CN103050919B - Intelligent device for circularly melting ice on power transmission line with ten split sub-conductors by current - Google Patents

Intelligent device for circularly melting ice on power transmission line with ten split sub-conductors by current Download PDF

Info

Publication number
CN103050919B
CN103050919B CN201310021132.8A CN201310021132A CN103050919B CN 103050919 B CN103050919 B CN 103050919B CN 201310021132 A CN201310021132 A CN 201310021132A CN 103050919 B CN103050919 B CN 103050919B
Authority
CN
China
Prior art keywords
sub
conductor
current
ice
transmission line
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310021132.8A
Other languages
Chinese (zh)
Other versions
CN103050919A (en
Inventor
陆佳政
蒋兴良
张志劲
蒋正龙
胡琴
李波
胡建林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing University
State Grid Corp of China SGCC
Disaster Prevention and Mitigation Center of State Grid Hunan Electric Power Co Ltd
Original Assignee
Chongqing University
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Hunan Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing University, State Grid Corp of China SGCC, Electric Power Research Institute of State Grid Hunan Electric Power Co Ltd filed Critical Chongqing University
Priority to CN201310021132.8A priority Critical patent/CN103050919B/en
Publication of CN103050919A publication Critical patent/CN103050919A/en
Application granted granted Critical
Publication of CN103050919B publication Critical patent/CN103050919B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention relate to an intelligent device for circularly melting ice on a power transmission line with ten split sub-conductors by current. The external environment condition is monitored to judge whether the power transmission line is iced up or not, and an intelligent controller controls a circuit breaker to switch on and off to transfer the total current transmitted by the power transmission line to one part of the ten sub-conductors so as to increase the current density of the sub-conductors and achieve the purpose of melting ice. The intelligent controller adopts the load current measured by a current inducer, the icing state measured by an icing-parameter monitoring unit and the external environment condition to automatically compute the time spent on melting ice, controls the circuit breaker to transfer the current to the other part of the sub-conductors after the ice on one part of the sub-conductors is melted and returns to the normal work state until the ice on the ten split sub-conductors is completely melted and shed. During the working of the intelligent device, the intelligent controller is used for controlling integrally. The work standard of the intelligent controller is judged by the current inducer, the icing-parameter monitoring unit and the external environment condition. The intelligent device can be used for melting and removing the ice on the power transmission line without manual intervention.

