water retaining board, which is used for the sealing connection between the metal roof panel and the gutter, including:

顶部横板;top horizontal board;

多个顶部封堵结构,设置在所述顶部横板的上表面,形成与金属屋面板的形状相匹配的波峰波谷结构;A plurality of top sealing structures are arranged on the upper surface of the top horizontal plate to form a crest and trough structure matching the shape of the metal roof plate;

左侧竖板,连接所述顶部横板的左端;a left vertical plate connected to the left end of the top horizontal plate;

所述左侧竖板的左侧面与天沟侧板上的第一胶泥层相配合形成所述挡水板与所述天沟之间的第一密封结构;The left side of the left vertical plate cooperates with the first cement layer on the side plate of the gutter to form a first sealing structure between the water retaining plate and the gutter;

所述多个顶部封堵结构的上表面以及所述顶部横板的露出的上表面上涂覆第二胶泥层,所述金属屋面板支撑在所述第二胶泥层上,形成所述挡水板与所述金属屋面板之间的第二密封结构。The upper surfaces of the plurality of top sealing structures and the exposed upper surfaces of the top horizontal plates are coated with a second cement layer, and the metal roof panel is supported on the second cement layer to form the water-retaining A second sealing structure between the panel and the metal roof panel.

优选地,上述的防水檐口挡水板中,还包括:Preferably, the above-mentioned waterproof eaves flap also includes:

右侧竖板,连接所述顶部横板的右端。The right vertical board is connected to the right end of the top horizontal board.

优选地,上述的防水檐口挡水板中,还包括:Preferably, the above-mentioned waterproof eaves flap also includes:

底部横板,连接所述左侧竖板的底端。The bottom horizontal board is connected to the bottom of the left vertical board.

优选地,上述的防水檐口挡水板中,所述顶部横板、所述左侧竖板、所述右侧竖板和所述底部横板为一体弯折成型;Preferably, in the above-mentioned waterproof eaves fender, the top horizontal plate, the left vertical plate, the right vertical plate and the bottom horizontal plate are integrally bent and formed;

所述顶部横板的端部安装有第一连接板,所述第一连接板的上表面与所述顶部横板的下表面位于同一平面;A first connecting plate is installed at the end of the top horizontal plate, and the upper surface of the first connecting plate is on the same plane as the lower surface of the top horizontal plate;

所述左侧竖板的端部安装有第二连接板,所述第二连接板的左侧面与所述左侧竖板的右侧面位于同一平面。A second connecting plate is installed at the end of the left vertical plate, and the left side of the second connecting plate is on the same plane as the right side of the left vertical plate.

本发明还提供一种防渗水的金属屋面板与天沟的连接方法,包括:The present invention also provides a method for connecting the water-proof metal roof panel and the gutter, including:

步骤一,在天沟侧板的内侧面上的涂覆第一胶泥层;Step 1, coating the first cement layer on the inner side of the gutter side plate;

步骤二,将挡水板的左侧竖板贴附在所述第一胶泥层上,并将所述左侧竖板与所述天沟侧板相固定;Step 2, attaching the left vertical board of the water retaining board to the first cement layer, and fixing the left vertical board to the gutter side board;

步骤三,所述挡水板的顶部横板上具有多个顶部封堵结构,形成与金属屋面板的形状相匹配的波峰波谷结构,在所述多个顶部封堵结构的上表面以及所述顶部横板的露出的上表面上涂覆第二胶泥层;Step 3, there are a plurality of top sealing structures on the top horizontal plate of the water retaining plate, forming a crest and trough structure matching the shape of the metal roof panel, on the upper surface of the plurality of top sealing structures and the coating the exposed upper surface of the top horizontal plate with a second layer of mastic;

步骤四,将所述金属屋面板的尾端支撑在所述第二胶泥层上;Step 4, supporting the tail end of the metal roof panel on the second cement layer;

步骤五,在所述金属屋面板上安装金属压板,从而固定所述金属屋面板。Step 5, installing a metal pressing plate on the metal roof panel to fix the metal roof panel.

