CN103022991A - Power distribution network fault quick response method based on controller area network (CAN) bus expansion - Google Patents

Power distribution network fault quick response method based on controller area network (CAN) bus expansion Download PDF

Info

Publication number
CN103022991A
CN103022991A CN2012104806874A CN201210480687A CN103022991A CN 103022991 A CN103022991 A CN 103022991A CN 2012104806874 A CN2012104806874 A CN 2012104806874A CN 201210480687 A CN201210480687 A CN 201210480687A CN 103022991 A CN103022991 A CN 103022991A
Authority
CN
China
Prior art keywords
fault
communication management
bus
data processing
distribution
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012104806874A
Other languages
Chinese (zh)
Inventor
李同智
王华广
董啸
郑玉实
贾珍
曾祥飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANDONG ELECTRIC POWER CORP
Zhuhai XJ Electric Co Ltd
Original Assignee
SHANDONG ELECTRIC POWER CORP
Zhuhai XJ Electric Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANDONG ELECTRIC POWER CORP, Zhuhai XJ Electric Co Ltd filed Critical SHANDONG ELECTRIC POWER CORP
Priority to CN2012104806874A priority Critical patent/CN103022991A/en
Publication of CN103022991A publication Critical patent/CN103022991A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

本发明公开了一种基于CAN总线扩展的配电网故障快速响应方法,通过在配电网线路中设置若干配电监控终端来对配电网故障进行处理。本发明通过数据处理模块实时监测配电线路的电压、电流、零序电流和配电设备运行状态,数据处理模块将故障信息和开关变位等信息通过内部CAN总线快速上送到通信管理模块,各个配电监控终端的通信管理模块之间通过以太网通信,完成线路故障区域的快速定位、故障隔离和非故障区域的快速恢复供电。本发明采用CAN总线方式扩展的快速处理机制,有效提高了故障数据的传输时间,极大缩短了线路故障处理时间,提高了电网供电的稳定和可靠性,给整个社会带来较大的收益。

Figure 201210480687

The invention discloses a fast response method for distribution network faults based on CAN bus expansion, which handles distribution network faults by setting a plurality of distribution monitoring terminals in the distribution network lines. The invention monitors the voltage, current, zero-sequence current of the power distribution line and the operating state of the power distribution equipment in real time through the data processing module, and the data processing module quickly sends information such as fault information and switch displacement to the communication management module through the internal CAN bus, The communication management modules of each power distribution monitoring terminal communicate with each other through Ethernet to complete the rapid location of line fault areas, fault isolation and fast recovery of power supply in non-faulty areas. The present invention adopts the extended fast processing mechanism of CAN bus, effectively improves the transmission time of fault data, greatly shortens the line fault processing time, improves the stability and reliability of power grid power supply, and brings greater benefits to the whole society.