Description

Ten bundle conductor transmission line current cycle intelligence deicing devices
Technical field
The present invention relates to Voltage Power technical field, particularly a kind of ultra-high-tension power transmission line deicing device for ten bundle conductors.
Background technology
In the environment of low temperature, high humility in the winter time, icing phenomenon can be there is in high-tension electricity transmission line, serious icing causes electric power line pole tower to collapse, conductor cord disconnection etc. affects the major accident of power system security reliability service, cause electric grid large area power cut, have a strong impact on industrial and agricultural production and people's lives, and cause tremendous economic to lose.
Ultra-high-tension power transmission line is anti-icing, ice-melt and deicing are the focus paid close attention to both at home and abroad always.The anti-icing technology of existing deicing high-voltage power transmission line is still immature, can not meet the requirement of large area anti-icing and deicing, though part clearing ice technology can be applied in engineering, need carry out under additional equipment or manual operation instruct.The anti-icing transmission line of a kind of multiple conducting wires disclosed in the Chinese invention patent Publication Specification of publication number CN101527442A, it increases ice-melt switch at the two ends of multiple conducting wires transmission line, each wire equal normal power-up when not needing ice-melt, interruption of power supply when needing ice-melt after icing, take the mode of manual operation switch, make a wire transmission electric current, all the other wires disconnect, and manual operation progressively makes the ice sheet of each wire melt.The method needs to set up switching device, change the structure of transmission line, the necessary interruption of power supply of deicing processes, ice-melt there is potential safety hazard and operation is extremely inconvenient, ice-melt cost is high, and ice-melt starts and stops all needing artificial Subjective Intervention, can not treat icing line segment in various degree with a certain discrimination and realize anti-icing in real time, infeasible for supertension line breaker deciliter wire, particularly can not meet the anti-icing of ultra high voltage bundle conductor, the and for example a kind of automatic ice melting method for multiple division electricity transmission line disclosed in Chinese invention patent of publication number CN101459327 and special switch thereof, it adopts to install special switch in icing transmission line two ends transformer station, then manual remote control sends instruction, make special switch generation action realize transmission line electric current and be all transferred to the sub-conductor treating ice-melt, this sub-conductor generates heat, ice-melt, this patent of invention needs the on-the-spot circuit of artificial judgment whether to there is icing, and need power scheduling department to coordinate adjusting circuit load, last manual remote control at the scene sends ice-melt instruction, cannot realize needing sectional and real-time intelligent ice-melt according to icing degree, the local icing section technical staff such as micro climate microclimate are difficult to be on the scene observation icing situation and send ice-melt instruction.
Summary of the invention
The object of this invention is to provide a kind of current cycle intelligence deicing device being applied to ten bundle conductor transmission lines, the measurement result of its environmentally condition and ice coating state, auto-controlled circuit breaker opening and closing, the load current of ten bundle conductor Transmission Lines is transferred to single sub-conductor respectively, increases sub-conductor current density and reach ice-melt object.
The object of the invention is by such technical scheme realize, it includes ten current input terminal R, ten current output terminal S and the current cycle intelligence deicing device main body be arranged between current input terminal and current output terminal, described current cycle intelligence deicing device main body includes the conductive plate that confluxes, shunting conductive plate, division board, reference voltage plate and the insulation output board being provided with current output terminal, ten current input terminal R are fixed on and conflux on conductive plate, conflux between conductive plate with shunting conductive plate and be connected by the primary winding contact rod as electricity-getting mutual inductor, shunting conductive plate is provided with ten conducting rods, ten conducting rods are connected on reference voltage plate through division board, the circuit breaker of ten band by-pass switches is provided with between insulation output board and division board, arc control device one end of each circuit breaker is all fixed with insulation output board and is connected to a corresponding current output terminal S, the arc control device other end of circuit breaker is through reference voltage plate, and be connected with the actuator of a circuit breaker, shunting conductive plate is also provided with intelligent controller and built-in icing parameter monitoring unit, intelligent controller and built-in icing parameter monitoring unit are between division board and shunting conductive plate, intelligent controller is electrically connected with built-in icing parameter monitoring unit and actuator respectively.