优选地,上述的方法中,在所述步骤三之前,还包括:Preferably, in the above-mentioned method, before said step three, it also includes:

安装金属屋面板支架以及屋面保温层。Install metal roof panel brackets and roof insulation.

优选地,上述的方法中,在所述步骤二中,通过螺钉将所述左侧竖板与所述天沟侧板相固定。Preferably, in the above method, in the second step, the left vertical board is fixed to the gutter side board by screws.

优选地,上述的方法中,所述第一胶泥层为延所述天沟侧板的内侧面上横向延伸贯通的长条形状。Preferably, in the above method, the first cement layer is in the shape of a strip extending transversely along the inner surface of the gutter side plate.

本发明实施例至少存在以下技术效果:Embodiments of the present invention at least have the following technical effects:

1)挡水板的形状与金属屋面板的波峰波谷结构相匹配,从而封堵了金属屋面板的端部,并且通过第一胶泥层封堵了挡水板与天沟之间的缝隙,通过第二胶泥层封堵了挡水板与金属屋面板之间的缝隙,从而完全堵塞了天沟中的雨水浸入金属屋面板内侧的通路,不但完全防水,而且实现了防潮功能,极大的改善了金属屋面的性能。1) The shape of the water retaining plate matches the crest and trough structure of the metal roof panel, thereby sealing the end of the metal roof plate, and sealing the gap between the water retaining plate and the gutter through the first layer of cement, through The second layer of cement seals the gap between the water retaining plate and the metal roof panel, thereby completely blocking the passage of rainwater in the gutter into the inner side of the metal roof panel, which is not only completely waterproof, but also realizes the moisture-proof function, which greatly improves performance of metal roofs.

2)右侧竖板340具有三个作用,一是起到导流的作用,防止雨水冲泡第二胶泥层,另外就是具有结构加强的作用,用来加强挡水板的强度,第三就是起到圆角保护作用,防止直舒的顶部横板刮伤施工者。2) The vertical plate 340 on the right side has three functions. One is to divert water to prevent rainwater from pouring into the second cement layer. The other is to strengthen the structure and strengthen the strength of the water barrier. It plays the role of round corner protection and prevents the straight and comfortable top horizontal plate from scratching the constructor.

3)底部横板350具有2个作用。一是起到导流的作用,防止雨水浸泡第一胶泥层,另外就是具有结构加强的作用,用来加强挡水板的强度。3) The bottom horizontal plate 350 has two functions. One is to play the role of diversion to prevent rainwater from soaking the first cement layer, and the other is to have the function of structural reinforcement to strengthen the strength of the water retaining board.

附图说明Description of drawings

图1为金属屋面板与天沟的配合示意图;Figure 1 is a schematic diagram of the cooperation between the metal roof panel and the gutter;

图2为金属屋面板的结构图;Fig. 2 is a structural diagram of a metal roof panel;

图3为本发明提供的防水檐口挡水板的结构图;Fig. 3 is the structural diagram of waterproof eaves water retaining plate provided by the present invention;

图4为图3的局部放大图;Figure 4 is a partially enlarged view of Figure 3;

图5为本发明挡水板安装在天沟上的安装示意图;Fig. 5 is the installation sketch map that water retaining plate of the present invention is installed on the gutter;

图6为本发明金属屋面板与天沟连接完毕后的示意图;Fig. 6 is the schematic diagram after the metal roof panel of the present invention is connected with the gutter;

图7为现有挡水板的安装示意图。Figure 7 is a schematic diagram of the installation of the existing water baffle.

具体实施方式Detailed ways

为使本发明实施例的目的、技术方案和优点更加清楚,下面将结合附图对具体实施例进行详细描述。In order to make the purpose, technical solutions and advantages of the embodiments of the present invention more clear, specific embodiments will be described in detail below with reference to the accompanying drawings.