Figure 201210480687

Description

Distribution network failure fast response method based on the expansion of CAN bus
Technical field
The present invention relates to a kind of maintaining method of power distribution network, specifically be based on the distribution network failure fast response method of CAN bus expansion, belong to distribution network automated technical field.
Background technology
Present domestic distribution automation technology obtains significant progress, the distribution network failure tupe mainly is the concentrated pattern, it is the pattern of distribution terminal+communication network+main website, this kind pattern not only dependence to communication network is stronger, and the fault treating procedure of the fast recovery of power supply of whole fault location, Fault Isolation and non-fault zone is a minute level, can't satisfy the fast processing requirement to distribution network failure.
Summary of the invention
The deficiency that exists for overcoming above-mentioned prior art the invention provides the distribution network failure fast response method based on the expansion of CAN bus, and it not only can improve the fault handling time of distribution line, and can improve the stable and reliability of mains supply.
The present invention solves the technical scheme that its technical problem takes: based on the distribution network failure fast response method of CAN bus expansion, by being set in distribution network line, some monitoring of electric power terminal come distribution network failure is processed, described monitoring of electric power terminal is by in the interconnection switch access distribution network line, and access is connected with the Ethernet of distribution network system main frame, it is characterized in that
Described monitoring of electric power terminal comprises CAN bus, communication management module and some data processing modules, described CAN bus links to each other with data processing module with communication management module respectively, described communication management module access network based on ethernet, described data processing module is in order to the Real-Time Monitoring distribution line;
Said method comprising the steps of:
S1, whether the data processing module Real-Time Monitoring distribution line of monitoring of electric power terminal breaks down;
S2, when detecting fault-signal, data processing module sends to communication management module by the CAN bus with fault-signal;
S3, communication management module sends to adjacent monitoring of electric power terminal by Ethernet with fault-signal after receiving fault-signal;
S4, adjacent monitoring of electric power terminal carry out the fault location judgement after receiving fault-signal, if adjacent monitoring of electric power terminal does not detect fault-signal, then are judged to be two circuits between the monitoring of electric power terminal and break down; If adjacent monitoring of electric power terminal detects fault-signal, then repeat S3 and S4 step, until till the position, fault point.
S5 carries out Fault Isolation to the fault zone;
S6 restores electricity to non-fault zone.
In the said method, described monitoring distribution line comprises the running status of monitoring distribution circuit electric voltage, electric current, zero-sequence current and distribution terminal equipment.
The step of described in the said method Fault Isolation being carried out in the fault zone comprises following process:
The communication management module of two ends, fault zone monitoring of electric power terminal issues trip signal by the CAN bus to data processing module;
Data processing module receives and disconnects corresponding interconnection switch behind the trip signal, and returns to communication management module and to trip into function signal;
Communication management module receives and trips into backward other monitoring of electric power terminal of function signal and send and trip into function signal.
The step that described in the said method non-fault zone is restored electricity comprises following process:
Become function signal if monitoring of electric power terminal receives the tripping operation that is adjacent monitoring of electric power terminal other end interconnection switch, communication management module issues the order of closing a floodgate by the CAN bus to data processing module;
Data processing module receives the corresponding interconnection switch that closes after the order of closing a floodgate, and returns to communication management module and to trip into function signal.
The invention has the beneficial effects as follows, the present invention is by voltage, electric current, zero-sequence current and the controller switching equipment running status of data processing module Real-Time Monitoring distribution line, data processing module is crossed inner CAN bus with information exchanges such as fault message and switch changed positions and is delivered to communication management module on fast, by ethernet communication, finish the fast recovery of power supply of quick location, Fault Isolation and the non-fault zone in line fault zone between the communication management module of each monitoring of electric power terminal.The present invention adopts the fast processing mechanism of CAN bus mode expansion, Effective Raise the transmission time of fault data, greatly shortened the line fault processing time, improved the stable and reliability of mains supply, bring larger income to entire society.
Description of drawings
The present invention is further described below in conjunction with accompanying drawing:
Fig. 1 is program flow diagram of the present invention;
Fig. 2 is the theory diagram of monitoring of electric power terminal of the present invention;
Fig. 3 is the schematic diagram of implementation distribution failure response of the present invention.
Embodiment