Further, described intelligent controller, actuator and built-in icing parameter monitoring unit are powered by the electricity-getting mutual inductor being benchmark with reference voltage plate.
Further, described circuit breaker and by-pass switch all arrange independently actuator.
Further, described device also includes external icing parameter monitoring unit, external icing parameter monitoring unit is used for monitoring of environmental parameter, conductor temperature, current in wire and wire icing loading condition, and the data monitored are sent to intelligent controller by communication.
Further, described shunting conductive plate includes insulation daughter board and conduction daughter board, and conduction daughter board is embedded in the center of insulation daughter board, conduction daughter board is provided with ten for through the hole of conducting rod and one for installing the hole of electricity-getting mutual inductor.
Further, described device also includes two respectively successively through the insulating bar of the conductive plate that confluxes, shunting conductive plate, division board, reference voltage plate and insulation output board.
Further, described device also includes insulation crust, and the conductive plate that confluxes, shunting conductive plate, division board, reference voltage plate and insulation output board are installed in insulation crust.
Owing to have employed technique scheme, the present invention has following advantage:
The present invention can by the icing parameter monitoring unit inspection of built-in and external two kinds of modes to external environment condition judge whether to occur icing phenomenon, intelligent controller controls the folding of circuit breaker, the load current of ten bundle conductor Transmission Lines is transferred on a part of sub-conductor, increase sub-conductor current density and reach ice-melt object, intelligent controller calculates the ice-melt time automatically according to the load current of power taking sensor measurement and external environment condition parameter, after the complete ice-melt of this parton wire, control circuit breaker electric current to be transferred to successively on another part sub-conductor, come off until ten root conductive line surfaces ice sheets all melt, then normal operating conditions is recovered.In the course of the work, controlled by intelligent controller entirety, the criterion of intelligent controller work is provided by the icing parameter monitoring unit of electricity-getting mutual inductor and built-in and external two kinds of modes, can realize the transmission line de-icing work that prosthetic is intervened in the present invention.
Other advantages of the present invention, target and feature will be set forth to a certain extent in the following description, and to a certain extent, based on will be apparent to those skilled in the art to investigating hereafter, or can be instructed from the practice of the present invention.Target of the present invention and other advantages can be realized by specification below and claims and be obtained.
Accompanying drawing explanation
Accompanying drawing of the present invention is described as follows.
Fig. 1 is structural representation of the present invention;
Fig. 2 is workflow diagram of the present invention;
Fig. 3 is the program control block diagram of intelligent controller;
Fig. 4 is shunting conductive plate structure schematic diagram.
In figure: 1. conflux conductive plate; 2. electricity-getting mutual inductor; 3. shunt conductive plate; 4. division board; 5. reference voltage plate; 6. insulate output board; 7. conducting rod; 8. built-in icing parameter monitoring unit; 9. intelligent controller; 10. circuit breaker; 11. by-pass switches; 12. actuators; 13. conduction daughter boards; 14. insulation daughter boards; 15. insulation crusts; 16. insulating bars.
Embodiment
Below in conjunction with drawings and Examples, the invention will be further described.
As shown in Figure 1, the transmission current of each sub-conductor of ten bundle conductors is concentrated through the conductive plate 1 that confluxes by current input terminal R, electricity-getting mutual inductor 2 is utilized to measure ten bundle conductor Transmission Lines electric current total values, reference voltage plate 5 is transferred to through shunting conductive plate 3 and conducting rod 7, reference voltage plate 5 is connected to one end of all circuit breakers 10 and by-pass switch in parallel 11, the other end of circuit breaker 10 and by-pass switch 11 respectively connected the sub-conductor current output terminal S being fixed on insulation output board 6, and each root wire correspondence is connected to a circuit breaker 10 and a by-pass switch 11 in parallel, ten circuit breaker 10 initial conditions are closure state, ten by-pass switch 11 initial conditions in parallel are in the state of cut-offfing.Intelligent