图3为本发明提供的防水檐口挡水板的结构图,图4为图3的局部放大图,如图3、图4所示,本发明实施例提供了一种防水檐口挡水板,用于金属屋面板与天沟的密封连接,其包括:Fig. 3 is a structural diagram of the waterproof cornice water retaining plate provided by the present invention, and Fig. 4 is a partially enlarged view of Fig. 3, as shown in Fig. 3 and Fig. 4, the embodiment of the present invention provides a waterproof cornice water retaining plate, used For the sealing connection of metal roof panels and gutters, including:

顶部横板310;top horizontal plate 310;

多个顶部封堵结构320,设置在所述顶部横板310的上表面,形成与金属屋面板的形状相匹配的波峰波谷结构;A plurality of top sealing structures 320 are arranged on the upper surface of the top horizontal plate 310 to form a crest and trough structure matching the shape of the metal roof panel;

左侧竖板330,连接所述顶部横板310的左端;The left vertical plate 330 is connected to the left end of the top horizontal plate 310;

所述左侧竖板330的左侧面与天沟侧板上的第一胶泥层相配合形成所述挡水板与所述天沟之间的第一密封结构;The left side of the left vertical plate 330 cooperates with the first cement layer on the side plate of the gutter to form a first sealing structure between the water retaining plate and the gutter;

所述多个顶部封堵结构320的上表面以及所述顶部横板310的露出的上表面上涂覆第二胶泥层,所述金属屋面板支撑在所述第二胶泥层上,形成所述挡水板与所述金属屋面板之间的第二密封结构。The upper surface of the plurality of top sealing structures 320 and the exposed upper surface of the top horizontal plate 310 are coated with a second cement layer, and the metal roof panel is supported on the second cement layer to form the A second sealing structure between the water retaining plate and the metal roof panel.

可见,本发明实施例中,挡水板的形状与金属屋面板的波峰波谷结构相匹配,从而封堵了金属屋面板的端部,并且通过第一胶泥层封堵了挡水板与天沟之间的缝隙,通过第二胶泥层封堵了挡水板与金属屋面板之间的缝隙,从而完全堵塞了天沟中的雨水浸入金属屋面板内侧的通路,不但完全防水,而且实现了防潮功能,极大的改善了金属屋面的性能。It can be seen that in the embodiment of the present invention, the shape of the water retaining plate matches the crest and trough structure of the metal roof panel, thereby sealing off the end of the metal roof plate, and sealing the water retaining plate and the gutter through the first cement layer The gap between the water retaining board and the metal roof panel is blocked by the second layer of cement, thereby completely blocking the channel for the rainwater in the gutter to penetrate into the inner side of the metal roof panel, which is not only completely waterproof, but also moisture-proof function, which greatly improves the performance of the metal roof.

由于多个顶部封堵结构320,其间距与屋面板波峰间距相同,工厂预制,位置准确,在施工现场起到固定屋面板相对位置的作用。Since the plurality of top sealing structures 320 have the same spacing as the wave crest spacing of the roof panels, they are prefabricated in the factory, and their positions are accurate, and they play a role in fixing the relative positions of the roof panels at the construction site.

预留安装孔,减少了现场的安装工作强度,且安装连接钉距离准确。The installation holes are reserved, which reduces the intensity of installation work on site, and the distance between the installation and connection nails is accurate.

在本发明的一个优选实施例中,还包括:右侧竖板340,连接所述顶部横板310的右端。右侧竖板有三个作用,一是起到导流的作用,防止雨水冲泡第二胶泥层,另外就是具有结构加强的作用,用来加强挡水板的强度,第三就是起到圆角保护作用,防止直舒的顶部横板刮伤施工者。In a preferred embodiment of the present invention, it further includes: a right vertical board 340 connected to the right end of the top horizontal board 310 . The vertical plate on the right side has three functions. One is to divert water to prevent the rainwater from pouring into the second cement layer. The other is to strengthen the structure and strengthen the strength of the water retaining board. The third is to play a rounded corner. Protective effect, preventing the construction worker from being scratched by the straight and comfortable top horizontal board.

在本发明的一个优选实施例中,还包括:底部横板350,连接所述左侧竖板330的底端。底部横板具有2个作用。一是起到导流的作用,防止雨水浸泡第一胶泥层,另外就是具有结构加强的作用,用来加强挡水板的强度。In a preferred embodiment of the present invention, it further includes: a bottom horizontal plate 350 connected to the bottom end of the left vertical plate 330 . The bottom horizontal plate has 2 functions. One is to play the role of diversion to prevent rainwater from soaking the first cement layer, and the other is to have the function of structural reinforcement to strengthen the strength of the water retaining board.