A kind of distribution network failure fast response method based on the expansion of CAN bus of the present invention, by being set in distribution network line, some monitoring of electric power terminal come distribution network failure is processed, described monitoring of electric power terminal is by in the interconnection switch access distribution network line, and access is connected with the Ethernet of distribution network system main frame.
As shown in Figure 2, described monitoring of electric power terminal comprises CAN bus, communication management module and some data processing modules, described CAN bus links to each other with data processing module with communication management module respectively, described communication management module access network based on ethernet, described data processing module is in order to the Real-Time Monitoring distribution line;
As shown in Figure 1, method of the present invention may further comprise the steps:
Step S01, the work beginning.
Step S02, whether the data processing module Real-Time Monitoring distribution line of monitoring of electric power terminal breaks down.
Step S03 if data processing module detects fault-signal, then enters step S04, otherwise changes step S05. over to
Step S04, data processing module sends to communication management module by the CAN bus with fault-signal.
Step S05, whether communication management module receives fault-signal, if yes then enter step S06, otherwise changes step S03 over to.
Step S06, communication management module sends to adjacent monitoring of electric power terminal by Ethernet with the fault-signal of receiving;
Step S07, whether adjacent monitoring of electric power terminal detects fault-signal, if it is changes step S06 over to, otherwise enters step S08.
Step S08, fault location, adjacent monitoring of electric power terminal carries out the fault location judgement after receiving fault-signal, if adjacent monitoring of electric power terminal does not detect fault-signal, then is judged to be two circuits between the monitoring of electric power terminal and breaks down.
Step S09 carries out Fault Isolation to the fault zone.The described step that Fault Isolation is carried out in the fault zone comprises following process: 1) communication management module of two ends, fault zone monitoring of electric power terminal issues trip signal by the CAN bus to data processing module; 2) data processing module receives and disconnects corresponding interconnection switch behind the trip signal, and returns to communication management module and to trip into function signal; 3) communication management module receives and trips into backward other monitoring of electric power terminal of function signal and send and trip into function signal.
Step S, 10, non-fault zone is restored electricity.The described step that non-fault zone is restored electricity comprises following process: 1) become function signal if monitoring of electric power terminal receives the tripping operation that is adjacent monitoring of electric power terminal other end interconnection switch, communication management module issues the order of closing a floodgate by the CAN bus to data processing module; 2) data processing module receives the corresponding interconnection switch that closes after the order of closing a floodgate, and returns to communication management module and to trip into function signal.
In the said method, described monitoring distribution line comprises the running status of monitoring distribution circuit electric voltage, electric current, zero-sequence current and distribution terminal equipment.
Fig. 3 is the schematic diagram of implementation distribution failure response of the present invention.As shown in Figure 3, suppose between interconnection switch S2 and the interconnection switch S3 phase fault to occur, the present invention is as follows to the processing procedure of this fault: 1) data processing module of distribution testing control terminal 1 will detect the phase fault electric current of interconnection switch S2 in the 40ms.
2) data processing module of distribution testing control terminal 1 sends to communication management module with fault-signal by the CAN bus immediately, transmits delay time<100ms.
3) after the communication management module of distribution testing control terminal 1 is received fault-signal, fault-signal is sent to distribution testing control terminal 2 by ethernet network, transmit delay time<20ms.
4) distribution testing control terminal 2 is received the switch fault signal of interconnection switch S2, and distribution testing control terminal 2 does not detect fault-signal, therefore thereby can judge that the fault zone finishes fault location at interconnection switch S2 and interconnection switch S.
5) communication management module of distribution testing control terminal 1 and distribution testing control terminal 1 issues trip signal to data processing module fast by the CAN bus, difference tripping interconnection switch S2 and interconnection switch S3, thus finish fault section isolation.
6) after distribution testing control terminal 3 receives that the tripping operation of the interconnection switch S3 of the interconnection switch S2 of distribution testing control terminal 1 and distribution testing control terminal 2 becomes function signal, its communication management module issues the order of closing a floodgate to data processing module fast by the CAN bus, the interconnection switch S5 that closes, thus the fast recovery of power supply of non-fault zone finished.
Because switchgear house monitoring circuit feeder number is more simultaneously, the monitoring capacity relative of separate unit monitoring of electric power terminal is fixed, therefore, the present invention it is also conceivable that and passes through dispersion treatment, the mode of centralized management realizes the monitoring of switchgear house, solves the multi-loop line monitoring problem by growth data processing module quantity.