controller 9, according to external icing parameter monitoring unit and built-in icing parameter monitoring unit 8 measurement result and built-in control program, sends and whether starts ice-melt instruction.Division board 4 is for carrying out isolation and protection by actuator 12 with intelligent controller 9, built-in icing parameter monitoring unit 8.Reference voltage plate 5 is power voltage references points of electricity-getting mutual inductor, and electricity-getting mutual inductor is actuator 12, built-in icing parameter monitoring unit 8 and intelligent controller 9 provide working power.By-pass switch 11 provided current channel when circuit breaker 10 loses efficacy.Insulating bar 16 respectively connected the conductive plate 1 that confluxes, shunting conductive plate 3, division board 4, reference voltage plate 5 and insulation output board 6, fixes and install location for machinery.
As shown in Figure 4, shunting conductive plate 3 includes insulation daughter board 14 and conduction daughter board 13, conduction daughter board 13 is embedded in the center of insulation daughter board 3, conduction daughter board 13 is provided with ten for the hole through conducting rod 7, and the heart arranges one for installing the hole of electricity-getting mutual inductor 2 primary conductive rod wherein.
If intelligent controller 9 judges not need to start ice-melt, then intelligent controller 9 sends instruction to actuator 12, and actuator determines that circuit breaker 10 and by-pass switch 11 remain on initial condition, makes extremely to split each sub-conductor and runs by under normal transmission current status.
When intelligent controller 9 judges to need to start ice-melt, by controlling the switch of respective circuit breakers, following ice-melting mode can be performed:
Ice-melting mode one
1) according to the measurement result of the load current of built-in and external environmental parameter, ice coating state and the power taking sensor measurement of device, ten bundle conductor transmission line current cycle intelligence deicing devices are utilized Transmission Lines electric current to be automatically transferred to wherein sub-conductor I, sub-conductor II, sub-conductor III, sub-conductor IV and sub-conductor V, this five roots current in wire is increased, generates heat, load current according to ice coating state and power taking sensor measurement calculates the ice-melt time automatically, melts the ice sheet of this sub-conductor within the time automatically calculated.Intelligent controller 9 sends instruction to actuator 12, then determining that circuit breaker 10 action that sub-conductor VI, sub-conductor VII, sub-conductor VIII, sub-conductor Ⅸ, sub-conductor X connect " is cut-off " by actuator 12 makes ten bundle conductor Transmission Lines current transfer to sub-conductor I, sub-conductor II, sub-conductor III, sub-conductor IV and sub-conductor V, make that sub-conductor I, sub-conductor II, sub-conductor III, sub-conductor IV and sub-conductor V generate heat, ice-melt, determine the ice-melt time by intelligent controller 9.
2) sub-conductor I, sub-conductor II, sub-conductor III, sub-conductor IV and sub-conductor V sub-conductor ice sheet melt end, Transmission Lines current intelligent is transferred to sub-conductor VI, sub-conductor VII, sub-conductor VIII, sub-conductor Ⅸ and sub-conductor X by ten bundle conductor transmission line current cycle deicing devices automatically, this five roots current in wire is increased, generates heat, load current according to ice coating state and power taking sensor measurement calculates the ice-melt time automatically, melts the ice sheet of this sub-conductor within the time automatically calculated.Step 1) in, if sub-conductor I, sub-conductor II, sub-conductor III, sub-conductor IV and sub-conductor V ice-melt terminate, instruction is sent to actuator 12 by intelligent controller 9, first sub-conductor VI is made, sub-conductor VII, sub-conductor VIII, circuit breaker 10 action that sub-conductor Ⅸ is connected with sub-conductor X " closes ", then sub-conductor I, sub-conductor II, sub-conductor III, circuit breaker 10 action that sub-conductor IV is connected with sub-conductor V " is cut-off ", then ten bundle conductor Transmission Lines current transfer are to sub-conductor VI, sub-conductor VII, sub-conductor VIII, sub-conductor Ⅸ and sub-conductor X, make sub-conductor VI, sub-conductor VII, sub-conductor VIII, sub-conductor Ⅸ and sub-conductor X generate heat, ice-melt, the ice-melt time is determined by intelligent controller 9.
3) when the whole ice-melt of ice sheet of 10 root wires terminates, intelligent apparatus recovers the conducting state of normal transmission electric current, waits for next icing process and starts deicing processes next time, in this way reaching the object of cyclic deicing.
(2) ice-melting mode two
1) according to the measurement result of the load current of built-in and external environmental parameter, ice coating state and the power taking sensor measurement of device, ten bundle conductor transmission line current cycle intelligence deicing devices are utilized Transmission Lines electric current to be automatically transferred to wherein sub-conductor I, sub-conductor II, this two roots current in wire is increased, generates heat, load current according to ice coating state and power taking sensor measurement calculates the ice-melt time automatically, melts the ice sheet of this sub-conductor within the time automatically calculated.