在本发明的一个优选实施例中,顶部横板310、左侧竖板330、右侧竖板340和底部横板350为一体弯折成型,例如通过一张板材冲压成型,加工方便,而且结构强度大。而多个顶部封堵结构320,可以通过不间断连续焊接的方式连接在顶部横板310上。In a preferred embodiment of the present invention, the top horizontal plate 310, the left vertical plate 330, the right vertical plate 340, and the bottom horizontal plate 350 are integrally bent and formed, for example, stamped and formed by a sheet material, which is convenient for processing, and the structure Strong. A plurality of top sealing structures 320 may be connected to the top horizontal plate 310 by uninterrupted continuous welding.

在本发明的一个优选实施例中,所述顶部横板310的端部安装有第一连接板370,所述第一连接板370的上表面与所述顶部横板310的下表面位于同一平面;所述左侧竖板330的端部安装有第二连接板360,所述第二连接板360的左侧面与所述左侧竖板330的右侧面位于同一平面。In a preferred embodiment of the present invention, a first connecting plate 370 is installed at the end of the top horizontal plate 310 , and the upper surface of the first connecting plate 370 is on the same plane as the lower surface of the top horizontal plate 310 The end of the left vertical plate 330 is installed with a second connecting plate 360, and the left side of the second connecting plate 360 is located on the same plane as the right side of the left vertical plate 330.

通过第一连接板370、第二连接板360,可以把多个挡水板完美拼接成一整条组合挡水板,从而适应不同的施工需求。Through the first connecting plate 370 and the second connecting plate 360, multiple water retaining plates can be spliced perfectly into a whole combined water retaining plate, so as to meet different construction requirements.

图5为挡水板安装在天沟上的安装示意图,如图5所示,所述第一胶泥层400设置所述天沟侧板的内侧面上。本发明实施例中,第一胶泥层为延所述天沟侧板的内侧面上横向延伸贯通的长条形状(图5中仅仅显示了胶泥层400的断面结构)。Fig. 5 is a schematic diagram of installing the water retaining board on the gutter. As shown in Fig. 5, the first cement layer 400 is provided on the inner side of the gutter side plate. In the embodiment of the present invention, the first cement layer is in the shape of a strip extending transversely along the inner surface of the gutter side plate (only the cross-sectional structure of the cement layer 400 is shown in FIG. 5 ).

本发明实施例还提供了一种防渗水的金属屋面板与天沟的连接方法,包括:The embodiment of the present invention also provides a method for connecting a water-proof metal roof panel and a gutter, including:

步骤一,在天沟侧板的内侧面上的涂覆第一胶泥层;Step 1, coating the first cement layer on the inner side of the gutter side plate;

步骤二,将挡水板的左侧竖板330贴附在所述第一胶泥层上,并将所述左侧竖板330与所述天沟侧板相固定;Step 2, attaching the left vertical plate 330 of the water barrier to the first cement layer, and fixing the left vertical plate 330 to the gutter side plate;

步骤三,所述挡水板的顶部横板310上具有多个顶部封堵结构320,形成与金属屋面板的形状相匹配的波峰波谷结构,在所述多个顶部封堵结构320的上表面以及所述顶部横板310的露出的上表面上涂覆第二胶泥层;Step 3: There are a plurality of top sealing structures 320 on the top horizontal plate 310 of the water retaining plate, forming a crest and trough structure matching the shape of the metal roof panel, and on the upper surface of the plurality of top sealing structures 320 And coating the second cement layer on the exposed upper surface of the top horizontal plate 310;

步骤四,将所述金属屋面板的尾端支撑在所述第二胶泥层上;Step 4, supporting the tail end of the metal roof panel on the second cement layer;

步骤五,在所述金属屋面板上安装金属压板,从而固定所述金属屋面板。Step 5, installing a metal pressing plate on the metal roof panel to fix the metal roof panel.

其中,在所述步骤三之前,还包括:安装金属屋面板支架以及屋面保温层。Wherein, before the third step, it also includes: installing the metal roof panel support and the roof insulation layer.