Claims (4)

1.基于CAN总线扩展的配电网故障快速响应方法,通过在配电网线路中设置若干配电监控终端来对配电网故障进行处理,所述配电监控终端通过联络开关接入配电网线路中,并接入连接有配电网系统主机的以太网,其特征是,1. A quick response method for distribution network faults based on CAN bus expansion, by setting a number of distribution monitoring terminals in the distribution network lines to handle distribution network faults, and the distribution monitoring terminals are connected to the distribution network through a contact switch In the network line, and access to the Ethernet connected to the host of the distribution network system, the characteristics are: 所述配电监控终端包括CAN总线、通信管理模块和若干数据处理模块,所述CAN总线分别与通信管理模块和数据处理模块相连,所述通信管理模块接入以太网,所述数据处理模块用以实时监测配电线路;The power distribution monitoring terminal includes a CAN bus, a communication management module and several data processing modules, the CAN bus is connected to the communication management module and the data processing module respectively, the communication management module is connected to the Ethernet, and the data processing module uses To monitor distribution lines in real time; 所述方法包括以下步骤:The method comprises the steps of: S1,配电监控终端的数据处理模块实时监测配电线路是否发生故障;S1, the data processing module of the power distribution monitoring terminal monitors whether the power distribution line is faulty in real time; S2,当检测到故障信号时,数据处理模块通过CAN总线将故障信号发送到通信管理模块;S2, when the fault signal is detected, the data processing module sends the fault signal to the communication management module through the CAN bus; S3,通信管理模块收到故障信号后通过以太网将故障信号发送到相邻的配电监控终端;S3. After receiving the fault signal, the communication management module sends the fault signal to the adjacent power distribution monitoring terminal through Ethernet; S4,相邻配电监控终端收到故障信号后进行故障定位判断,如果相邻配电监控终端没有检测到故障信号,则判定为两个配电监控终端之间的线路出现故障;如果相邻配电监控终端检测到故障信号,则重复S3和S4步骤,直至故障点位为止。S4. The adjacent power distribution monitoring terminal performs fault location judgment after receiving the fault signal. If the adjacent power distribution monitoring terminal does not detect the fault signal, it is determined that the line between the two power distribution monitoring terminals is faulty; When the power distribution monitoring terminal detects a fault signal, steps S3 and S4 are repeated until the fault point is located. S5,对故障区域进行故障隔离;S5, performing fault isolation on the fault area; S6,对非故障区域进行恢复供电。S6, restoring power supply to the non-faulty area. 2.根据权利要求1所述的基于CAN总线扩展的配电网故障快速响应方法,其特征是,所述监测配电线路包括监测配电线路电压、电流、零序电流和配电终端设备的运行状态。2. the distribution network fault rapid response method based on CAN bus extension according to claim 1, is characterized in that, described monitoring distribution line comprises monitoring distribution line voltage, current, zero-sequence current and distribution terminal equipment Operating status. 3.根据权利要求1所述的基于CAN总线扩展的配电网故障快速响应方法,其特征是,所述对故障区域进行故障隔离的步骤包括以下过程:3. the distribution network fault rapid response method based on CAN bus expansion according to claim 1, is characterized in that, the described step of carrying out fault isolation to the fault area comprises the following process: 故障区域两端配电监控终端的通信管理模块通过CAN总线向数据处理模块下发跳闸命令;The communication management module of the power distribution monitoring terminal at both ends of the fault area sends a trip command to the data processing module through the CAN bus; 数据处理模块接收到跳闸命令后断开相应联络开关,并向通信管理模块返回跳闸成功信号;The data processing module disconnects the corresponding contact switch after receiving the trip command, and returns a trip success signal to the communication management module; 通信管理模块接收到跳闸成功信号后向其他配电监控终端发送跳闸成功信号。The communication management module sends a successful trip signal to other power distribution monitoring terminals after receiving the successful trip signal. 4.根据权利要求1所述的基于CAN总线扩展的配电网故障快速响应方法,其特征是,所述对非故障区域进行恢复供电的步骤包括以下过程:4. The distribution network fault rapid response method based on CAN bus expansion according to claim 1, wherein the step of restoring power supply to non-fault areas comprises the following processes: 如果配电监控终端接收到与其相邻配电监控终端另一端联络开关的跳闸成功信号,通信管理模块通过CAN总线向数据处理模块下发合闸命令;If the power distribution monitoring terminal receives a successful trip signal from the contact switch at the other end of the adjacent power distribution monitoring terminal, the communication management module sends a closing command to the data processing module through the CAN bus; 数据处理模块接收到合闸命令后合上相应联络开关,并向通信管理模块返回跳闸成功信号。The data processing module closes the corresponding contact switch after receiving the closing command, and returns a tripping success signal to the communication management module.
CN2012104806874A 2012-11-20 2012-11-20 Power distribution network fault quick response method based on controller area network (CAN) bus expansion Pending CN103022991A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012104806874A CN103022991A (en) 2012-11-20 2012-11-20 Power distribution network fault quick response method based on controller area network (CAN) bus expansion

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012104806874A CN103022991A (en) 2012-11-20 2012-11-20 Power distribution network fault quick response method based on controller area network (CAN) bus expansion

Publications (1)

Publication Number Publication Date
CN103022991A true CN103022991A (en) 2013-04-03

Family

ID=47971260

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012104806874A Pending CN103022991A (en) 2012-11-20 2012-11-20 Power distribution network fault quick response method based on controller area network (CAN) bus expansion

Country Status (1)