2) sub-conductor I, sub-conductor II ice sheet melt and terminate, according to the measurement result of the load current of built-in and external environmental parameter, ice coating state and the power taking sensor measurement of device, ten bundle conductor transmission line current cycle intelligence deicing devices are utilized Transmission Lines electric current to be automatically transferred to wherein sub-conductor III, sub-conductor IV, this two roots current in wire is increased, generates heat, load current according to ice coating state and power taking sensor measurement calculates the ice-melt time automatically, melts the ice sheet of this sub-conductor within the time automatically calculated.
3) sub-conductor III, sub-conductor IV ice sheet melt and terminate, according to the measurement result of the load current of built-in and external environmental parameter, ice coating state and the power taking sensor measurement of device, ten bundle conductor transmission line current cycle intelligence deicing devices are utilized Transmission Lines electric current to be automatically transferred to wherein sub-conductor V, sub-conductor VI, this two roots current in wire is increased, generates heat, load current according to ice coating state and power taking sensor measurement calculates the ice-melt time automatically, melts the ice sheet of this sub-conductor within the time automatically calculated.
4) sub-conductor V, sub-conductor VI ice sheet melt and terminate, according to the measurement result of the load current of built-in and external environmental parameter, ice coating state and the power taking sensor measurement of device, ten bundle conductor transmission line current cycle intelligence deicing devices are utilized Transmission Lines electric current to be automatically transferred to wherein sub-conductor VII, sub-conductor VIII, this two roots current in wire is increased, generates heat, load current according to ice coating state and power taking sensor measurement calculates the ice-melt time automatically, melts the ice sheet of this sub-conductor within the time automatically calculated.
5) sub-conductor VII, sub-conductor VIII ice sheet melt and terminate, according to the measurement result of the load current of built-in and external environmental parameter, ice coating state and the power taking sensor measurement of device, ten bundle conductor transmission line current cycle intelligence deicing devices are utilized Transmission Lines electric current to be automatically transferred to wherein sub-conductor Ⅸ, sub-conductor X, this two roots current in wire is increased, generates heat, load current according to ice coating state and power taking sensor measurement calculates the ice-melt time automatically, melts the ice sheet of this sub-conductor within the time automatically calculated.
6) when the whole ice-melt of ice sheet of 10 root wires terminates, intelligent apparatus recovers the conducting state of normal transmission electric current, waits for next icing process and starts deicing processes next time, in this way reaching the object of cyclic deicing.
(3) ice-melting mode three
1) according to the measurement result of the load current of built-in and external environmental parameter, ice coating state and the power taking sensor measurement of device, ten bundle conductor transmission line current cycle intelligence deicing devices are utilized Transmission Lines electric current to be automatically transferred to wherein sub-conductor I, sub-conductor II, sub-conductor III, sub-conductor IV, this four roots current in wire is increased, generates heat, load current according to ice coating state and power taking sensor measurement calculates the ice-melt time automatically, melts the ice sheet of this sub-conductor within the time automatically calculated.
2) sub-conductor I, sub-conductor II, sub-conductor III, sub-conductor IV ice sheet melts and terminates, the environmental parameter built-in and external according to device, the measurement result of the load current of ice coating state and power taking sensor measurement, utilize ten bundle conductor transmission line current cycle intelligence deicing devices that Transmission Lines electric current is automatically transferred to wherein sub-conductor V, sub-conductor VI, sub-conductor VII, sub-conductor VIII, this five roots current in wire is increased, heating, load current according to ice coating state and power taking sensor measurement calculates the ice-melt time automatically, the ice sheet of this sub-conductor is melted within the time automatically calculated.
3) sub-conductor V, sub-conductor VI, sub-conductor VII, sub-conductor VIII ice sheet melts and terminates, the environmental parameter built-in and external according to device, the measurement result of the load current of ice coating state and power taking sensor measurement, utilize ten bundle conductor transmission line current cycle intelligence deicing devices that Transmission Lines electric current is automatically transferred to wherein sub-conductor Ⅸ, sub-conductor X, sub-conductor I, sub-conductor II, this four roots current in wire is increased, heating, load current according to ice coating state and power taking sensor measurement calculates the ice-melt time automatically, the ice sheet of this sub-conductor is melted within the time automatically calculated.