其中,在所述步骤二中,通过螺钉将所述左侧竖板330与所述天沟侧板相固定。Wherein, in the second step, the left vertical plate 330 is fixed to the gutter side plate by screws.

其中,所述第一胶泥层为延所述天沟侧板的内侧面上横向延伸贯通的长条形状。Wherein, the first cement layer is in the shape of a strip extending transversely along the inner surface of the side plate of the gutter.

图6为本发明金属屋面板与天沟连接完毕后的示意图,如图6所示,天沟左右两侧都连接金属屋面板,本发明实施例中的挡水板在左右两侧都可以用,用在右侧时候旋转一下就可以了。Fig. 6 is a schematic diagram after the metal roof panel of the present invention is connected to the gutter. , just rotate it when it is on the right side.

由上可知,本发明实施例具有以下优势:It can be seen from the above that the embodiments of the present invention have the following advantages:

1)挡水板的形状与金属屋面板的波峰波谷结构相匹配,从而封堵了金属屋面板的端部,并且通过第一胶泥层封堵了挡水板与天沟之间的缝隙,通过第二胶泥层封堵了挡水板与金属屋面板之间的缝隙,从而完全堵塞了天沟中的雨水浸入金属屋面板内侧的通路,不但完全防水,而且实现了防潮功能,极大的改善了金属屋面的性能。1) The shape of the water retaining plate matches the crest and trough structure of the metal roof panel, thereby sealing the end of the metal roof plate, and sealing the gap between the water retaining plate and the gutter through the first layer of cement, through The second layer of cement seals the gap between the water retaining plate and the metal roof panel, thereby completely blocking the passage of rainwater in the gutter into the inner side of the metal roof panel, which is not only completely waterproof, but also realizes the moisture-proof function, which greatly improves performance of metal roofs.

2)右侧竖板340具有三个作用,一是起到导流的作用,防止雨水冲泡第二胶泥层,另外就是具有结构加强的作用,用来加强挡水板的强度,第三就是起到圆角保护作用,防止直舒的顶部横板刮伤施工者。2) The vertical plate 340 on the right side has three functions. One is to divert water to prevent rainwater from pouring into the second cement layer. The other is to strengthen the structure and strengthen the strength of the water barrier. It plays the role of round corner protection and prevents the straight and comfortable top horizontal plate from scratching the constructor.

3)底部横板350具有2个作用。一是起到导流的作用,防止雨水浸泡第一胶泥层,另外就是具有结构加强的作用,用来加强挡水板的强度。3) The bottom horizontal plate 350 has two functions. One is to play the role of diversion to prevent rainwater from soaking the first cement layer, and the other is to have the function of structural reinforcement to strengthen the strength of the water retaining board.

以上所述仅是本发明的优选实施方式,应当指出,对于本技术领域的普通技术人员来说,在不脱离本发明原理的前提下,还可以做出若干改进和润饰,这些改进和润饰也应视为本发明的保护范围。The above is only a preferred embodiment of the present invention, it should be pointed out that, for those of ordinary skill in the art, without departing from the principle of the present invention, some improvements and modifications can also be made, and these improvements and modifications can also be made. It should be regarded as the protection scope of the present invention.

Claims (8)