Country Link
CN (1) CN103022991A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106329502A (en) * 2016-11-11 2017-01-11 东华大学 Relay protection method based on PLC and CAN bus technology
CN111505442A (en) * 2020-05-06 2020-08-07 北京科锐配电自动化股份有限公司 A peer-to-peer communication-based distribution network fault handling method
CN119596077A (en) * 2025-02-08 2025-03-11 清大智能(北京)科技有限公司 A method and system for quickly locating, isolating and restoring ground faults in a distribution network

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5784237A (en) * 1996-11-29 1998-07-21 S&C Electric Company Control method and apparatus for power distribution network
US20040233598A1 (en) * 2003-03-14 2004-11-25 Tmt&D Corporation Distribution network monitoring and control system
CN102306929A (en) * 2011-09-14 2012-01-04 宁波市鄞州供电局 Method and system for realizing fault self-healing
CN102709889A (en) * 2012-05-29 2012-10-03 长园深瑞继保自动化有限公司 Self-healing method and self-healing system for faults of power distribution network

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5784237A (en) * 1996-11-29 1998-07-21 S&C Electric Company Control method and apparatus for power distribution network
US20040233598A1 (en) * 2003-03-14 2004-11-25 Tmt&D Corporation Distribution network monitoring and control system
CN102306929A (en) * 2011-09-14 2012-01-04 宁波市鄞州供电局 Method and system for realizing fault self-healing
CN102709889A (en) * 2012-05-29 2012-10-03 长园深瑞继保自动化有限公司 Self-healing method and self-healing system for faults of power distribution network

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
刘健等: "一种快速自愈的分布智能馈线自动化系统", 《电力系统自动化》 *
刘淑芬等: "基于CAN 总线的配电自动化系统", 《高电压技术》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106329502A (en) * 2016-11-11 2017-01-11 东华大学 Relay protection method based on PLC and CAN bus technology
CN111505442A (en) * 2020-05-06 2020-08-07 北京科锐配电自动化股份有限公司 A peer-to-peer communication-based distribution network fault handling method
CN119596077A (en) * 2025-02-08 2025-03-11 清大智能(北京)科技有限公司 A method and system for quickly locating, isolating and restoring ground faults in a distribution network

Similar Documents

Publication Publication Date Title
CN109713794B (en) A distributed intelligent self-recovery system and method
CN104810921B (en) Feeder line broken string power failure range identifying system and method based on distribution transformer terminals information
CN103022994B (en) Method for achieving fault isolation and recovery of power distribution network with permeability distribution type power supply
CN102306929B (en) Method and system for realizing fault self-healing
CN103311906B (en) A kind of switch changed position islanding detect based on Wide-area Measurement Information and directly tripping operation formula island protect method
CN103354390A (en) Distributed intelligent feed line automation control method
CN103606910A (en) Wide area information based fault self-healing method for dead zone of feeder outlet of distribution network
CN103872660A (en) Network type protection method based on closed-loop mode operation of power network
CN113890190B (en) Method, device and medium for collaborative self-healing of intelligent distributed terminal and distribution network master station
CN104882959B (en) Power distribution network area management method and system
CN107370235A (en) Based on the adaptive region spare power automatic switching system and method under composite power supply pattern
CN105896490B (en) A kind of fault handling method and device of power distribution network
CN112311090A (en) Distributed fault recovery method and system for ring distribution network adapting to 5G communication network
CN108521122A (en) A Static Security Analysis Method of Power System Considering Standby and Automatic Switching
CN114825627A (en) Self-healing method for line fault of power distribution network
CN106160187A (en) Middle pressure power transmission and distribution automatic switching control system and control method
CN107612148A (en) Fault self-healing method and system for overhead line of distribution network
CN104242467A (en) Intelligent self-healing controlling method of feeder line of distribution network
CN114744765B (en) Self-healing method for distribution line faults
CN111817353B (en) A kind of fault handling method of distribution network equipment
CN106712301B (en) Fault-tolerance processing method suitable for power distribution network distributed fault self-healing
CN119253552B (en) Snowflake distribution network self-healing processing logic optimization method, system, device and medium
CN203774871U (en) Open-loop mode operation based hybrid networking power network system
CN202550668U (en) Distributed power distribution network management terminal
CN104882867A (en) Power distribution network self-healing control method and system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20130403