3) when the whole ice-melt of ice sheet of 10 root wires terminates, intelligent apparatus recovers the conducting state of normal transmission electric current, waits for next icing process and starts deicing processes next time, in this way reaching the object of cyclic deicing.
(4) ice-melting mode four
1) according to the measurement result of the load current of built-in and external environmental parameter, ice coating state and the power taking sensor measurement of device, ten bundle conductor transmission line current cycle intelligence deicing devices are utilized Transmission Lines electric current to be automatically transferred to wherein sub-conductor I, sub-conductor II, sub-conductor III, this three roots current in wire is increased, generates heat, load current according to ice coating state and power taking sensor measurement calculates the ice-melt time automatically, melts the ice sheet of this sub-conductor within the time automatically calculated.
2) sub-conductor I, sub-conductor II, sub-conductor III ice sheet melts and terminates, the environmental parameter built-in and external according to device, the measurement result of the load current of ice coating state and power taking sensor measurement, utilize ten bundle conductor transmission line current cycle intelligence deicing devices that Transmission Lines electric current is automatically transferred to wherein sub-conductor IV, sub-conductor V, sub-conductor VI, this three roots current in wire is increased, heating, load current according to ice coating state and power taking sensor measurement calculates the ice-melt time automatically, the ice sheet of this sub-conductor is melted within the time automatically calculated.
3) sub-conductor IV, sub-conductor V, sub-conductor VI ice sheet melts and terminates, the environmental parameter built-in and external according to device, the measurement result of the load current of ice coating state and power taking sensor measurement, utilize ten bundle conductor transmission line current cycle intelligence deicing devices that Transmission Lines electric current is automatically transferred to wherein sub-conductor VII, sub-conductor VIII, sub-conductor Ⅸ, this three roots current in wire is increased, heating, load current according to ice coating state and power taking sensor measurement calculates the ice-melt time automatically, the ice sheet of this sub-conductor is melted within the time automatically calculated.
4) sub-conductor VII, sub-conductor VIII, sub-conductor Ⅸ ice sheet melt and terminate, according to the measurement result of the load current of built-in and external environmental parameter, ice coating state and the power taking sensor measurement of device, ten bundle conductor transmission line current cycle intelligence deicing devices are utilized Transmission Lines electric current to be automatically transferred to wherein sub-conductor X, sub-conductor I, sub-conductor II, this three roots current in wire is increased, generates heat, load current according to ice coating state and power taking sensor measurement calculates the ice-melt time automatically, melts the ice sheet of this sub-conductor within the time automatically calculated.
5) when the whole ice-melt of ice sheet of 10 root wires terminates, intelligent apparatus recovers the conducting state of normal transmission electric current, waits for next icing process and starts deicing processes next time, in this way reaching the object of cyclic deicing.
As shown in Figure 2, external icing parameter monitoring unit Real-Time Monitoring environmental parameter, conductor temperature, current in wire and wire icing loading condition, and by above-mentioned parameter wirelessly real-time Transmission to intelligent controller 9, built-in icing parameter monitoring unit 8 Real-Time Monitoring environmental parameter, conductor temperature, current in wire and wire icing loading condition, and above-mentioned parameter is passed through wired mode real-time Transmission to intelligent controller 9, intelligent controller 9 is according to external icing parameter monitoring unit, the data that built-in icing parameter monitoring unit 8 and electricity-getting mutual inductor 2 provide, instruction to determine circuit breaker 10 and by-pass switch in parallel 11 operating state to actuator 12 is sent according to built-in control program.
What finally illustrate is, above embodiment is only in order to illustrate technical scheme of the present invention and unrestricted, although with reference to preferred embodiment to invention has been detailed description, those of ordinary skill in the art is to be understood that, can modify to technical scheme of the present invention or equivalent replacement, and not departing from aim and the scope of the technical program, it all should be encompassed in the middle of right of the present invention.