1.一种防水檐口挡水板,用于金属屋面板与天沟的密封连接,其特征在于,包括:1. A waterproof eaves baffle, used for the sealing connection of metal roof panels and gutters, is characterized in that, comprising: 顶部横板(310);top horizontal plate (310); 多个顶部封堵结构(320),设置在所述顶部横板(310)的上表面,形成与金属屋面板的形状相匹配的波峰波谷结构;A plurality of top sealing structures (320) are arranged on the upper surface of the top horizontal plate (310), forming a crest and trough structure matching the shape of the metal roof plate; 左侧竖板(330),连接所述顶部横板(310)的左端;the left vertical plate (330), connected to the left end of the top horizontal plate (310); 所述左侧竖板(330)的左侧面与天沟侧板上的第一胶泥层相配合形成所述挡水板与所述天沟之间的第一密封结构;The left side of the left vertical plate (330) cooperates with the first cement layer on the side plate of the gutter to form a first sealing structure between the water retaining plate and the gutter; 所述多个顶部封堵结构(320)的上表面以及所述顶部横板(310)的露出的上表面上涂覆第二胶泥层,所述金属屋面板支撑在所述第二胶泥层上,形成所述挡水板与所述金属屋面板之间的第二密封结构。The upper surfaces of the plurality of top sealing structures (320) and the exposed upper surfaces of the top horizontal plates (310) are coated with a second cement layer, and the metal roof panels are supported on the second cement layer , forming a second sealing structure between the water retaining plate and the metal roof panel. 2.根据权利要求1所述的防水檐口挡水板,其特征在于,还包括:2. The waterproof eaves baffle according to claim 1, further comprising: 右侧竖板(340),连接所述顶部横板(310)的右端。The right vertical board (340) is connected to the right end of the top horizontal board (310). 3.根据权利要求2所述的防水檐口挡水板,其特征在于,还包括:3. The waterproof eaves baffle according to claim 2, further comprising: 底部横板(350),连接所述左侧竖板(330)的底端。The bottom horizontal plate (350) is connected to the bottom of the left vertical plate (330). 4.根据权利要求3所述的防水檐口挡水板,其特征在于,4. The waterproof eaves water retaining board according to claim 3, characterized in that, 所述顶部横板(310)、所述左侧竖板(330)、所述右侧竖板(340)和所述底部横板(350)为一体弯折成型;The top horizontal plate (310), the left vertical plate (330), the right vertical plate (340) and the bottom horizontal plate (350) are integrally bent and formed; 所述顶部横板(310)的端部安装有第一连接板(370),所述第一连接板(370)的上表面与所述顶部横板(310)的下表面位于同一平面;A first connecting plate (370) is installed at the end of the top horizontal plate (310), and the upper surface of the first connecting plate (370) is on the same plane as the lower surface of the top horizontal plate (310); 所述左侧竖板(330)的端部安装有第二连接板(360),所述第二连接板(360)的左侧面与所述左侧竖板(330)的右侧面位于同一平面。A second connecting plate (360) is installed at the end of the left vertical plate (330), and the left side of the second connecting plate (360) is located at the right side of the left vertical plate (330). same plane. 5.一种防渗水的金属屋面板与天沟的连接方法,其特征在于,包括:5. A method for connecting a water-proof metal roof panel to a gutter, characterized in that it comprises: 步骤一,在天沟侧板的内侧面上的涂覆第一胶泥层;Step 1, coating the first cement layer on the inner side of the gutter side plate; 步骤二,将挡水板的左侧竖板(330)贴附在所述第一胶泥层上,并将所述左侧竖板(330)与所述天沟侧板相固定;Step 2, attaching the left vertical board (330) of the water retaining board to the first cement layer, and fixing the left vertical board (330) to the gutter side board; 步骤三,所述挡水板的顶部横板(310)上具有多个顶部封堵结构(320),形成与金属屋面板的形状相匹配的波峰波谷结构,在所述多个顶部封堵结构(320)的上表面以及所述顶部横板(310)的露出的上表面上涂覆第二胶泥层;Step 3, there are a plurality of top sealing structures (320) on the top horizontal plate (310) of the water retaining plate, forming a crest and trough structure matching the shape of the metal roof panel, and the plurality of top sealing structures Coating a second cement layer on the upper surface of (320) and the exposed upper surface of the top horizontal plate (310); 步骤四,将所述金属屋面板的尾端支撑在所述第二胶泥层上;Step 4, supporting the tail end of the metal roof panel on the second cement layer; 步骤五,在所述金属屋面板上安装金属压板,从而固定所述金属屋面板。Step 5, installing a metal pressing plate on the metal roof panel to fix the metal roof panel. 6.根据权利要求5所述的连接方法,其特征在于,在所述步骤三之前,还包括:6. The connection method according to claim 5, characterized in that, before said step 3, further comprising: 安装金属屋面板支架以及屋面保温层。Install metal roof panel brackets and roof insulation. 7.根据权利要求6所述的连接方法,其特征在于,在所述步骤二中,通过螺钉将所述左侧竖板(330)与所述天沟侧板相固定。7. The connection method according to claim 6, characterized in that, in the second step, the left vertical plate (330) is fixed to the gutter side plate by screws. 8.根据权利要求6所述的连接方法,其特征在于,所述第一胶泥层为延所述天沟侧板的内侧面上横向延伸贯通的长条形状。8 . The connection method according to claim 6 , characterized in that, the first cement layer is in the shape of a strip extending transversely along the inner side surface of the gutter side plate. 8 .
CN201210587640.8A 2012-12-28 2012-12-28 Connecting method of metal roof plate and gutter and waterproof eave water baffle plate Active CN103061458B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210587640.8A CN103061458B (en) 2012-12-28 2012-12-28 Connecting method of metal roof plate and gutter and waterproof eave water baffle plate

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210587640.8A CN103061458B (en) 2012-12-28 2012-12-28 Connecting method of metal roof plate and gutter and waterproof eave water baffle plate

Publications (2)

Publication Number Publication Date
CN103061458A true CN103061458A (en) 2013-04-24
CN103061458B CN103061458B (en) 2015-03-11

Family

ID=48104321

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210587640.8A Active CN103061458B (en) 2012-12-28 2012-12-28 Connecting method of metal roof plate and gutter and waterproof eave water baffle plate

Country Status (1)

Country Link
CN (1) CN103061458B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106939674A (en) * 2016-01-05 2017-07-11 五冶集团上海有限公司 The downpipe installation method of metal sandwich roof plate
CN107905461A (en) * 2017-12-27 2018-04-13 浙江东南网架股份有限公司 It is a kind of to meet flexible desired stainless steel gutter docking node and its construction method
CN110469026A (en) * 2019-07-29 2019-11-19 中国一冶集团有限公司 A kind of architectural engineering waterproof construction and installation method
CN113235836A (en) * 2021-05-21 2021-08-10 宁波市明森建筑设计院有限公司 Impervious roofing waterproof drainage structure
CN114775925A (en) * 2022-04-20 2022-07-22 中建八局第一建设有限公司 Be applied to double-deck drainage gutter of assembled of metal roofing
CN116241025A (en) * 2022-12-30 2023-06-09 东方诚建设集团有限公司 An installation method of cornice and gutter structure and cornice and gutter structure

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB8504876D0 (en) * 1985-02-26 1985-03-27 Inoventors Ltd Verge caps for pitched rooves
JPH0827979A (en) * 1994-07-19 1996-01-30 Sekisui Chem Co Ltd Rainwater intrusion prevention structure at the eaves
CN201991149U (en) * 2011-03-18 2011-09-28 北京东方诚国际钢结构工程有限公司 Open valley assembly
CN202248587U (en) * 2011-08-31 2012-05-30 厦门新长诚钢构浪板有限公司 Cornice draining board
CN203034707U (en) * 2012-12-28 2013-07-03 北京东方诚国际钢结构工程有限公司 Water baffle for waterproof cornices

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB8504876D0 (en) * 1985-02-26 1985-03-27 Inoventors Ltd Verge caps for pitched rooves
GB2174124A (en) * 1985-02-26 1986-10-29 Scott Verge capping system
JPH0827979A (en) * 1994-07-19 1996-01-30 Sekisui Chem Co Ltd Rainwater intrusion prevention structure at the eaves
CN201991149U (en) * 2011-03-18 2011-09-28 北京东方诚国际钢结构工程有限公司 Open valley assembly
CN202248587U (en) * 2011-08-31 2012-05-30 厦门新长诚钢构浪板有限公司 Cornice draining board
CN203034707U (en) * 2012-12-28 2013-07-03 北京东方诚国际钢结构工程有限公司 Water baffle for waterproof cornices