Claims (7)

1. ten bundle conductor transmission line current cycle intelligence deicing devices, it is characterized in that: described device includes ten current input terminal R, ten current output terminal S and the current cycle intelligence deicing device main body be arranged between current input terminal and current output terminal, described current cycle intelligence deicing device main body includes the conductive plate that confluxes, shunting conductive plate, division board, reference voltage plate and the insulation output board being provided with current output terminal, ten current input terminal R are fixed on and conflux on conductive plate, conflux between conductive plate with shunting conductive plate and be connected by the primary winding contact rod as electricity-getting mutual inductor, shunting conductive plate is provided with ten conducting rods, ten conducting rods are connected on reference voltage plate through division board, the circuit breaker of ten band by-pass switches is provided with between insulation output board and division board, arc control device one end of each circuit breaker is all fixed with insulation output board and is connected to a corresponding current output terminal S, the arc control device other end of circuit breaker is through reference voltage plate, and be connected with the actuator of a circuit breaker, shunting conductive plate is also provided with intelligent controller and built-in icing parameter monitoring unit, intelligent controller and built-in icing parameter monitoring unit are between division board and shunting conductive plate, intelligent controller is electrically connected with built-in icing parameter monitoring unit and actuator respectively.
2. ten bundle conductor transmission line current cycle intelligence deicing devices as claimed in claim 1, is characterized in that: described intelligent controller, actuator and built-in icing parameter monitoring unit are powered by the electricity-getting mutual inductor being benchmark with reference voltage plate.
3. ten bundle conductor transmission line current cycle intelligence deicing devices as claimed in claim 1, is characterized in that: described circuit breaker and by-pass switch all arrange independently actuator.
4. ten bundle conductor transmission line current cycle intelligence deicing devices as claimed in claim 1, it is characterized in that: described device also includes external icing parameter monitoring unit, external icing parameter monitoring unit is used for monitoring of environmental parameter, conductor temperature, current in wire and wire icing loading condition, and the data monitored are sent to intelligent controller by communication.
5. ten bundle conductor transmission line current cycle intelligence deicing devices as claimed in claim 1, it is characterized in that: described shunting conductive plate includes insulation daughter board and conduction daughter board, conduction daughter board is embedded in the center of insulation daughter board, conduction daughter board is provided with ten for through the hole of conducting rod and one for installing the hole of electricity-getting mutual inductor.
6. ten bundle conductor transmission line current cycle intelligence deicing devices as claimed in claim 1, is characterized in that: described device also includes two respectively successively through the insulating bar of the conductive plate that confluxes, shunting conductive plate, division board, reference voltage plate and insulation output board.
7. ten bundle conductor transmission line current cycle intelligence deicing devices as claimed in claim 1, it is characterized in that: described device also includes insulation crust, the conductive plate that confluxes, shunting conductive plate, division board, reference voltage plate and insulation output board are installed in insulation crust.
CN201310021132.8A 2013-02-16 2013-02-16 Intelligent device for circularly melting ice on power transmission line with ten split sub-conductors by current Active CN103050919B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310021132.8A CN103050919B (en) 2013-02-16 2013-02-16 Intelligent device for circularly melting ice on power transmission line with ten split sub-conductors by current