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106939674A (en) * 2016-01-05 2017-07-11 五冶集团上海有限公司 The downpipe installation method of metal sandwich roof plate
CN107905461A (en) * 2017-12-27 2018-04-13 浙江东南网架股份有限公司 It is a kind of to meet flexible desired stainless steel gutter docking node and its construction method
CN110469026A (en) * 2019-07-29 2019-11-19 中国一冶集团有限公司 A kind of architectural engineering waterproof construction and installation method
CN110469026B (en) * 2019-07-29 2020-10-23 中国一冶集团有限公司 Waterproof structure for constructional engineering and installation method
CN113235836A (en) * 2021-05-21 2021-08-10 宁波市明森建筑设计院有限公司 Impervious roofing waterproof drainage structure
CN114775925A (en) * 2022-04-20 2022-07-22 中建八局第一建设有限公司 Be applied to double-deck drainage gutter of assembled of metal roofing
CN114775925B (en) * 2022-04-20 2023-08-08 中建八局第一建设有限公司 A prefabricated double-layer drainage gutter applied to metal roof
CN116241025A (en) * 2022-12-30 2023-06-09 东方诚建设集团有限公司 An installation method of cornice and gutter structure and cornice and gutter structure

Also Published As

Publication number Publication date
CN103061458B (en) 2015-03-11

Similar Documents

Publication Publication Date Title
CN103061458B (en) Connecting method of metal roof plate and gutter and waterproof eave water baffle plate
US8205400B2 (en) Solar panel roof kit
CN101781917B (en) Complex heat-preservation roof and construction method thereof
CA2954809C (en) Welded roof for modular building units
US20080190047A1 (en) Solar Panel Roof Kit
CN204571113U (en) The multiple water proof structure at steel structural roof low cornice place
CN218437855U (en) Film-coated metal groove type groove
CN102409816A (en) Double-layer waterproof heat-preserving fireproof metal roof
CN203569761U (en) Secondary waterproof structure of spherical aluminum plate roof
CN100451266C (en) Wood structure house roof water-proof treatment technology
CN209509341U (en) A kind of steel structural roof and concrete parapet junction gutter
CN204850273U (en) Steel sheet gutter in steel construction building
CN110219410A (en) Sloping roof structure
CN212271426U (en) Roofing eaves mouth structure and roofing system
CN211007362U (en) Metal structure of cornicing with effect modelled after an antique
CN115288374B (en) Drainage system in metal roof and construction method of drainage device
CN111188465A (en) Metal roof system
CN203034707U (en) Water baffle for waterproof cornices
CN220686549U (en) A kind of weatherboard structure and house construction
CN219710791U (en) Archaize building slope roof gutter structure
CN205776999U (en) A kind of steel building lighting roof
CN217782531U (en) Metal roofing of antiseep
CN102900202A (en) Building waterproof shutter roof board
CN214034420U (en) Sloping roof flashing board
CN101886433B (en) Waterproof member and waterproof structure on top of wall opening for steel structure building

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent of invention or patent application
CB03 Change of inventor or designer information

Inventor after: Qin Lian

Inventor after: Duo Yuegang

Inventor after: Wang Yue

Inventor before: Wang Yue

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: WANG YUE TO: QIN LIAN DUO YUEGANG WANG YUE

C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20161207

Address after: 100083 Beijing, Xueyuan Road, a number of 2 cottage B-1192 room

Patentee after: Changku (Beijing) Technology Co.,Ltd.

Address before: 100083 Beijing city Haidian District Xueqing Road 768 creative garden Dahua hospital B East Gate 1231

Patentee before: Beijing OHC Steelwork Engineering Co.,Ltd.

CP03 Change of name, title or address

Address after: 100083 Beijing, Xueyuan Road, a number of 2 cottage B-1192 room

Patentee after: Sharp technology (Beijing) Co.,Ltd.

Address before: Room 5, building B-1192, No. 1, Xueyuan Road,

Patentee before: Changku (Beijing) Technology Co.,Ltd.

CP03 Change of name, title or address
TR01 Transfer of patent right

Effective date of registration: 20251103

Address after: 101313 Beijing Shunyi District Fuqian Street No. 56 Yuan Donggang Xin Zhuo Xi Lou 1-512

Patentee after: Dongfangcheng Construction Group Co.,Ltd.

Country or region after: China

Address before: 100083 Beijing, Xueyuan Road, a number of 2 cottage B-1192 room

Patentee before: Sharp technology (Beijing) Co.,Ltd.

Country or region before: China

TR01 Transfer of patent right