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310021132.8A CN103050919B (en) 2013-02-16 2013-02-16 Intelligent device for circularly melting ice on power transmission line with ten split sub-conductors by current

Publications (2)

Publication Number Publication Date
CN103050919A CN103050919A (en) 2013-04-17
CN103050919B true CN103050919B (en) 2015-04-08

Family

ID=48063471

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310021132.8A Active CN103050919B (en) 2013-02-16 2013-02-16 Intelligent device for circularly melting ice on power transmission line with ten split sub-conductors by current

Country Status (1)

Country Link
CN (1) CN103050919B (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101409438A (en) * 2008-07-25 2009-04-15 中国电力工程顾问集团西北电力设计院 Ice-melting method suitable for transmission line with multiple fission conductor
CN101431224A (en) * 2008-12-12 2009-05-13 武汉大学 De-icing technology for overhead transmission line
CN101710683A (en) * 2009-12-25 2010-05-19 重庆大学 Intelligent circulation anti-icing method for transmitting current by split lead

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007166836A (en) * 2005-12-15 2007-06-28 Tokyo Electric Power Services Co Ltd Snow and ice falling-off prevention device

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101409438A (en) * 2008-07-25 2009-04-15 中国电力工程顾问集团西北电力设计院 Ice-melting method suitable for transmission line with multiple fission conductor
CN101431224A (en) * 2008-12-12 2009-05-13 武汉大学 De-icing technology for overhead transmission line
CN101710683A (en) * 2009-12-25 2010-05-19 重庆大学 Intelligent circulation anti-icing method for transmitting current by split lead

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
四分裂导线运行电流分组融冰方法与现场试验;张志劲等;《电网技术》;20120705;第36卷(第7期);第54-59页 *
智能循环电流融冰方法及临界融冰电流研究;舒立春等;《电工技术学报》;20121026;第27卷(第10期);第26-34页 *

Also Published As

Publication number Publication date
CN103050919A (en) 2013-04-17

Similar Documents

Publication Publication Date Title
CN101242087A (en) Ice fusion method for power transmission line
CN103378574B (en) DC de-icing device realizes the Control protection method of ice-melt function
CN102931609B (en) On-load changes the operational method of 10kV fuse switch
CN106159859B (en) A kind of OPGW ice melting systems
CN104158307B (en) Can system for getting online of superhigh pressure conductors on quad bundled ice-melting device for transmission line
CN103050918B (en) Intelligent device for circularly melting ice on power transmission line with four split sub-conductors by current
CN103050917B (en) Intelligent device for circularly melting ice on power transmission line with twelve split sub-conductors by current
CN103094869B (en) Electric transmission line current circulation intelligent ice melting device of five divided conductors
CN103050920B (en) Binary fission wire transmission line current cycle intelligence deicing device
CN103050923B (en) Intelligent device for circularly melting ice on power transmission line with eight split sub-conductors by current
CN103066543B (en) Current circulating smart ice melting device of three-bundle-conductor electric transmission line
CN103050921B (en) Intelligent device for circularly melting ice on power transmission line with six split sub-conductors by current
CN100578883C (en) Self-heating ice and snow-proof aerial electric power line for securing steady operation of electric network without power-off
CN103050919B (en) Intelligent device for circularly melting ice on power transmission line with ten split sub-conductors by current
CN103050922B (en) Intelligent device for circularly melting ice on power transmission line with eleven split sub-conductors by current
CN103078285B (en) Nine-bundle conductor transmission line current circulation intelligent ice-melting device
CN103078286B (en) Current-circulating intelligent ice-melting device for hepta-bundled conductor power transmission line
CN110932215A (en) System and method for deicing overhead line by using photovoltaic power generation
CN211377605U (en) Uninterrupted parallel operation grid-connected system of medium-voltage power supply vehicle
CN201252380Y (en) Transmission line de-icing device of bundled multi-split conductor
CN106159860B (en) A kind of OPGW de-icing methods under the conditions of nonisulatedization transformation
CN204205517U (en) A kind of automatic defrosting snow device of transmission system
CN103151745A (en) Method for deicing by connecting double-side deicing overhead ground wires in series
CN113078603A (en) Ice melting device for power line
CN210167854U (en) Combined switch control system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: STATE GRID CORPORATION OF CHINA

Free format text: FORMER OWNER: HU NAN ELECTRIC POWER COMPANY RESEARCH ACADEMY

Effective date: 20150618

Owner name: CHONGQING UNIVERSITY DISASTER PREVENTION AND MITIG

Free format text: FORMER OWNER: CHONGQING UNIVERSITY STATE GRID CORPORATION OF CHINA

Effective date: 20150618

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20150618

Address after: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Patentee after: State Grid Corporation of China

Patentee after: Chongqing University

Patentee after: State Grid Hunan Electric Power Company prevents and reduces natural disasters center

Address before: 410007 No. 79 hydroelectric power street, east pond, Hunan, Changsha

Patentee before: Science Research Institute of Hunan Electric Power Co., Ltd.

Patentee before: Chongqing University

Patentee before: State Grid Corporation of China